CN204875839U - 一种铁塔基础浇筑模具 - Google Patents

一种铁塔基础浇筑模具 Download PDF

Info

Publication number
CN204875839U
CN204875839U CN201520533909.3U CN201520533909U CN204875839U CN 204875839 U CN204875839 U CN 204875839U CN 201520533909 U CN201520533909 U CN 201520533909U CN 204875839 U CN204875839 U CN 204875839U
Authority
CN
China
Prior art keywords
mould
iron tower
metal die
pour
tower basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520533909.3U
Other languages
English (en)
Inventor
韩艳波
田炳照
程宏伟
段峰
牛继海
冯峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Co Of Guo Wang Yishui Shandong County
State Grid Corp of China SGCC
Original Assignee
Electric Co Of Guo Wang Yishui Shandong County
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Co Of Guo Wang Yishui Shandong County, State Grid Corp of China SGCC filed Critical Electric Co Of Guo Wang Yishui Shandong County
Priority to CN201520533909.3U priority Critical patent/CN204875839U/zh
Application granted granted Critical
Publication of CN204875839U publication Critical patent/CN204875839U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种铁塔基础浇筑模具,其要点是它包括相向而对的两块半圆金属模具,所述金属模具的一端通过转轴转动连接,另一端分别设有连接板;所述连接板之间通过螺栓连接;所述金属模具上分别设有拉环。有效解决了现有技术存在稳定性差、资源耗费高的技术问题。

Description

一种铁塔基础浇筑模具
技术领域本实用新型属于电力塔基技术领域,涉及一种铁塔基础浇筑模具。
背景技术随着社会的发展,电力线路的铺设日益增多,铁塔的塔基是安全保障的第一步。目前,塔基采用钢筋混凝土结构,浇筑混凝土后,再进行振捣、夯实。为了防止设在塔基上的铁塔遭到雨水浸泡、人为破坏等,塔基要高出周围地面一部分,而高出的这一部分在浇筑的时候需要支模板,由于周围空旷,在振捣的时候极容易涨模,而且模板在使用2-3次就更换,浪费严重。还有在周圈砌墙的,这种方式虽然稳固,但是砌墙耗费人力物力大,而且还要对外墙面进行抹灰,成本高。
发明内容本实用新型的目的是解决现有技术存在稳定性差、资源耗费高的技术问题,提供一种铁塔基础浇筑模具,以克服现有技术的不足。
为了实现上述目的,本实用新型一种铁塔基础浇筑模具,其要点是它包括相向而对的两块半圆金属模具,所述金属模具的一端通过转轴转动连接,另一端分别设有连接板;所述连接板之间通过螺栓连接;所述金属模具上分别设有拉环。
所述金属模具也可以为其它多边形。
本实用新型,采用相向而对的两块半圆金属模具,安装拆卸方便,使用过程中无损耗,有效的解决了现有技术存在稳定性差、资源耗费高的技术问题。
附图说明图1是本实用新型结构示意图;
图2是图1的后视图。
图中1、转轴2、金属模具3、连接板4、螺栓5、拉环
具体实施方式根据附图,本实用新型一种铁塔基础浇筑模具,它包括相向而对的两块半圆金属模具2,所述金属模具2的一端通过转轴1转动连接,另一端分别设有连接板3;所述连接板3之间通过螺栓4连接;所述金属模具上分别设有拉环5。所述金属模具也可以为其它多边形。
使用时,将本实用新型坐在扎好钢筋的基槽上,为了防止金属模具位移,可在模具的四周放置石块等加固。浇筑时边振捣边夯实,浇筑后的顶面为中间高四周低的弧面。混凝土初凝后,拧下连接板上的螺栓,分别向两侧拉动拉环,金属模具绕转轴转动形成开口,可以轻松取出。如果长时间使用表面产生锈迹,在浇筑之间可以在表面刷一层油,既能防止锈蚀、又容易拆卸。

Claims (1)

1.一种铁塔基础浇筑模具,其特征是它包括相向而对的两块半圆金属模具,所述金属模具的一端通过转轴转动连接,另一端分别设有连接板;所述连接板之间通过螺栓连接;所述金属模具上分别设有拉环。
CN201520533909.3U 2015-07-22 2015-07-22 一种铁塔基础浇筑模具 Expired - Fee Related CN204875839U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520533909.3U CN204875839U (zh) 2015-07-22 2015-07-22 一种铁塔基础浇筑模具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520533909.3U CN204875839U (zh) 2015-07-22 2015-07-22 一种铁塔基础浇筑模具

Publications (1)

Publication Number Publication Date
CN204875839U true CN204875839U (zh) 2015-12-16

Family

ID=54820231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520533909.3U Expired - Fee Related CN204875839U (zh) 2015-07-22 2015-07-22 一种铁塔基础浇筑模具

Country Status (1)

Country Link
CN (1) CN204875839U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809618A (zh) * 2020-08-04 2020-10-23 林瑞 一种发电厂输电杆塔地基处理方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809618A (zh) * 2020-08-04 2020-10-23 林瑞 一种发电厂输电杆塔地基处理方法
CN111809618B (zh) * 2020-08-04 2021-11-02 湖南湘投铜湾水利水电开发有限责任公司 一种发电厂输电杆塔地基处理方法

Similar Documents

Publication Publication Date Title
CN105926803B (zh) 一种具有凹凸纹路的3d打印配筋砌体剪力墙结构
CN106284307B (zh) 带螺纹的预制uhpc管桩及其制作施工方法
CN207633540U (zh) 装配式剪力墙间的竖向多铰连接结构
CN203755334U (zh) 单管塔预制螺旋钢管桩基础
CN103774687A (zh) 单管塔预制螺旋钢管桩基础
CN105971007A (zh) 一种分体式无模浇筑地下综合管廊
CN103343547B (zh) 集装箱式活动房装配式型钢混凝土四柱基础及施工方法
CN204875839U (zh) 一种铁塔基础浇筑模具
CN206752693U (zh) 一种箍筋加密的装配式钢筋混凝土柱与柱拼接节点
CN209114873U (zh) 一种土建基模固定夹具
CN103422499A (zh) 一种冻土区桩基内外护筒施工方法
CN207092104U (zh) 一种钢管桩连接结构
CN204343778U (zh) 一种线杆
CN105862909B (zh) 一种水电站厂房定子基础结构及其浇筑方法
CN204898711U (zh) 一种装配式挡土墙
CN102071692A (zh) 采用环板进行基坑底板换撑的施工方法
CN203947419U (zh) 一种高速铁路桥梁垫石模板
CN203514341U (zh) 大型设备混凝土基础孔的支模结构
CN203145028U (zh) 一种波纹管集水井
CN210233391U (zh) 一种pc构件成型组合振源
CN203429656U (zh) 集装箱式活动房装配式型钢混凝土四柱组合基础
CN202990418U (zh) 一种防止现浇混凝土柱烂根的漏浆保护装置
CN207619988U (zh) 条形基坑现浇混凝土对撑与预制连系梁的连接结构
CN102051888B (zh) 设备基础直埋地脚螺栓调整孔的施工方法
CN205530400U (zh) 倾斜桩试验模型钢筋笼垫块

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20160722

CF01 Termination of patent right due to non-payment of annual fee