CN204821555U - Light -duty fast -assembling cableway - Google Patents

Light -duty fast -assembling cableway Download PDF

Info

Publication number
CN204821555U
CN204821555U CN201520298002.3U CN201520298002U CN204821555U CN 204821555 U CN204821555 U CN 204821555U CN 201520298002 U CN201520298002 U CN 201520298002U CN 204821555 U CN204821555 U CN 204821555U
Authority
CN
China
Prior art keywords
cableway
bracket
light
loading
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520298002.3U
Other languages
Chinese (zh)
Inventor
焦光伟
蒲宏斌
陈飞
陈明
尹恒
常向东
卢彦博
张世峡
范晓明
邓松圣
陈绍令
陈玉玺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Logistical Engineering University of PLA
Original Assignee
Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Logistical Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp, Logistical Engineering University of PLA filed Critical Natural Gas Chuanqidong Transmission Pipeline Branch China Petroleum & Chemical Corp
Priority to CN201520298002.3U priority Critical patent/CN204821555U/en
Application granted granted Critical
Publication of CN204821555U publication Critical patent/CN204821555U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

本实用新型涉及一种轻型快装索道,包括动力控制装置、支架装置、小车装置,所述动力控制装置包括卷扬机、副卷扬机、控制柜,所述支架装置包括设置在不同地理高度的上支架和下支架,所述上支架通过牵引索与下支架连接,所述小车装置包括滚轮、连接器、支架、手拉葫芦,所述滚轮通过交叉状的连接器与两条支架连接,所述卷扬机和副卷扬机分别与牵引索连接,所述上横梁通过滚轮与所述牵引索滑动连接,所述下横梁与所述承力索连接。本实用新型提供一种轻型快装索道,解决了现有索道只能固定安装、回收难、建设周期长的技术问题,轻型快装索道可以快速安装于山涧、河流、峭壁等复杂地形,也可以用于紧急救援或临时施工时的物资输送。

The utility model relates to a light fast-loading cableway, which comprises a power control device, a bracket device and a trolley device. The power control device includes a hoist, an auxiliary hoist, and a control cabinet. The bracket device includes upper brackets and The lower bracket, the upper bracket is connected with the lower bracket through a traction cable, the trolley device includes a roller, a connector, a bracket, and a chain block, and the roller is connected with two brackets through a cross-shaped connector. The hoist and The auxiliary winches are respectively connected to the traction cables, the upper beam is slidingly connected to the traction cables through rollers, and the lower beam is connected to the bearing cables. The utility model provides a light fast-loading cableway, which solves the technical problems that the existing cableway can only be fixedly installed, difficult to recycle, and has a long construction period. It is used for material transportation during emergency rescue or temporary construction.

Description

一种轻型快装索道A light-duty fast-loading ropeway

技术领域 technical field

本实用新型涉及一种运输索道,尤其地,本实用新型涉及应用于货物运输领域的一种轻型快装索道。 The utility model relates to a transportation cableway, in particular, the utility model relates to a light fast loading cableway applied in the field of cargo transportation.

背景技术 Background technique

随着新技术、新工艺的发展进步,索道的应用越来越广泛,同时索道的制造技术也越来越成熟,其相应制作规范也越来越全面。例如,根据索道分类,有专门用于名山大川的载人观光索道,也有专用于森林采伐的木材集材索道,还有用于偏远山区渡河用的简易滑索等等。其中简单的滑索,就是在上下两端之间固定一根钢丝绳,依托不同地形的自然落差,成为能跨山、越河、适应各种复杂地形的运输工具。 With the development and progress of new technology and new technology, the application of cableway is becoming more and more extensive. At the same time, the manufacturing technology of cableway is becoming more and more mature, and its corresponding manufacturing specifications are becoming more and more comprehensive. For example, according to the classification of cableways, there are manned sightseeing cableways specially used for famous mountains and rivers, timber skidding cableways specially used for forest logging, and simple ziplines used for crossing rivers in remote mountainous areas. Among them, the simple zipline is to fix a steel wire rope between the upper and lower ends. Relying on the natural drop of different terrains, it becomes a means of transportation that can cross mountains, cross rivers, and adapt to various complex terrains.

当然上述滑索对于地形的要求较高,而复杂的载人/载物索道可能延绵数千米,要翻越多个山头,所以需要复杂的结构体系、控制体系。但无论结构简单或复杂,上述索道都发挥着重要的运输功能,在特殊地带起着其他交通工具不可替代的作用。 Of course, the above-mentioned zipline has high requirements on the terrain, and the complex manned/loaded cableway may stretch for several kilometers and have to climb over multiple hills, so a complex structural system and control system are required. However, no matter the structure is simple or complex, the above-mentioned ropeways all play an important transportation function and play an irreplaceable role in other transportation means in special areas.

索道作为一种有效的运输工具,目前在使用上具有其局限性,即只能固定使用,而且建设周期长,回收较为困难。所以索道大多搭建具有大面积采伐需求的林区,或者人员流动量较大的观光景区。 As an effective means of transportation, the cableway has its limitations in use at present, that is, it can only be used fixedly, and the construction period is long, and it is difficult to recycle. Therefore, cableways are mostly built in forest areas with large-scale logging needs, or tourist attractions with large flow of people.

能否设计一种索道,不仅适用于大部分地形,组装简单,使用完毕后还可以再次回收。设计一种能够快速安装、回收简单的索道,是当下索道发展历程中亟需解决的一个技术问题。 Is it possible to design a cableway that is not only suitable for most terrains, but also easy to assemble and can be recycled again after use. Designing a cableway that can be installed quickly and recovered easily is a technical problem that needs to be solved urgently in the current development of cableways.

实用新型内容 Utility model content

本实用新型的一个目的在于,提供一种轻型快装索道,解决了现有索道只能固定安装、回收难、建设周期长的的技术问题。 One purpose of the utility model is to provide a light-duty quick-loading cableway, which solves the technical problems that the existing cableway can only be installed fixedly, is difficult to recycle, and has a long construction period.

本实用新型的上述目的和其他目的通过以下技术方案来解决: The above-mentioned purpose and other purposes of the utility model are solved through the following technical solutions:

本实用新型提供一种轻型快装索道,包括动力控制装置、支架装置、小车装置,所述动力控制装置包括卷扬机、副卷扬机、控制柜,所述卷扬机、副卷扬机和控制柜依次设置在低端平坦地面上,所述支架装置包括设置在不同地理高度的上支架和下支架,所述上支架通过牵引索与下支架连接,所述小车装置包括滚轮、连接器、支架、手拉葫芦,所述滚轮通过交叉状的连接器与横梁连接,所述横梁包括上横梁和下横梁,其特征在于: The utility model provides a light fast-loading cableway, which includes a power control device, a bracket device, and a trolley device. The power control device includes a hoist, an auxiliary hoist, and a control cabinet, and the hoist, auxiliary hoist, and control cabinet are sequentially arranged at the lower end On a flat ground, the support device includes an upper support and a lower support arranged at different geographical heights, the upper support is connected to the lower support through a traction cable, and the trolley device includes a roller, a connector, a support, and a chain hoist. The rollers are connected to the beam through a cross-shaped connector, and the beam includes an upper beam and a lower beam, and is characterized in that:

所述卷扬机和副卷扬机分别与一根牵引索连接; The hoist and the auxiliary hoist are respectively connected to a traction cable;

所述支架装置的顶端设置有转向滑轮或转向滑车; The top of the bracket device is provided with a steering pulley or a steering pulley;

所述上支架和下支架之间通过缠绕在所述转向滑轮或转向滑车外轮外径的牵引索相连; The upper bracket and the lower bracket are connected by a traction cable wrapped around the outer diameter of the steering pulley or the outer wheel of the steering block;

所述上支架和下支架之间通过缠绕在所述转向滑轮或转向滑车内轮外径的承力索相连; The upper bracket and the lower bracket are connected by a catenary cable wound around the outer diameter of the steering pulley or the inner wheel of the steering block;

所述上横梁通过滚轮与所述牵引索滑动连接,所述下横梁与所述承力索连接。 The upper beam is slidingly connected with the traction cable through rollers, and the lower beam is connected with the bearing cable.

本实用新型提供的一种轻型快装索道,优选地,所述储绳器通过机架固定设置在所述下支架一侧的地面上。 In the light-duty fast-loading cableway provided by the utility model, preferably, the rope storage device is fixedly arranged on the ground on one side of the lower support through a frame.

本实用新型提供的一种轻型快装索道,优选地,所述张力调节器固定在所述下支架的顶端,所述张力调节器与所述承力索连接。 In the light-duty fast-loading cableway provided by the utility model, preferably, the tension regulator is fixed on the top of the lower bracket, and the tension regulator is connected to the load-bearing cable.

本实用新型提供的一种轻型快装索道,优选地,所述储绳器通过纤维绳与所述张力调节器连接。 In the light-duty fast-loading cableway provided by the utility model, preferably, the rope storage device is connected with the tension regulator through a fiber rope.

本实用新型提供的一种轻型快装索道,优选地,所述支架装置呈人字形,所述支架装置通过地脚固定在地面上,所述支架装置与所述张紧索连接呈三角形。 In the light-duty fast-loading cableway provided by the utility model, preferably, the support device is in the shape of a herringbone, the support device is fixed on the ground by feet, and the support device is connected with the tension cable in a triangular shape.

本实用新型提供的一种轻型快装索道,优选地,所述支架装置由人字形的支撑架组成,所述支撑架之间设有交叉的张力绳。 The utility model provides a light-duty fast-loading cableway. Preferably, the support device is composed of herringbone support frames, and intersecting tension ropes are arranged between the support frames.

本实用新型提供的一种轻型快装索道,优选地,所述支架装置之间设置有垂向的两根稳定杆,分别设置在所述人字形的支撑架的对称位置。 In the light-duty fast-loading cableway provided by the utility model, preferably, two vertical stabilizing bars are arranged between the support devices, which are respectively arranged at symmetrical positions of the herringbone-shaped support frame.

本实用新型提供的一种轻型快装索道,优选地,所述手拉葫芦通过竖向连接装置与所述下横梁连接,所述手拉葫芦通过钢丝绳与物料连接。 The utility model provides a light fast-loading cableway. Preferably, the chain block is connected to the lower beam through a vertical connection device, and the chain block is connected to materials through a wire rope.

本实用新型提供的一种轻型快装索道,优选地,物料的一端通过安全线与所述上支架连接。 In the light-duty fast-loading cableway provided by the utility model, preferably, one end of the material is connected to the upper bracket through a safety wire.

本实用新型提供的一种轻型快装索道,优选地,所述支架装置为分节结构,所述支架装置的组装零件的重量都小于等于50kg,所述支架装置的高度为6.5m-7.5m、宽度为3.5m-4.5m,所述卷扬机和副卷扬机分别选取型号为1T和0.5T标准的专用卷扬机,物料输送距离为0-200m。 In the light-duty fast-loading cableway provided by the utility model, preferably, the support device is a segmented structure, the weight of the assembly parts of the support device is less than or equal to 50kg, and the height of the support device is 6.5m-7.5m , the width is 3.5m-4.5m, the hoist and the auxiliary hoist are respectively selected as special-purpose hoists with models of 1T and 0.5T standards, and the material conveying distance is 0-200m.

本实用新型的优点和有益效果在于: Advantage and beneficial effect of the present utility model are:

1、本实用新型首次将索道制造成便携拆装式、标准化产品,适用于紧急救援、河流、山涧等地形的人力或物资运输; 1. For the first time in the utility model, the cableway is manufactured into a portable disassembled and standardized product, which is suitable for emergency rescue, human or material transportation in rivers, mountain streams and other terrains;

2、本实用新型提供的一种轻型快装索道,架设时间短,单个零部件重量轻,适合人力搬运,适用于机械设备无法到达的地区。 2. The utility model provides a light-duty fast-loading cableway, which has a short erection time and a single component is light in weight, which is suitable for manual handling and is suitable for areas where mechanical equipment cannot reach.

3、本实用新型提供的一种轻型快装索道本索道,承力索、牵引索采用超高分子量聚乙烯纤维绳,代替传统结构钢丝绳,因此索体柔软、重量轻,加上快速支架是本实用新型中所述索道适于在野外人工快速架设。 3. The utility model provides a light-duty fast-loading cableway. The cableway uses ultra-high molecular weight polyethylene fiber ropes for the load-bearing cables and traction cables instead of traditional steel wire ropes. Therefore, the cable body is soft and light. The cableway described in the utility model is suitable for artificial rapid erection in the field.

附图说明 Description of drawings

下面结合附图对本实用新型的优选实施方式进行详细或者优选地描述,其中, The preferred embodiments of the present utility model are described in detail or preferably below in conjunction with the accompanying drawings, wherein,

图1为本实用新型的总体布局结构示意图; Fig. 1 is the overall layout structural representation of the utility model;

图2为图1的局部放大图; Figure 2 is a partially enlarged view of Figure 1;

图3为支架装置的结构示意图; Fig. 3 is the structural representation of support device;

图4为小车装置的机构示意图; Fig. 4 is the schematic diagram of the mechanism of the trolley device;

动力控制装置-1、卷扬机-11、副卷扬机-12、控制柜-13、支架装置-2、上支架-21、下支架-22、支撑架-23、张力绳-24、稳定杆-25、小车装置-3、滚轮-31、连接器-32、横梁-33、上横梁-331、下横梁-332、手拉葫芦-34、牵引索-4、承力索-5、储绳器-6、张力调节器-7、地脚-8、张紧索-9、安全线-10。 Power control device-1, hoist-11, auxiliary hoist-12, control cabinet-13, bracket device-2, upper bracket-21, lower bracket-22, support frame-23, tension rope-24, stabilizer bar-25, Trolley device-3, roller-31, connector-32, beam-33, upper beam-331, lower beam-332, chain hoist-34, traction rope-4, bearing cable-5, rope storage device-6 , Tension regulator-7, ground foot-8, tension cable-9, safety line-10.

具体实施方式 Detailed ways

本实用新型提供一种轻型快装索道,包括动力控制装置1、支架装置2、小车装置3,动力控制装置包括卷扬机11、副卷扬机12、控制柜13,卷扬机11、副卷扬机12和控制柜13依次设置在低端平坦地面上,支架装置2包括设置在不同地理高度的上支架21和下支架22,上支架21通过牵引索4与下支架23连接,小车装置3包括滚轮31、连接器32、横梁33、手拉葫芦34,滚轮31通过交叉状的连接器32与横梁33连接,横梁33包括上横梁331和下横梁332,其特征在于: The utility model provides a light fast-loading cableway, which includes a power control device 1, a bracket device 2, and a trolley device 3. The power control device includes a hoist 11, an auxiliary hoist 12, and a control cabinet 13. The hoist 11, the auxiliary hoist 12 and the control cabinet 13 Set on the low-end flat ground in turn, the support device 2 includes an upper support 21 and a lower support 22 arranged at different geographical heights, the upper support 21 is connected with the lower support 23 through a traction cable 4, and the trolley device 3 includes a roller 31 and a connector 32 , crossbeam 33, chain block 34, roller 31 is connected with crossbeam 33 by cross-shaped connector 32, crossbeam 33 comprises upper crossbeam 331 and lower crossbeam 332, it is characterized in that:

卷扬机11和副卷扬机12分别与一根牵引索4连接; The hoist 11 and the auxiliary hoist 12 are respectively connected with a traction cable 4;

支架装置2的顶端设置有转向滑轮或转向滑车; The top of the bracket device 2 is provided with a steering pulley or a steering tackle;

上支架21和下支架22之间通过缠绕在转向滑轮或转向滑车外轮外径的牵引索4相连; The upper bracket 21 and the lower bracket 22 are connected by a traction rope 4 wrapped around the outer diameter of the steering pulley or the outer wheel of the steering block;

上支架21和下支架22之间通过缠绕在转向滑轮或转向滑车内轮外径的承力索5相连; The upper bracket 21 and the lower bracket 22 are connected by a catenary cable 5 wrapped around the outer diameter of the steering pulley or the inner wheel of the steering block;

上横梁331通过滚轮31与牵引索4滑动连接,下横梁332与承力索5连接。 The upper beam 331 is slidably connected with the traction cable 4 through the roller 31 , and the lower beam 332 is connected with the catenary cable 5 .

优选地,储绳器6通过机架固定设置在下支架22一侧的地面上。 Preferably, the rope storage device 6 is fixedly arranged on the ground on one side of the lower support 22 through a frame.

优选地,张力调节器7固定在下支架22的顶端,张力调节器7与承力索5连接。 Preferably, the tension adjuster 7 is fixed on the top of the lower bracket 22 , and the tension adjuster 7 is connected with the catenary cable 5 .

优选地,储绳器6通过纤维绳与张力调节器7连接。 Preferably, the rope storage device 6 is connected with the tension regulator 7 through a fiber rope.

优选地,支架装置2呈人字形,支架装置2通过地脚8固定在地面上,支架装置2与张紧索9连接呈三角形。 Preferably, the support device 2 is herringbone-shaped, the support device 2 is fixed on the ground through the feet 8, and the support device 2 is connected with the tension cable 9 to form a triangle.

优选地,支架装置2由人字形的支撑架23组成,支撑架23之间设有交叉的张力绳24。 Preferably, the support device 2 is composed of herringbone-shaped support frames 23 , and intersecting tension ropes 24 are arranged between the support frames 23 .

优选地,支架装置2之间设置有垂向的两根稳定杆25,分别设置在人字形的支撑架23的对称位置。 Preferably, two vertical stabilizing rods 25 are arranged between the bracket devices 2 , and are respectively arranged at symmetrical positions of the herringbone-shaped support frame 23 .

优选地,手拉葫芦34通过竖向连接装置与下横梁332连接,手拉葫芦34通过钢丝绳与物料连接。 Preferably, the chain hoist 34 is connected to the lower beam 332 through a vertical connection device, and the chain hoist 34 is connected to the material through a wire rope.

优选地,物料的一端通过安全线10与上支架21连接。 Preferably, one end of the material is connected to the upper bracket 21 through the safety wire 10 .

优选地,支架装置2为分节结构,支架装置2的组装零件的重量都小于等于50kg,支架装置2的高度为6.5m-7.5m、宽度为3.5m-4.5m,卷扬机11和副卷扬机12分别选取型号为1T和0.5T标准的专用卷扬机,物料输送距离为0-200m。 Preferably, the support device 2 is a segmented structure, the weight of the assembly parts of the support device 2 is less than or equal to 50kg, the height of the support device 2 is 6.5m-7.5m, and the width is 3.5m-4.5m. The winch 11 and the auxiliary winch 12 Select special hoists with models of 1T and 0.5T respectively, and the material conveying distance is 0-200m.

本实用新型提供一种轻型快装索道,其技术方案和对应的技术效果如下: The utility model provides a light-duty fast-loading cableway, and its technical scheme and corresponding technical effects are as follows:

①参考附图1-3本实用新型提供的一种轻型快装索道,采用单点往复式货运索道的基本结构,但和标准单点往复式货运索道相比,为了能够快速安装,支架装置2由可以快速拆装的金属结构构成,且支架装置2的每个组成零件自重均不大于50Kg,满足人工在山道上搬运。支架装置2呈人字形,与张紧索9连接共同构成一个稳定的三角支撑。张紧索9承担索道承力索5的主要拉力,长度可调,可以根据野外地形,捆绑于粗大树木、突起的岩石上或牢固的建筑上,否则只能使用锚具与地面固定连接。 ① Referring to accompanying drawings 1-3, a light-duty quick-loading cableway provided by the utility model adopts the basic structure of a single-point reciprocating freight cableway. It is composed of a metal structure that can be quickly disassembled and assembled, and the self-weight of each component of the bracket device 2 is not greater than 50Kg, which can meet manual handling on mountain roads. The bracket device 2 is in the shape of a herringbone, and is connected with the tension cable 9 to form a stable triangular support. The tension cable 9 bears the main tension of the cableway catenary cable 5, and its length is adjustable. It can be bound to thick trees, protruding rocks or firm buildings according to the field terrain, otherwise it can only be fixedly connected with the ground using anchorage.

承力索5设置在上支架21和下支架22之间,承力索5采用超高分子量聚乙烯纤维绳,作用是充当小车装置3移动的滑道。承力索5的表面经聚脲或其他喷涂处理,使得索体紧密且有良好的耐磨性能。纤维绳的质量只有钢丝绳的1/7到1/8,适合人工搬运和安装。 Bearing cable 5 is arranged between upper support 21 and lower support 22, and bearing cable 5 adopts ultra-high molecular weight polyethylene fiber rope, and the effect is to act as the slideway that trolley device 3 moves. The surface of the catenary cable 5 is treated with polyurea or other spray coating, so that the cable body is compact and has good wear resistance. The quality of fiber rope is only 1/7 to 1/8 of steel wire rope, suitable for manual handling and installation.

牵引索4采用超高分子量聚乙烯纤维绳,卷扬机11和副卷扬机12分别与一根牵引索4连接,因此牵引索4上、下运行均采用动力牵引,以保证在上支架21和下支架22之间的高度不足以依靠重力使吊钩下滑时使用。同样,卷扬机11、副卷扬机12组成部件的自重不超过50Kg。 The traction rope 4 adopts ultra-high molecular weight polyethylene fiber rope, and the hoist 11 and the auxiliary hoist 12 are respectively connected with a traction rope 4, so that the upper and lower running of the traction rope 4 adopts power traction to ensure that the upper bracket 21 and the lower bracket 22 It is used when the height between them is not enough to rely on gravity to make the hook slide down. Equally, the self-weight of hoisting machine 11, auxiliary hoisting machine 12 components is no more than 50Kg.

②储绳器6通过机架固定设置在下支架22一端,张力调节器7固定在下支架22的顶端,张力调节器7与承力索5连接,储绳器6和张力调节器7用于随时调节承力索5的驰度以及上支架21和下支架22间的准确距离。 ② The rope storage device 6 is fixed on one end of the lower bracket 22 through the frame, and the tension regulator 7 is fixed on the top of the lower bracket 22. The tension regulator 7 is connected with the load-bearing cable 5, and the rope storage device 6 and the tension regulator 7 are used for adjusting at any time. The latitude of catenary cable 5 and the accurate distance between upper support 21 and lower support 22.

参考附图4: Refer to attached picture 4:

③滚轮31通过交叉状的连接器与两条支架连接,小车装置3的上端依靠滚轮31在承力索5上滚动行走,承力索5承受绝大部分重力。上横梁331通过滚轮31与牵引索4滑动连接,牵引索4牵引小车装置3上下行走。手拉葫芦34通过竖向连接装置与下横梁332连接,手拉葫芦34通过钢丝绳与物料连接,方便物料的起吊和卸货,还可以在器械需要保持水平时运输。 ③ The roller 31 is connected to the two brackets through a cross-shaped connector, and the upper end of the trolley device 3 rolls and walks on the catenary cable 5 by means of the roller 31, and the catenary cable 5 bears most of the gravity. The upper beam 331 is slidingly connected with the traction cable 4 through the roller 31, and the traction cable 4 pulls the trolley device 3 to move up and down. The chain block 34 is connected with the lower beam 332 through a vertical connection device, and the chain block 34 is connected with the material through a wire rope, which is convenient for lifting and unloading of the material, and can also be transported when the equipment needs to be kept horizontal.

安装的具体步骤:将轻型快装索道的零部件迅速搬运到指定位置,组装完毕后,将承力索5缠绕在转向滑轮或转向滑车内轮外将上支架21和下支架22连接起来,开动张力调节器7,收紧承力索5。在收紧承力索5的同时,将两端支架立起(拉起来)。目测支架和水平面基本垂直。 The specific steps of installation: quickly move the parts of the light-duty quick-loading cableway to the designated position. After the assembly is completed, wrap the catenary cable 5 around the steering pulley or the inner wheel of the steering block to connect the upper bracket 21 and the lower bracket 22, and start Tension regulator 7 tightens catenary 5. While tightening the catenary cable 5, stand up (pull up) the supports at both ends. Visually, the bracket and the horizontal plane are basically vertical.

安装后,试吊一件满载荷工件,目测是否可以通过全部障碍物,调节承力索5的驰度,保证所有工件都能顺利输送,既可以进行正常使用。 After installation, try to lift a fully loaded workpiece, visually check whether all obstacles can be passed, adjust the latitude of catenary cable 5, ensure that all workpieces can be transported smoothly, and can be used normally.

结合具体实施例对本实用新型中的技术方案作进一步理解: In conjunction with specific embodiment, the technical scheme in the utility model is further understood:

实施例:QKS-1-200型快装索道 Embodiment: QKS-1-200 type fast loading cableway

一、索道参数 1. Cableway parameters

Q:轻型;K:快装型;S:单支点单索往复式架空索道;1输送货物重量0-1吨,200有效输送距离20米-200米。 Q: Light type; K: Quick loading type; S: Single fulcrum single cable reciprocating aerial ropeway; 1. The weight of the transported goods is 0-1 ton, and the effective conveying distance of 200 meters is 20 meters-200 meters.

二、索道结构形式 Second, the structure of the cableway

索道型式:单支点单索往复式架空索道; Cableway type: single fulcrum single cable reciprocating overhead cableway;

运行速度:运行的最大速度为2.5m/s,放绳速度为2.5m/s; Running speed: the maximum running speed is 2.5m/s, and the rope releasing speed is 2.5m/s;

承力索:φ24mm超高耐磨超高分子量聚乙烯绳、安全系数取>2.5,储绳器一台(200),专用张力调节器一台(15吨) Bearing cable: φ24mm ultra-high wear-resistant ultra-high molecular weight polyethylene rope, safety factor > 2.5, one rope storage device (200), one special tension regulator (15 tons)

支架装置:整体组装式钢结构支架,支撑架高度分5节,高7.0m,支架的宽度约4.0m。 Bracket device: overall assembled steel structure bracket, the height of the support frame is divided into 5 sections, the height is 7.0m, and the width of the bracket is about 4.0m.

牵引索:超高耐磨φ12mm超高分子量聚乙烯绳(专用),安全系数取>2.5; Traction rope: ultra-high wear-resistant φ12mm ultra-high molecular weight polyethylene rope (for special use), with a safety factor of >2.5;

专用卷扬机1台(1吨),副卷扬机1台(0.5吨); 1 set of special hoist (1 ton), 1 set of auxiliary hoist (0.5 ton);

三、使用说明 3. Instructions for use

索道选址:对架空索道的选择应遵循下列原则:首先应对架设位置进行现场实地调查,并按照架空索道跨距最小、中间没有明显凸出物、两端地势平坦的原则择优选取;索道两端应能够允许人通过,能够搬卸基本物品和铺设电缆;牵引索4和电缆一同铺设,尽可能避开树木等会影响索体张紧升空的障碍物,如果必须通过树林等,可对局部小范围树木进行移植处理。 Cableway site selection: The selection of the aerial cableway should follow the following principles: first, the site survey should be conducted on the erection location, and the optimal selection should be made according to the principles of the smallest span of the aerial cableway, no obvious protrusions in the middle, and flat terrain at both ends; It should be able to allow people to pass through, be able to unload basic items and lay cables; the traction rope 4 is laid together with the cables, and avoid trees and other obstacles that will affect the tension of the cable body. If it is necessary to pass through the woods, etc., local Small-scale trees are transplanted.

基础和固定:在索道主体结构的固定过程中,为提高安装速度,应当尽可能利用现场环境,如粗大的树木、树墩、突起的岩石或牢固的建筑物等进行固定,固定物受力应不低于13吨。 Foundation and fixing: In the fixing process of the main structure of the cableway, in order to increase the installation speed, the on-site environment should be used as much as possible, such as thick trees, tree stumps, protruding rocks or firm buildings, etc. less than 13 tons.

对于没有突出岩石、平缓的沉土层等,无法找到固定张紧索9的特殊地况,须根据经验判断地基的制作情况。根据实际情况,利用自带的岩锚杆和快干水泥对地基进行快速固定,或制作土层基桩,必要时须有专业的地质工程师做正确的预判,在使用时,应当测试地基承重。 For not protruding rock, gentle subsidence soil layer etc., can't find the special ground condition of fixing tension cable 9, must judge the making situation of foundation according to experience. According to the actual situation, use the built-in rock bolts and quick-drying cement to quickly fix the foundation, or make soil foundation piles. If necessary, professional geological engineers must make correct predictions. When using, the foundation should be tested for load bearing .

支架装置安装:选定基础,将支架装置2等的零部件全部运输到位。首先,按照尺寸制作支架装置2的快速固定地基。地基预埋上支架21和下支架22的轴孔连线,目测要与承力索5基本保持垂直。地基经快干水泥基本紧固后,开始组装支架装置2。 Bracket device installation: select the foundation, and transport all parts such as the bracket device 2 into place. First, make the quick-fix foundation for the stand unit 2 to size. The shaft hole connection line of the pre-embedded upper support 21 and the lower support 22 in the foundation shall be kept vertical substantially with the catenary cable 5 by visual inspection. After the foundation is basically fastened by quick-drying cement, the bracket device 2 starts to be assembled.

组装支架装置2时,支架装置2的方向为顶端向外,即接近地锚。将张紧索9链接地锚与支架的顶部,并根据张紧索9与水平面的夹角预估张紧索9所需长度,调节张紧索9的长度,使支架装置2立起时不会向对侧倾翻。支架装置2安装紧固完成后,在支架装置2的人字形的支撑架23之间设置交叉的张力绳24,将支架装置2张紧,其张紧程度应以两根人字形支撑架23不晃动、不弯曲为准。 When assembling the support device 2, the direction of the support device 2 is that the top end is outward, that is, it is close to the ground anchor. Connect the tension cable 9 to the top of the ground anchor and the support, and estimate the required length of the tension cable 9 according to the angle between the tension cable 9 and the horizontal plane, and adjust the length of the tension cable 9 so that the support device 2 does not stand up. Will tip over to the opposite side. After the support device 2 was installed and fastened, cross tension ropes 24 were set between the herringbone support frames 23 of the support device 2, and the support device 2 was tensioned. Shaking and not bending shall prevail.

承力索安装:在将支架装置2运输到到指定位置的同时,预放一根直径4mm的超高分子量聚乙烯纤维索,人工直接将承力索5和牵引索4拖拽到指定位置。将承力索5和牵引索4与相应装置连接,进行简单固定。 Cataclysm installation: While transporting the support device 2 to the designated location, pre-place a 4mm diameter ultra-high molecular weight polyethylene fiber cable, and manually drag the catenary cable 5 and the traction cable 4 to the designated location. Connect the catenary cable 5 and the traction cable 4 with corresponding devices for simple fixing.

支架装置立起和张紧:上述步骤进行完毕,检查无误后,可以通电启动卷扬机11缓慢张紧承力索5,利用承力索5的张紧力将上支架21和下支架22立起。调整张紧索9的张力,保持支架装置2与水平垂直(可以自制重锤,简单测试垂直度)。将牵引索4适当张紧,牵引索4的起升过程中,应保证牵引索4不会脱落,也不要挂在树枝或小车侧面。 Stand erection and tensioning: the above steps are completed, after the inspection is correct, the hoist 11 can be energized to slowly tension the catenary cable 5, and the upper bracket 21 and the lower bracket 22 will be erected by utilizing the tension force of the catenary cable 5. Adjust the tension of the tensioning cable 9 to keep the support device 2 vertical to the level (you can make your own weight to simply test the verticality). The traction rope 4 is properly tensioned. During the lifting process of the traction rope 4, it should be ensured that the traction rope 4 will not fall off, and it should not be hung on the branches or the side of the dolly.

试运行与驰度调整:承力索5的驰度的大小是索道能否正常工作的基础,驰度太大,在运输过程中,因受集中荷载的作用,料斗或被物料及器材易与被跨越物碰撞;驰度太小,则在集中荷载的作用下,承力索5应力会大幅增加,降低索道的运载重量。因此,在架设索道时,应尽可能增大索道的驰度,保证物料通过即可。对于个别突出的岩石、树木等障碍物,必要时,将上述障碍物移除。 Trial run and latitude adjustment: The latitude of the catenary cable 5 is the basis for the normal operation of the cableway. If the latitude is too large, during transportation, due to the effect of concentrated load, the hopper or the materials and equipment are easily separated Collided by the spanning object; if the latitude is too small, under the action of concentrated load, the stress of the catenary cable 5 will increase significantly, reducing the carrying weight of the cableway. Therefore, when erecting the cableway, the laxity of the cableway should be increased as much as possible to ensure that the materials pass through. For individual protruding rocks, trees and other obstacles, if necessary, remove the above obstacles.

鉴于以上原则,索道在首次试运行时,可选择1.05吨的物料试吊,重点应检查支架装置2、相关连接件、张紧索9以及其他重要部件的牢固程度,调节承力索5的驰度,目测物料是否等够顺利通过。承力索5的驰度不得小于4米。 In view of the above principles, during the first test run of the cableway, 1.05 tons of material can be selected for trial lifting. The focus should be to check the firmness of the support device 2, related connectors, tension cables 9 and other important components, and adjust the speed of the catenary cable 5. Degree, visually check whether the material is waiting enough to pass through smoothly. The latitude of catenary cable 5 must not be less than 4 meters.

将被吊物料在短距离内(可控距离)反复运行数次,运行正常,则可以正常使用轻型快装索道。 Repeatedly run the hoisted material several times within a short distance (controllable distance), and if the operation is normal, the light-duty quick-loading cableway can be used normally.

索道回收与保养:本索道回收时,检查和鉴定零部件的损坏情况,及时淘汰不符合要求的零部件,清除全部零件表面的尘土,给运转部位涂润滑油。 Cableway recovery and maintenance: When the cableway is recovered, check and identify the damage of the parts, eliminate the parts that do not meet the requirements in time, remove the dust on the surface of all parts, and apply lubricating oil to the running parts.

装箱以占用空间最小为原则,零部件应当方便拆卸,便于运输,装箱各部件不大于50kg,进行编号后放于箱内的固定位置,方便存取。 Packing is based on the principle of occupying the smallest space. Parts should be easy to disassemble and transport. Each part of the packing should not exceed 50kg. After numbering, put them in a fixed position in the box for easy access.

为保持索道整体简洁、实用、轻便的特性,在电气控制方面,也采取了最简单的设计,将电气控制的装置集中安装在控制柜13内,满足可操控性的需要。 In order to keep the overall simplicity, practicality and portability of the cableway, the simplest design is also adopted in terms of electrical control, and the electrical control devices are centrally installed in the control cabinet 13 to meet the needs of maneuverability.

根据本实用新型的技术方案,在不变更本实用新型的实质精神的情况下,本领域的普通技术人员可以提出本实用新型的多个结构方式。因此以下具体实施方式以及附图只是对本实用新型的技术方案的具体说明,而不应当视为本实用新型的全部或者视为对本实用新型技术方案的限定或限制。 According to the technical solution of the utility model, those skilled in the art can propose multiple structural modes of the utility model without changing the essential spirit of the utility model. Therefore, the following specific embodiments and drawings are only specific descriptions of the technical solution of the utility model, and should not be regarded as the whole of the utility model or as a limitation or restriction on the technical solution of the utility model.

Claims (10)

1.一种轻型快装索道,包括动力控制装置(1)、支架装置(2)、小车装置(3),所述动力控制装置(1)包括卷扬机(11)、副卷扬机(12)、控制柜(13),所述卷扬机(11)、副卷扬机(12)和控制柜(13)依次设置在低端平坦地面上,所述支架装置(2)包括设置在不同地理高度的上支架(21)和下支架(22),所述上支架(21)通过牵引索(4)与下支架(22)连接,所述小车装置(3)包括滚轮(31)、连接器(32)、横梁(33)、手拉葫芦(34),所述滚轮(31)通过交叉状的连接器(32)与横梁(33)连接,所述横梁(33)包括上横梁(331)和下横梁(332),其特征在于: 1. A light-duty fast loading cableway, comprising power control device (1), support device (2), trolley device (3), described power control device (1) comprises hoist (11), auxiliary hoist (12), control cabinet (13), the hoist (11), the auxiliary hoist (12) and the control cabinet (13) are sequentially arranged on the low-end flat ground, and the bracket device (2) includes upper brackets (21) arranged at different geographical heights ) and the lower support (22), the upper support (21) is connected with the lower support (22) by the traction cable (4), and the trolley device (3) includes a roller (31), a connector (32), a crossbeam ( 33), chain hoist (34), described roller (31) is connected with beam (33) by cross-shaped connector (32), and described beam (33) comprises upper beam (331) and lower beam (332) , characterized by: 所述卷扬机(11)和副卷扬机(12)分别与一根牵引索(4)连接; The hoist (11) and the auxiliary hoist (12) are respectively connected with a traction cable (4); 所述支架装置(2)的顶端设置有转向滑轮或转向滑车; The top of the bracket device (2) is provided with a steering pulley or a steering block; 所述上支架(21)和下支架(22)之间通过缠绕在所述转向滑轮或转向滑车外轮外径的牵引索(4)相连; The upper bracket (21) and the lower bracket (22) are connected by a traction cable (4) wrapped around the outer diameter of the steering pulley or the outer wheel of the steering block; 所述上支架(21)和下支架(22)之间通过缠绕在所述转向滑轮或转向滑车内轮外径的承力索(5)相连; The upper bracket (21) and the lower bracket (22) are connected by a catenary cable (5) wound around the outer diameter of the steering pulley or the inner wheel of the steering block; 所述上横梁(331)通过滚轮(31)与所述牵引索(4)滑动连接,所述下横梁(332)与所述承力索(5)连接。 The upper beam (331) is slidably connected to the traction cable (4) through rollers (31), and the lower beam (332) is connected to the catenary cable (5). 2.根据权利要求1所述的一种轻型快装索道,其特征在于,储绳器(6)通过机架固定设置在所述下支架(22)一侧的地面上。 2. A light-duty fast-loading cableway according to claim 1, characterized in that the rope storage device (6) is fixedly arranged on the ground on one side of the lower bracket (22) through a frame. 3.根据权利要求2所述的一种轻型快装索道,其特征在于,张力调节器(7)固定在所述下支架(22)的顶端,所述张力调节器(7)与所述承力索(5)连接。 3. A kind of light fast loading cableway according to claim 2, is characterized in that, tension regulator (7) is fixed on the top of described lower support (22), and described tension regulator (7) and described bearing The cable (5) is connected. 4.根据权利要求3所述的一种轻型快装索道,其特征在于,储绳器(6)通过纤维绳与所述张力调节器(7)连接。 4. A light-duty fast-loading cableway according to claim 3, characterized in that the rope storage device (6) is connected to the tension regulator (7) through a fiber rope. 5.根据权利要求1所述的一种轻型快装索道,其特征在于,所述支架装置(2)呈人字形,所述支架装置(2)通过地脚(8)固定在地面上,所述支架装置(2)与张紧索(9)连接呈三角形。 5. A kind of light-duty quick loading cableway according to claim 1, is characterized in that, described support device (2) is herringbone, and described support device (2) is fixed on the ground by anchor (8), so The support device (2) is connected with the tension cable (9) in a triangular shape. 6.根据权利要求5所述的一种轻型快装索道,其特征在于,所述支架装置(2)由人字形的支撑架(23)组成,所述支撑架(23)之间设有交叉的张力绳(24)。 6. A light-duty quick-loading cableway according to claim 5, characterized in that, the support device (2) is composed of herringbone support frames (23), and a cross is provided between the support frames (23). tension rope (24). 7.根据权利要求6所述的一种轻型快装索道,其特征在于,所述支架装置(2)之间设置有垂向的两根稳定杆(25),分别设置在所述人字形的支撑架(23)的对称位置。 7. A kind of light-duty quick loading cableway according to claim 6, is characterized in that, two vertical stabilizing rods (25) are arranged between said support device (2), are respectively arranged on said herringbone The symmetrical position of support frame (23). 8.根据权利要求1所述的一种轻型快装索道,其特征在于,所述手拉葫芦(34)通过竖向连接装置与所述下横梁(332)连接,所述手拉葫芦(34)通过钢丝绳与物料连接。 8. A light-duty fast-loading cableway according to claim 1, characterized in that, the chain block (34) is connected to the lower beam (332) through a vertical connection device, and the chain block (34) ) is connected with the material through a wire rope. 9.根据权利要求1所述的一种轻型快装索道,其特征在于,物料的一端通过安全线(10)与所述上支架(21)连接。 9. A light fast loading cableway according to claim 1, characterized in that one end of the material is connected to the upper bracket (21) through a safety wire (10). 10.根据权利要求1所述的一种轻型快装索道,其特征在于,所述支架装置(2)为分节结构,所述支架装置(2)的组装零件的重量都小于等于50kg,所述支架装置(2)的高度为6.5m-7.5m、宽度为3.5m-4.5m,所述卷扬机(11)和副卷扬机(12)分别选取型号为1T和0.5T标准的专用卷扬机,物料输送距离为0-200m。 10. A kind of light fast loading cableway according to claim 1, characterized in that, the support device (2) is a segmented structure, and the weight of the assembled parts of the support device (2) is all less than or equal to 50kg, so The height of the support device (2) is 6.5m-7.5m, and the width is 3.5m-4.5m. The hoist (11) and the auxiliary hoist (12) are respectively selected as special-purpose hoisting machines of 1T and 0.5T standards. The distance is 0-200m.
CN201520298002.3U 2015-05-08 2015-05-08 Light -duty fast -assembling cableway Expired - Fee Related CN204821555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520298002.3U CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520298002.3U CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Publications (1)

Publication Number Publication Date
CN204821555U true CN204821555U (en) 2015-12-02

Family

ID=54679185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520298002.3U Expired - Fee Related CN204821555U (en) 2015-05-08 2015-05-08 Light -duty fast -assembling cableway

Country Status (1)

Country Link
CN (1) CN204821555U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106114526A (en) * 2016-07-22 2016-11-16 巨力索具股份有限公司 Air transport deliverance apparatus
CN106184237A (en) * 2015-05-08 2016-12-07 中国石油化工股份有限公司天然气川气东送管道分公司 A kind of Light-duty Quick-installation cableway
CN106314448A (en) * 2016-09-20 2017-01-11 巨力索具股份有限公司 Ropeway supporting frame and inverted installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106184237A (en) * 2015-05-08 2016-12-07 中国石油化工股份有限公司天然气川气东送管道分公司 A kind of Light-duty Quick-installation cableway
CN106114526A (en) * 2016-07-22 2016-11-16 巨力索具股份有限公司 Air transport deliverance apparatus
CN106314448A (en) * 2016-09-20 2017-01-11 巨力索具股份有限公司 Ropeway supporting frame and inverted installation method thereof

Similar Documents

Publication Publication Date Title
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN201494438U (en) Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN104195952A (en) Steel box girder erection method applied to steel and concrete hybrid girder cable-stayed bridge
CN106081924B (en) A kind of lightweight Multifunctional container gantry crane and its assemble method
CN105620493B (en) A kind of novel rapid-installation freight ropeway
CN102259649A (en) Curve cableway transporting system of double-cable circulating type
CN205489264U (en) Hydraulic pressure assembled crossing structure
CN104494602A (en) Construction method for transmission line project material transport by prefabricated cableway
CN204821555U (en) Light -duty fast -assembling cableway
CN213140288U (en) Cable-stayed and suspension cable combined bridge double-rope rail transport line
CN101787677B (en) Method for erecting girder of suspension bridge by double-hoisting hydraulic NC (numerical control) cable crane
CN101481903A (en) The method of erecting the main truss of the suspension bridge in mountainous area by reversing and assembling the spanning cable crane
CN202413791U (en) Assembling-type cableway transport device
CN108657192A (en) A kind of mountain area transport cableway system
CN107476195A (en) A kind of suspension bridge transports the fortune beam tackle system of stiff girder
CN201033858Y (en) Double load-bearing cable freight ropeway with adjustable tower height
CN207091932U (en) A kind of equipment of aerial trackless erecting suspension bridge stiff girder
CN101063285B (en) Double carrying rope freight traffic cable way with height-adjustable pylon
CN110820555B (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN105539806A (en) Suspension balloon cableway transporting device
CN102442317A (en) Assembled type cableway transport device
CN106315427B (en) A kind of crawler type goods jack conveyance
CN221479333U (en) Photovoltaic simple rope sliding device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20170508