CN208250928U - A kind of steel and wood composite template - Google Patents

A kind of steel and wood composite template Download PDF

Info

Publication number
CN208250928U
CN208250928U CN201820838561.2U CN201820838561U CN208250928U CN 208250928 U CN208250928 U CN 208250928U CN 201820838561 U CN201820838561 U CN 201820838561U CN 208250928 U CN208250928 U CN 208250928U
Authority
CN
China
Prior art keywords
steel
formwork
wooden
pair
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820838561.2U
Other languages
Chinese (zh)
Inventor
刘强
何敏
杨亮
钟明松
伍任雄
古思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing University
Priority to CN201820838561.2U priority Critical patent/CN208250928U/en
Application granted granted Critical
Publication of CN208250928U publication Critical patent/CN208250928U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型提供了一种钢木组合模板,包括木模板和钢模板,木模板包括木模和第一固定装置,钢模板包括钢模和第二固定装置,第一固定装置包括木模设有卡槽,钢模设有能卡入卡槽的卡条,第一固定装置包括支撑钢条、支撑木方和钢板,一对平行的支撑钢条上下端固定一对支撑木方,一对平行的支撑钢条中间固定一对钢板,钢板上设有通孔,结构件内预埋PVC管,穿过PVC管的对拉螺杆两端分别再穿过通孔固定在钢板上。本实用新型钢模板和木模板分别通过第一固定装置和第二固定装置固定,通过对拉螺杆将相对设置的一对木模和钢模进行两侧的连接;湿接缝模板体系采用钢木组合模板,转角处采用钢模板,其余直线部位采用木模板。

The utility model provides a steel-wood combination formwork, which comprises a wooden formwork and a steel formwork, the wooden formwork comprises a wooden formwork and a first fixing device, the steel formwork comprises a steel formwork and a second fixing device, the first fixing device comprises a wooden formwork and a Card slot, the steel mold is provided with a card bar that can be snapped into the card slot, the first fixing device includes a support steel bar, a support wooden square and a steel plate, a pair of parallel support steel bars upper and lower ends fix a pair of support wooden squares, a pair of parallel support A pair of steel plates are fixed in the middle of the supporting steel bars, and there are through holes on the steel plates, PVC pipes are embedded in the structural parts, and the two ends of the pull screws passing through the PVC pipes are respectively fixed on the steel plates through the through holes. The steel formwork and wooden formwork of the utility model are respectively fixed by the first fixing device and the second fixing device, and a pair of wooden molds and steel molds which are oppositely arranged are connected on both sides through the opposite pull screw; the wet joint formwork system adopts steel wood Combined formwork, steel formwork is used at the corner, and wood formwork is used for the rest of the straight line.

Description

一种钢木组合模板A steel-wood combination formwork

技术领域technical field

本实用新型涉及建筑施工领域,具体涉及一种种钢木组合模板。The utility model relates to the field of building construction, in particular to a steel-wood composite template.

背景技术Background technique

随着我国桥梁建设的发展,预制混凝土桥梁以其施工效率高、质量好等优点得到日益广泛的应用,其中预制节段的现场拼装是预制混凝土桥梁施工的重要环节,对施工工期、施工质量和安全具有重大影响;然而现有湿接法存在湿接缝模板体系较大且吊装困难、预应力张拉质量难以保证、施工工序复杂且节段梁对接难度大等问题。With the development of bridge construction in our country, prefabricated concrete bridges have been widely used due to their advantages of high construction efficiency and good quality. Among them, the on-site assembly of prefabricated segments is an important link in the construction of precast concrete bridges. Safety has a major impact; however, the existing wet joint method has problems such as large wet joint formwork system and difficult hoisting, difficult to guarantee the quality of prestressed tension, complex construction process and difficult butt joint of segmental beams.

实用新型内容Utility model content

本实用新型要解决的问题是针对现有技术中所存在的上述不足而提供一种钢木组合模板提高了模板工程的安装拆卸速度。The problem to be solved by the utility model is to provide a steel-wood composite formwork to improve the installation and disassembly speed of the formwork project in view of the above-mentioned shortcomings in the prior art.

为实现上述目的,本实用新型采用了如下的技术方案:一种钢木组合模板,包括木模板和钢模板,所述木模板包括木模和第一固定装置,所述钢模板包括钢模和第二固定装置,所述第一固定装置和所述第二固定装置结构相同,所述第一固定装置包括木模设有卡槽,所述钢模设有能卡入所述卡槽的卡条,所述第一固定装置包括支撑钢条、支撑木方和钢板,一对平行的所述支撑钢条上下端固定一对所述支撑木方,一对平行的所述支撑钢条中间固定一对所述钢板,所述钢板上设有通孔,一对所述木模和一对所述钢模之间均浇筑混凝土形成结构件,所述结构件内预埋PVC管,穿过所述PVC管的对拉螺杆两端分别再穿过所述通孔固定在所述钢板上。In order to achieve the above object, the utility model adopts the following technical scheme: a steel-wood combination formwork, comprising a wood formwork and a steel formwork, the wood formwork comprising a wood formwork and a first fixing device, and the steel formwork comprising a steel formwork and a steel formwork The second fixing device, the first fixing device and the second fixing device have the same structure, the first fixing device includes a wooden mold with a card slot, and the steel mold is provided with a card that can be snapped into the card slot The first fixing device includes a supporting steel bar, a supporting wooden square and a steel plate, a pair of parallel supporting steel bars are fixed at the upper and lower ends of a pair of supporting wooden squares, and a pair of parallel supporting steel bars are fixed in the middle A pair of said steel plates, said steel plates are provided with through holes, concrete is poured between a pair of said wooden molds and a pair of said steel molds to form structural parts, PVC pipes are pre-embedded in said structural parts, and pass through the said structural parts The two ends of the pull screw rods of the PVC pipe respectively pass through the through holes and are fixed on the steel plates.

进一步,所述一种钢木组合模板还包括T形件和卡件,所述T形件连接螺栓,所述木模上设有能连通所述卡槽的穿孔,所述T形件通过所述螺栓穿过所述穿孔与螺母配合固定在所述木模上使所述T形件表面与所述木模内侧面齐平,所述钢模板设有缺口,所述缺口与所述T形件之间形成凸形槽,所述凸形槽与所述卡件卡接使所述卡件两端分别与所述木模和所述钢模齐平,所述卡件上端连接有具体凸起的连接件,所述木模和所述钢模上分别设有与所述凸起相适配的第一插孔和第二插孔。Further, the steel-wood composite formwork also includes a T-shaped piece and a clip, the T-shaped piece is connected with a bolt, the wooden formwork is provided with a perforation that can communicate with the clamping groove, and the T-shaped piece passes through the Said bolt passes through said perforation and is fixed on said wooden formwork by cooperating with nut so that the surface of said T-shaped piece is flush with the inner surface of said wooden formwork. A convex groove is formed between the pieces, and the convex groove is clamped with the clip so that the two ends of the clip are respectively flush with the wooden mold and the steel mold, and the upper end of the clip is connected with a specific convex The wooden formwork and the steel formwork are respectively provided with a first socket and a second socket adapted to the protrusion.

相比于现有技术,本实用新型具有如下有益效果:与传统湿接缝处采用大模板不同,本实用新型将整个模板分为若干小块,每个小块包括钢模板和木模板两种,转角处采用钢模板,平直段采用木模板,所述钢模板和木模板分别通过第一固定装置和第二固定装置固定,通过对拉螺杆将相对设置的一对所述木模和钢模进行两侧的连接,提高了模板工程的安装拆卸速度;湿接缝模板体系采用钢木组合模板,转角处采用钢模板,其余直线部位采用木模板,可循环使用且质量轻,加快了安装及拆卸速度。Compared with the prior art, the utility model has the following beneficial effects: different from the traditional large formwork used at wet joints, the utility model divides the entire formwork into several small blocks, and each small block includes two types of steel formwork and wooden formwork. , a steel formwork is used at the corner, and a wooden formwork is used for the straight section. The steel formwork and the wooden formwork are fixed by the first fixing device and the second fixing device respectively, and a pair of the wooden formwork and the steel formwork that are oppositely arranged are set by the opposite pull screw. The formwork is connected on both sides, which improves the installation and disassembly speed of the formwork project; the wet joint formwork system adopts steel-wood composite formwork, steel formwork is used at the corners, and wood formwork is used for the rest of the straight line, which can be recycled and light in weight, which speeds up the installation and removal speed.

本实用新型的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本实用新型的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the utility model will partly be embodied through the following description, and partly will be understood by those skilled in the art through the research and practice of the utility model.

附图说明Description of drawings

图1为本实用新型一种钢木组合模板结构示意图。Fig. 1 is a structural schematic diagram of a steel-wood composite formwork of the present invention.

图2为本实用新型图1的A处局部放大的侧视图。Fig. 2 is a partially enlarged side view of A in Fig. 1 of the present utility model.

图3为本实用新型钢模与木木模的连接示意图。Fig. 3 is the connection schematic diagram of the utility model steel formwork and wooden wooden formwork.

具体实施方式Detailed ways

为了使本实用新型实现的技术手段、创作特征、达成目的与作用更加清楚及易于了解,下面结合附图和具体实施方式对本实用新型作进一步阐述:In order to make the technical means, creative features, purpose and effect of the utility model realized clearer and easier to understand, the utility model will be further elaborated below in conjunction with the accompanying drawings and specific implementation methods:

本实用新型提到的上下左右为附图3所示的上下左右,其中所述木模4与所述钢模5上方为浇筑混凝土的地方即结构件成型的地方并位于内侧和里侧。The up, down, left, and right mentioned in the utility model are up, down, left, and right shown in accompanying drawing 3, wherein the place above the wooden formwork 4 and the steel formwork 5 is the place where the concrete is poured, that is, the place where the structural parts are formed and is located on the inner side and the inner side.

本实用新型提出了一种钢木组合模板,包括木模板1和钢模板2,所述木模板1包括木模4和第一固定装置3,所述钢模板2包括钢模5和第二固定装置,所述第一固定装置3和所述第二固定装置结构相同,所述第一固定装置3包括木模4设有卡槽6,所述钢模5设有能卡入所述卡槽6的卡条7,所述第一固定装置3包括支撑钢条8、支撑木方9和钢板10,一对平行的所述支撑钢条8上下端固定一对所述支撑木方9,一对平行的所述支撑钢条8中间固定一对所述钢板10,所述钢板10上设有通孔11,一对所述木模4和一对所述钢模5之间均浇筑混凝土形成结构件,所述结构件内预埋PVC管12,穿过所述PVC管的对拉螺杆两端分别再穿过所述通孔11固定在所述钢板10上。The utility model proposes a steel-wood combination formwork, including a wooden formwork 1 and a steel formwork 2, the wooden formwork 1 includes a wooden formwork 4 and a first fixing device 3, and the steel formwork 2 includes a steel formwork 5 and a second fixing device device, the first fixing device 3 has the same structure as the second fixing device, the first fixing device 3 includes a wooden mold 4 with a slot 6, and the steel mold 5 is provided with a slot that can be snapped into the slot 6, the first fixing device 3 includes a supporting steel bar 8, a supporting wooden square 9 and a steel plate 10, and a pair of parallel supporting steel bars 8 are fixed to a pair of supporting wooden squares 9 at the upper and lower ends. A pair of steel plates 10 are fixed in the middle of the parallel supporting steel bars 8, and through holes 11 are provided on the steel plates 10. Concrete is poured between a pair of wooden molds 4 and a pair of steel molds 5 to form Structural parts, PVC pipes 12 are pre-embedded in the structural parts, and the two ends of the pull screw passing through the PVC pipes respectively pass through the through holes 11 and are fixed on the steel plate 10 .

作为具体实施例,为了方便连接所述木模4和钢模5,所述一种钢木组合模板还包括T形件13和卡件14,所述T形件13连接螺栓16,所述木模4上设有能连通所述卡槽6的穿孔15,所述T形件13通过所述螺栓16穿过所述穿孔15与螺母配合固定在所述木模4上使所述T形件13表面与所述木模4内侧面齐平,所述T形件13包括水平板和垂直连接在所述水平板中间的竖板,所述竖板垂直连接在所述水平板上形成T形,所述螺栓16垂直连接在所述竖板下方,当所述螺栓16穿过所述穿孔15被螺母锁紧后所述水平板与所述木模4内侧表面齐平,所述螺母位于所述卡槽6内,所述钢模板2设有缺口,所述缺口与所述T形件13之间形成凸形槽,所述凸形槽与所述卡件14卡接使所述卡件14两端分别与所述木模4和所述钢模5齐平,所述卡件14上端连接有具体凸起的连接件,所述木模4和所述钢模5上分别设有与所述凸起相适配的第一插孔17和第二插孔18,所述卡条7卡入所述卡槽6后距离所述卡槽6最左侧还有一定的距离使当浇筑混凝土使所述木模4与所述钢模5拉伸时具有一定的缓冲作用避免损坏所述木模4,通过在所述木模4与所述钢模5之间设置所述卡件14从而保护所述木模4,因为混凝土浇筑如果遇到膨胀挤压所述木模4与所述钢模5的连接处时除了利用所述卡槽6与所述卡条7之间的缝隙缓冲外还可以通过所述卡件14,所述卡件14采用木制成,所述卡件14两侧设有第一台阶,所述T形件13两侧设有反向的第二台阶20,右侧的所述第二台阶20与所述第一台阶相适配,所述木模4右侧设有第三台阶19与所述第二台阶20相适配。As a specific embodiment, in order to facilitate the connection of the wooden mold 4 and the steel mold 5, the steel-wood composite template also includes a T-shaped piece 13 and a clip 14, the T-shaped piece 13 is connected with a bolt 16, and the wooden mold The mold 4 is provided with a perforation 15 that can communicate with the draw-in groove 6, and the T-shaped piece 13 is fixed on the wooden mold 4 through the bolt 16 through the perforated hole 15 and the nut to make the T-shaped piece The surface of 13 is flush with the inner surface of the wooden formwork 4, and the T-shaped piece 13 includes a horizontal plate and a vertical plate vertically connected in the middle of the horizontal plate, and the vertical plate is vertically connected on the horizontal plate to form a T shape , the bolt 16 is vertically connected below the vertical plate, and when the bolt 16 passes through the perforation 15 and is locked by a nut, the horizontal plate is flush with the inner surface of the wooden formwork 4, and the nut is located at the In the clamping groove 6, the steel template 2 is provided with a gap, and a convex groove is formed between the gap and the T-shaped piece 13, and the convex groove and the clamping piece 14 are clamped to make the clamping piece The two ends of 14 are flush with the wooden mold 4 and the steel mold 5 respectively, and the upper end of the clip 14 is connected with a concrete raised connector, and the wooden mold 4 and the steel mold 5 are respectively provided with The first socket 17 and the second socket 18 that the protrusion is compatible with, the clip strip 7 is snapped into the clip slot 6 and there is still a certain distance from the leftmost side of the clip slot 6 so that when pouring The concrete has a certain cushioning effect when the wooden formwork 4 and the steel formwork 5 are stretched to avoid damage to the wooden formwork 4, by setting the clip 14 between the wooden formwork 4 and the steel formwork 5 Thereby protect described wooden formwork 4, because if pouring concrete encounters expansion and extrusion when the joint of described wooden formwork 4 and described steel formwork 5, except utilizing the gap buffering between described draw-in groove 6 and described clamping bar 7 It is also possible to pass through the clamp 14, the clamp 14 is made of wood, the first steps are provided on both sides of the clamp 14, and the opposite second steps 20 are provided on both sides of the T-shaped member 13. , the second step 20 on the right is compatible with the first step, and the wooden formwork 4 is provided with a third step 19 on the right side to be compatible with the second step 20 .

最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the utility model can be Modifications or equivalent replacements of the technical solutions without departing from the purpose and scope of the technical solutions of the utility model shall be covered by the claims of the utility model.

Claims (2)

1. a kind of steel and wood composite template, it is characterised in that: including plank sheathing (1) and steel form (2), the plank sheathing (1) includes Wooden model (4) and first fixed device (3), the steel form (2) include punching block (5) and the second fixed device, and described first is fixed Device (3) is identical with second fixture structure, and described first fixed device (3) include that wooden model (4) are equipped with card slot (6), The punching block (5), which is equipped with, can be caught in the strips (7) of the card slot (6), described first fixed device (3) include support steel bar (8), Flitch (9) and steel plate (10) are supported, a pair of parallel support steel bar (8) upper and lower side fixes a pair of support flitch (9), Fixed a pair of steel plate (10), the steel plate (10) are equipped with through-hole (11) among a pair of parallel support steel bar (8), Equal casting concrete formation structural member between a pair of wooden model (4) and a pair of punching block (5), it is pre-buried in the structural member Pvc pipe (12) is then passed through the through-hole (11) across the Screw arbor with nut at both-ends both ends of the pvc pipe respectively and is fixed on the steel plate (10) On.
2. a kind of steel and wood composite template according to claim 1, it is characterised in that: a kind of steel and wood composite template further includes T-piece (13) and fastener (14), the T-piece (13) connect bolt (16), and the wooden model (4), which is equipped with, can be connected to the card slot (6) perforation (15), the T-piece (13) passes through the perforation (15) by the bolt (16) and nut cooperation is fixed on institute Stating flushes the T-piece (13) surface with the wooden model (4) medial surface, and the steel form (2) is equipped with notch, Convex slot is formed between the notch and the T-piece (13), the convex slot and the fastener (14) clamping make the fastener (14) both ends are flushed with the wooden model (4) and the punching block (5) respectively, and fastener (14) upper end is connected with the company of specific protrusion Compatible first jack (17) and second with the protrusion is respectively equipped on fitting, the wooden model (4) and the punching block (5) to insert Hole (18).
CN201820838561.2U 2018-05-31 2018-05-31 A kind of steel and wood composite template Expired - Fee Related CN208250928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820838561.2U CN208250928U (en) 2018-05-31 2018-05-31 A kind of steel and wood composite template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820838561.2U CN208250928U (en) 2018-05-31 2018-05-31 A kind of steel and wood composite template

Publications (1)

Publication Number Publication Date
CN208250928U true CN208250928U (en) 2018-12-18

Family

ID=64652003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820838561.2U Expired - Fee Related CN208250928U (en) 2018-05-31 2018-05-31 A kind of steel and wood composite template

Country Status (1)

Country Link
CN (1) CN208250928U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417218A (en) * 2021-07-29 2021-09-21 中建八局第四建设有限公司 Prestressed concrete half-inverted T-shaped invisible bent cap steel-wood combined template and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417218A (en) * 2021-07-29 2021-09-21 中建八局第四建设有限公司 Prestressed concrete half-inverted T-shaped invisible bent cap steel-wood combined template and construction method

Similar Documents

Publication Publication Date Title
CN105275203B (en) Extensible canopy and the adjustable die system and the construction method of the mould bases using its making
CN110748153A (en) A new type of prefabricated frame structure cast-in-situ plate belt lifting device
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN208250928U (en) A kind of steel and wood composite template
CN209760787U (en) A post-cast belt support structure that can be used in turnaround
CN209703778U (en) A kind of assembled disassembly-free thermal-insulation form board with hoisting structure
CN204676608U (en) A kind of template-setup structure reserving ater-casting for basement wall
CN206625566U (en) Arc-shaped structure template fixing and shaping system
CN222667192U (en) Assembled wall panel and wall panel system
CN214738804U (en) Node connection structure of prefabricated assembled concrete wall and board
CN114837404A (en) Sunken type falling plate pouring mold and pouring method
CN103498419A (en) Box girder steel core mould and construction method thereof
CN218779542U (en) A support-free structure for post-cast belt part hanging mold
CN204455758U (en) Shape-setting clamp formula shuttering supporting leverage
CN206829428U (en) A kind of light steel lightweight concrete exempts from form removal wall body structure
CN211341746U (en) A new type of prefabricated frame structure cast-in-situ plate belt lifting device
CN115030403A (en) Mounting and reinforcing device for mould-disassembly-free beam and plate and implementation method
CN211447767U (en) Back-up structure and formwork structure of floor slab post-casting belt support
CN212025812U (en) Concrete road surface pull rod false joint construction equipment
CN204081482U (en) V-type cylinder transposition section concreting mould
CN111042519B (en) An early dismantling system for floor formwork containing beam and slab structure buildings
CN205775885U (en) A kind of continuous rigid frame bridge closure segment pushing tow top board pushing tow system
CN206913414U (en) Assembled steel pedestal
CN211285428U (en) A concrete guardrail hanging board assembled formwork
CN212294363U (en) Integral template for T-beam pouring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181218

Termination date: 20210531

CF01 Termination of patent right due to non-payment of annual fee