CN204821555U - Light -duty fast -assembling cableway - Google Patents

Light -duty fast -assembling cableway Download PDF

Info

Publication number
CN204821555U
CN204821555U CN201520298002.3U CN201520298002U CN204821555U CN 204821555 U CN204821555 U CN 204821555U CN 201520298002 U CN201520298002 U CN 201520298002U CN 204821555 U CN204821555 U CN 204821555U
Authority
CN
China
Prior art keywords
light
holder device
cableway
winch
duty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520298002.3U
Other languages
Chinese (zh)
Inventor
焦光伟
蒲宏斌
陈飞
陈明
尹恒
常向东
卢彦博
张世峡
范晓明
邓松圣
陈绍令
陈玉玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Sinopec Sichuan East Gas Pipeline Co Ltd
Logistical Engineering University of PLA
Original Assignee
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Logistical Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp, Logistical Engineering University of PLA filed Critical Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Priority to CN201520298002.3U priority Critical patent/CN204821555U/en
Application granted granted Critical
Publication of CN204821555U publication Critical patent/CN204821555U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model relates to a light -duty fast -assembling cableway, including power control unit, support device, dolly device, power control unit includes hoist engine, vice hoist engine, switch board, the support device is including setting up upper bracket and the lower carriage at different geographical height, the upper bracket passes through the traction cable and is connected with the lower carriage, the dolly device includes gyro wheel, connector, support, chain block, the gyro wheel is through handing over forked connector and two leg joints, the hoist engine is connected with the traction cable respectively with vice hoist engine, the entablature pass through the gyro wheel with traction cable sliding connection, the bottom end rail with the carrier cable is connected. The utility model provides a light -duty fast -assembling cableway, it can only fixed mounting to have solved current cableway, it is difficult to retrieve, technical problem that construction period is long, and light -duty fast -assembling cableway can install in complicated topography such as mountain stream, river, cliffs fast, and also can be used for emergency rescue or the goods and materials when temporarily being under construction are carried.

Description

A kind of Light-duty Quick-installation cableway
Technical field
The utility model relates to a kind of transport cableway, and in particular, the utility model relates to a kind of Light-duty Quick-installation cableway being applied to goods transport field.
Background technology
Along with the progress of up-to-date technology, new process, the application of cableway is more and more extensive, and the manufacturing technology of cableway is also more and more ripe simultaneously, and its corresponding making specification is also more and more comprehensive.Such as, according to cableway classification, there is the manned sightseeing cableway being specifically designed to famous mountains and great rivers, also have the timber skidding ropeway being exclusively used in forest harvesting, also have simple and easy slip rope of crossing a river for remote mountain areas etc.Wherein simple slip rope, fixes steel cable exactly between upper and lower two ends, and rely on the natural-drop of different terrain, becoming can across the transportation means of mountain, Yue He, the various complex-terrain of adaptation.
Certain above-mentioned slip rope is higher for the requirement of landform, and complexity manned/loading cableway may prolong continuous thousands of rice, cross multiple hilltop, so need complicated structural system, the hierarchy of control.But no matter structure is simple or complicated, and above-mentioned cableway all plays important transportation function, plays the irreplaceable effect of other vehicle in express zone.
Cableway, as a kind of actv. transportation means, has its limitation at present, namely can only fix use, and the construction period is long in use, reclaims comparatively difficulty.So cableway is built mostly have the forest zone that large area fells demand, or sightseeing scenic spot that flow of personnel amount is larger.
Can design a kind of cableway, not be only applicable to mostly shape, assembling be simple, can also again reclaim after finishing using.Design one can Fast Installation, reclaim simple cableway, be the technical matters instantly needing solution in cableway development course badly.
Utility model content
An object of the present utility model is, provides a kind of Light-duty Quick-installation cableway, solve existing cableway can only fixedly mount, reclaim difficulty, construction period long technical matters.
Above-mentioned purpose of the present utility model and other objects solve by the following technical programs:
The utility model provides a kind of Light-duty Quick-installation cableway, comprise power control unit, holder device, carriage device, described power control unit comprises winch, secondary winch, control housing, described winch, secondary winch and control housing are successively set on the smooth ground of low side, described holder device comprises the upper bracket and lower bracket that are arranged on different geographical height, described upper bracket is connected with lower bracket by trailing cable, described carriage device comprises roller, adaptor union, support, chain block, described roller is connected with crossbeam by the adaptor union of cross-like, described crossbeam comprises entablatrance and cross sill, it is characterized in that:
Described winch and secondary winch are connected with a trailing cable respectively;
The top of described holder device is provided with deflection sheave or angle block;
Trailing cable by being wrapped in described deflection sheave or angle block foreign steamer external diameter between described upper bracket and lower bracket is connected;
Be connected by being wrapped in the catenary of taking turns external diameter in described deflection sheave or angle block between described upper bracket and lower bracket;
Described entablatrance is by roller and described trailing cable sliding block joint, and described cross sill is connected with described catenary.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described storage rope device is fixedly installed on the ground of described lower bracket side by frame.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described tension link is fixed on the top of described lower bracket, and described tension link is connected with described catenary.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described storage rope device is connected with described tension link by textile rope.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described holder device is chevron pointing, and described holder device is fixed on the ground by lower margin, and described holder device is connected triangular in shape with described side tension cords.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described holder device is made up of lambdoid bracing frame, is provided with the tension ropes of intersection between support frame as described above.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, is provided with two vertical stabilizer rods, is separately positioned on the symmetric position of described lambdoid bracing frame between described holder device.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described chain block is connected with described cross sill by vertical connecting device, and described chain block is connected with material by steel rope.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, one end of material is connected with described upper bracket by catch siding.
A kind of Light-duty Quick-installation cableway that the utility model provides, preferably, described holder device is articulated structure, the weight of the parts of described holder device is all less than or equal to 50kg, the height of described holder device is 6.5m-7.5m, width is 3.5m-4.5m, the special winch that model is 1T and 0.5T standard chosen respectively by described winch and secondary winch, and mass transport distance is 0-200m.
Advantage of the present utility model and beneficial effect are:
1, cableway is manufactured Portable detachable, standard product by the utility model first, is applicable to manpower or the Material Transportation of the landform such as emergency relief, river, mountain stream;
2, a kind of Light-duty Quick-installation cableway of providing of the utility model, the erection time is short, and single component weight is light, is applicable to manpower transport, is applicable to the area that mechanical equipment cannot arrive.
3, a kind of Light-duty Quick-installation cableway Ben Suodao of providing of the utility model, catenary, trailing cable adopt superhigh molecular weight polyethylene fibers rope, replace conventional confguration steel rope, therefore cable body is soft, lightweight, adds that quick support is that cableway described in the utility model is suitable for artificial fast erecting in the wild.
Accompanying drawing explanation
Carry out describing in detail or preferably to preferred implementation of the present utility model below in conjunction with accompanying drawing, wherein,
Fig. 1 is total arrangement of the present utility model structural representation;
Fig. 2 is the partial enlarged drawing of Fig. 1;
Fig. 3 is the structural representation of holder device;
Fig. 4 is the structural scheme of mechanism of carriage device;
Power control unit-1, winch-11, secondary winch-12, control housing-13, holder device-2, upper bracket-21, lower bracket-22, bracing frame-23, tension ropes-24, stabilizer rod-25, carriage device-3, roller-31, adaptor union-32, crossbeam-33, entablatrance-331, cross sill-332, chain block-34, trailing cable-4, catenary-5, Chu Shengqi-6, tension link-7, lower margin-8, side tension cords-9, catch siding-10.
Detailed description of the invention
The utility model provides a kind of Light-duty Quick-installation cableway, comprise power control unit 1, holder device 2, carriage device 3, power control unit comprises winch 11, secondary winch 12, control housing 13, winch 11, secondary winch 12 and control housing 13 are successively set on the smooth ground of low side, holder device 2 comprises the upper bracket 21 and lower bracket 22 that are arranged on different geographical height, upper bracket 21 is connected with lower bracket 23 by trailing cable 4, carriage device 3 comprises roller 31, adaptor union 32, crossbeam 33, chain block 34, roller 31 is connected with crossbeam 33 by the adaptor union 32 of cross-like, crossbeam 33 comprises entablatrance 331 and cross sill 332, it is characterized in that:
Winch 11 is connected with a trailing cable 4 respectively with secondary winch 12;
The top of holder device 2 is provided with deflection sheave or angle block;
Trailing cable 4 by being wrapped in deflection sheave or angle block foreign steamer external diameter between upper bracket 21 and lower bracket 22 is connected;
Be connected by being wrapped in the catenary 5 of taking turns external diameter in deflection sheave or angle block between upper bracket 21 and lower bracket 22;
Entablatrance 331 is by roller 31 and trailing cable 4 sliding block joint, and cross sill 332 is connected with catenary 5.
Preferably, storage rope device 6 is fixedly installed on the ground of lower bracket 22 side by frame.
Preferably, tension link 7 is fixed on the top of lower bracket 22, and tension link 7 is connected with catenary 5.
Preferably, storage rope device 6 is connected with tension link 7 by textile rope.
Preferably, holder device 2 is in chevron pointing, and holder device 2 is fixed on the ground by lower margin 8, and holder device 2 is connected triangular in shape with side tension cords 9.
Preferably, holder device 2 is made up of lambdoid bracing frame 23, is provided with the tension ropes 24 of intersection between bracing frame 23.
Preferably, be provided with two vertical stabilizer rods 25 between holder device 2, be separately positioned on the symmetric position of lambdoid bracing frame 23.
Preferably, chain block 34 is connected with cross sill 332 by vertical connecting device, and chain block 34 is connected with material by steel rope.
Preferably, one end of material is connected with upper bracket 21 by catch siding 10.
Preferably, holder device 2 is articulated structure, the weight of the parts of holder device 2 is all less than or equal to 50kg, the height of holder device 2 is 6.5m-7.5m, width is 3.5m-4.5m, the special winch that model is 1T and 0.5T standard chosen respectively by winch 11 and secondary winch 12, and mass transport distance is 0-200m.
The utility model provides a kind of Light-duty Quick-installation cableway, and the technique effect of its technical scheme and correspondence is as follows:
1. with reference to a kind of Light-duty Quick-installation cableway that accompanying drawing 1-3 the utility model provides, adopt the basic structure of single-point reciprocating cargo ropeway, but compare with standard single-point reciprocating cargo ropeway, in order to can Fast Installation, holder device 2 is by can the metal construction of fast assembling-disassembling form, and each component part of holder device 2 is not more than 50Kg from weight average, meets and manually carry on mountain pass.Holder device 2, in chevron pointing, is connected with side tension cords 9 and jointly forms a stable gusseted.Side tension cords 9 bears the main pulling force of cableway catenary 5, adjustable length, can according to field landform, on the rock being bundled in thick trees, projection or firmly architectural, otherwise ground tackle can only be used to be fixedly connected with ground.
Catenary 5 is arranged between upper bracket 21 and lower bracket 22, and catenary 5 adopts superhigh molecular weight polyethylene fibers rope, and effect is the slideway serving as carriage device 3 movement.The surface of catenary 5, through polyureas or other spray treatment, makes cable body closely and has good wear resisting property.The quality of textile rope only has 1/7 to 1/8 of steel rope, is applicable to a dead lift and installation.
Trailing cable 4 adopts superhigh molecular weight polyethylene fibers rope, winch 11 is connected with a trailing cable 4 respectively with secondary winch 12, therefore the upper and lower operation of trailing cable 4 all adopts power traction, to ensure that the height between upper bracket 21 and lower bracket 22 is not enough to use when relying on gravity to make suspension hook glide.Equally, the deadweight of winch 11, secondary winch 12 constituent elements is no more than 50Kg.
2. storage rope device 6 is fixedly installed on lower bracket 22 one end by frame, tension link 7 is fixed on the top of lower bracket 22, tension link 7 is connected with catenary 5, and storage rope device 6 and tension link 7 are for regulating the degree of speeding of catenary 5 and the accurate distance between upper bracket 21 and lower bracket 22 at any time.
With reference to accompanying drawing 4:
3. roller 31 is connected with two supports by the adaptor union of cross-like, and the upper end dependence roller 31 of carriage device 3 rolls walking on catenary 5, and catenary 5 bears most gravity.Entablatrance 331 is by roller 31 and trailing cable 4 sliding block joint, and trailing cable 4 trailer wagon device 3 walks up and down.Chain block 34 is connected with cross sill 332 by vertical connecting device, and chain block 34 is connected with material by steel rope, facilitates lifting and the unloading of material, can also need to transport during maintenance level at apparatus.
The concrete steps of installing: the parts of Light-duty Quick-installation cableway are transported to assigned address rapidly, after assembling, catenary 5 is wrapped in deflection sheave or angle block and outside wheel, upper bracket 21 and lower bracket 22 is coupled together, start tension link 7, tighten up catenary 5.While tightening up catenary 5, two end supports are erected (pulling up).Range estimation support is substantially vertical with horizontal surface.
After installation, a full and down workpiece is hung in examination, and whether range estimation can pass through whole obstacle, the degree of speeding of adjustment catenary 5, ensures that all workpiece can smooth delivery of power, both can normally use.
Do to understand further to the technical scheme in the utility model in conjunction with specific embodiments:
Embodiment: QKS-1-200 type fast installation cableway
One, cableway parameter
Q: light-duty; K: quick mounting type; S: single single point rope reversible tramway; 1 conveying articles weight 0-1 ton, 200 effective fed distance 20 meters-200 meters.
Two, runway structures form
Cableway pattern: single single point rope reversible tramway;
Running velocity: the maximum speed of operation is 2.5m/s, putting rope speed is 2.5m/s;
Catenary: φ 24mm super-high wear-resistant ultra-high molecular weight polyethylene rope, safety factor get >2.5, storage rope device one (200), special tension link one (15 tons)
Holder device: integrally assembled type steel structure support, bracing frame height divides 5 joints, high 7.0m, and the width of support is about 4.0m.
Trailing cable: super-high wear-resistant φ 12mm ultra-high molecular weight polyethylene rope (special), safety factor gets >2.5;
1, special winch (1 ton), 1, secondary winch (0.5 ton);
Three, description of operation
Cableway addressing: following principle should be followed to the selection of aerial rope way: first tackle decorating position and carry out on-the-spot on-site inspection, and, centre minimum according to aerial rope way span does not have the smooth principle of obvious ridge, two ends physical features preferentially to choose; Cableway two ends should be able to allow people to pass through, and can remove and unload primary goods and cable laying; Trailing cable 4 and cable are together laid, and avoid the obstacle that trees etc. can affect cable body tensioning lift-off as far as possible, if must by the woods etc., can to local among a small circle trees carry out migration process.
Basis and fixing: in the fixation procedure of cableway agent structure, be improve installation rate, site environment should be utilized as far as possible, as thick trees, stump, projection rock or firmly building etc. be fixed, fixture is stressed should be not less than 13 tons.
For not outstanding rock, mild heavy soil layer etc., the distinguishingly condition of fixed tensioning rope 9 cannot be found, must according to the making situation of micro-judgment ground.According to actual conditions, the rock anchors that utilization carries and high speed cement are fixed fast to ground, or make soil layer foundation pile, the geomatics engineer of specialty must be had if desired to do correct anticipation, in use, should test ground load-bearing.
Holder device is installed: selected basis, is all transported by the parts of holder device 2 grade and puts in place.First, the fixing fast ground of holder device 2 is made according to size.The axis hole line of the pre-buried upper bracket 21 of ground and lower bracket 22, range estimation will keep vertical substantially with catenary 5.Ground, after high speed cement is substantially fastening, starts to assemble holder device 2.
During assembling holder device 2, the direction of holder device 2 is that top is outside, namely close to earth anchor.Side tension cords 9 is linked the top of earth anchor and support, and estimate side tension cords 9 Len req according to side tension cords 9 and the angle of horizontal surface, regulate the length of side tension cords 9, can not tumble to offside when holder device 2 is erected.After holder device 2 installs fastening completing, the tension ropes 24 of intersection is set between the lambdoid bracing frame 23 of holder device 2, by holder device 2 tensioning, its tensioning degree should not rock with two timbering with rafter arch sets's framves 23, to be bendingly as the criterion.
Catenary is installed: while holder device 2 is transported to assigned address, put the superhigh molecular weight polyethylene fibers rope of a diameter 4mm in advance, manually direct catenary 5 and trailing cable 4 is dragged to assigned address.Catenary 5 is connected with related device with trailing cable 4, simply fixes.
Holder device erects and tensioning: above-mentioned steps is carried out complete, check errorless after, can be energized and start winch 11 slowly tensioning catenary 5, utilize the tensile force of catenary 5 upper bracket 21 and lower bracket 22 to be erected.The tension force of adjustment side tension cords 9, keeps holder device 2 and horizontal vertical (can make weight by oneself, simple test squareness).By trailing cable 4 suitably tensioning, trailing cable 4 hoist in process, should ensure that trailing cable 4 can not come off, also not hang over branch or dolly side.
Trail run and degree of speeding adjusts: the size of the degree of speeding of catenary 5 is bases that can cableway normally work, and degree of speeding is too large, in transportation, because of the effect by concentrated load, hopper or by material and equipment easy and crossed over thing and collide; Degree of speeding is too little, then, under the effect of concentrated load, catenary 5 stress can significantly increase, and reduces the launch weight of cableway.Therefore, when setting up cableway, the degree of speeding of cableway should be increased as far as possible, ensureing that material passes through.For indivedual outstanding obstacle such as rock, trees, if desired, above-mentioned obstacle is removed.
In view of above principle, cableway is when trail run first, and the material of 1.05 tons can be selected to try to hang, and emphasis should check the firmness of holder device 2, related fittings, side tension cords 9 and other vitals, regulate the degree of speeding of catenary 5, whether range estimation material waits enough is passed through smoothly.The degree of speeding of catenary 5 must not be less than 4 meters.
Repeatedly run by suspended object material (controllable distance) in short range for several times, normal operation, then can normally use Light-duty Quick-installation cableway.
Cableway reclaims and maintenance: when Ben Suodao reclaims, and checks and identify the damaged condition of parts, eliminates undesirable parts in time, the dust of the piece surface that clears all, and gives running position painting lubricating oil.
Case minimum for principle to take up room, parts should be for convenience detach, and be convenient to transport, each parts of casing are not more than 50kg, are put in the fixed position in case after being numbered, convenient access.
For keeping the characteristic that cableway is overall succinct, practical, light, in electrical control, also taking and the most simply designing, the device of electrical control being installed concentratedly in control housing 13, meet can be handling needs.
According to the technical solution of the utility model, when not changing connotation of the present utility model, those of ordinary skill in the art can propose multiple frame mode of the present utility model.Therefore following detailed description of the invention and accompanying drawing just illustrating the technical solution of the utility model, and should not be considered as of the present utility model all or the restriction be considered as technical solutions of the utility model or restriction.

Claims (10)

1. a Light-duty Quick-installation cableway, comprise power control unit (1), holder device (2), carriage device (3), described power control unit (1) comprises winch (11), secondary winch (12), control housing (13), described winch (11), secondary winch (12) and control housing (13) are successively set on the smooth ground of low side, described holder device (2) comprises the upper bracket (21) and lower bracket (22) that are arranged on different geographical height, described upper bracket (21) is connected with lower bracket (22) by trailing cable (4), described carriage device (3) comprises roller (31), adaptor union (32), crossbeam (33), chain block (34), described roller (31) is connected with crossbeam (33) by the adaptor union (32) of cross-like, described crossbeam (33) comprises entablatrance (331) and cross sill (332), it is characterized in that:
Described winch (11) and secondary winch (12) are connected with a trailing cable (4) respectively;
The top of described holder device (2) is provided with deflection sheave or angle block;
Trailing cable (4) by being wrapped in described deflection sheave or angle block foreign steamer external diameter between described upper bracket (21) and lower bracket (22) is connected;
Be connected by being wrapped in the catenary (5) of taking turns external diameter in described deflection sheave or angle block between described upper bracket (21) and lower bracket (22);
Described entablatrance (331) is by roller (31) and described trailing cable (4) sliding block joint, and described cross sill (332) is connected with described catenary (5).
2. a kind of Light-duty Quick-installation cableway according to claim 1, is characterized in that, Chu Shengqi (6) is fixedly installed on the ground of described lower bracket (22) side by frame.
3. a kind of Light-duty Quick-installation cableway according to claim 2, it is characterized in that, tension link (7) is fixed on the top of described lower bracket (22), and described tension link (7) is connected with described catenary (5).
4. a kind of Light-duty Quick-installation cableway according to claim 3, is characterized in that, Chu Shengqi (6) is connected with described tension link (7) by textile rope.
5. a kind of Light-duty Quick-installation cableway according to claim 1, it is characterized in that, described holder device (2) is in chevron pointing, described holder device (2) is fixed on the ground by lower margin (8), and described holder device (2) is connected triangular in shape with side tension cords (9).
6. a kind of Light-duty Quick-installation cableway according to claim 5, it is characterized in that, described holder device (2) is made up of lambdoid bracing frame (23), is provided with the tension ropes (24) of intersection between support frame as described above (23).
7. a kind of Light-duty Quick-installation cableway according to claim 6, it is characterized in that, be provided with two vertical stabilizer rods (25) between described holder device (2), be separately positioned on the symmetric position of described lambdoid bracing frame (23).
8. a kind of Light-duty Quick-installation cableway according to claim 1, it is characterized in that, described chain block (34) is connected with described cross sill (332) by vertical connecting device, and described chain block (34) is connected with material by steel rope.
9. a kind of Light-duty Quick-installation cableway according to claim 1, is characterized in that, one end of material is connected with described upper bracket (21) by catch siding (10).
10. a kind of Light-duty Quick-installation cableway according to claim 1, it is characterized in that, described holder device (2) is articulated structure, the weight of the parts of described holder device (2) is all less than or equal to 50kg, the height of described holder device (2) is 6.5m-7.5m, width is 3.5m-4.5m, the special winch that model is 1T and 0.5T standard chosen respectively by described winch (11) and secondary winch (12), and mass transport distance is 0-200m.
CN201520298002.3U 2015-05-08 2015-05-08 Light -duty fast -assembling cableway Expired - Fee Related CN204821555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520298002.3U CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520298002.3U CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Publications (1)

Publication Number Publication Date
CN204821555U true CN204821555U (en) 2015-12-02

Family

ID=54679185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520298002.3U Expired - Fee Related CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Country Status (1)

Country Link
CN (1) CN204821555U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114526A (en) * 2016-07-22 2016-11-16 巨力索具股份有限公司 Air transport deliverance apparatus
CN106184237A (en) * 2015-05-08 2016-12-07 中国石油化工股份有限公司天然气川气东送管道分公司 A kind of Light-duty Quick-installation cableway
CN106314448A (en) * 2016-09-20 2017-01-11 巨力索具股份有限公司 Ropeway supporting frame and inverted installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106184237A (en) * 2015-05-08 2016-12-07 中国石油化工股份有限公司天然气川气东送管道分公司 A kind of Light-duty Quick-installation cableway
CN106114526A (en) * 2016-07-22 2016-11-16 巨力索具股份有限公司 Air transport deliverance apparatus
CN106314448A (en) * 2016-09-20 2017-01-11 巨力索具股份有限公司 Ropeway supporting frame and inverted installation method thereof

Similar Documents

Publication Publication Date Title
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN201494438U (en) Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN104695752B (en) Rapid rush-repair Tower System and its erection method
CN101446066B (en) Erection method of stiffening girder of suspension bridge and device thereof
CN105620493B (en) A kind of novel rapid-installation freight ropeway
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN106049293B (en) Stiffening girder of suspension bridge installation method and used shifting system is swung on navigable river
CN204821555U (en) Light -duty fast -assembling cableway
CN106245527A (en) A kind of dicyclic suspender and the erection method of Long span cat road track cable
CN106976797A (en) Three suspension centres turn round suspender
CN213140288U (en) Cable-stayed and suspension cable combined bridge double-rope rail transport line
CN111691305A (en) Method for installing main beam of suspension bridge
CN105735103A (en) Portable quick installation can dismantle bridge on foot
CN103626042A (en) Cableway transport lifting device
CN105586832A (en) Suspension type catwalk surface net mounting system
CN107022958A (en) The method in cable-stayed bridge across girder is installed using cable crane
CN105275251A (en) Railway existing line overhead line system hard crossbeam erection method
CN114873483A (en) Suspension cable type hanger rail hoisting equipment and construction method thereof
CN102442317B (en) Assembled type cableway transport device
CN207091932U (en) A kind of equipment of aerial trackless erecting suspension bridge stiff girder
CN201288308Y (en) Construction device for rope-suspension bridge stiff girder
CN110886188A (en) Large-span suspension bridge stiffening beam erecting system and use method thereof
CN110040638B (en) Cable-mounted crane device for mounting stiff beam of suspension bridge and mounting method
CN110820555A (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20170508

CF01 Termination of patent right due to non-payment of annual fee