CN205046551U - Solution cavity district sleeve pipe bored concrete pile - Google Patents
Solution cavity district sleeve pipe bored concrete pile Download PDFInfo
- Publication number
- CN205046551U CN205046551U CN201520761730.3U CN201520761730U CN205046551U CN 205046551 U CN205046551 U CN 205046551U CN 201520761730 U CN201520761730 U CN 201520761730U CN 205046551 U CN205046551 U CN 205046551U
- Authority
- CN
- China
- Prior art keywords
- solution cavity
- casing
- muscle
- support portion
- thick bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a solution cavity district sleeve pipe bored concrete pile, indulging the muscle and being fixed in many main cages including many main cages and indulge the outside stirrup of muscle, its characterized in that, this bored concrete pile still indulge the outside section of thick bamboo that protects of muscle including being located main cage, should protect the barrel casing dress and be equipped with and protect an axial horizontally supporting part in the periphery that the muscle was indulged to main cage, the bottom of protecting a section of thick bamboo. The utility model discloses the simple compactness of mechanism, low in production cost, through will protecting during a section of thick bamboo goes a hole, form the similar sheathed tube dado body in solution cavity mouth bottom to the stake hole pore wall between the top, place steel reinforcement cage and irrigation concrete again, prevent to run off from the solution cavity mouth pouring into the in -process concrete, guarantee to become a quality, it is shorter to protect the tube length degree simultaneously, selects the corresponding section of thick bamboo that protects according to solution cavity actual size, has practiced thrift the material, and the height that protects a section of thick bamboo that shortens has also made things convenient for the transportation.
Description
Technical field
The utility model relates to technical field of building construction, more particularly, particularly relates to a kind of solution cavity district sleeve filling pile for solution cavity geology.
Background technology
In the process of building operations, normally utilize punching pile machine on the ground impact place one there is the stake holes of the larger degree of depth, then in stake holes, sink to castinplace pile, placing of concrete in last Reperfu-sion stake, form the bottom foundation pile of building.Due to friction when castinplace pile has a construction, little without soil compaction, noise, be suitable in advantages such as City Building City Regions uses, be therefore widely used in work progress.
Existing castinplace pile is normally indulged muscle by multiple main cage and is looped around multiple stirrups that main cage indulges muscle periphery and forms, when solution cavity geology is constructed, stake holes can be circulated into solution cavity inside usually, because solution cavity is communicated with stake holes, when concrete perfusion, a large amount of concrete can flow out from castinplace pile side, and enter solution cavity inside from the connectivity part of stake holes and solution cavity, and solution cavity inside has larger space usually, therefore, the concrete of flow-like can enter into inner and existing solid by solution cavity in solution cavity district, just can arrive the top of stake holes afterwards, that is existing castinplace pile can slattern a large amount of concrete usually when solution cavity geological province is constructed, namely to surpass filling amount large for concrete, fullness coefficient is high, therefore result in construction costs higher.
Existing three kinds are mainly contained to the method that solution cavity geology carries out filling pile construction, the first is when disclosing solution cavity in pore forming process, in solution cavity, fill block stone or clay bag, then proceed pore-forming operation until projected depth, last below reinforcing cage and fluid concrete.Due to solution cavity out-of-shape and filling leakiness, filler is difficult to solution cavity to fill up completely tamp, and concrete easily runs off from large space, and under concrete side pressure effect, the hole wall that filler is formed easily subsides, and causes pile difficulty.
Second method wraps up one deck iron clad skin in reinforcing cage surrounding, and this method cost is low, simple to operate, but owing to there being larger gap between iron sheet and hole wall, concrete cannot be filled into, this section of pile body sidewall friction resistance is lost, and stake footpath diminishes simultaneously, causes the bearing capacity of stake to reduce.
Utility model content
The purpose of this utility model is for above-mentioned the deficiencies in the prior art, a kind of solution cavity district sleeve filling pile is provided, by by under casing in stake holes, form the retaining wall body of similar sleeve pipe to the stake holes hole wall between top bottom solution cavity mouth, place reinforcing cage and concrete perfusion again, prevent concrete in filling process to run off from solution cavity mouth, guarantee pile quality.
The technical solution of the utility model is achieved in that solution cavity district sleeve filling pile, comprise many main cages to indulge muscle and be fixed on the stirrup that muscle outside indulged by many main cages, it is characterized in that, this castinplace pile also comprises and is positioned at the casing that muscle outside indulged by main cage, this casing is sleeved on the periphery that muscle indulged by main cage, and the bottom of casing is provided with the support portion of the axial level with casing.
Further, described stirrup comprises two spiral stirrups and multiple ring-type stirrup, and two spiral stirrups are separately fixed at the upper and lower end that muscle indulged by many main cages, and multiple ring-type stirrup is arranged between two spiral stirrups.
Further, described casing is made up of steel material.
Further, the thickness of described casing is 10-20mm.
Further, described support portion is reinforcing bar.
Further, top, described support portion is provided with screw thread, is provided with screwed hole bottom casing, the adjustment of the fixing and support portion length of position both being realized by threaded engagement bottom support portion and casing.
Further, described support portion is provided with and multiplely distributes along casing bottom even.
Technical thought of the present utility model is: by by under casing in stake holes, form the retaining wall body of similar sleeve pipe to the stake holes hole wall between top bottom solution cavity mouth, place reinforcing cage and concrete perfusion again, prevent concrete in filling process to run off from solution cavity mouth, guarantee pile quality; Casing is steel pile casting, and have length not wait multiple, select corresponding casing according to the height of actual solution cavity; By coordinating of casing and support portion reinforcing bar, realize the fixing of casing position, ensure that casing is fixed on between top bottom solution cavity mouth, passable up and down; Leave certain surplus, prevent that excessive gap causes concrete to spill from gap.
The beneficial effects of the utility model are: the utility model mechanism is simply compact, and cost of production is low; By by under casing in stake holes, bottom solution cavity mouth, form the retaining wall body of similar sleeve pipe to the stake holes hole wall between top, then place reinforcing cage and concrete perfusion, prevent concrete in filling process to run off from solution cavity mouth, guarantee pile quality; Casing length is shorter simultaneously, and select corresponding casing according to solution cavity real size, saved material, the height of the casing of shortening, also facilitates transport.
Accompanying drawing explanation
Below in conjunction with the embodiment in accompanying drawing, the utility model is described in further detail, but do not form any restriction of the present utility model.
Fig. 1 is the structural representation of the utility model solution cavity district sleeve filling pile.
In figure, the main cage of 1-indulges muscle, 2-stirrup, 3-casing, 4-support portion.
Detailed description of the invention
Consult shown in Fig. 1, solution cavity district of the present utility model sleeve filling pile, comprise many main cages to indulge muscle 1 and be fixed on the stirrup 2 that muscle 1 outside indulged by many main cages, this castinplace pile also comprises and is positioned at the casing 3 that muscle 1 outside indulged by main cage, this casing 3 is sleeved on the periphery that muscle 1 indulged by main cage, and the bottom of casing 3 is provided with the support portion 4 with the axial level of casing 3.
Stirrup 2 comprises two spiral stirrups 2 and multiple ring-type stirrup 2, two spiral stirrups 2 are separately fixed at the upper and lower end that muscle 1 indulged by many main cages, and multiple ring-type stirrup 2 is arranged between two spiral stirrups 2.
Casing 3 is made up of steel material, and the thickness of casing 3 is 10-20mm, and steel casing provides enough bearing capacities, and guarantee can not be subsided outward.
Support portion 4 is reinforcing bar, and support portion 4 is provided with at least three, and support portion distributes along casing 3 bottom even; Top, support portion 4 is provided with screw thread, is provided with screwed hole bottom casing 3, the adjustment of fixing and support portion 4 length of position both being realized by threaded engagement bottom support portion 4 and casing 3.
By by casing 3 times in stake holes, bottom solution cavity mouth, form the retaining wall body of similar sleeve pipe to the stake holes hole wall between top, then place reinforcing cage and concrete perfusion, prevent concrete in filling process to run off from solution cavity mouth, guarantee pile quality; Casing 3 is steel pile casting, and have length not wait multiple, select corresponding casing 3 according to the height of actual solution cavity; By coordinating of casing 3 and support portion 4 reinforcing bar, realize the fixing of casing 3 position, ensure that casing is fixed on between top bottom solution cavity mouth, passable up and down; Leave certain surplus, prevent that excessive gap causes concrete to spill from gap.
Above illustrated embodiment is better embodiment of the present utility model, only be used for conveniently the utility model being described, not any pro forma restriction is done to the utility model, have in any art and usually know the knowledgeable, if do not depart from the utility model carry in the scope of technical characteristic, utilize the utility model disclose the Equivalent embodiments changing or modify in the done local of technology contents, and do not depart from technical characteristic content of the present utility model, all still belong in the scope of the utility model technical characteristic.
Claims (7)
1. solution cavity district sleeve filling pile, comprise many main cages to indulge muscle (1) and be fixed on the stirrup (2) that muscle (1) outside indulged by many main cages, it is characterized in that: this castinplace pile also comprises and is positioned at main cage and indulges the outside casing (3) of muscle (1), this casing (3) is sleeved on the periphery that muscle (1) indulged by main cage, and the bottom of casing (3) is provided with the support portion (4) with casing (3) axial level.
2. solution cavity district according to claim 1 sleeve filling pile, it is characterized in that: described stirrup (2) comprises two spiral stirrups (2) and multiple ring-type stirrup (2), two spiral stirrups (2) are separately fixed at the upper and lower end that muscle (1) indulged by many main cages, and multiple ring-type stirrup (2) is arranged between two spiral stirrups (2).
3. solution cavity district according to claim 1 sleeve filling pile, is characterized in that: described casing (3) is made up of steel material.
4. solution cavity district according to claim 1 sleeve filling pile, is characterized in that: the thickness of described casing (3) is 10-20mm.
5. solution cavity district according to claim 1 sleeve filling pile, is characterized in that: described support portion (4) are reinforcing bar.
6. solution cavity district according to claim 1 sleeve filling pile, it is characterized in that: described support portion (4) top is provided with screw thread, casing (3) bottom is provided with screwed hole, the adjustment of fixing and support portion (4) length of position both support portion (4) and casing (3) bottom are realized by threaded engagement.
7. solution cavity district according to claim 1 sleeve filling pile, is characterized in that: described support portion (4) are provided with and multiplely distribute along casing (3) bottom even.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520761730.3U CN205046551U (en) | 2015-09-29 | 2015-09-29 | Solution cavity district sleeve pipe bored concrete pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520761730.3U CN205046551U (en) | 2015-09-29 | 2015-09-29 | Solution cavity district sleeve pipe bored concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205046551U true CN205046551U (en) | 2016-02-24 |
Family
ID=55340148
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520761730.3U Active CN205046551U (en) | 2015-09-29 | 2015-09-29 | Solution cavity district sleeve pipe bored concrete pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205046551U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246006A (en) * | 2017-06-29 | 2017-10-13 | 深圳市蛇口招商港湾工程有限公司 | Concrete-pile reinforcement cage structure and pile-filling method |
CN108894214A (en) * | 2018-08-27 | 2018-11-27 | 孙德明 | A kind of solution cavity geological environment bored concrete pile and its bore forming method |
CN109056735A (en) * | 2018-09-04 | 2018-12-21 | 中铁大桥局第七工程有限公司 | The leakproof concrete device of solution cavity is met for cast-in-situ bored pile |
CN109707322A (en) * | 2018-12-08 | 2019-05-03 | 深圳市勘察研究院有限公司 | A kind of solution cavity isolating device and the solution cavity partition method using the device |
CN109868810A (en) * | 2019-02-27 | 2019-06-11 | 中建一局集团第一建筑有限公司 | One kind passing through buried major diameter discarded pipe and does operation pile making method |
CN110863488A (en) * | 2019-11-15 | 2020-03-06 | 广东地山基础工程有限公司 | Device for preventing concrete loss of perfusion pile and construction method |
CN111395346A (en) * | 2020-03-19 | 2020-07-10 | 广州市建筑科学研究院有限公司 | Construction method for pouring concrete into karst cave |
CN111733802A (en) * | 2020-07-03 | 2020-10-02 | 中铁八局集团建筑工程有限公司 | Construction method of cast-in-place pile penetrating through karst cave |
CN113981958A (en) * | 2021-11-26 | 2022-01-28 | 中铁十六局集团第四工程有限公司 | Method for plugging karst cave of mechanical pore-forming cast-in-place pile |
CN114108607A (en) * | 2021-11-10 | 2022-03-01 | 中国一冶集团有限公司 | Construction method of cast-in-place pile penetrating through karst cave |
CN115125940A (en) * | 2022-07-09 | 2022-09-30 | 广东省第一建筑工程有限公司 | Full casing cast-in-place pile without pretreatment in karst cave region |
-
2015
- 2015-09-29 CN CN201520761730.3U patent/CN205046551U/en active Active
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246006A (en) * | 2017-06-29 | 2017-10-13 | 深圳市蛇口招商港湾工程有限公司 | Concrete-pile reinforcement cage structure and pile-filling method |
CN107246006B (en) * | 2017-06-29 | 2019-11-05 | 深圳市蛇口招商港湾工程有限公司 | The pile-filling method of concrete-pile |
CN108894214A (en) * | 2018-08-27 | 2018-11-27 | 孙德明 | A kind of solution cavity geological environment bored concrete pile and its bore forming method |
CN109056735A (en) * | 2018-09-04 | 2018-12-21 | 中铁大桥局第七工程有限公司 | The leakproof concrete device of solution cavity is met for cast-in-situ bored pile |
CN109707322A (en) * | 2018-12-08 | 2019-05-03 | 深圳市勘察研究院有限公司 | A kind of solution cavity isolating device and the solution cavity partition method using the device |
CN109868810A (en) * | 2019-02-27 | 2019-06-11 | 中建一局集团第一建筑有限公司 | One kind passing through buried major diameter discarded pipe and does operation pile making method |
CN110863488A (en) * | 2019-11-15 | 2020-03-06 | 广东地山基础工程有限公司 | Device for preventing concrete loss of perfusion pile and construction method |
CN111395346A (en) * | 2020-03-19 | 2020-07-10 | 广州市建筑科学研究院有限公司 | Construction method for pouring concrete into karst cave |
CN111733802A (en) * | 2020-07-03 | 2020-10-02 | 中铁八局集团建筑工程有限公司 | Construction method of cast-in-place pile penetrating through karst cave |
CN114108607A (en) * | 2021-11-10 | 2022-03-01 | 中国一冶集团有限公司 | Construction method of cast-in-place pile penetrating through karst cave |
CN113981958A (en) * | 2021-11-26 | 2022-01-28 | 中铁十六局集团第四工程有限公司 | Method for plugging karst cave of mechanical pore-forming cast-in-place pile |
CN115125940A (en) * | 2022-07-09 | 2022-09-30 | 广东省第一建筑工程有限公司 | Full casing cast-in-place pile without pretreatment in karst cave region |
CN115125940B (en) * | 2022-07-09 | 2024-02-13 | 广东省第一建筑工程有限公司 | Full-sleeve cast-in-place pile without pretreatment in karst cave area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205046551U (en) | Solution cavity district sleeve pipe bored concrete pile | |
CN104452749B (en) | The constructional method of a kind of reinforced concrete cast-in-situ pile tube | |
CN107905218A (en) | A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain | |
CN100402759C (en) | Screw-thread bored concrete pile piling method | |
CN208167713U (en) | A kind of film bag grouting and reinforcing type filling pile structure | |
CN100595391C (en) | Synchronous soil lifting grouting rectangular filling pile apparatus and method | |
CN108951595A (en) | One kind porous water pressure gauge in one hole buries structure and method for embedding | |
CN102635110B (en) | Construction method for concrete pile | |
CN204081279U (en) | Floor absolute altitude disjunctor split heads | |
CN204959787U (en) | Novel tower crane combination formula basis | |
CN105970994A (en) | Pouring jacket cofferdam pile cap structure and construction method | |
CN105133641A (en) | Thin-wall continuous-wall-type foundation reinforcing structure and method | |
CN103966996A (en) | Gravel pile and manufacturing method thereof | |
CN204385727U (en) | Spiral grouting preformed pile | |
CN102477743A (en) | Construction method for concrete bagged pouring in small-diameter pile hole | |
CN106592569A (en) | Device and method for reinforcing silty-fine sand foundation of passenger dedicated line | |
CN103790173A (en) | Lime-soil compaction pile and CFG rigid pile combined device and method for disposing collapsible loess | |
CN204282348U (en) | A kind of reinforced concrete cast-in-situ pile tube | |
CN206971210U (en) | A kind of long casing in pile foundation construction | |
CN205999885U (en) | A kind of hollow pile | |
CN103981880A (en) | Treatment method of composite foundation using top-enlarged and bottom-enlarged CFG piles | |
CN209538212U (en) | A kind of anti-horizontal displacement radical combination soil-baffling structure | |
CN203755332U (en) | Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined | |
CN110080314B (en) | Method for reducing side friction resistance of pile foundation | |
CN201254432Y (en) | Tower crane support structure of deep base pit engineer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |