CN204849773U - It protects device of a bond stress to increase back cover concrete and steel - Google Patents

It protects device of a bond stress to increase back cover concrete and steel Download PDF

Info

Publication number
CN204849773U
CN204849773U CN201520496288.6U CN201520496288U CN204849773U CN 204849773 U CN204849773 U CN 204849773U CN 201520496288 U CN201520496288 U CN 201520496288U CN 204849773 U CN204849773 U CN 204849773U
Authority
CN
China
Prior art keywords
steel
back cover
cover concrete
pile casting
steel pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520496288.6U
Other languages
Chinese (zh)
Inventor
吴士民
刘志如
张俊兵
胡国伟
刘晓栋
游中建
连紫旭
郭星亮
李英杰
申立刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201520496288.6U priority Critical patent/CN204849773U/en
Application granted granted Critical
Publication of CN204849773U publication Critical patent/CN204849773U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model belongs to the technical field of deep water basis back cover concrete construction, concretely relates to it protects device of a bond stress to increase back cover concrete and steel. It protects the bond stress between the section of thick bamboo to have increased back cover concrete and steel, the at utmost has improved construction factor of safety, an it protects device of a bond stress to increase back cover concrete and steel, protect a section of thick bamboo including the steel, the steel protects the back cover concrete that bobbin base portion pour, the steel protects and is equipped with a plurality of floors in the back cover concrete of bobbin base portion, floor welded connection protects bobbin base portion week side at the steel, welded connection has a plurality of circles to use the steel to protect section of thick bamboo center for the circumferential reinforcement in the common centre of a circle between a plurality of floors, the welding has the radial reinforcing bar of a plurality of radial settings between the circumferential reinforcement. The utility model discloses make full use of reinforcing bar with ribbing net piece and floor combined action, effectual increase steel protect the area of contact of a section of thick bamboo and back cover concrete, and the better provides decurrent counter -force vertical to the back cover concrete.

Description

A kind of device increasing bottom concrete and steel pile casting bond stress
Technical field
The utility model belongs to the technical field of deep water foundation bottom concrete construction, is specifically related to a kind of device increasing bottom concrete and steel pile casting bond stress.
Background technology
Along with the development of China's economic construction, the deep-water bridge crossing over great rivers also gets more and more.The cofferdam adopted in deepwater bridge construction, being the operation platform of drilled pile in early stage, is again the water-retaining structure of later stage bearing platform construction, is the Focal point and difficult point in construction always.During the cofferdam construction of basis, after perfusion bottom concrete, will carry out drawing water and form anhydrous construction environment in cofferdam, now cofferdam come mainly through the bond stress between bottom concrete and steel pile casting and the weight of concrete self jointly resist suffered by cofferdam to buoyancy.
Due to bottom concrete and steel pile casting bond stress current general calculate in usually adopt test method(s) and empirical method two kinds of obtaining value methods, testing error and construction deviation larger.Therefore, under the prerequisite of theoretical computationally secure, how increasing the bond stress between bottom concrete and steel pile casting, at utmost improve safety factor, is the important problem considered back cover construction period.
Summary of the invention
The utility model, in order to increase the bond stress between bottom concrete and steel pile casting, at utmost improves construction safety coefficient, provides a kind of device increasing bottom concrete and steel pile casting bond stress.
The utility model takes following technical scheme: a kind of device increasing bottom concrete and steel pile casting bond stress, comprise steel pile casting, the bottom concrete of building bottom steel pile casting, some floors are provided with in bottom concrete bottom steel pile casting, floor is welded to connect all sides bottom steel pile casting, be welded to connect the circumferential reinforcement that some circles are together circle center with steel pile casting center between some floors, between circumferential reinforcement, be welded with the radial reinforcing bar that some radial directions are arranged.
Described floor is provided with 4 pieces, and all sides of every two floors uniform welding steel pile casting in 90 °, floor is the equilateral right-angled triangle steel plate being of a size of 250 × 250mm.
Described circumferential reinforcement is provided with 3 circles, and the spacing between adjacent circumferential reinforcement is 10cm.
Described circumferential reinforcement is connected with floor bottom welding.
Compared with prior art, the beneficial effects of the utility model: make full use of Ribbed Bar mesh sheet and floor acting in conjunction, the effective contact area increasing steel pile casting and bottom concrete, better provides downward counter-force vertical to bottom concrete.Construct convenient, less input, and safety is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Ribbed Bar mesh sheet top view;
1-steel pile casting in figure, 2-bottom concrete, 3-floor, 4-circumferential reinforcement, the radial reinforcing bar of 5-.
Detailed description of the invention
As shown in Figure 1, a kind of device increasing bottom concrete and steel pile casting bond stress, comprise steel pile casting 1, the bottom concrete 2 of building bottom steel pile casting 1, some floors 3 are provided with in bottom concrete 2 bottom steel pile casting 1, floor 3 is welded to connect all sides bottom steel pile casting 1, is welded with some circle circumferential reinforcements 4 between floor 3, is welded with some radial reinforcing bars 5 between circumferential reinforcement 4.
Described floor 3 is provided with 4 pieces, every two floors 3 uniform welding steel pile casting in 90 ° 1 week side, and floor is the equilateral right-angled triangle steel plate being of a size of 250 × 250mm.
Described circumferential reinforcement 4 is provided with 3 circles, and the spacing between adjacent circumferential reinforcement 4 is 10cm.
Described circumferential reinforcement 4 is connected with floor 3 bottom welding.
Floor adopts 10mm steel plate to weld with steel pile casting, and arrange four pieces in steel pile casting direction in 90 ° respectively, floor is of a size of 250 × 250 equilateral right angles; Radial reinforcing bar adopts the HRB335 level reinforcing bar of Φ 14mm, be connected with steel pile casting by the form of welding, 4 are arranged respectively in steel pile casting direction in 90 °, circumferential reinforcement and floor, radial reinforcement welding form Ribbed Bar mesh sheet, the circumferential reinforcement HRB335 level reinforcing bar of Φ 14mm, spacing 10cm, arranges 3 circles in radial direction.
Specific implementation process:
1, floor makes: after steel pile casting makes completion of processing, around steel pile casting, four pieces of floors are welded in 90 ° of directions.
2, radial reinforcement fabrication: after floor welding, around steel pile casting, below floor, the HRB335 level reinforcing bar of 4 Φ 14mm is welded in 90 ° of directions.
3, circumferential reinforcement makes: below floor and radial reinforcing bar, by the HRB335 level reinforcing bar of circumferential reinforcement Φ 14mm, arrange 3 circles according to radial spacing 10cm, with floor, radial reinforcement welding.
4, after increasing the device completion of processing of bottom concrete and steel pile casting bond stress, steel pile casting carries out inserted to play to design altitude, then builds bottom concrete.

Claims (4)

1. one kind increases the device of bottom concrete and steel pile casting bond stress, comprise steel pile casting (1), the bottom concrete (2) that steel pile casting (1) bottom is built, it is characterized in that: in the bottom concrete (2) of steel pile casting (1) bottom, be provided with some floors (3), floor (3) is welded to connect in all sides, steel pile casting (1) bottom, be welded to connect the circumferential reinforcement (4) that some circles are together circle center with steel pile casting center between some floors (3), between circumferential reinforcement (4), be welded with the radial reinforcing bar (5) that some radial directions are arranged.
2. the device of increase bottom concrete according to claim 1 and steel pile casting bond stress, it is characterized in that: described floor (3) is provided with 4 pieces, every two floor (3) uniform welding in 90 ° steel pile casting (1) all sides, floor is the equilateral right-angled triangle steel plate being of a size of 250 × 250mm.
3. the device of increase bottom concrete according to claim 2 and steel pile casting bond stress, is characterized in that: described circumferential reinforcement (4) is provided with 3 circles, and the spacing between adjacent circumferential reinforcement (4) is 10cm.
4. the device of increase bottom concrete according to claim 3 and steel pile casting bond stress, is characterized in that: described circumferential reinforcement (4) is connected with floor (3) bottom welding.
CN201520496288.6U 2015-07-10 2015-07-10 It protects device of a bond stress to increase back cover concrete and steel Active CN204849773U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520496288.6U CN204849773U (en) 2015-07-10 2015-07-10 It protects device of a bond stress to increase back cover concrete and steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520496288.6U CN204849773U (en) 2015-07-10 2015-07-10 It protects device of a bond stress to increase back cover concrete and steel

Publications (1)

Publication Number Publication Date
CN204849773U true CN204849773U (en) 2015-12-09

Family

ID=54740341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520496288.6U Active CN204849773U (en) 2015-07-10 2015-07-10 It protects device of a bond stress to increase back cover concrete and steel

Country Status (1)

Country Link
CN (1) CN204849773U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217680A (en) * 2017-05-16 2017-09-29 中交武汉港湾工程设计研究院有限公司 The method for reducing the device and construction of steel suspended box cofferdam bottoming concrete thickness
CN109778891A (en) * 2019-01-03 2019-05-21 中交二航局第四工程有限公司 A method of the enhancing back cover bond stress based on offshore steel taper pile basis

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107217680A (en) * 2017-05-16 2017-09-29 中交武汉港湾工程设计研究院有限公司 The method for reducing the device and construction of steel suspended box cofferdam bottoming concrete thickness
CN107217680B (en) * 2017-05-16 2022-05-24 中交武汉港湾工程设计研究院有限公司 Device for reducing thickness of bottom sealing concrete of steel suspension box cofferdam and construction method
CN109778891A (en) * 2019-01-03 2019-05-21 中交二航局第四工程有限公司 A method of the enhancing back cover bond stress based on offshore steel taper pile basis

Similar Documents

Publication Publication Date Title
CN101220593A (en) Fastening method of post-treating pipe pile break with pre-stress pipe pile construction
CN205058277U (en) Prefabricated T girder iron muscle mould
CN104314095B (en) A kind of shaped steel buttress for the construction of super thick raft plate and valve plate and construction method
CN105735113A (en) Pier pile transition connection structure for concrete-filled steel tube bridge and construction method of pier pile transition connection structure
CN204849773U (en) It protects device of a bond stress to increase back cover concrete and steel
CN104863063A (en) Bridge underwater structure cofferdam-free fast reinforcing method based on PVC composite formwork
CN202626977U (en) Fixing device for steel bar cage of pile foundation and concrete pouring hopper
CN204174634U (en) A kind of wind-driven generator tower frame foundation structure
CN201746979U (en) Column hoop device for beam-column core area in concrete construction
CN203626055U (en) Super-high-rise large-section half-embedded type intensive anchor bar steel column base locating support
CN206256545U (en) A kind of steel bar connecting structure of bean column node
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN108842602A (en) A kind of hyperboloid vase pier framework of steel reinforcement
CN209339171U (en) A kind of transmission line of electricity assembled sheet pile composite foundation
CN204475183U (en) A kind of hoop platform for bridge pier column construction
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN206220359U (en) A kind of support heel for reinforced bar and support system
CN103205973B (en) A kind of shaped steel cement mixing method inner supporting structure and method for supporting thereof
CN104908159A (en) Operation equipment for industrial large-scale solid square pile production line
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN104265005A (en) Steel plate and steel bar combined beam top reinforced structure
CN205296195U (en) Shaped steel column holder
CN203626264U (en) Protective layer control apparatus for hogging moment reinforced steel bar suspension construction
CN104727486B (en) A kind of synthetic method of precast reinforced cage
CN208219546U (en) A kind of pile cover integral inverted hangs bottom system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant