CN201746979U - Column hoop device for beam-column core area in concrete construction - Google Patents

Column hoop device for beam-column core area in concrete construction Download PDF

Info

Publication number
CN201746979U
CN201746979U CN 201020233732 CN201020233732U CN201746979U CN 201746979 U CN201746979 U CN 201746979U CN 201020233732 CN201020233732 CN 201020233732 CN 201020233732 U CN201020233732 U CN 201020233732U CN 201746979 U CN201746979 U CN 201746979U
Authority
CN
China
Prior art keywords
stirrup
concrete construction
column
core space
reinforcement bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020233732
Other languages
Chinese (zh)
Inventor
唐恩宽
聂海波
徐兴宏
尹亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN 201020233732 priority Critical patent/CN201746979U/en
Application granted granted Critical
Publication of CN201746979U publication Critical patent/CN201746979U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a column hoop device for a beam-column core area in concrete construction. The column hoop device is characterized in that the column hoop device comprises steel bars and hoop bars, the steel bars are vertically arranged, the hoop bars surround the steel bars and welding spot connection is formed through welding. By adopting the column hoop device during concrete construction, the utility model has the advantages that the binding quality of the steel bars in the core area is greatly reinforced, the succession of the construction process is speeded up, the structural safety is ensured, the time for inspection and acceptance is obtained, the construction period is shortened and the economic benefit is remarkable.

Description

The tie device of beam column core space in a kind of concrete construction
Technical field
The utility model relates to concreting outfit, particularly the tie device of beam column core space in a kind of concrete construction.
Background technology
Large-scale framework, the design feature that frame is cut building is exactly that its main framing is basic building compositions such as beam slab post, a large amount of beam column interface points will certainly appear, and these positions arrangement of reinforcement core space often, stirrup all can be encrypted, certainly will cause no small difficulty to colligation, for convenience can take to reduce stirrup in the practice of construction or arbitrarily replace with non-closed stirrup, though do not reduce stirrup quantity, but design bearing capacity greatly descends, not only caused great hidden danger to workmanship, and entail dangers to structural safety when serious, for the convenience that guarantees to construct and by the seriousness of figure construction, press for and a kind ofly can solve the difficult problem of core space stirrup colligation preferably.
The utility model content
The purpose of this utility model is when solving concrete construction, the problem of core space stirrup colligation difficulty, and the spy provides the tie device of beam column core space in a kind of concrete construction.
The utility model provides the tie device of beam column core space in a kind of concrete construction, it is characterized in that: the tie device of beam column core space comprises reinforcement bar 1 in the described concrete construction, stirrup 2;
Reinforcement bar 1 is arranged vertically, stirrup 2 be looped around reinforcement bar 1 around, form solder joint 3 by welding and connect.
The radical of described vertically arranged reinforcement bar 1 is 3 to 10.
The number of plies of described stirrup 2 is 3 to 20 layers.
Be primarily aimed at the stirrup colligation difficult problem of beam column infall core space, use for reference the thought of getting slider in the structural mechanics, take the stirrup device formed as stud by the drawing that processes design stirrup 2, reinforcement bar 1, be filled to earlier the relevant position in advance, main muscle is installed again, then the stirrup device is put a series of ways, well solved the core space stirrup difficult problem is installed to the drawing position.
Advantage of the present utility model:
Take tie device described in the utility model in the concrete construction, strengthened core space laid reinforcement binding quality greatly, accelerated the successive of work progress, guaranteed safety of structure, won reception time, saved the duration, remarkable in economical benefits.
Description of drawings
Below in conjunction with drawings and the embodiments the utility model is described in further detail:
Fig. 1 is the overall structure schematic diagram of tie device.
The specific embodiment
Embodiment 1
Present embodiment provides the tie device of beam column core space in a kind of concrete construction, it is characterized in that: the tie device of beam column core space comprises reinforcement bar 1 in the described concrete construction, stirrup 2;
Reinforcement bar 1 is arranged vertically, stirrup 2 be looped around reinforcement bar 1 around, form solder joint 3 by welding and connect.
The radical of described vertically arranged reinforcement bar 1 is 4.
The number of plies of described stirrup 2 is 4 layers.
Be primarily aimed at the stirrup colligation difficult problem of beam column infall core space, use for reference the thought of getting slider in the structural mechanics, take the stirrup device formed as stud by the drawing that processes design stirrup 2, reinforcement bar 1, be filled to earlier the relevant position in advance, main muscle is installed again, then the stirrup device is put a series of ways, well solved the core space stirrup difficult problem is installed to the drawing position.
Embodiment 2
Present embodiment provides the tie device of beam column core space in a kind of concrete construction, it is characterized in that: the tie device of beam column core space comprises reinforcement bar 1 in the described concrete construction, stirrup 2;
Reinforcement bar 1 is arranged vertically, stirrup 2 be looped around reinforcement bar 1 around, form solder joint 3 by welding and connect.
The radical of described vertically arranged reinforcement bar 1 is 10.
The number of plies of described stirrup 2 is 10 layers.
Be primarily aimed at the stirrup colligation difficult problem of beam column infall core space, use for reference the thought of getting slider in the structural mechanics, take the stirrup device formed as stud by the drawing that processes design stirrup 2, reinforcement bar 1, be filled to earlier the relevant position in advance, main muscle is installed again, then the stirrup device is put a series of ways, well solved the core space stirrup difficult problem is installed to the drawing position.
Embodiment 3
Present embodiment provides the tie device of beam column core space in a kind of concrete construction, it is characterized in that: the tie device of beam column core space comprises reinforcement bar 1 in the described concrete construction, stirrup 2;
Reinforcement bar 1 is arranged vertically, stirrup 2 be looped around reinforcement bar 1 around, form solder joint 3 by welding and connect.
The radical of described vertically arranged reinforcement bar 1 is 6.
The number of plies of described stirrup 2 is 20 layers.
Be primarily aimed at the stirrup colligation difficult problem of beam column infall core space, use for reference the thought of getting slider in the structural mechanics, take the stirrup device formed as stud by the drawing that processes design stirrup 2, reinforcement bar 1, be filled to earlier the relevant position in advance, main muscle is installed again, then the stirrup device is put a series of ways, well solved the core space stirrup difficult problem is installed to the drawing position.

Claims (3)

1. the tie device of beam column core space in the concrete construction, it is characterized in that: the tie device of beam column core space comprises reinforcement bar (1) in the described concrete construction, stirrup (2);
Reinforcement bar (1) is arranged vertically, stirrup (2) be looped around reinforcement bar (1) around, form solder joint (3) by welding and connect.
2. according to the tie device of beam column core space in the described concrete construction of claim 1, it is characterized in that: the radical of described vertically arranged reinforcement bar (1) is 3 to 10.
3. according to the tie device of beam column core space in the described concrete construction of claim 1, it is characterized in that: the number of plies of described stirrup (2) is 3 to 20 layers.
CN 201020233732 2010-06-23 2010-06-23 Column hoop device for beam-column core area in concrete construction Expired - Fee Related CN201746979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020233732 CN201746979U (en) 2010-06-23 2010-06-23 Column hoop device for beam-column core area in concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020233732 CN201746979U (en) 2010-06-23 2010-06-23 Column hoop device for beam-column core area in concrete construction

Publications (1)

Publication Number Publication Date
CN201746979U true CN201746979U (en) 2011-02-16

Family

ID=43581660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020233732 Expired - Fee Related CN201746979U (en) 2010-06-23 2010-06-23 Column hoop device for beam-column core area in concrete construction

Country Status (1)

Country Link
CN (1) CN201746979U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251627A (en) * 2011-04-27 2011-11-23 中冶建工集团有限公司 Welded mesh sheet stirrup for concrete structure
CN102352669A (en) * 2011-08-22 2012-02-15 李治轮 Combined multi-limb constraint stirrup
CN102359230A (en) * 2011-08-03 2012-02-22 李治轮 Combined multi-limb restricted stirrup
CN102383496A (en) * 2011-08-26 2012-03-21 章雪峰 Prefabricated steel hoop barrel of reinforced concrete beam column joint and construction method
CN106624522A (en) * 2017-01-23 2017-05-10 重庆房地产职业学院 Reinforcement cage stirrup end tip compressing welding device for modern prefabricated constructional engineering

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251627A (en) * 2011-04-27 2011-11-23 中冶建工集团有限公司 Welded mesh sheet stirrup for concrete structure
CN102251627B (en) * 2011-04-27 2013-06-19 中冶建工集团有限公司 Welded mesh sheet stirrup for concrete structure
CN102359230A (en) * 2011-08-03 2012-02-22 李治轮 Combined multi-limb restricted stirrup
CN102352669A (en) * 2011-08-22 2012-02-15 李治轮 Combined multi-limb constraint stirrup
CN102383496A (en) * 2011-08-26 2012-03-21 章雪峰 Prefabricated steel hoop barrel of reinforced concrete beam column joint and construction method
CN106624522A (en) * 2017-01-23 2017-05-10 重庆房地产职业学院 Reinforcement cage stirrup end tip compressing welding device for modern prefabricated constructional engineering

Similar Documents

Publication Publication Date Title
CN201746979U (en) Column hoop device for beam-column core area in concrete construction
CN206408836U (en) Weld stirrup steel rib beam column
CN203238780U (en) Prefabricated stirrup cage of beam column core area
CN105442864A (en) Local reinforcing method of circular reinforced concrete column
CN203669156U (en) Point type tie cast-in-situ compound concrete shear wall
CN105201204B (en) A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column
CN106088640A (en) The method that existing frame structure is carried out demolishing columns
CN205531326U (en) L type dysmorphism post template
CN102619286B (en) Connecting joint of steel pipe concrete column and profile steel concrete beam
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN105937290B (en) A kind of aspect is than combined steel and concrete column and its construction and construction method
CN104818784B (en) Thin-wall steel pipe concrete frame-light steel light concrete combined shear wall and construction method thereof
CN104746791B (en) Semirigid frame-interior fills out regeneration concrete wallboard and manufacture method
CN204343550U (en) Washroom water stopping thresholds jig
CN106638617A (en) Pouring method of concrete without template in lattice beam type slope support
CN205024826U (en) Beam column core space slide orientation stirrup device
CN202969732U (en) Positioning device of upper reinforcement protective cover of cast-in-place slab
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN201695694U (en) Differently-labeled concrete construction separating device in the same vertical structure of reinforced concrete wall
CN204418228U (en) A kind of steel plate for sealing water Horizontal mounting arrangements
CN104727486B (en) A kind of synthetic method of precast reinforced cage
CN203284893U (en) Connecting device of section steel columns and steel bars of beam column joints
CN202611112U (en) Reinforcing steel bar frame body for controlling thicknesses of protective layers of plate negative reinforcements
CN101824909A (en) Pouring construction method of combination part between cylindrical component and beam poured by paper tube template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110216

Termination date: 20110623