CN207314126U - Bridge pier, which binds, supports cover board - Google Patents
Bridge pier, which binds, supports cover board Download PDFInfo
- Publication number
- CN207314126U CN207314126U CN201721265403.4U CN201721265403U CN207314126U CN 207314126 U CN207314126 U CN 207314126U CN 201721265403 U CN201721265403 U CN 201721265403U CN 207314126 U CN207314126 U CN 207314126U
- Authority
- CN
- China
- Prior art keywords
- locking nub
- hanging ring
- cover board
- bar
- binds
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
It the utility model is related to bridge pier construction field, and in particular to a kind of bridge pier, which binds, supports cover board, including one piece of second locking nub and two pieces of first locking nubs for being symmetrically arranged at the second locking nub both sides;Have and block-shaped the first bar-mat reinforcement to match of corresponding first segment in the laid inside of every piece of first locking nub;There is the second bar-mat reinforcement to match with the second locking nub shape in the laid inside of the second locking nub;The first hanging ring is both provided with above every piece of first locking nub, the second hanging ring is provided with above the second locking nub;First hanging ring and the second hanging ring are all bent by round steel and formed, the inside that the both ends of each first hanging ring penetrate corresponding first locking nub is fixedly connected with corresponding first bar-mat reinforcement, and the inside that the both ends of second hanging ring penetrate the second locking nub is fixedly connected with the second bar-mat reinforcement.Its is simple in structure, easy for installation, and adds the structural strength and stability of cover board, improves the efficiency and security of Coping Construction, has great promotional value.
Description
Technical field
It the utility model is related to bridge pier construction field, and in particular to a kind of bridge pier, which binds, supports cover board.
Background technology
At present, hollow pier concrete construction of binding is mostly inner support supporting frame:Completed using steel pipe in pier shaft
Portion sets up inner support, stent upper berth setting steel form or plank sheathing, binds concrete construction in this, as Thin-wall Hollow Pier
Supporting frame.
There are the following problems for currently widely used inner support supporting frame:Inner support is set up cannot be synchronous with pier construction
Carry out, row sets up internal frame supporting frame again when pier construction to pier top binds concrete, influences the duration;Inner support frame body is set up
Highly larger, security risk is larger, and cradle top template assembly and reinforcing difficulty are big, are not easy to ensure formwork reinforcement quality;
The dismounting of later stage stent and template takes a lot of work, is time-consuming, and removes difficult outside pier shaft.
Utility model content
The technical problems to be solved in the utility model is, overcomes the shortcomings of existing technology, there is provided a kind of bridge pier binds
Cover board is supported, its is simple in structure, easy for installation, saves substantial amounts of man power and material by the prefabricated cover board that binds, adds lid
The structural strength and stability of plate, improve the efficiency and security of Coping Construction.
To reach above-mentioned purpose, a kind of bridge pier that the utility model is related to binds support cover board, including one piece of second locking nub
And two pieces of first locking nubs for being symmetrically arranged at the second locking nub both sides;The laid inside of every piece of first locking nub have with it is corresponding
Block-shaped the first bar-mat reinforcement to match of first segment;The laid inside of the second locking nub have match with the second locking nub shape
Two bar-mat reinforcements;The first hanging ring is both provided with above every piece of first locking nub, the second hanging ring is provided with above the second locking nub;
First hanging ring and the second hanging ring are all bent by round steel and formed, and the both ends of each first hanging ring penetrate corresponding first locking nub
Inside be fixedly connected with corresponding first bar-mat reinforcement, the both ends of second hanging ring penetrate inside and the second reinforcing bar of the second locking nub
Net is fixedly connected.
Preferably, two the first hanging rings are both provided with every piece of first locking nub, described two first hanging rings are symmetrical
It is arranged on the middle part of corresponding first locking nub.
Preferably, two the second hanging rings are provided with second locking nub, described two second hanging rings are symmetrically arranged on
The middle part of second locking nub.
Preferably, second locking nub is higher than the concrete section of pier shaft strength grade of concrete for square and strength grade
Block.
Preferably, two piece of first locking nub is the coagulation that arch and strength grade are higher than pier shaft strength grade of concrete
Native locking nub.
Preferably, two piece of first locking nub width is equal with the width of the second locking nub, the arc of two piece of first locking nub
Shape side is outwards set, the straight line of two piece of first locking nub respectively with the symmetrical both sides of the second locking nub in succession.
Preferably, first hanging ring and the second hanging ring are all located on same straight line, and first hanging ring is all set
On the central axes of corresponding first locking nub, second hanging ring is arranged on the central axes of the second locking nub.
Preferably, second bar-mat reinforcement forms square, and first bar-mat reinforcement forms arch.
Preferably, first bar-mat reinforcement and the second bar-mat reinforcement are all a plurality of screw-thread steel longitude and latitude structure for 10cm by spacing
Into the thickness of first locking nub and the second locking nub is 10cm.
Preferably, first hanging ring and the second hanging ring are arch OR gate font, the both ends of first hanging ring with it is corresponding
The screw-thread steel electric welding of first bar-mat reinforcement connects, and the both ends of second hanging ring connect with the screw-thread steel electric welding of the second bar-mat reinforcement.
It is using beneficial effect caused by above-mentioned technical proposal:Precast support cover board can be synchronous with bridge pier pier construction
Carry out, and need not be removed after the completion of binding, task difficulty can be reduced and shortened the construction period.Support and uniformly buried in each locking nub of cover board
Stability of hanging ring when enhancing each cover board locking nub of lifting so that the assembly of cover board locking nub becomes convenient, fast, can be effective
Control bridge pier binds support the cover board quality and progress put up.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, other attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the support cover board plan of the utility model;
Fig. 2 is reinforced mesh figure in the support cover board of the utility model embodiment;
Fig. 3 is the support cover board assembly design sketch of the utility model.
Wherein:The first locking nubs of 1-, the second locking nubs of 2-, the first bar-mat reinforcements of 3-, the second bar-mat reinforcements of 4-, the first hanging rings of 5-, 6-
Two hanging rings, 7- support cover boards, 8- bridge pier chamferings.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained, shall fall within the protection scope of the present invention.
Referring to figs. 1 to Fig. 2, a kind of bridge pier bind support cover board, the present embodiment by hollow pier bind support cover board exemplified by into
Row explanation.As shown in the figure, the hollow pier binds, support cover board includes the second locking nub 2 and two the first locking nubs 1, wherein the second locking nub
2 is square, and the length of side is more than the outside diameter of hollow position at the top of hollow pier.The shape of first locking nub 1 is by three adjacent right-angle sides
Formed with arc-shaped side, two the first locking nubs 1 are symmetricly set on the opposite both sides of the second locking nub 2, each first locking nub 1 with
The opposite side of arc-shaped side is connected with the second locking nub 2 respectively and size is equal with the length of side of the second locking nub 2.First locking nub 1 and
Two locking nubs 2 are formed by the concreting higher than hollow pier pier shaft concrete strength, and particularly, each locking nub can be poured to 10cm
Thickness, support is provided for the concrete that binds, and offsets the weight for the concrete that binds and its load of generation.As shown in the figure, in first segment
The inside of 1 and second locking nub 2 of block is all equipped with the first bar-mat reinforcement 3 and the second bar-mat reinforcement 4 to match with each locking nub shape, its
In, every piece of bar-mat reinforcement is all made of screw-thread steel longitude and latitude, and the spacing of steel bar arrangement is 10cm × 10cm, and particularly, screw-thread steel is optional
With a diameter of 12 millimeters12 reinforcing bars, the skeleton using the built-in bar-mat reinforcement of each locking nub as the first locking nub 1 and the second locking nub 2,
Increase each locking nub support strength, improve 7 overall support quality of support cover board.As shown in the figure, it is both provided with above each locking nub
Two hanging rings arranged in parallel.Wherein, at the central axes of the first locking nub 1 both ends of two parallel inbuilt first hanging rings 5 with
First bar-mat reinforcement 3 of 1 laid inside of the first locking nub welds, and two parallel inbuilt second are hung at the central axes of the second locking nub 2
The both ends of ring 6 and the second bar-mat reinforcement 4 of 2 laid inside of the second locking nub weld.Particularly, hanging ring can be selected a diameter of 25 millimeters25 round steel, which are bent, to be formed, to ensure the bearing of hanging ring.Thus, each locking nub can buried preferably at the central axes of stress
There are two hanging rings, enhance the stability of each cover board locking nub of lifting so that the assembly of cover board locking nub becomes convenient, fast, can
The effectively assembled quality and progress of control support cover board 7.
With reference to Fig. 3, the assembled design sketch of the support cover board 7 of the present embodiment, since the size of each locking nub is both greater than hollow pier
The outside diameter of head space, so when carrying out capping operation, can independently lifting is positioned at the top of hollow pier in order, and and hollow pier
Chamfering 8 at come into full contact with, it is ensured that each locking nub for the cover board 7 that binds and 8 stress equalization of chamfering of hollow pier, improve the stabilization to bind
Property.So far, completion hollow pier, which binds, supports the prefabricated of cover board and sets up, and the prefabricated cover board of the present embodiment is without waiting for pier construction
Completion makes again, synchronous with bridge pier pier construction can carry out, greatly shortens the duration, and since inbuilt hanging ring provides
Can lifting operation so that operation of binding is convenient, simple and direct.The cover board that binds is not required to remove, and more conventional inner support removes operation
The danger of worker's working at height is reduced, there is very positive meaning.
It should be understood that the particular order or level of the step of during disclosed are the examples of illustrative methods.Based on setting
Count preference, it should be appreciated that during the step of particular order or level can be in the feelings for the protection domain for not departing from the disclosure
Rearranged under condition.Appended claim to a method gives the key element of various steps with exemplary order, and not
It is to be limited to the particular order or level.
Claims (10)
- The support cover board 1. a kind of bridge pier binds, it is characterised in that:It is symmetrically arranged including one piece of second locking nub (2) and two pieces The first locking nub (1) on the second locking nub (2) both sides;There is the first bar-mat reinforcement (3) to match with corresponding first locking nub (1) shape in the laid inside of every piece of first locking nub (1);There is the second bar-mat reinforcement (4) to match with the second locking nub (2) shape in the laid inside of the second locking nub (2);The first hanging ring (5) is both provided with above every piece of first locking nub (1), second is provided with above the second locking nub (2) Hanging ring (6);First hanging ring (5) and the second hanging ring (6) are all bent by round steel and formed, and the both ends of each first hanging ring (5) are worn The inside for entering corresponding first locking nub (1) is fixedly connected with corresponding first bar-mat reinforcement (3), and the both ends of second hanging ring (6) penetrate The inside of second locking nub (2) is fixedly connected with the second bar-mat reinforcement (4).
- The support cover board 2. bridge pier according to claim 1 binds, it is characterised in that:On every piece of first locking nub (1) all Two the first hanging rings (5) are provided with, described two first hanging rings (5) are symmetrically arranged on the middle part of corresponding first locking nub (1).
- The support cover board 3. bridge pier according to claim 2 binds, it is characterised in that:It is provided with second locking nub (2) Two the second hanging rings (6), described two second hanging rings (6) are symmetrically arranged on the middle part of the second locking nub (2).
- The support cover board 4. bridge pier according to claim 3 binds, it is characterised in that:Second locking nub (2) is square And strength grade is higher than the concrete locking nub of pier shaft strength grade of concrete.
- The support cover board 5. bridge pier according to claim 4 binds, it is characterised in that:Two piece of first locking nub (1) be Arch and strength grade are higher than the concrete locking nub of pier shaft strength grade of concrete.
- The support cover board 6. bridge pier according to claim 5 binds, it is characterised in that:Two piece of first locking nub (1) width Equal with the width of the second locking nub (2), the arc-shaped side of two piece of first locking nub (1) is outwards set, two piece of first locking nub (1) straight line respectively with the symmetrical both sides of the second locking nub (2) in succession.
- The support cover board 7. bridge pier according to claim 6 binds, it is characterised in that:First hanging ring (5) and second is hung Ring (6) is all located on same straight line, and first hanging ring (5) is all disposed within the central axes of corresponding first locking nub (1), institute The second hanging ring (6) is stated to be arranged on the central axes of the second locking nub (2).
- The support cover board 8. bridge pier according to claim 7 binds, it is characterised in that:Second bar-mat reinforcement (4) is formed just Square, first bar-mat reinforcement (3) forms arch.
- The support cover board 9. bridge pier according to claim 8 binds, it is characterised in that:First bar-mat reinforcement (3) and second Bar-mat reinforcement (4) is made of a plurality of screw-thread steel longitude and latitude that spacing is 10cm, first locking nub (1) and the second locking nub (2) Thickness is 10cm.
- The support cover board 10. bridge pier according to any one of claim 1 to 9 binds, it is characterised in that:First hanging ring (5) and the second hanging ring (6) is arch OR gate font, the screw thread of the both ends of first hanging ring (5) and corresponding first bar-mat reinforcement (3) Steel electric welding connects, and the both ends of second hanging ring (6) connect with the screw-thread steel electric welding of the second bar-mat reinforcement (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721265403.4U CN207314126U (en) | 2017-09-29 | 2017-09-29 | Bridge pier, which binds, supports cover board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721265403.4U CN207314126U (en) | 2017-09-29 | 2017-09-29 | Bridge pier, which binds, supports cover board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207314126U true CN207314126U (en) | 2018-05-04 |
Family
ID=62428654
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721265403.4U Active CN207314126U (en) | 2017-09-29 | 2017-09-29 | Bridge pier, which binds, supports cover board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207314126U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113403936A (en) * | 2021-07-09 | 2021-09-17 | 中铁十一局集团第五工程有限公司 | Bracket-free rapid construction method for hollow pier partition plate of bridge |
CN113756193A (en) * | 2021-08-27 | 2021-12-07 | 中铁七局集团有限公司 | Hollow pier construction method |
-
2017
- 2017-09-29 CN CN201721265403.4U patent/CN207314126U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113403936A (en) * | 2021-07-09 | 2021-09-17 | 中铁十一局集团第五工程有限公司 | Bracket-free rapid construction method for hollow pier partition plate of bridge |
CN113756193A (en) * | 2021-08-27 | 2021-12-07 | 中铁七局集团有限公司 | Hollow pier construction method |
CN113756193B (en) * | 2021-08-27 | 2022-12-23 | 中铁七局集团有限公司 | Hollow pier construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847156A (en) | Steel reinforcement cage suitable for underground diaphragm wall of air shaft and use method | |
CN205058277U (en) | Prefabricated T girder iron muscle mould | |
CN207295473U (en) | A kind of Thin-wall Hollow Pier binds concrete support cover board | |
CN105220619B (en) | A kind of method of quick manufacture two-wire nose circle solid pier | |
CN204019724U (en) | Make the mold of prefabricated case beam framework of steel reinforcement | |
CN109183628A (en) | A kind of ultra-large type variable cross-section Sarasota reinforcing bar component production method | |
CN207314126U (en) | Bridge pier, which binds, supports cover board | |
CN205153536U (en) | Structure is assembled to self -balancing integral template of reinforced concrete roof beam | |
CN207878263U (en) | Half precast pier segment and bridge pier | |
CN206784915U (en) | A kind of new steel structure suspension type flooring gang form | |
CN108729545A (en) | The connecting joint structure and construction method of circular steel tube concrete column and reinforced beam | |
CN202369931U (en) | Arch ring bracket | |
CN207419232U (en) | A kind of traffic bridge column | |
CN207362894U (en) | Steel plate water-stopping device | |
CN203373751U (en) | Triangular surrounding purlin for inner supporting system for foundation pit supporting | |
CN203187288U (en) | Box girder hanger | |
CN108946435A (en) | A kind of hanging beam structure | |
CN204225098U (en) | Overweight reinforcing cage | |
CN205577264U (en) | Location structure of girder iron muscle | |
CN211143049U (en) | Steel reinforcement cage suitable for air shaft underground continuous wall | |
CN203924484U (en) | A kind of precast beam and there is the reinforced concrete structure of tenon anchor system | |
CN114108499A (en) | Suspended casting beam reference section hinged type triangular bracket combined hanging basket integrated device and construction method thereof | |
CN203393721U (en) | Inner support main purlin component | |
CN203066043U (en) | Diversion tunnel top arch concrete lining steel formwork support | |
CN202181728U (en) | Foundation reinforcing bar non-connector construction structure for shear wall and attached-wall column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |