CN204967130U - A hanging flower basket for high altitude cable laying operation - Google Patents
A hanging flower basket for high altitude cable laying operation Download PDFInfo
- Publication number
- CN204967130U CN204967130U CN201520672987.1U CN201520672987U CN204967130U CN 204967130 U CN204967130 U CN 204967130U CN 201520672987 U CN201520672987 U CN 201520672987U CN 204967130 U CN204967130 U CN 204967130U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- fixed
- hook
- vertical support
- aerial cables
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a hanging flower basket for high altitude cable laying operation, include: a bottom plate and a pair of couple, be fixed with threely at least on the bottom plate and the vertical support column of bottom plate vertically, along every vertical support column all is fixed with predetermines spaced transversal branch dagger, on a pair of couple was fixed in two arbitrary adjacent vertical support columns, this was in on the same level to the couple, this is to still being fixed with a plurality of transversal branch dagger between geting in touch, this is located in the steel bay track of high altitude cable laying work location department the couple.
Description
Technical field
The utility model relates to a kind of hanging basket, particularly relates to a kind of hanging basket for aerial cables laying task.
Background technology
The power industry of current China is in the fast-developing stage, and along with the continuous increase of unit capacity, being on the increase of job site equipment and measuring point, cable laying amount is just thereupon growing.When ground space is rather nervous, cable testing bridge is often designed in high aerial overhead positions, though save ground space, adds difficulty to the installation of suspension and support.
Current job site generally adopts sets up scaffold to install unsettled cable suspension and support, before unsettled crane span structure is installed, by scaffolder by scaffold building to crane span structure installation site, then carry out weld job by welder.Construction method is rather loaded down with trivial details, and economic and practical is not high, and therefore current construction method haves much room for improvement.At substantial time, human and material resources, financial resources are torn in taking of scaffold open, occupy large number of ground space, and when ground space is limited, feasibility and the flexibility of setting up scaffold are not high.And crane span structure installation site is higher, scaffold building cost is higher, the time is longer.
Hanging basket is the building machinery of architectural engineering work high above the ground, acts on curtain wall and installs, outside Wall Cleaning.Hanging basket is that one can substitute traditional pin hand cradle, can reduce labor intensity, increase work efficiency, and can reusable novel high-rise working equipment.The use of building hanging basket becomes a kind of trend gradually, install at the external wall construction of high layer multi-layer high building, curtain wall, heat preservation construction and maintenance cleaning exterior wall etc. exceed in operation and extensively approved, can be used for the operation of the engineerings such as large tank, bridge and dam simultaneously.Use this product, can scaffolding be exempted from.Construction cost is reduced, and operating expenses is 28% of traditional pin hand cradle, and operating efficiency significantly improves.But according to the difference of difficulty of construction and job location, the structure of hanging basket is all not identical.
Especially in limited space and when cannot use crane and scaffold, in aerial cables laying task, both needed the fail safe ensureing workmen, and reached construction equipment structure again and be simply easy to operation and can reuse.
Utility model content
In order to solve the problem, the utility model provides a kind of hanging basket for aerial cables laying task, this hanging basket save take tear scaffold open time, manpower and scaffolding hiring cost, save ground space; And in limited space and when cannot use crane and scaffold, for aerial cables laying task provides conveniently.
For achieving the above object, the utility model is by the following technical solutions:
For a hanging basket for aerial cables laying task, comprising:
A base plate and a pair hook, described base plate is fixed with at least three vertical support columns vertical with base plate;
The horizontal support post of predetermined interval is all fixed with along each described vertical support column;
A pair hook is fixed on any two adjacent vertical support columns, and this is on same level height to hook;
This is also fixed with several horizontal support posts between hook;
This is located in the steel tank track of aerial cables laying task position hook.
Described base plate is rectangle or circle.
On described vertical support column, the clinodiagonal of any two adjacent horizontal support posts is fixed with bearing diagonal post.
The shape of described hook and the mating shapes of steel tank track.
Each described horizontal support post is equipped with anti-slip veins.
Described vertical support column and horizontal support post are rigid material, and are coated with paint.
The beneficial effects of the utility model are:
(1) barrel structure of the present utility model is simple, fixing, easy to connect, is easy to processing and manufacturing, does not have complexity, valuable components and parts, low cost of manufacture;
(2) hanging basket of the present utility model uses flexibly, and convenient transfer, can repeatedly reuse;
(3) in hanging basket of the present utility model not electrically and the components and parts such as hydraulic pressure, there will not be the situation that cannot use because of component damage, can to use for a long time and not fragile.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1, base plate; 2, vertical support column; 3, horizontal support post; 4, link up with; 5, bearing diagonal post.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described further:
Hanging basket for aerial cables laying task of the present utility model, comprising:
A base plate 1 and a pair hook 4, base plate 1 is fixed with at least three vertical support columns 2 vertical with base plate;
The horizontal support post 3 of predetermined interval is all fixed with along each vertical support column 2; Wherein, the spacing be arranged between the adjacent horizontal support post 3 on vertical support column 2 can be equal, also can be unequal, and the spacing between these horizontal support posts 3 can design according to the construction requirement of reality;
A pair hook 4 is fixed on any two adjacent vertical support columns 2, and this is on same level height to hook 4; When this is consistent to the level height of hook 4, the whole hanging basket for aerial cables laying task just can stably be fixed in steel tank track, workmen's construction is provided to the environment of stability and safety;
This is to being also fixed with several horizontal support posts 3 between hook 4;
This is located in the steel tank track of aerial cables laying task position hook 4.
Further, base plate 1 can be rectangle or circle.Base plate 1 also can select other shapes, and the effect of this base plate 1 is for carrying workmen.As shown in Figure 1, base plate 1 is rectangle.
Further, on vertical support column 2, the clinodiagonal of any two adjacent horizontal support posts 3 is fixed with bearing diagonal post 4, this structure can be used for ensureing the safety of the workmen of the aerial cables laying task stood on base plate.
Further, the hook shape of 4 and the mating shapes of steel tank track, only have when the shape of hook 4 and the shape of steel tank track match, just can ensure the stability of whole hanging basket, hook 4 and the channel-section steel of such hanging basket are fitted but not fastening, the hook of hanging basket can be avoided to depart from or too clamp, be convenient to taking off and transfer of hanging basket.
Further, each horizontal support post 3 is equipped with anti-slip veins, such constructability personnel at same construction location and highly different situations, can utilize climbing horizontal support post 3 to carry out the aerial cables laying task of differing heights position.
Further, vertical support column 2 and horizontal support post 3 are rigid material, and are coated with paint.
Wherein, the whole vertical support column 2 for aerial cables laying task hanging basket and horizontal support post 3 all can adopt hot galvanizing round steel or steel-pipe welding to manufacture and form, also other can be adopted to have the material of toughness, and the base plate 1 of hanging basket of the present utility model must can bear the weight of workmen.Being coated with paint at vertical support column 2 and horizontal support post 3, for avoiding hanging basket to be corroded, improving life-span and the utilization rate thereof of hanging basket.
The course of work of the hanging basket for aerial cables laying task of the present utility model is:
First, fix steel tank track in aerial cables laying task position, this steel tank track matches with the hook for the hanging basket of aerial cables laying task, and this steel tank is the track of hanging basket movement;
The safety rope that workmen is born by it, is placed in the hanging basket of this aerial cables laying task position, and utilizes climbing horizontal support post to carry out the aerial cables laying task of differing heights position.
By reference to the accompanying drawings embodiment of the present utility model is described although above-mentioned; but the restriction not to the utility model protection range; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection range of the present utility model.
Claims (6)
1. for a hanging basket for aerial cables laying task, it is characterized in that, comprising:
A base plate and a pair hook, described base plate is fixed with at least three vertical support columns vertical with base plate;
The horizontal support post of predetermined interval is all fixed with along each described vertical support column;
A pair hook is fixed on any two adjacent vertical support columns, and this is on same level height to hook;
This is also fixed with several horizontal support posts between hook;
This is located in the steel tank track of aerial cables laying task position hook.
2. a kind of hanging basket for aerial cables laying task as claimed in claim 1, it is characterized in that, described base plate is rectangle or circle.
3. a kind of hanging basket for aerial cables laying task as claimed in claim 1, is characterized in that, on described vertical support column, the clinodiagonal of any two adjacent horizontal support posts is fixed with bearing diagonal post.
4. a kind of hanging basket for aerial cables laying task as claimed in claim 1, is characterized in that, the shape of described hook and the mating shapes of steel tank track.
5. a kind of hanging basket for aerial cables laying task as claimed in claim 1, is characterized in that, each described horizontal support post is equipped with anti-slip veins.
6. a kind of hanging basket for aerial cables laying task as claimed in claim 1, it is characterized in that, described vertical support column and horizontal support post are rigid material, and are coated with paint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520672987.1U CN204967130U (en) | 2015-09-01 | 2015-09-01 | A hanging flower basket for high altitude cable laying operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520672987.1U CN204967130U (en) | 2015-09-01 | 2015-09-01 | A hanging flower basket for high altitude cable laying operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204967130U true CN204967130U (en) | 2016-01-13 |
Family
ID=55062171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520672987.1U Active CN204967130U (en) | 2015-09-01 | 2015-09-01 | A hanging flower basket for high altitude cable laying operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204967130U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108963858A (en) * | 2018-06-29 | 2018-12-07 | 国网山东省电力公司潍坊供电公司 | One kind being attached to moveable insulated isolated device in insulation bucket |
-
2015
- 2015-09-01 CN CN201520672987.1U patent/CN204967130U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108963858A (en) * | 2018-06-29 | 2018-12-07 | 国网山东省电力公司潍坊供电公司 | One kind being attached to moveable insulated isolated device in insulation bucket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN206569235U (en) | A kind of ship hanger bracket and boat scaffold | |
CN201826516U (en) | Novel attached lifting scaffold | |
CN210103312U (en) | Adjustable balance hanger | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN204967130U (en) | A hanging flower basket for high altitude cable laying operation | |
CN205069139U (en) | Screen work roll -over stand is stored to nuclear power plant's spentnuclear fuel | |
CN103967263A (en) | Novel hydraulic automatic climbing discharging platform | |
CN202302300U (en) | Combined pipeline mounting operation platform | |
CN204418629U (en) | A kind of integrated form climbing frame | |
CN101818563A (en) | Jack-up integral lifting mobile platform and using method | |
CN205693609U (en) | Ground photovoltaic bracket and photovoltaic module hanger bracket device are installed | |
CN202731270U (en) | Movable platform for high-altitude installation operation of space steel structure | |
CN205646578U (en) | Special lifting rope of bridge formula transformer installation | |
CN209179519U (en) | Hang the truss splicing steel construction moulding bed of auxiliary installation in a kind of gymnasium top | |
CN209837631U (en) | Multistage assembled lattice frame building structure | |
CN208361837U (en) | A kind of Lifting basket of no suspension mechanism | |
CN206571492U (en) | Combined shaft shaft equipment is installed with special-shaped hanging scaffold | |
CN112049017A (en) | Bailey frame integral frame falling device for cast-in-place box girder and construction process | |
CN205330132U (en) | Boat scaffold | |
CN209369289U (en) | Detachable safety operating platform | |
CN103387196A (en) | Hanging basket supporting seat capable of adjusting balance | |
CN203373108U (en) | Hanging basket support with balance adjustable | |
CN203383493U (en) | Hanging basket support with balance weights in multiple directions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |