CN205058277U CN201520594920.0U CN201520594920U CN205058277U CN 205058277 U CN205058277 U CN 205058277U CN 201520594920 U CN201520594920 U CN 201520594920U CN 205058277 U CN205058277 U CN 205058277U
Authority
CN
China
Prior art keywords
prefabricated
direction support
frame structure
steel
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520594920.0U
Other languages
Chinese (zh)
Inventor
冯涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201520594920.0U priority Critical patent/CN205058277U/en
Application granted granted Critical
Publication of CN205058277U publication Critical patent/CN205058277U/en
Priority to PCT/CN2016/089698 priority patent/WO2017020685A1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种预制T梁钢筋胎具,包括水平的框体结构和多根Z向支撑梁,所述Z向支撑梁垂直于所述框体结构并对所述框体结构进行支撑,所述Z向支撑梁沿Z轴方向间隔设有多根平行于所述框体结构的一条边的套管,所述套管内径大于T梁钢筋的直径,用于穿设T梁钢筋。本实用新型通过设计一种预制T梁钢筋胎具,使T梁钢筋骨架绑扎规范化,标准化,外观平整、顺直,质量优良,对于多跨桥梁大量生产T梁的情况,能够大大减少劳动力的耗费,施工周期缩短。

The utility model discloses a prefabricated T-beam reinforced tire, which comprises a horizontal frame structure and a plurality of Z-direction support beams, and the Z-direction support beams are perpendicular to the frame structure and support the frame structure , the Z-direction support beam is provided with a plurality of sleeves parallel to one side of the frame structure at intervals along the Z-axis direction, and the inner diameter of the sleeves is larger than the diameter of the T-beam reinforcement, and is used for piercing the T-beam reinforcement. The utility model designs a prefabricated T-beam steel bar tire to standardize and standardize the binding of the T-beam steel bar frame. , The construction period is shortened.

Description

一种预制T梁钢筋胎具A prefabricated T-beam reinforcement mold

技术领域technical field

本实用新型涉及公路工程中的T型梁预制技术,尤其涉及一种预制T梁钢筋胎具。The utility model relates to the T-beam prefabrication technology in highway engineering, in particular to a prefabricated T-beam reinforcement mold.

背景技术Background technique

公路工程中的T型梁钢筋骨架一般在钢筋台座上绑扎,先在钢筋台座上定好相应钢筋的位置,由工人手工进行绑扎,绑扎时钢筋规格、根数、位置、间距要求准确,否则可靠性无法保证,造成受力不理想。批量生产时,人工绑扎效率较低,易出现偏位、歪斜的现象,外观质量较差。The T-beam steel skeleton in highway engineering is generally bound on the steel bar pedestal. First, the position of the corresponding steel bar is determined on the steel bar pedestal, and the worker manually binds it. Unable to guarantee, resulting in unsatisfactory force. In mass production, the efficiency of manual binding is low, and it is prone to deviation and skewing, and the appearance quality is poor.

实用新型内容Utility model content

鉴于现有技术存在的不足,本实用新型提供了一种标准化程度高、有利于批量生产、钢筋位置准确无误、外观质量得到保证的预制T梁钢筋胎具,大大缩短了绑扎时间,缩短了施工周期。In view of the deficiencies in the prior art, the utility model provides a prefabricated T-beam reinforcement mold with a high degree of standardization, which is conducive to mass production, accurate reinforcement position, and guaranteed appearance quality, which greatly shortens the binding time and shortens the construction time. cycle.

为了实现上述的目的,本实用新型采用了如下的技术方案:In order to realize above-mentioned purpose, the utility model adopts following technical scheme:

一种预制T梁钢筋胎具,包括水平的框体结构和多根Z向支撑梁,所述Z向支撑梁垂直于所述框体结构并对所述框体结构进行支撑,所述Z向支撑梁沿Z轴方向间隔设有多根平行于所述框体结构的一条边的套管,所述套管内径大于T梁钢筋的直径,用于穿设T梁钢筋。A prefabricated T-beam reinforcement mold, comprising a horizontal frame structure and a plurality of Z-direction support beams, the Z-direction support beams are perpendicular to the frame structure and support the frame structure, the Z-direction The support beam is provided with a plurality of sleeves parallel to one side of the frame structure at intervals along the Z-axis direction, and the inner diameter of the sleeves is larger than the diameter of the T-beam steel bar for piercing the T-beam steel bar.

其中,多根所述Z向支撑梁沿T梁钢筋的延伸方向呈至少两排设置。Wherein, the multiple Z-direction support beams are arranged in at least two rows along the extension direction of the T-beam reinforcement.

其中,所述框体结构包括平行间隔设置的方钢、圆钢和垂直连接所述方钢和所述圆钢的多根连接条。Wherein, the frame structure includes square steel, round steel arranged in parallel at intervals, and a plurality of connecting bars vertically connecting the square steel and the round steel.

其中,所述预制T梁钢筋胎具还包括连接于相邻两个所述Z向支撑梁的底部的第二连接条,所述第二连接条平行于所述套管。Wherein, the prefabricated T-beam reinforcement form further includes a second connecting bar connected to the bottoms of two adjacent Z-direction support beams, and the second connecting bar is parallel to the casing.

其中,所述Z向支撑梁焊接于钢筋台座上。Wherein, the Z-direction supporting beam is welded on the reinforced pedestal.

本实用新型通过设计一种预制T梁钢筋胎具,使T梁钢筋骨架绑扎规范化,标准化,外观平整、顺直,质量优良,对于多跨桥梁大量生产T梁的情况,能够大大减少劳动力的耗费,施工周期缩短。The utility model designs a prefabricated T-beam reinforcement mold to standardize and standardize the tying of the T-beam reinforcement framework, with a smooth, straight appearance and excellent quality. For the mass production of T-beams for multi-span bridges, the labor cost can be greatly reduced. , The construction period is shortened.

附图说明Description of drawings

图1为本发明实施例的预制T梁钢筋胎具结构示意图。FIG. 1 is a schematic structural view of a prefabricated T-beam reinforcement mold according to an embodiment of the present invention.

图2为本发明实施例的预制T梁钢筋胎具的主视示意图。Fig. 2 is a schematic front view of a prefabricated T-beam reinforcement mold according to an embodiment of the present invention.

图3为本发明实施例的预制T梁钢筋胎具的俯视示意图。Fig. 3 is a schematic top view of a prefabricated T-beam reinforcing bar mold according to an embodiment of the present invention.

图4为图3的A-A向视图。Fig. 4 is a view along the line A-A of Fig. 3 .

具体实施方式detailed description

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

参阅图1,本实用新型的预制T梁钢筋胎具包括水平的框体结构和多根Z向支撑梁3,Z向支撑梁3垂直于框体结构并对框体结构进行支撑,Z向支撑梁3沿Z轴方向间隔设有多根平行于框体结构的一条边的套管4,套管4内径大于T梁钢筋5的直径,用于穿设T梁钢筋5。Referring to Fig. 1, the prefabricated T-beam reinforced tire of the present invention comprises a horizontal frame structure and a plurality of Z-direction support beams 3, and the Z-direction support beams 3 are perpendicular to the frame structure and support the frame structure, and the Z-direction support The beam 3 is provided with a plurality of sleeves 4 parallel to one side of the frame structure at intervals along the Z-axis direction. The inner diameter of the sleeves 4 is larger than the diameter of the T-beam reinforcement 5 for piercing the T-beam reinforcement 5 .

套管4内径大于T梁钢筋5的直径,将套管4的间距和位置确定后,只需将T梁钢筋5插入其中,使得T梁钢筋5收放自如,易控制钢筋骨架合适的间距、位置,精确度高,工人操作更方便、更省力,工作效率高。The inner diameter of the casing 4 is larger than the diameter of the T-beam reinforcement 5. After the spacing and position of the casing 4 are determined, only the T-beam reinforcement 5 needs to be inserted therein, so that the T-beam reinforcement 5 can be retracted freely, and it is easy to control the appropriate spacing of the reinforcement skeleton, Position, high precision, more convenient and labor-saving operation for workers, and high work efficiency.

多根Z向支撑梁3沿T梁钢筋5的延伸方向呈至少两排设置。A plurality of Z-direction support beams 3 are arranged in at least two rows along the extension direction of the T-beam reinforcement 5 .

结合图2和图3,框体结构包括平行间隔设置的方钢1、圆钢2和垂直连接方钢1和圆钢2的多根连接条12。Referring to Fig. 2 and Fig. 3, the frame structure includes square steel 1, round steel 2 arranged at intervals in parallel and a plurality of connecting bars 12 vertically connecting the square steel 1 and the round steel 2.

结合图4所示,相邻的两个Z向支撑梁3的底部还连接有第二连接条6,第二连接条6平行于套管4设置。As shown in FIG. 4 , the bottoms of two adjacent Z-direction support beams 3 are also connected with a second connecting bar 6 , and the second connecting bar 6 is arranged parallel to the casing 4 .

其中,Z向支撑梁3焊接于钢筋台座10上。Wherein, the Z-direction support beam 3 is welded on the reinforced pedestal 10 .

优选2为圆钢,1为镀锌方钢。通过采用镀锌方钢焊接框体结构,横平竖直,保证钢筋骨架绑扎平整、顺直,且结构稳定性好,利用率高。方钢1、圆钢2、连接条12之间均焊接在一起,框体结构与Z向支撑梁3之间也采用焊接工艺连接。Preferably 2 is a round steel, and 1 is a galvanized square steel. By adopting galvanized square steel welded frame structure, horizontal and vertical, it ensures that the steel frame is tied flat and straight, and the structure has good stability and high utilization rate. The square steel 1, the round steel 2, and the connecting bar 12 are all welded together, and the frame structure and the Z-direction support beam 3 are also connected by a welding process.

本实用新型通过设计一种预制T梁钢筋胎具,使T梁钢筋骨架绑扎规范化,标准化程度高、有利于批量生产、钢筋位置准确无误、外观质量得到保证的预制T梁钢筋胎具,大大缩短了绑扎时间,缩短了施工周期。The utility model designs a prefabricated T-beam steel-bar mold to standardize the binding of the T-beam steel-bar skeleton, which has a high degree of standardization, is conducive to mass production, has accurate steel bar positions, and ensures the appearance quality of the prefabricated T-beam steel bar mold, which greatly shortens the The binding time is reduced and the construction period is shortened.

以上所述仅是本申请的具体实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本申请原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本申请的保护范围。The above description is only the specific implementation of the present application. It should be pointed out that for those of ordinary skill in the art, without departing from the principle of the present application, some improvements and modifications can also be made. It should be regarded as the protection scope of this application.

Claims (5)

1.一种预制T梁钢筋胎具,其特征在于,包括水平的框体结构和多根Z向支撑梁(3),所述Z向支撑梁(3)垂直于所述框体结构并对所述框体结构进行支撑,所述Z向支撑梁(3)沿Z轴方向间隔设有多根平行于所述框体结构的一条边的套管(4),所述套管(4)内径大于T梁钢筋(5)的直径,用于穿设T梁钢筋(5)。1. a kind of prefabricated T-beam reinforcing bar mold, is characterized in that, comprises horizontal frame body structure and a plurality of Z-direction support beams (3), and described Z-direction support beam (3) is perpendicular to described frame body structure and to The frame structure is supported, and the Z-direction support beam (3) is provided with a plurality of sleeves (4) parallel to one side of the frame structure at intervals along the Z-axis direction, and the sleeves (4) The inner diameter is greater than the diameter of the T-beam reinforcing bar (5), and is used for piercing the T-beam reinforcing bar (5). 2.根据权利要求1所述的预制T梁钢筋胎具,其特征在于,多根所述Z向支撑梁(3)沿T梁钢筋(5)的延伸方向呈至少两排设置。2. The prefabricated T-beam reinforcing bar mold according to claim 1, characterized in that, the plurality of Z-direction support beams (3) are arranged in at least two rows along the extending direction of the T-beam reinforcing bar (5). 3.根据权利要求1所述的预制T梁钢筋胎具,其特征在于,所述框体结构包括平行间隔设置的方钢(1)、圆钢(2)和垂直连接所述方钢(1)和所述圆钢(2)的多根第一连接条(12)。3. prefabricated T-beam reinforced tire form according to claim 1, is characterized in that, described frame structure comprises the square steel (1) that arranges at intervals in parallel, round steel (2) and vertical connection described square steel (1) ) and multiple first connecting bars (12) of the round steel (2). 4.根据权利要求2所述的预制T梁钢筋胎具,其特征在于,还包括连接于相邻两个所述Z向支撑梁(3)的底部的第二连接条(6),所述第二连接条(6)平行于所述套管(4)。4. The prefabricated T-beam reinforcing bar mold according to claim 2, is characterized in that, also comprises the second connecting bar (6) that is connected to the bottom of two adjacent described Z-direction support beams (3), described The second connecting strip (6) is parallel to the sleeve (4). 5.根据权利要求1-4任一所述的预制T梁钢筋胎具,其特征在于,所述Z向支撑梁(3)焊接于钢筋台座(10)上。5. The prefabricated T-beam steel reinforcement mold according to any one of claims 1-4, characterized in that, the Z-direction support beam (3) is welded on the steel bar pedestal (10).
CN201520594920.0U 2015-08-06 2015-08-06 Prefabricated T girder iron muscle mould Expired - Fee Related CN205058277U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201520594920.0U CN205058277U (en) 2015-08-06 2015-08-06 Prefabricated T girder iron muscle mould
PCT/CN2016/089698 WO2017020685A1 (en) 2015-08-06 2016-07-11 Prefabricated t beam steel die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520594920.0U CN205058277U (en) 2015-08-06 2015-08-06 Prefabricated T girder iron muscle mould

Publications (1)

Publication Number Publication Date
CN205058277U true CN205058277U (en) 2016-03-02

Family

ID=55384876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520594920.0U Expired - Fee Related CN205058277U (en) 2015-08-06 2015-08-06 Prefabricated T girder iron muscle mould

Country Status (2)

Country Link
CN (1) CN205058277U (en)
WO (1) WO2017020685A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017020685A1 (en) * 2015-08-06 2017-02-09 严利容 Prefabricated t beam steel die

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108453887A (en) * 2018-03-30 2018-08-28 江苏省交通工程集团有限公司 T beam steel cages integrally manufacture mould
CN108748650A (en) * 2018-05-30 2018-11-06 浙江交工集团股份有限公司 A kind of pedestal structure for the installation of preform lid beam steel
CN108560428B (en) * 2018-06-29 2024-03-15 中交二公局第四工程有限公司 Assembled steel bar binding jig frame group suitable for prefabricated T beams of different sizes
CN109109155A (en) * 2018-10-22 2019-01-01 湖南路桥建设集团有限责任公司 A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled
CN110681806A (en) * 2019-10-09 2020-01-14 上海建工集团股份有限公司 Device and method for manufacturing beam slab prefabricated steel bar
CN110682413A (en) * 2019-10-28 2020-01-14 中交路桥建设有限公司 Pedestal for prefabricating T-shaped beam
CN112171881B (en) * 2020-10-30 2025-05-06 中交路桥建设有限公司 Prefabricated T-beam to prefabricated box beam pedestal and its modification method
CN112775361B (en) * 2020-12-23 2023-12-15 湾区(广东)建筑装配科技有限公司 Shaping die carrier for box girder reinforcement cage
CN114770706B (en) * 2022-04-27 2024-01-26 中交一公局集团有限公司 A kind of light T-beam prefabricated equipment and prefabricated installation and construction method
CN115431399A (en) * 2022-09-17 2022-12-06 浙江永峰模具制造有限公司 A prefabricated tire frame for T-beam reinforcement frame

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6871839B2 (en) * 2001-11-27 2005-03-29 Hamilton Form Co., Inc. Strand feeder device
CN202148694U (en) * 2011-05-18 2012-02-22 新疆生产建设兵团第五建筑安装工程公司 Prefabricated T-shaped beam steel bar colligation positioning device
CN202187567U (en) * 2011-07-25 2012-04-11 中建七局第三建筑有限公司 Installing and positioning frame for T-shaped beam rib reinforcement
CN203403370U (en) * 2013-08-09 2014-01-22 中铁七局集团郑州工程有限公司 Overloading T-shaped rail beam bottom web rebar binding die
CN204076498U (en) * 2014-07-28 2015-01-07 中国建筑第六工程局有限公司 A kind of Precast T-Beam beam rib steel-bar binding location moulding bed
CN205058277U (en) * 2015-08-06 2016-03-02 中国水利水电第四工程局有限公司 Prefabricated T girder iron muscle mould

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017020685A1 (en) * 2015-08-06 2017-02-09 严利容 Prefabricated t beam steel die

Also Published As

Publication number Publication date
WO2017020685A1 (en) 2017-02-09

Similar Documents

Publication Publication Date Title
CN205058277U (en) Prefabricated T girder iron muscle mould
CN206493422U (en) A kind of prefabricated case beam reinforcing steel bar-binding bench frame
CN204876586U (en) T roof beam reinforcement fixes a position rack
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN204877493U (en) Soft rock tunnel supporting construction
CN202227590U (en) Column rib positioner for reinforced concrete column
CN204040515U (en) Cat ladder
CN205735475U (en) Web steel bar binding clamping fixture at the bottom of a kind of prefabricated case beam
CN202527885U (en) Pedestal for manufacturing framework of subway pipe piece
CN204817843U (en) Prefabricated utility tunnel's steel reinforcement cage processingequipment
CN206487155U (en) Pier stud reinforcing bar positioning clamping fixture method Integral processing device
CN204225098U (en) Overweight reinforcing cage
CN204418535U (en) Strengthening beam steel cushion block
CN204149320U (en) The producing device of steel bar framework of box beam
CN206383282U (en) Precast T-Beam beam rib reinforcement skeleton tire film frame
CN105364291A (en) Bridge reinforcement cage ground mold roll welding frame and application thereof
CN207210968U (en) Mould for binding steel reinforcement framework of box girder top plate
CN205200789U (en) A kind of bridge steel cage ground form roll welding frame
CN206174482U (en) Outsourcing concrete ring beam reinforcing bar integral erection device of no bracket steel -pipe column
CN204212069U (en) Hanging basket for building construction
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN202055182U (en) Positioner for circular arc-shaped steel bar of pier
CN202192685U (en) Pre-binding clamping fixture for U-shaped beam reinforcement cages
CN202152540U (en) Shear wall formwork support structure based on prefabricated block of guide wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302