CN204801780U - Device of car is transversely transferred fast to two tracks - Google Patents

Device of car is transversely transferred fast to two tracks Download PDF

Info

Publication number
CN204801780U
CN204801780U CN201520576982.9U CN201520576982U CN204801780U CN 204801780 U CN204801780 U CN 204801780U CN 201520576982 U CN201520576982 U CN 201520576982U CN 204801780 U CN204801780 U CN 204801780U
Authority
CN
China
Prior art keywords
car
crawler belt
fast
crawler
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520576982.9U
Other languages
Chinese (zh)
Inventor
郭晓勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520576982.9U priority Critical patent/CN204801780U/en
Application granted granted Critical
Publication of CN204801780U publication Critical patent/CN204801780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model discloses a device of car is transversely transferred fast to two tracks. Its technical scheme's main points are, it mainly includes power device, transmission shaft, action wheel, follower, riding wheel, two track, bearing frame, support base, car load -bearing platform, two tracks be two tracks that are parallel to each other, two tracks set up on the car load -bearing platform of train, two tracks by the drive of corresponding two sets of action wheels, follower, be provided with a plurality of riding wheels between each group's action wheel and follower, power device drive transmission shaft, transmission shaft drive action wheel, the car on the two tracks of action wheel drive moves to same direction. The utility model discloses a device be fit for to set up and to utilize high -speed railway to use on transporting high speed train and/or the train platform of car fast, and it can realize that over one hundred car was accomplished simultaneously and get on the bus, get off in 2-3 minutes between train platform and train, has to save the fuel by a wide margin, to reduce automobile exhaust, to improve car functioning speed's effect.

Description

A kind of pair of crawler belt laterally transfers the device of car fast
Technical field the utility model relates to the device that a kind of pair of crawler belt laterally transfers car fast.More particularly, it is a kind of device being applicable to being arranged on the horizontal transfer car fast of a kind of pair of crawler belt utilizing high speed railway network to transport fast the high speed train of car and/or railway platform use, and device of the present utility model can make over one hundred car complete fast within the time of 2 ~ 3 minutes between railway platform and high speed train to get on the bus simultaneously, get off.
Background technology is current, and domestic and international high speed railway network is all for passenger traffic, high speed railway network is not used for the precedent of car fast transportation.Global high speed railway is only for passenger traffic, and the capacity causing high speed railway a large amount of is idle, and the high speed railway overwhelming majority of China is all in lossing state, especially inter-city high-speed rail, and most of inter-city high-speed rail bus occupant has a full house rate less than 50%.On the other hand, the Car on express highway is completely for suffering from, and the vehicle congestion especially in big city is even more serious.
Along with the fast development of economy, the owning amount of private car constantly rises, and causes the Car Traffic in big city or megalopolis to block up day by day serious; The another aspect that Car Traffic in big city or megalopolis blocks up is exactly that the discharge of car tail gas causes aerial contamination, and have expert to point out, in city haze, the contribution rate of car tail gas is not less than 20%.
If the idle capacity of public backbones high speed railway network, inter-city high-speed rail network can be made full use of, and rapid transit network is created in big city or megalopolis, allow national main line high speed railway network, inter-city high-speed rail network, rapid transit network-efficient transport car fast, just can realize the energy-saving and environmental protection of car, quick, Effec-tive Function.Certainly, car energy-saving and environmental protection, fast, efficient operating mode will become dazzling world's business card.
Realize above-mentioned target, solve car can complete fast between railway platform and high speed train get on the bus, a kind of pair of crawler belt of getting off laterally fast the device of transfer car be exactly a crucial sport technique segment.
Utility model content the purpose of this utility model will overcome deficiency of the prior art exactly, transport for utilizing high speed railway network the device that the high speed train of car and railway platform provide the horizontal transfer car fast of a kind of pair of crawler belt fast, thus realize the two-way quick transfer of car between railway platform and train.
Now the device of a kind of pair of crawler belt of the present utility model horizontal transfer fast car is described below.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, it mainly comprises engine installation, transmission shaft, driving wheel, follower, support roller, two crawler belt, bearing seat, support plinth, car carrying platform, described two crawler belts are two crawler belts be parallel to each other, described two crawler belts are arranged on car carrying platform, described two crawler belts are by corresponding two groups of driving wheels, follower drives, multiple support roller is also provided with between each group driving wheel and follower, described engine installation drives transmission shaft, transmission shaft drives driving wheel, follower, driving wheel, follower drives the car on two crawler belt to run to same direction.
A device for the horizontal transfer car fast of pair crawler belt, the main points of its technical scheme are, two driving wheels of described two crawler belts to be preferably disposed on same transmission shaft but to be not limited to be arranged on same transmission shaft.The benefit that two driving wheels of described two crawler belts are arranged on same transmission shaft is, the front-wheel of car can realize synchronous, synchronized transverse shifting better with trailing wheel.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the two ends of the wheel shaft of described two groups of driving wheels, follower or multiple support roller are arranged on corresponding bearing seat, described bearing block is arranged on support plinth, and described support plinth is arranged on car carrying platform.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the two ends of the wheel shaft of described driving wheel are arranged on corresponding bearing seat, described bearing block is arranged on support plinth, described support plinth is arranged on car carrying platform, the two ends of the wheel shaft of described follower or multiple support roller are arranged on corresponding support plinth, and described support plinth is arranged on car carrying platform.
A device for the horizontal transfer car fast of pair crawler belt, the main points of its technical scheme are, the distance between two described crawler belts be parallel to each other is more than or equal to the distance between the front-wheel of car and trailing wheel.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the length of described two crawler belts is preferably equal but be not limited to equal, the Origin And Destination of described two crawler belts to be preferably in respectively on the same straight line perpendicular with two track length direction but to be not limited to be in respectively on the same straight line perpendicular with two track length direction, the length of the two crawler belt Origin And Destination benefit be in respectively on the same straight line perpendicular with two track length direction that is equal and two crawler belt is also in order to the front-wheel of car and trailing wheel can realize synchronous better, synchronized transverse shifting.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, described two crawler belts also comprise and is provided with raised line, distance often between adjacent two raised lines is greater than the width of car wheel, make car wheel can be parked between two raised lines, the setting of raised line avoids car wheel to skid on two crawler belt.
A kind of pair of crawler belt laterally transfers the device of car fast; the main points of its technical scheme are; also comprise and be provided with car bearing plate; the position that the below that described car bearing plate is arranged on two crawler belts of carrying car is pressed close to mutually; the two ends of described car bearing plate are arranged on car carrying platform; the setting of car bearing plate both can protect two crawler belt, also can ensure that car runs more stably on two crawler belt.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, also comprise and be provided with transition wheel, described transition wheel is arranged on one end of two crawler belt but is not limited to be arranged on one end of two crawler belt, transition wheel is arranged on railway platform and enters the station district and car is waited between district and/or car is waited between district and high speed train and/or high speed train and railway platform set off between district junction, the two ends of the wheel shaft of transition wheel are arranged on support plinth, described support plinth is arranged on car carrying platform, the setting of transition wheel be in order to ensure car railway platform enter the station district and car is waited between district and/or car is waited between district and high speed train and/or high speed train and railway platform set off between district junction two crawler belts on accessiblely to run more stably.
In order to deepen the understanding of the device two crawler belt laterally being transferred fast to car, the using method of the special device to a kind of pair of above-mentioned crawler belt horizontal transfer fast car is described below.
The every one deck car carrying platform utilizing high speed railway to transport the high speed train of car fast is all provided with multiple or multiple with the device of the horizontal transfer car fast of last pair of crawler belt, each the stratose station console utilizing high speed railway to transport car is fast respectively arranged with enter the station district, car of car and waits district, car departures district, and the car of railway platform wait district, car departures district of district, car of entering the station all is respectively arranged with multiple or multiple with the device of the horizontal transfer car fast of last pair of crawler belt, the method that two crawler belts that a kind of railway platform of this utility model uses laterally transfer car has fast comprised car get on the bus program, the car of the program of waiting, car that enter the station and to have got off departures program, described car get on the bus program, the car of the program of waiting, car that enter the station is got off in departures program and is all completed under the unified matching coordinative between the automation control system and the automation control system of railway platform of described high speed train, and the automation control system of high speed train and the automation control system of railway platform accept the higher level high speed railway that utilizes and transport instruction or the control of the automation control system of the at full line of car or the automation control system of this circuit fast, high speed railway is utilized to transport car inventory information on every one deck car carrying platform of the high speed train of car fast, car inventory information on the car carrying platform of unloaded information and each stratose station console, unloaded information is transmitted mutually by the automation control system of the automation control system of high speed train and the automation control system of railway platform and the higher level automation control system and this circuit that utilize high speed railway to transport the at full line of car fast respectively, calculation process, feedback, only have when car have enter the station wait or car is got on the bus or car is got off demand time, relevant two crawler belts on every one deck car carrying platform of high speed train device that laterally the quick relevant two crawler belts transferred on the device of car and the car carrying platform of each stratose station console laterally transfer car fast just operates, contrary then do not operate, described car get on the bus program, the car of the program of waiting, car that enter the station is got off two crawler belts laterally unlatching of the engine installation of the device of transfer car fast of the high speed train described in departures program, the instruction that sends of the automation control system of two crawler belts laterally transfer the unlatching of the engine installation of the device of car fast, closing movement accepts high speed train respectively automation control system and railway platform of closing movement and railway platform and control, the succinct convenience of this section in order to describe, by two crawler belt, laterally the device of transfer car is referred to as two crawler belt fast, and district of being entered the station by the car of railway platform, car wait district, car departures district respectively referred to as district of entering the station, the district that waits, departures district.(1), car enters the station the program of waiting, car sails district of entering the station into, the district that waits is sailed into again: car sails into two crawler belts in district of entering the station along the rectilinear direction perpendicular with two track length direction from district of entering the station, before car, before trailing wheel is parked in respectively, on rear crawler belt, car comes to a complete stop brake, the two crawler belt in district of entering the station is corresponding with two crawler belts in the district that waits to align, when car is for sailing two crawler belt in the district that waits into from two crawler belts in district of entering the station, now start the engine installation of the engine installation of two crawler belts in district of entering the station and two crawler belts in the district that waits simultaneously, engine installation drives transmission shaft, transmission shaft drives driving wheel, follower, driving wheel, follower drives the car be parked on two crawler belts of entering the station in district to move on two crawler belts in the district that waits to target direction transverse direction, now close engine installation, two crawler belt is out of service, car to come to a complete stop on two crawler belts in the district that waits and brakes.(2), car is got on the bus program, car sails high speed train into from the district that waits: the high speed train being loaded with car enters the district that waits, two crawler belt on high speed train is corresponding with two crawler belts in the district that waits to align, high speed train comes to a complete stop, when car is for sailing two crawler belt of high speed train into from two crawler belts in the district that waits, now start the wait engine installation of two crawler belts in district and the engine installation of two crawler belts of high speed train simultaneously, engine installation drives transmission shaft, transmission shaft drives driving wheel, follower, driving wheel, follower drives the car be parked on two crawler belts in the district that waits laterally to move on two crawler belts of high speed train to target direction, now close engine installation, two crawler belt is out of service, car to come to a complete stop on two crawler belts of high speed train and brakes.(3), car is got off departures program, car sails departures district into from high speed train and sets off: the high speed train being loaded with car enters departures district, two crawler belt on high speed train is corresponding with two crawler belts in departures district to align, high speed train comes to a complete stop, when car sails the two crawler belt set off in district into for getting off from two crawler belts of high speed train, now start the engine installation of the engine installation of two crawler belts of high speed train and two crawler belts in departures district simultaneously, engine installation drives transmission shaft, transmission shaft drives driving wheel, follower, driving wheel, follower drives the car be parked on two crawler belts of high speed train laterally to move on two crawler belts in departures district to target direction, now close engine installation, two crawler belt is out of service, car rolls along the rectilinear direction perpendicular with two track length direction the district that sets off away from.
A kind of pair of crawler belt of the present utility model laterally fast the device of transfer car when realizing the two-way quick transfer of car between railway platform with train, there is following features: 1, the length direction of car parallels with the length direction of train, and car is without the need to turning to; 2, during the two-way quick transfer of car between railway platform and train, institute takes time the shortest; 3, laterally the apparatus structure of transfer car is simple fast for two crawler belt; 4, laterally the device manufacturing cost of transfer car is relatively low fast for two crawler belt.
The device that a kind of pair of crawler belt of the present utility model laterally transfers car is fast particularly suitable for using in following three kinds of high speed railway Operation Networks as the supporting technology utilizing high speed railway to transport car fast: 1, public backbones high speed railway network, transports car for long-range or very long range high speed railway; 2, the inter-city high-speed rail network between each provincial capital and surrounding cities, transports car for inter-city high-speed rail; 3, create rapid transit network in big city or super-large city, transport car for high speed railway in city.
A kind of pair of crawler belt of the present utility model laterally transfers the device of car compared with prior art fast, and its beneficial effect is:
1, fast convenient, save time.A kind of pair of crawler belt of the present utility model laterally fast the device of transfer car can make car when upper and lower high speed train can passenger train upper and lower as passenger time quick and convenient; Under normal circumstances, drive car and handle affairs from surrounding cities to provincial capital, car is run through section, city, 100KM express highway+40KM left and right and is about needed two hours, if change by car take high speed railway run through same mileage need only 30 minutes.
2, high ferro can be made to transport thoroughly make a profit instead of suffering a loss.At present, global high speed railway is only for passenger traffic, the high speed railway overwhelming majority of China is all in lossing state, reason is just that a large amount of capacity of high speed railway is idle, and the high speed railway achievement present situation being in lossing state for a long time makes the high-speed rail technology of China be difficult to promote in the whole world, the device of a kind of pair of crawler belt of the present utility model horizontal transfer fast car puts into effect and fully can excavate the idle capacity of high speed railway, high speed railway is thoroughly made a profit instead of suffering a loss, thus is greatly conducive to the outlet of the high speed railway complete set technology of China's independent intellectual property right.
3, energy-efficient, the locomotive engine motion of the high speed train of quick transport car makes locomotive wheel turns by power, what produce between wheel turns and track is cliding friction, and the wheel of the high-speed train body of fully loaded car also rotates on track, is friction of rolling between them; We know, when identical in quality, larger than force of rolling friction 40 times to 60 times of force of sliding friction, so slide much laborsaving at ground surface object than push object, so the locomotive engine transporting the high speed train of car fast just can draw the high speed train advance that tens joints are fully loaded with car; When car travels on highway, the drive wheel of car and the friction on ground are cliding frictions, and the flower wheel of car and the friction on ground are friction of rollings, when car is absorbed in muddy, the drive wheel of car rotates there will be and skids and earth is ground zanjon, and flower wheel but can not rotate; If the amount of the energy that the high speed train of fully loaded 300 cars is consumed and pollutant discharge amount with travel on highway while of 300 cars consume the energy total amount and gross contamination emission compared with, by the most conservative estimation, the former is only the latter's 1/10.
4, environmental protection is beneficial to.High speed railway uses electric energy, and electric energy is clear energy sources, and electric energy can pass through the number of ways acquisitions such as hydropower, wind-power electricity generation, solar electrical energy generation, nuclear energy power generation; Mostly car is the energy using oil etc. non-renewable, and can discharge a large amount of vehicle exhausts, thus, and a kind of pair of crawler belt of the present utility model laterally device of transfer car or a great green technology fast.
5, can ensure that car still can be gone on a journey under the severe weather conditions such as thick fog, heavy rain and ice and snow.Aircraft airport, express highway must be closed under the severe weather conditions such as thick fog, heavy rain and ice and snow, if rely on high speed railway to transport car fast, then greatly can improve anti-disaster performance and the safety performance of car operation.
6, the device of a kind of pair of crawler belt of the present utility model horizontal transfer fast car puts into effect and can share the operating pressure of a part of express highway, blocking up of express highway can be reduced, widen the running distance between vehicle on expressway, reduce the generation of car accident.
Accompanying drawing explanation
The two crawler belt of Fig. 1 laterally transfers the device birds-eye view of car fast.
In Fig. 2 Fig. 1, the two crawler belt of A-A laterally transfers the device section-drawing of car fast.
Fig. 3 railway platform (length) two crawler belt laterally transfers the device birds-eye view of car fast.
Fig. 4 train (short) two crawler belt laterally transfers the device birds-eye view of car fast.
The two crawler belt of Fig. 5 laterally transfers the device back view of car fast.
The two crawler belt of Fig. 6 laterally transfers the planar view of car bearing plate in the device of car fast.
The two crawler belt of Fig. 7 laterally transfers the plant running schematic diagram (backsight) of car fast.
Fig. 8 laterally transfers at two two crawler belts the transition wheel section-drawing configured between the device of car fast.
Fig. 9 car is laterally transferred fast between the device of car at two two crawler belts and is run schematic diagram (backsight).
On Figure 10 railway platform, two crawler belt laterally transfers the plant running schematic diagram (overlooking) of car fast.
Figure 11 car runs birds-eye view in wait district, train, railway platform departures of the railway platform being provided with the horizontal transfer car device of two crawler belts between district.
Figure 12 car runs birds-eye view in the railway platform being provided with the horizontal transfer car device of two crawler belts wait district, train, railway platform departures of district, railway platform of entering the station between district.
Figure 13 fills the double-layer high-speed train-side view of car.
The two crawler belt of Figure 14 laterally driving wheel transferred in car device arranges front view on railway platform, train.
The two crawler belt of Figure 15 laterally driving wheel transferred in car device arranges lateral plan on railway platform, train.
In figure: 1. transmission shaft, 2. driving wheel, 3. follower, 4. support roller, 5. bearing seat, 6. support plinth, 7. transition wheel, 8. two crawler belt, 9. pair crawler belt raised line, 10. car bearing plate, 11. cars, 12. car carrying platforms, 13. car carrying platform numberings, the double-layer high-speed train of 14. carrying cars, 15. high-speed train bodies, 16. high speed train chassis systems, 17. high-speed train wheel systems, 18. high speed train shock mitigation systems, 19. high speed train traction systems, 20. cars enter the station district, 21. cars are waited district, 22. car departures districts, 23. rail, 24. railway platform concrete columns.
Detailed description of the invention laterally transfers the device of car fast detailed description of the invention below in conjunction with a kind of pair of crawler belt of the present utility model is further described the utility model.
In the present embodiment, two crawler belts of the drive system of high speed train, high speed train laterally fast the engine installation of device of transfer car, the car of railway platform wait district, the engine installation that two crawler belts in car departures district laterally transfer the device of car fast of district, car that enter the station all do not draw.
A kind of pair of crawler belt in the present embodiment laterally transfers the device of car fast, the main points of its technical scheme are, it mainly comprises engine installation, transmission shaft 1, driving wheel 2, follower 3, support roller 4, two crawler belt 8, bearing seat 5, support plinth 6, car carrying platform 12, described two crawler belts 8 are two crawler belts be parallel to each other, described two crawler belts 8 are arranged on car carrying platform 12, described two crawler belts 8 are by corresponding two groups of driving wheels 2, follower 3 drives, multiple support roller 4 is also provided with between each group driving wheel 2 and follower 3, described engine installation drives transmission shaft 1, transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3 drives the car 11 on two crawler belt 8 to run to same direction.
A device for the horizontal transfer car fast of pair crawler belt, the main points of its technical scheme are, two driving wheels 2 of described two crawler belts 8 to be preferably disposed on same transmission shaft 1 but to be not limited to be arranged on same transmission shaft 1.The benefit that two driving wheels 2 of described two crawler belts 8 are arranged on same transmission shaft 1 is, the front-wheel of car 11 can realize synchronous, synchronized transverse shifting better with trailing wheel.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the two ends of the wheel shaft of described two groups of driving wheels 2, follower 3 or multiple support roller 4 are arranged on corresponding bearing seat 5, described bearing seat 5 is arranged on support plinth 6, and described support plinth 6 is arranged on car carrying platform 12.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the two ends of the wheel shaft of described driving wheel 2 are arranged on corresponding bearing seat 5, described bearing seat 5 is arranged on support plinth 6, described support plinth 6 is arranged on car carrying platform 12, the two ends of described follower 3 or the wheel shaft of multiple support roller 4 are arranged on corresponding support plinth 6, and described support plinth 6 is arranged on car carrying platform 12.
A device for the horizontal transfer car fast of pair crawler belt, the main points of its technical scheme are, the distance between two described crawler belts be parallel to each other 8 is more than or equal to the distance between the front-wheel of car 11 and trailing wheel.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, the length of described two crawler belts 8 is preferably equal but be not limited to equal, the Origin And Destination of described two crawler belts 8 to be preferably in respectively on the same straight line perpendicular with two crawler belt 8 length direction but to be not limited to be in respectively on the same straight line perpendicular with two crawler belt 8 length direction, the length of the two crawler belt 8 Origin And Destination benefit be in respectively on the same straight line perpendicular with two track length direction that is equal and two crawler belt 8 is also in order to the front-wheel of car 11 and trailing wheel can realize synchronous better, synchronized transverse shifting.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, described two crawler belts 8 also comprise and is provided with raised line 9, distance often between adjacent two raised lines 9 is greater than the width of car 11 wheel, make car 12 wheel can be parked between two raised lines 9, the setting of raised line 9 avoids car 11 wheel to skid on two crawler belt.
A kind of pair of crawler belt laterally transfers the device of car fast; the main points of its technical scheme are; also comprise and be provided with car bearing plate 10; the position that the below that described car bearing plate 10 is arranged on two crawler belts 8 of carrying car 11 is pressed close to mutually; the two ends of described car bearing plate 10 are arranged on car carrying platform 12; the setting of car bearing plate 10 both can protect two crawler belt 8, also can ensure that car 11 runs more stably on two crawler belt 8.
A kind of pair of crawler belt laterally transfers the device of car fast, the main points of its technical scheme are, also comprise and be provided with transition wheel 7, described transition wheel 7 is arranged on one end of two crawler belt 8 but is not limited to be arranged on one end of two crawler belt 8, transition wheel 7 is arranged on railway platform and enters the station district 20 and car is waited between district 21 and/or car is waited between district 21 and high speed train 14 and/or high speed train 14 and railway platform set off between district 22 junction, the two ends of the wheel shaft of transition wheel 7 are arranged on support plinth 6, described support plinth 6 is arranged on car carrying platform 12, the setting of transition wheel 7 be in order to ensure car 11 railway platform enter the station district 20 and car is waited between district 21 and/or car is waited between district 21 and high speed train 14 and/or high speed train 14 and railway platform set off between district 22 junction two crawler belts 8 on accessiblely to run more stably.
In order to deepen the understanding of the device two crawler belt laterally being transferred fast to car, the using method of the special device to a kind of pair of above-mentioned crawler belt horizontal transfer fast car is described below.
The every one deck car carrying platform 12 utilizing high speed railway to transport the high speed train 14 of car 11 fast is all provided with multiple or multiple with the device of the horizontal transfer car fast of last pair of crawler belt, each the stratose station console utilizing high speed railway to transport car is fast respectively arranged with enter the station district 20, car of car and waits district 21, car departures district 22, and the car of railway platform wait district 21, car departures district 22 of district 20, car of entering the station all is respectively arranged with multiple or multiple with the device of the horizontal transfer car fast of last pair of crawler belt, the method that two crawler belts that a kind of railway platform of this utility model uses laterally transfer car has fast comprised car get on the bus program, the car of the program of waiting, car that enter the station and to have got off departures program, described car get on the bus program, the car of the program of waiting, car that enter the station is got off in departures program and is all completed under the unified matching coordinative between the automation control system and the automation control system of railway platform of described high speed train, and the automation control system of high speed train and the automation control system of railway platform accept the higher level high speed railway that utilizes and transport instruction or the control of the automation control system of the at full line of car and/or the automation control system of this circuit fast, high speed railway is utilized to transport car inventory information on every one deck car carrying platform 12 of the high speed train 14 of car fast, car inventory information on the car carrying platform 12 of unloaded information and each stratose station console, unloaded information is transmitted mutually by the automation control system of the automation control system of high speed train and the automation control system of railway platform and the higher level automation control system and/or this circuit that utilize high speed railway to transport the at full line of car fast respectively, calculation process, feedback, only have when car have enter the station wait and/or car is got on the bus and/or car is got off demand time, relevant two crawler belts on every one deck car carrying platform 12 of high speed train 14 device that laterally the quick relevant two crawler belts transferred on the device of car and the car carrying platform 12 of each stratose station console laterally transfer car fast just operates, contrary then do not operate, described car get on the bus program, the car of the program of waiting, car that enter the station is got off two crawler belts laterally unlatching of the engine installation of the device of transfer car fast of the high speed train described in departures program, the instruction that sends of the automation control system of two crawler belts laterally transfer the unlatching of the engine installation of the device of car fast, closing movement accepts high speed train respectively automation control system and railway platform of closing movement and/or railway platform or control, the succinct convenience of this section in order to describe, by two crawler belt, laterally the device of transfer car is referred to as two crawler belt fast, and district of being entered the station by the car of railway platform, car wait district, car departures district respectively referred to as district of entering the station, the district that waits, departures district.(1), car enters the station the program of waiting, car 14 sails district 20 of entering the station into, the district 21 that waits is sailed into again: car 11 sails into along the rectilinear direction perpendicular with two track length direction and enters the station two crawler belts 8 in district 20 from district 20 of entering the station, before car 11, before trailing wheel is parked in respectively, on rear crawler belt, car 11 comes to a complete stop brake, enter the station district 20 two crawler belts 8 wait with car that two crawler belts 8 in district 21 are corresponding to align, when car 11 is for sailing two crawler belt 8 in the district 21 that waits into from two crawler belts 8 in district 20 of entering the station, now start the engine installation of the engine installation of two crawler belts 8 in district 20 of entering the station and two crawler belts 8 in the district 21 that waits simultaneously, engine installation drives transmission shaft 1, transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3 drives the car 11 be parked on two crawler belts 8 of entering the station in district 20 to move to target direction transverse direction to wait on two crawler belts 8 in district 21, now close engine installation, two crawler belt 8 is out of service, car 11 to come to a complete stop on two crawler belts 8 in district 21 of waiting and brakes.(2), car is got on the bus program, car 11 sails high speed train 14 into from the district 21 that waits: the high speed train 14 being loaded with car 11 enters the district 21 that waits, two crawler belts 8 on high speed train 14 are corresponding with two crawler belts 8 in the district that waits to align, high speed train 14 comes to a complete stop, when car 11 is for sailing two crawler belt 8 of high speed train 14 into from two crawler belts 8 in the district 21 that waits, now start the wait engine installation of two crawler belts 8 in district 21 and the engine installation of two crawler belts 8 of high speed train 14 simultaneously, engine installation drives transmission shaft 1, transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3 driving is parked in the car 11 of waiting on two crawler belts 8 in district 21 and laterally moves on two crawler belts 8 of high speed train 14 to target direction, now close engine installation, two crawler belt 8 is out of service, car 11 to come to a complete stop on two crawler belts 8 of high speed train 14 and brakes.(3), car is got off departures program, car 11 sails departures district 22 into from high speed train 14 and sets off: the high speed train 14 being loaded with car 11 enters departures district 22, two crawler belts 8 on high speed train 14 are corresponding with two crawler belts 8 in departures district to align, high speed train 14 comes to a complete stop, when car 11 sails the two crawler belt 8 set off in district 22 into for getting off from two crawler belts 8 of high speed train 14, now start the engine installation of the engine installation of two crawler belts 8 of high speed train 14 and two crawler belts 8 in departures district simultaneously, engine installation drives transmission shaft 1, transmission shaft 1 drives driving wheel 2, follower 3, driving wheel 2, follower 3 drives the car be parked on two crawler belts 8 of high speed train 14 laterally to move on two crawler belts 8 in departures district 22 to target direction, now close engine installation, two crawler belt 8 is out of service, car 11 rolls along the rectilinear direction perpendicular with two crawler belt 8 length direction the district 22 that sets off away from.

Claims (9)

1. a two crawler belt laterally quick device transferring car, it is characterized in that, it mainly comprises engine installation, transmission shaft, driving wheel, follower, support roller, two crawler belt, bearing seat, support plinth, car carrying platform, described two crawler belts are two crawler belts be parallel to each other, described two crawler belts are arranged on car carrying platform, described two crawler belts are by corresponding two groups of driving wheels, follower drives, multiple support roller is also provided with between each group driving wheel and follower, described engine installation drives transmission shaft, transmission shaft drives driving wheel, follower, driving wheel, follower drives the car on two crawler belt to run to same direction.
2. the device of the horizontal transfer car fast of a kind of pair of crawler belt according to claim 1, is characterized in that, two driving wheels of described two crawler belts to be preferably disposed on same transmission shaft but to be not limited to be arranged on same transmission shaft.
3. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, the two ends of the wheel shaft of described two groups of driving wheels, follower or multiple support roller are arranged on corresponding bearing seat, described bearing block is arranged on support plinth, and described support plinth is arranged on car carrying platform.
4. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, the two ends of the wheel shaft of described driving wheel are arranged on corresponding bearing seat, described bearing block is arranged on support plinth, described support plinth is arranged on car carrying platform, the two ends of the wheel shaft of described follower or multiple support roller are arranged on corresponding support plinth, and described support plinth is arranged on car carrying platform.
5. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, and it is characterized in that, the distance between two described crawler belts be parallel to each other is more than or equal to the distance between the front-wheel of car and trailing wheel.
6. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, the length of described two crawler belts is preferably equal but be not limited to equal, and the Origin And Destination of described two crawler belts to be preferably in respectively on the same straight line perpendicular with two track length direction but to be not limited to be in respectively on the same straight line perpendicular with two track length direction.
7. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, described two crawler belts also comprises and is provided with raised line.
8. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, also comprise and be provided with car bearing plate, described car bearing plate is arranged on the below of two crawler belts of carrying car, and the two ends of described car bearing plate are arranged on car carrying platform.
9. a kind of pair of crawler belt according to claim 1 laterally transfers the device of car fast, it is characterized in that, also comprise and be provided with transition wheel, described transition wheel is arranged on one end of two crawler belt but is not limited to be arranged on one end of two crawler belt, the two ends of the wheel shaft of transition wheel are arranged on support plinth, and described support plinth is arranged on car carrying platform.
CN201520576982.9U 2015-07-26 2015-07-26 Device of car is transversely transferred fast to two tracks Expired - Fee Related CN204801780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520576982.9U CN204801780U (en) 2015-07-26 2015-07-26 Device of car is transversely transferred fast to two tracks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520576982.9U CN204801780U (en) 2015-07-26 2015-07-26 Device of car is transversely transferred fast to two tracks

Publications (1)

Publication Number Publication Date
CN204801780U true CN204801780U (en) 2015-11-25

Family

ID=54586654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520576982.9U Expired - Fee Related CN204801780U (en) 2015-07-26 2015-07-26 Device of car is transversely transferred fast to two tracks

Country Status (1)

Country Link
CN (1) CN204801780U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105035095A (en) * 2015-07-26 2015-11-11 郭卫康 Double-track device and method for horizontal and quick car transfer used for train platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105035095A (en) * 2015-07-26 2015-11-11 郭卫康 Double-track device and method for horizontal and quick car transfer used for train platform

Similar Documents

Publication Publication Date Title
KR200468591Y1 (en) Smart mass transit rail system
CN104015732B (en) A kind of car high-speed rail fast freight system cracking urban traffic blocking world-famous puzzle
CN105059290B (en) A kind of method that double crawler belts laterally quickly transfer car
CN104828105A (en) Device and method for automatically locking and fastening cars and applied to train
CN104828033A (en) Motor vehicle in-situ steering device and method for train platform
CN101574931A (en) Charging method of high-efficient power highway and electric automobile during traveling
CN103935368B (en) A kind of car industrial railway platform of quick transport car
CN109927737A (en) A kind of wide compartment bullet train of quick transport car
CN105035095A (en) Double-track device and method for horizontal and quick car transfer used for train platform
CN105035111A (en) Double-track device and method for horizontal and quick car transfer used for train
CN204801780U (en) Device of car is transversely transferred fast to two tracks
CN205169546U (en) Device of car is transversely transferred fast to two tracks that train platform used
CN204801781U (en) Device of car is transversely transferred fast to two tracks that train used
CN104002819A (en) Simple high-speed rail station capable of quickly loading and unloading cars
CN104002826A (en) Train with wide carriages
CN202081349U (en) New concept railroad rail road and locomotive thereof
CN104044597A (en) High-speed train provided with driver and passenger rest rooms for rapidly transporting cars
CN101259846A (en) Intelligent traffic for combining highway and railway
CN103935287A (en) Device and method for locking car on automobile or train fast
CN103953214A (en) Device and method for quickly locking saloon car on fixed parking stall of electric vehicle or train
CN104828101A (en) Motor vehicle in-situ steering device and method for train
CN103879417A (en) High-speed train capable of realizing quick locking and quick transporting of cars
CN104074107A (en) Wide-gauge railway
CN208428974U (en) A kind of drive system of electron orbit intelligence train
CN202029739U (en) Land aircraft carrier traffic system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20160726

CF01 Termination of patent right due to non-payment of annual fee