CN205874988U - Case back board prestressing tendons positioner - Google Patents

Case back board prestressing tendons positioner Download PDF

Info

Publication number
CN205874988U
CN205874988U CN201620858399.1U CN201620858399U CN205874988U CN 205874988 U CN205874988 U CN 205874988U CN 201620858399 U CN201620858399 U CN 201620858399U CN 205874988 U CN205874988 U CN 205874988U
Authority
CN
China
Prior art keywords
prestressing tendons
positioning
reinforcing steel
presstressed reinforcing
transverse prestress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620858399.1U
Other languages
Chinese (zh)
Inventor
李科兴
王安东
宁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Railway Institute
Original Assignee
Shaanxi Railway Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Railway Institute filed Critical Shaanxi Railway Institute
Priority to CN201620858399.1U priority Critical patent/CN205874988U/en
Application granted granted Critical
Publication of CN205874988U publication Critical patent/CN205874988U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a case back board prestressing tendons positioner, form including transverse prestress muscle location frame, prestressing tendons pore width regulation ware, vertical prestressing tendons auxiliary positioning hole, prestressing tendons variable -spacing adjustment ware, transverse prestress muscle posting was put up the pin and was linked to each other with case beam mold board, and transverse prestress muscle location frame was put up prestressing tendons pore width regulation ware by two postings and is linked to each other and constitute, and two adjacent transverse prestress muscle postings were put up prestressing tendons variable -spacing adjustment ware and are linked to each other, be equipped with a plurality of vertical prestressing tendons auxiliary positioning hole on the frame of transverse prestress muscle location. The utility model discloses simple structure, convenient to use, economic cost low, application scope is wide, can pinpoint roof prestressing steel's position, avoids influencing web reforcement steel bar's position, reduces individual intensity of labour, improves production efficiency, the reduction of erection time.

Description

A kind of box beam top board prestressed rib positioning device
Technical field
This utility model relates to field of bridge construction, is specifically related to a kind of box beam top board prestressed rib positioning device.
Background technology
The placement of present stage transversely prestressed bars is after web reinforcement, is measured between presstressed reinforcing steel by template sideline Away from, transversely prestressed bars is positioned on template through web muscle, wears muscle relatively elaborate and can affect between web reinforcement Away from.
Utility model content
For solving the problems referred to above, this utility model provides a kind of box beam top board prestressed rib positioning device, is installed on case Top surface of the beam, auxiliary positioning web reinforcement, can quickly determine box beam top board presstressed reinforcing steel position, it is to avoid unnecessary web reinforcement Move or cut, it is ensured that main steel bar stress position is accurate, it is ensured that the overall stress of bridge is safe and stable.
For achieving the above object, the technical scheme that this utility model is taked is:
A kind of box beam top board prestressed rib positioning device, including transversely prestressed bars positioning framework, presstressed reinforcing steel duct width Degree actuator, vertical prestressing bar auxiliary positioning hole, presstressed reinforcing steel space regulator composition, transversely prestressed bars positioning framework leads to Crossing pin to be connected with box girder formwork, transversely prestressed bars positioning framework is adjusted by presstressed reinforcing steel cell wide by two positioning frameworks Joint device be connected constitute, adjacent two transversely prestressed bars positioning frameworks by presstressed reinforcing steel space regulator be connected, described laterally Presstressed reinforcing steel positioning framework is provided with some vertical prestressing bar auxiliary positioning holes.
As preferably, described presstressed reinforcing steel cell wide actuator is flower basket bolt;
As preferably, described presstressed reinforcing steel space regulator is flower basket bolt;
As preferably, described vertical prestressing bar auxiliary positioning hole is 3-5cm seamless steel pipe.
This utility model has the advantages that
Simple in construction, easy to use, Financial cost is low, applied widely, can be accurately positioned top board deformed bar Position, it is to avoid affect the position of web reinforcement, reduces individual labor intensity, improves production efficiency, reduction of erection time.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model embodiment.
Detailed description of the invention
In order to make the purpose of this utility model and advantage clearer, below in conjunction with embodiment, this utility model is entered Row further describes.Should be appreciated that specific embodiment described herein, and need not only in order to explain this utility model In limiting this utility model.
As it is shown in figure 1, this utility model embodiment provides a kind of box beam top board deformed bar quick positioning mechanism, its It is characterised by, determines including transversely prestressed bars positioning framework 1, presstressed reinforcing steel cell wide actuator 4, vertical prestressing bar auxiliary Hole 5, position, presstressed reinforcing steel space regulator 3 form, and transversely prestressed bars positioning framework 1 is connected with box girder formwork by pin 2, horizontal It is made up of by presstressed reinforcing steel cell wide actuator 4 is connected two positioning frameworks to presstressed reinforcing steel positioning framework 1, adjacent two Transversely prestressed bars positioning framework 1 is connected, on described transversely prestressed bars positioning framework 1 by presstressed reinforcing steel space regulator 3 It is provided with some vertical prestressing bar auxiliary positioning holes 5.
Described presstressed reinforcing steel cell wide actuator 4 is flower basket bolt;
Described presstressed reinforcing steel space regulator 3 is flower basket bolt;
Described vertical prestressing bar auxiliary positioning hole 5 is 3-5cm seamless steel pipe.
In the present embodiment, described transverse prestressed reinforcing steel bar fixed frame 1 and box girder formwork use pin 2 to fix, and conveniently tear open Unload, before laying, correctly to adjust presstressed reinforcing steel spacing 3 and cell wide actuator 4 according to drawing spacing.Vertical muscle location Hole 5 can be actual from Row sum-equal matrix according to engineering, and simply reinforcing bar is at vertical auxiliary locator.
When being originally embodied as using, before placing web reinforcement, first fixing this device at box beam end face, advance reservation is good Transversely prestressed bars and the position on vertical prestressing bar top, then installation drawing requires to place web reinforcement, is laying web To guarantee during reinforcing bar that this device is fixed, occurs without skew.Treat that web reinforcement is placed to terminate, in the duct reserved Top board deformed bar pipeline is conveniently placed in position, it is to avoid the secondary of web reinforcement moves or cuts, and improves construction effect Rate.
Originally being embodied as simple in construction, easy to use, Financial cost is low, applied widely, can be accurately positioned top board pre- The position of stress reinforcing bar, it is to avoid affect the position of web reinforcement, reduces individual labor intensity, improves production efficiency, reduction of erection time. The above is only preferred implementation of the present utility model, it is noted that come for those skilled in the art Saying, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection domain of the present utility model.

Claims (4)

1. a box beam top board prestressed rib positioning device, it is characterised in that include transversely prestressed bars positioning framework, prestressing force Muscle cell wide actuator, vertical prestressing bar auxiliary positioning hole, presstressed reinforcing steel space regulator composition, transversely prestressed bars is fixed Position framework is connected with box girder formwork by pin, and transversely prestressed bars positioning framework is passed through presstressed reinforcing steel hole by two positioning frameworks Road width adjustor is connected and constitutes, and adjacent two transversely prestressed bars positioning frameworks are connected by presstressed reinforcing steel space regulator, Described transversely prestressed bars positioning framework is provided with some vertical prestressing bar auxiliary positioning holes.
2. a kind of box beam top board prestressed rib positioning device as claimed in claim 1, it is characterised in that described presstressed reinforcing steel hole Road width adjustor is flower basket bolt.
3. a kind of box beam top board prestressed rib positioning device as claimed in claim 1, it is characterised in that between described presstressed reinforcing steel It is flower basket bolt away from actuator.
4. a kind of box beam top board prestressed rib positioning device as claimed in claim 1, it is characterised in that described vertical prestressing Muscle auxiliary positioning hole is 3-5cm seamless steel pipe.
CN201620858399.1U 2016-08-10 2016-08-10 Case back board prestressing tendons positioner Expired - Fee Related CN205874988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620858399.1U CN205874988U (en) 2016-08-10 2016-08-10 Case back board prestressing tendons positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620858399.1U CN205874988U (en) 2016-08-10 2016-08-10 Case back board prestressing tendons positioner

Publications (1)

Publication Number Publication Date
CN205874988U true CN205874988U (en) 2017-01-11

Family

ID=57704037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620858399.1U Expired - Fee Related CN205874988U (en) 2016-08-10 2016-08-10 Case back board prestressing tendons positioner

Country Status (1)

Country Link
CN (1) CN205874988U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235271A (en) * 2018-10-15 2019-01-18 中铁宝桥(扬州)有限公司 Combine the vertical bar positioning tool, positioning deck and working method of bridge tower steel shell segment
CN114808688A (en) * 2022-05-09 2022-07-29 中铁大桥局第九工程有限公司 Steel box composite beam prefabricated formwork guardrail steel bar positioning frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235271A (en) * 2018-10-15 2019-01-18 中铁宝桥(扬州)有限公司 Combine the vertical bar positioning tool, positioning deck and working method of bridge tower steel shell segment
CN109235271B (en) * 2018-10-15 2023-10-27 中铁宝桥(扬州)有限公司 Vertical rib positioning tool, positioning clamping seat and working method of combined bridge tower steel shell section
CN114808688A (en) * 2022-05-09 2022-07-29 中铁大桥局第九工程有限公司 Steel box composite beam prefabricated formwork guardrail steel bar positioning frame

Similar Documents

Publication Publication Date Title
CN205058277U (en) Prefabricated T girder iron muscle mould
CN105064196B (en) The fish belly I-shaped combination of prestressing force steel reinforced concrete simply supported girder bridge and its construction method of precast assembly
CN104294767A (en) Lengthening hanging basket used for cantilever beam cast-in-place construction and construction method of lengthening hanging basket
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN108818919A (en) Precast T-Beam reinforcing bar is bound in advance and the construction method of integral installation
CN204081079U (en) A kind of structure of open pore steel plate shear force
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN205874988U (en) Case back board prestressing tendons positioner
CN104328747A (en) Reinforcement method for single beam bearing of bridge and construction method thereof
CN103572707A (en) Box girder steel outer template and construction method thereof
CN204139075U (en) A kind of semi girder cast-in-place construction spreading Hanging Basket
CN202298438U (en) Bidirectional pre-bent multi-beam type structure of small steel-concrete box girder bridge
CN206636168U (en) A kind of overhanging scaffold system
CN109235235A (en) A kind of steel reinforced concrete combined bridge bridge floor continuously locates the longitudinally connected method of girder
CN211164594U (en) Jig frame for binding steel bar framework of T-shaped beam
CN205476083U (en) Concrete beam's cover to reinforcement structure
CN208250928U (en) A kind of steel and wood composite template
CN203571219U (en) Novel cable tray for bridge
CN209584870U (en) Pedestal structure for the prefabricated a variety of line style free cantilever erections segment of long line method
CN208792806U (en) A kind of floor of steel structure transformation node
CN203702172U (en) Arch-shaped lining roof steel formwork supporting system
CN106193456A (en) A kind of high-layer shear force wall reinforcing steel bar Exact Location Method and truss strength fixing device
CN105625711A (en) Construction-purpose roof template
CN207419388U (en) A kind of stiff skeleton structure of arched aqueduct box arch ring closure section
CN206887651U (en) A kind of support frame

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

Termination date: 20170810

CF01 Termination of patent right due to non-payment of annual fee