CN101824909A - Pouring construction method of combination part between cylindrical component and beam poured by paper tube template - Google Patents

Pouring construction method of combination part between cylindrical component and beam poured by paper tube template Download PDF

Info

Publication number
CN101824909A
CN101824909A CN201010027272A CN201010027272A CN101824909A CN 101824909 A CN101824909 A CN 101824909A CN 201010027272 A CN201010027272 A CN 201010027272A CN 201010027272 A CN201010027272 A CN 201010027272A CN 101824909 A CN101824909 A CN 101824909A
Authority
CN
China
Prior art keywords
paper web
paper tube
template
web template
poured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010027272A
Other languages
Chinese (zh)
Inventor
瞿跃方
陆海林
李忠湧
王汝敏
蒋开兵
王钧
孙健
孙亚龙
夏军
徐杰
郝肇轩
骆杰
毛辉
王浩良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PUDONG NEW DISTRICT CONSTRUCTION MARKET MANAGEMENT BUREAU
Original Assignee
SHANGHAI PUDONG NEW DISTRICT CONSTRUCTION MARKET MANAGEMENT BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PUDONG NEW DISTRICT CONSTRUCTION MARKET MANAGEMENT BUREAU filed Critical SHANGHAI PUDONG NEW DISTRICT CONSTRUCTION MARKET MANAGEMENT BUREAU
Priority to CN201010027272A priority Critical patent/CN101824909A/en
Publication of CN101824909A publication Critical patent/CN101824909A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a pouring construction method of a combination part between a cylindrical component and a beam poured by a paper tube template, which is characterized in that: A. a position notch is cut on a paper tube template on the upper part of a cylinder body which is formed in pouring way, is still wrapped by the paper tube template and is close to a poured beam according to the width and the thickness of the beam to be poured, and a cylindrical clamp is arranged on the lower part with a mould cylinder body which is close to the notch; B. a plurality of vertically arranged strip-shaped clamp plate grid bars and an arc purlin enclosure which closely surrounds the clamp plate grid bars are arranged on the cutting part of the paper tube template which is provided with the notch to be consolidated by nails; C. two ends of the arc purlin enclosure are fixedly connected with a clamp plate side mould at two side edges of the poured beam through horse-riding nails, so the formed concrete cylinder body with the paper tube template is reasonably connected with the beam template which is arranged on the cylinder body, and the normal concrete pouring procedure is proceeded according to the conventions.

Description

The pouring construction method of cylindrical component that the paper web template is built and beam joint portion
Technical field
The present invention relates to a kind of building construction technology, the cylindrical component that especially a kind of paper web template is built and the pouring construction method of beam joint portion belong to paper web formwork construction technology class.
Background technology
Because the pouring technique that utilizes the paper web template to carry out building structural member is a kind of a large amount of wooden template of both can having saved, can improves the external surface form again and reduce construction cost, so be a kind of concrete construction technology with large development prospect.But building field is also under test at home, does not see complete possible technique scheme as yet and openly reports.Especially after the pillar type column of finishing the building main truss is built, how on the basis of this pillar type column, realize that the pillar type column and the associativity of other frame girder build, just become a big problem of using the paper web mould to build.
Summary of the invention
Purpose of the present invention: propose a kind of method that is applicable to that concreting is carried out in circular abutment that the paper web template is built and crossbearer beam joint portion, make and utilize the paper web template to carry out the on-site concrete pouring technique to be promoted the use of widely in China's building trade.
The cylindrical component that this paper web template is built and the pouring construction method of beam joint portion:
At first building moulding, and still be wrapped in the cylinder top of the close casting beams of paper web template, width and thickness according to the need casting beams cut out corresponding position breach in the paper web template, and are setting up a post clamp near on the bottom band mould cylinder of indentation, there;
Then will be the cutting part of paper web template behind the gap,, and add an arc at the clamping plate grizzly bar and enclose purlin by the reinforcing of row's nail with vertically disposed some strip clamping plate grizzly bars.
Enclose the two ends of purlin by arc at last and the clamping plate side form of casting beams dual-side is fixed with staple, finish the concrete cylindrical of molded band paper web template and the reasonable link that beam forms is set up on top thus, and enter the normal casting process of concrete routinely.
The cylindrical component that this paper web template that proposes according to above technical scheme is built and the pouring construction method of beam joint portion, not only made full use of the paper web template, the while also provides a kind of very simple and feasible method for organic reasonable link of cylinder and casting beams.
Description of drawings
Fig. 1 is should be with beam column of the present invention joint portion plane structure schematic diagram;
Fig. 2 is the facade structures schematic diagram of beam column joint portion;
Fig. 3 is the local enlarged diagram of Fig. 1.
Among the figure: 1-concrete cylindrical 2-paper web template 3-clamping plate grizzly bar 4-arc encloses purlin 5-clamping plate beam side 6-beam 7-post clamp 8-clamping plate beam bottom board wood joist 9-clamping plate beam side and encloses purlin
The specific embodiment
Below in conjunction with Figure of description, further set forth the present invention and provide the specific embodiment of the present invention.
The cylindrical component that this paper web template is built and the pouring construction method of beam joint portion are as follows:
At first building moulding, and still be wrapped in the cylinder top of the close casting beams of paper web template, width and thickness according to the need casting beams cut out corresponding position breach in the paper web template, and are setting up a post clamp near on the bottom band mould cylinder of indentation, there; Simultaneously, processing is sealed at paper web template opening place, prevent that water or the concrete when carrying out frame girder builds from penetrating into the paper web inner chamber by this otch with polyurethane.
Then will be the cutting part of paper web template behind the gap,, and add an arc at the clamping plate grizzly bar and enclose purlin by the reinforcing of row's nail with vertically disposed some strip clamping plate grizzly bars.
Enclose the two ends of purlin by arc at last and the clamping plate side form of casting beams dual-side is fixed with staple, finish the concrete cylindrical of molded band paper web template and the reasonable link that beam forms is set up on top thus, and enter the normal casting process of concrete routinely.

Claims (1)

1. the paper web template cylindrical component of building and the pouring construction method of beam joint portion: it is characterized in that:
A, at first building moulding, and still be wrapped in the cylinder top of the close casting beams of paper web template, width and thickness according to the need casting beams cut out corresponding position breach in the paper web template, and are setting up a post clamp near on the bottom band mould cylinder of indentation, there;
B, then will be the cutting part of paper web template behind the gap, with vertically disposed some strip clamping plate grizzly bars and tightly be centered around the outer arc of clamping plate grizzly bar and enclose purlin with the reinforcing of row's nail;
C, enclose the two ends of purlin by arc at last and the clamping plate side form of casting beams dual-side is fixed with staple, finish the concrete cylindrical of molded band paper web template and the reasonable link that beam forms is set up on top thus, and enter the normal casting process of concrete routinely.
CN201010027272A 2010-01-15 2010-01-15 Pouring construction method of combination part between cylindrical component and beam poured by paper tube template Pending CN101824909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010027272A CN101824909A (en) 2010-01-15 2010-01-15 Pouring construction method of combination part between cylindrical component and beam poured by paper tube template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010027272A CN101824909A (en) 2010-01-15 2010-01-15 Pouring construction method of combination part between cylindrical component and beam poured by paper tube template

Publications (1)

Publication Number Publication Date
CN101824909A true CN101824909A (en) 2010-09-08

Family

ID=42689054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010027272A Pending CN101824909A (en) 2010-01-15 2010-01-15 Pouring construction method of combination part between cylindrical component and beam poured by paper tube template

Country Status (1)

Country Link
CN (1) CN101824909A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878698A (en) * 2015-06-09 2015-09-02 中国五冶集团有限公司 Column-concreting far-end fixing system with telescopic cylinder structure
CN105019659A (en) * 2015-06-09 2015-11-04 中国五冶集团有限公司 Sliding-type rapidly open-close locking structure for pouring of concrete column
CN109083401A (en) * 2018-09-25 2018-12-25 中国五冶集团有限公司 The template erection method and formwork structure of cylinder beam and frame girder connection

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878698A (en) * 2015-06-09 2015-09-02 中国五冶集团有限公司 Column-concreting far-end fixing system with telescopic cylinder structure
CN105019659A (en) * 2015-06-09 2015-11-04 中国五冶集团有限公司 Sliding-type rapidly open-close locking structure for pouring of concrete column
CN104878698B (en) * 2015-06-09 2017-02-22 中国五冶集团有限公司 Column-concreting far-end fixing system with telescopic cylinder structure
CN105019659B (en) * 2015-06-09 2017-03-08 中国五冶集团有限公司 A kind of rapidly opened and closed concrete column of slidingtype pours latch-up structure
CN109083401A (en) * 2018-09-25 2018-12-25 中国五冶集团有限公司 The template erection method and formwork structure of cylinder beam and frame girder connection
CN109083401B (en) * 2018-09-25 2021-01-26 中国五冶集团有限公司 Template erection method and template structure for joint of cylindrical beam and frame beam

Similar Documents

Publication Publication Date Title
CN103452039B (en) Cast-in-situs type Inverted T beam and bridge pier and Bridge Pier Construction technique thereof
CN106284654A (en) Novel fabricated beam column node connection device
CN202969586U (en) Prefabricated concrete beam-column anchor welding combined structure
CN203238780U (en) Prefabricated stirrup cage of beam column core area
CN104294984A (en) Thin-wall square box anti-floating structure and construction method thereof
CN101824909A (en) Pouring construction method of combination part between cylindrical component and beam poured by paper tube template
CN203049913U (en) Structural steel constructional column
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN204326313U (en) The residence outer wall plate of gas concrete batten assembling
CN105937290B (en) A kind of aspect is than combined steel and concrete column and its construction and construction method
CN205557838U (en) Assembled antidetonation honeycomb girder steel - shear force wall connection structure
CN102677958A (en) Building site greening ecological enclosing wall and construction method
KR101358878B1 (en) Reinforcement member and girder using the same
CN209686866U (en) A kind of building frame structure square column circumference button formwork
CN208502067U (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam
CN106968366B (en) Construction method for pouring constructional column without dismantling formwork
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN205558050U (en) Compound shear wall structure external wall insulation protective layer cushion
CN201972395U (en) Steel-frame double-layer-net building template
CN203684703U (en) Assembly jig frame for main truss spare parts of large-span steel structure roof cover
CN204826403U (en) Exempt from to tear open precast concrete roof beam heat preservation template
CN204199509U (en) Thin-walled square chest float Structure
CN207727981U (en) A kind of precast prestressed joint cores plank sheathing
CN207392552U (en) A kind of assembled composite floor
CN202248900U (en) Floorslab formwork supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100908