CN205024824U CN201520750295.4U CN201520750295U CN205024824U CN 205024824 U CN205024824 U CN 205024824U CN 201520750295 U CN201520750295 U CN 201520750295U CN 205024824 U CN205024824 U CN 205024824U
Authority
CN
China
Prior art keywords
prefabricated
wall body
prefabricated panel
precast wall
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520750295.4U
Other languages
Chinese (zh)
Inventor
张宗军
陈长林
吴丁华
张庆汉
姚尚斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Anhui Hailong Construction Industry Co Ltd
Original Assignee
ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI HAILONG BUILDING INDUSTRY Co Ltd filed Critical ANHUI HAILONG BUILDING INDUSTRY Co Ltd
Priority to CN201520750295.4U priority Critical patent/CN205024824U/en
Application granted granted Critical
Publication of CN205024824U publication Critical patent/CN205024824U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of the building, in particular to bathroom mounting structure, including prefabricated panel and the prefabricated roof that the level set up, prefabricated panel's last face is vertical to set up a plurality of prefabricated wall bodies, and a plurality of prefabricated wall bodies, prefabricated panel enclose to close with prefabricated roof and form the bathroom structure, and the combination position department between prefabricated wall body and the prefabricated wall body, the upper and lower terminal surface of prefabrication wall body are located all to scribble to be equipped with waterproof sealant with prefabrication roof and prefabricated panel's combination position respectively. Adopt roof prefabricated in advance, bottom plate and wall body, advance drainage pipe pre -buried in prefabricated concrete slab material, all scribble the position of establishing waterproof sealant and can stop prefabricated wall body and prefabricated wall body combination between prefabricated wall body and the prefabricated panel, prefabricated wall body combines the position to sentence with prefabricated panel and prefabricated wall body combines position department the phenomenon of infiltration to appear with prefabricated roof, the service life of the bathroom is prolonged, the actual assembly efficiency in bathroom has equally also been improved, reduce the influence of fitment bathroom to the environment.

Description

Toilet Installation structure
Technical field
The utility model belongs to technical field of buildings, particularly a kind of Toilet Installation structure.
Background technology
In recent years, precast unit, with its lower cost of manufacture, less environment pollution and higher strength character, makes concrete be widely used in the every field of building, becomes the new lover of builing industry gradually.
Existing washroom is also much adopt precast unit to be made, in the process of toilet decoration, inlet and outlet pipe lines in washroom and drainage pipe need to be laid in precast concrete in advance, make the ground of washroom in advance, and then the ground of washroom is arranged four sides concrete wall, prefabricated top, washroom is laid on the body of wall of four sides, the main-body structure of whole like this washroom completes, then in washroom, floor tile and wall brick is laid, water tap and washbasin etc. is set out again at the mouth of pipe place laying pipeline in advance, at end-of-the-pipe place, the sanitary equipments such as toilet are installed, whole like this washroom is just built and is completed.But existing washroom in use for some time, the position combined between body of wall and body of wall and body of wall and ground, be easy to the phenomenon occurring infiltration or leak, this drainage, be easy to cause the body of wall of the body of wall closed on to come off, whole building is damaged.
Utility model content
The purpose of this utility model is: provide a kind of Toilet Installation structure, effectively can prevent the phenomenon that washroom seeps water, leaks.
For achieving the above object, the technical solution adopted in the utility model is: a kind of Toilet Installation structure, comprise horizontally disposed prefabricated panel and prefabricated top board, the upper face of prefabricated panel is vertical arranges multiple precast wall body, multiple precast wall body, prefabricated panel and prefabricated top board enclose and form washroom structure, and the binding site place between precast wall body and precast wall body, the upper and lower end face of precast wall body are all coated with waterproof gasket cement with the binding site place of prefabricated top board and prefabricated panel respectively.
Compared with prior art, the technique effect that the utility model exists is: adopt prefabricated in advance top board, base plate and body of wall, be embedded in advance in prefabricated concrete plate by drainage pipe, precast concrete builds one-shot forming, between precast wall body, between precast wall body and prefabricated top board.All be coated with waterproof gasket cement between precast wall body with prefabricated panel and can stop the phenomenon that to seep water appear in position that precast wall body is combined with precast wall body, precast wall body and prefabricated panel binding site place and precast wall body and prefabricated top board binding site place, improve the application life of washroom, also improve the efficiency of assembling of washroom reality equally, reduce because finishing washroom is on the impact of environment.
Accompanying drawing explanation
Fig. 1 is the structural representation that washroom is overlooked;
Fig. 2 a and Fig. 2 b is the enlarged drawing of B and A in Fig. 1;
Fig. 3 is the main structural representation looked;
Fig. 4 is the enlarged diagram of precast wall body and prefabricated panel binding site in Fig. 3;
Fig. 5 is the structural representation that a left side of Fig. 3 is looked;
Fig. 6 is the structural representation of the backsight of Fig. 3;
Fig. 7 is the structural representation that the right side of Fig. 3 is looked.
Detailed description of the invention
Composition graphs 1 to Fig. 7, the utility model is further described:
Composition graphs 1 and Fig. 3, a kind of Toilet Installation structure, comprise horizontally disposed prefabricated panel 10 and prefabricated top board 30, the upper face of prefabricated panel 10 is vertical arranges multiple precast wall body 20, multiple precast wall body 20, prefabricated panel 10 enclose with prefabricated top board 30 and form washroom structure, and the binding site place between precast wall body 20 and precast wall body 20, the upper and lower end face of precast wall body 20 are all coated with waterproof gasket cement 40 with the binding site place of prefabricated top board 30 and prefabricated panel 10 respectively.
Adopt prefabricated in advance top board 30, base plate 10 and body of wall 20, be embedded in advance in prefabricated concrete plate by drainage pipe d, precast concrete builds one-shot forming, between precast wall body 20, between precast wall body 20 and prefabricated top board 30.All be coated with waterproof gasket cement 40 between precast wall body 20 with prefabricated panel 10 and can stop precast wall body 20 and the position that precast wall body 20 is combined, there is the phenomenon seeped water in precast wall body 20 and prefabricated panel 10 binding site place and precast wall body 20 and prefabricated top board 30 binding site place, improve the application life of washroom, similarly, inlet pipeline and discharge pipe line is buried underground in precast concrete, and reserve good floor drain and effluent pipe mouth, effluent pipe mouth is for installing bathtub a, showerhead c etc., at the sewage draining exit place of pipeline, toilet b is installed, also improve the efficiency of assembling of washroom reality, reduce because finishing washroom is on the impact of environment.The precast wall body 20 of washroom of the present invention can be understood as and is set to 4, and general that washroom mostly is the box-packed body structure of rectangle, certainly, the concrete structure of washroom can be depending on the design.
As preferred version of the present utility model, the bonding surface place of contiguous prefabricated body of wall 20 is provided with groove 21 and raised line 22 forms snap-fit engagement, the length direction of groove 21 and raised line 22 runs through setting along the vertical direction of precast wall body 20, and waterproof gasket cement 40 is along the length direction uniform application of groove 21 with the bonding surface of raised line 22.The groove 21 of design on precast wall body 20 is utilized to form snap-fit engagement with raised line 22, and at groove 21 and the position uniform application waterproof gasket cement 40 that raised line 22 is combined, while guaranteeing that clamping is firm, the sealing at precast wall body 20 and precast wall body 20 binding site place can be guaranteed.
Certainly, as another embodiment of the present utility model, the bonding surface position of contiguous prefabricated body of wall 20 is provided with step surface 21 ' and forms with step surface 21 ' and coordinate, the length direction of the step surface 21 ' cooperatively interacted runs through setting along the vertical direction of precast wall body 20, and waterproof gasket cement 40 is along the length direction uniform application of the bonding surface cooperatively interacted.Utilize the step surface 21 ' of design to coordinate with step surface 21 ', and be coated with waterproof gasket cement 40 in the position that step surface 21 ' coordinates, also can avoid the seepage of steam.
Certainly, when same washroom assembles, the structure of two kinds of above-mentioned precast wall bodies 20 can exist simultaneously, and according to concrete demand, the degree that is difficult to of assembling selects two kinds of above-mentioned assembly structures.
Due in the process that washroom uses in reality, shower unnecessary water base of producing concentrates on prefabricated panel 10, therefore, the waterproof difficult point of washroom is at the binding site place of precast wall body 20 with prefabricated panel 10, the binding site place capillary groove 23 of precast wall body 20 and prefabricated panel 10, described capillary groove 23 flute length direction level and the lower edge position be positioned at inside body of wall 20 processed, the notch of capillary groove 23 points to level, prefabricated panel 10 is equipped with waterproof coiled strip 50, described waterproof coiled strip 50 is covered to side cell wall and the groove bottom position of capillary groove 23.Can effectively avoid moisture along the gap leakage of prefabricated panel 10 with precast wall body 20 binding site place by the waterproof coiled strip 50 that reserved capillary groove 23 is laid, waterproof coiled strip 50 laying tiles e on the prefabricated panel 10 and inner wall surface laying tiles f at precast wall body 20, thus can by waterproof Cao 23 position every setting out the watertight cavity for isolated steam, the waterproof material volume 50 that the chamber wall of watertight cavity is laid effectively can stop the seepage of moisture, thus guarantees the effect that washroom seals.
In conjunction with 3 and Fig. 4, the cross section profile of described prefabricated panel 10 is groove platy structure, the both sides cell wall 11 of prefabricated panel 10 is fitted with the medial surface of precast wall body 20 respectively, and the both sides cell wall 10 of prefabricated panel 10 is arranged to wavy surface or serrated face 111 with the bonding position place of precast wall body 20.
On the downside of the upper surface of the both sides cell wall 11 of described prefabricated panel 10 and capillary groove 23, cell wall is identical, precast wall body 20 is reserved with spliced eye 24, described spliced eye 24 is bar perform hole and hole length direction horizontal direction is arranged, and described wavy surface or serrated face 111 are emerging in the aperture location of spliced eye 24.
Washroom of the present utility model vibrational power flow is on the above-below direction of a residential building, equally also can be spaced apart in a floor, when being arranged on the above-below direction of a residential building, the upper and lower floor in washroom is disposed in order, the prefabricated panel 10 being positioned at washroom above adjacent washroom is the prefabricated top board 30 in washroom below adjacent washroom, such assembled in sequence between just can conveniently paying attention to hygiene up and down assembled in sequence in residential building; When being arranged on the washroom in same floor and being disposed in order, spliced eye 24 position that one end interpolation of the base plate 10 of adjacent washroom is arranged on adjacent washroom precast wall body 20, the end face of one end cell wall 11 of washroom 10 and this wavy surface or serrated face 111 are fitted, and can guarantee the two strong degree combined.The wavy surface at this place or serrated face 111 are exactly in the process of hardening of concrete, this face is brushed a layer concrete drying retardant to slow down concrete sclerosis, proper time, giant is utilized to rinse towards this face, this face can be made to present serrated face or wavy surface 111, prefabricated panel 10 is with adjacent prefabricated panel 10 one end is combined time, and this serrated face or wavy surface 111 can strengthen the bonding force of structure and strengthen waterproof effect.

Claims (6)

1. a Toilet Installation structure, it is characterized in that: comprise horizontally disposed prefabricated panel (10) and prefabricated top board (30), the upper face of prefabricated panel (10) is vertical arranges multiple precast wall body (20), multiple precast wall body (20), prefabricated panel (10) and prefabricated top board (30) enclose and form washroom structure, and the upper and lower end face of the binding site place between precast wall body (20) and precast wall body (20), precast wall body (20) is all coated with waterproof gasket cement (40) with the binding site place of prefabricated top board (30) and prefabricated panel (10) respectively.
2. Toilet Installation structure according to claim 1, it is characterized in that: the bonding surface place of contiguous prefabricated body of wall (20) is provided with groove (21) and raised line (22) forms snap-fit engagement, the length direction of groove (21) and raised line (22) runs through setting along the vertical direction of precast wall body (20), and waterproof gasket cement (40) is along the length direction uniform application of groove (21) with the bonding surface of raised line (22).
3. Toilet Installation structure according to claim 1, it is characterized in that: binding site place capillary groove (23) of precast wall body (20) and prefabricated panel (10), described capillary groove (23) flute length direction level and be positioned at body of wall processed (20) inner side lower edge position, the notch of capillary groove (23) points to level, prefabricated panel (10) is equipped with waterproof coiled strip (50), described waterproof coiled strip (50) is covered to side cell wall and the groove bottom position of capillary groove (23).
4. Toilet Installation structure according to claim 1, it is characterized in that: the bonding surface position of contiguous prefabricated body of wall (20) is provided with step surface (21 ') and forms with step surface (21 ') and coordinate, the length direction of the step surface (21 ') cooperatively interacted runs through setting along the vertical direction of precast wall body (20), and waterproof gasket cement (40) is along the length direction uniform application of the bonding surface cooperatively interacted.
5. Toilet Installation structure according to claim 3, it is characterized in that: the cross section profile of described prefabricated panel (10) is groove platy structure, the both sides cell wall (11) of prefabricated panel (10) is fitted with the medial surface of precast wall body (20) respectively, and the both sides cell wall (11) of prefabricated panel (10) and the bonding position place of precast wall body (20) are arranged to wavy surface or serrated face (111).
6. Toilet Installation structure according to claim 5, it is characterized in that: the upper surface of the both sides cell wall (11) of described prefabricated panel (10) and capillary groove (23) downside being identical of cell wall, precast wall body (20) is reserved with spliced eye (24), described spliced eye (24) for bar perform hole and hole length direction horizontal direction arrange, described wavy surface or serrated face (111) are emerging in the aperture location of spliced eye (24).
CN201520750295.4U 2015-09-25 2015-09-25 Bathroom mounting structure Active CN205024824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520750295.4U CN205024824U (en) 2015-09-25 2015-09-25 Bathroom mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520750295.4U CN205024824U (en) 2015-09-25 2015-09-25 Bathroom mounting structure

Publications (1)

Publication Number Publication Date
CN205024824U true CN205024824U (en) 2016-02-10

Family

ID=55257369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520750295.4U Active CN205024824U (en) 2015-09-25 2015-09-25 Bathroom mounting structure

Country Status (1)

Country Link
CN (1) CN205024824U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277953A (en) * 2018-04-03 2018-07-13 中民筑友建筑科技(昆山)有限公司 Integral bathroom structure
CN109797987A (en) * 2019-02-21 2019-05-24 北京工业大学 The hard-cover integrated bathroom of inner wall provided pipe line groove hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277953A (en) * 2018-04-03 2018-07-13 中民筑友建筑科技(昆山)有限公司 Integral bathroom structure
CN109797987A (en) * 2019-02-21 2019-05-24 北京工业大学 The hard-cover integrated bathroom of inner wall provided pipe line groove hole

Similar Documents

Publication Publication Date Title
CN110878700B (en) Tunnel waterproof structure and construction method thereof
KR20110075701A (en) A prefabricated bathroom
CN112538989A (en) Integrated bathroom of ready-package assembled
CN205024824U (en) Bathroom mounting structure
CN201695529U (en) Integral waterproofing structure of toilet
WO2016107376A1 (en) Waterproof, deodorant and leak-proof integrated toilet
CN204781464U (en) Water bar between shower
CN104455757A (en) Downcomer assembly and installation method thereof
CN207685959U (en) A kind of floor when construction for Super High intercepts water drainage arrangement
CN204876261U (en) Prevention of seepage water building board
CN114319678A (en) Water stopping structure and water stopping construction method for water-containing room
KR101466644B1 (en) The construction method for root
CN114045880A (en) Basement post-cast strip treatment process
CN104790472A (en) Same floor drainage structure of toilet
CN108086489B (en) Water stopping structure with height-adjustable water stopping pier and construction method thereof
CN109930703A (en) A kind of construction technology of toilet warterproof beam
TW451019B (en) Water-proof and damp-proof method for basement side wall
JP2011089347A (en) Drainage container, construction method of drainage container, and floor drainage structure using drainage container
CN206667445U (en) Bathroom floor drain waterproof node
CN110984308A (en) Anti-leakage process for removing deposited water in toilet
TWI604109B (en) Water stop structure with adjustable height of water stop pier and its application method
CN216234080U (en) Water receiving bucket for building sewer leakage
JP2018021356A (en) Water cut-off method
CN109487864A (en) A kind of architectural engineering basement anti-leakage structure
CN213626151U (en) Prevention of seepage water building wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant