CN104002819A - Simple high-speed rail station capable of quickly loading and unloading cars - Google Patents

Simple high-speed rail station capable of quickly loading and unloading cars Download PDF

Info

Publication number
CN104002819A
CN104002819A CN201410252467.5A CN201410252467A CN104002819A CN 104002819 A CN104002819 A CN 104002819A CN 201410252467 A CN201410252467 A CN 201410252467A CN 104002819 A CN104002819 A CN 104002819A
Authority
CN
China
Prior art keywords
car
platform
high ferro
station
easy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410252467.5A
Other languages
Chinese (zh)
Inventor
郭晓勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410252467.5A priority Critical patent/CN104002819A/en
Publication of CN104002819A publication Critical patent/CN104002819A/en
Priority to PCT/CN2015/000104 priority patent/WO2015127827A1/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a simple high-speed rail station capable of quickly loading and unloading cars, in particular the high-speed rail station capable of enabling cars to quickly get off and get on the train when using a high-speed train to quickly transport cars. The simple high-speed rail station comprises a car entrance station and a car exit station; the car entrance station is arranged at one side of the same railway or the same high-speed train while the car exit station is arranged at the other side; the car entrance station comprises an entrance region and a car waiting region, wherein cars can run freely at the entrance region; the car exit station comprises an exit region, and cars can run freely at the exit region. The simple high-speed rail station usually comprises two layers. The simple high-speed rail station further comprises an intelligent car reaching number distributing system, and the entrance region where cars can run freely is provided with an intelligent car reaching number distribution billboard. The simple high-speed rail station capable of quickly loading and unloading cars is especially suitable for main high-speed rail networks of China, inter-city high-speed rail networks, city high-speed rail express networks for cars and connection networks for said three networks.

Description

A kind of simple and easy high ferro platform of quick handling car
Technical field the present invention relates to a kind of simple and easy high ferro platform of quick handling car, and more particularly, it relates to a kind ofly makes car climb up fast and sail out of the high ferro platform of high speed train while utilizing high speed train to transport car.
Background technology is current, and high ferro is all for passenger traffic both at home and abroad, is rarely used in shipping, more not the precedent for car fast transportation by high ferro.Global high ferro only causes a large amount of capacity of high ferro idle for passenger traffic, and the global high ferro overwhelming majority is all in lossing state, especially intercity high ferro, the passenger of the most of intercity high ferro railway line for passenger traffic rate less than 50% of having a full house; And Car on express highway is completely for suffering from,, often there is serious automobile jam in the most overload operations of express highway.
Under prior art condition, city traffic congestion problem is known as " Goldbach's Conjecture " in city, along with socioeconomic fast development, the owning amount of private car is constantly soaring, causes Car Traffic in big city or megalopolis to block up day by day serious, in global big city or megalopolis, there is not vehicle congestion in neither one city, city reaches all the more more traffic congestion, and all cities all can block up in the future, almost can't see the end.Urban traffic blocking has become world-famous puzzle.
As far back as in August, 1933 theory about city planning that the 4th meeting of international modern architecture association is passed through and " Athens Charter " just proposition of method: the legacy in the old times that the street system in existing city mostly being, street canyon, four corners is many, Ge Tiao fails in street to be distinguished according to different functions more, so can not adapt to the needs of the modern means of communication and volume of traffic.
" Athens Charter " thought can not solve Modern Traffic problem effectively with widening original street, restricting traffic or other ways.Have only and implement new city planning, design a new street system, to solve the needs of automotive traffic development.
Vehicle congestion in big city or megalopolis be exactly that the discharge of car tail gas causes aerial contamination on the other hand, have expert to point out, in the haze of city, the contribution rate of car tail gas is not less than 20%.
If can make full use of the idle capacity of main line high ferro network, intercity high ferro network, and in big city or megalopolis, newly ward off car high ferro fast freight network, allow the networking that integrates with of national main line high ferro network, intercity high ferro network, city car high ferro fast freight network, to realize the fast freight of car high ferro, just can realize car in a kind of brand-new energy-saving and environmental protection, move in high ferro network fast and efficiently.Certainly, energy-saving and environmental protection, high ferro car fast freight system will become dazzling world's business card fast and efficiently.
Realize above-mentioned target, the high ferro platform that high speed train was climbed up and sailed out of to solution car is fast exactly a crucial sport technique segment.
Summary of the invention object of the present invention will overcome deficiency of the prior art exactly, and a kind of high ferro platform that makes car can sail out of fast and climb up high speed train is provided.
Now to of the present invention, the high ferro platform that car could sail out of and climb up high speed train is fast described below.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car comprises car enter the station platform, car departures platform; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car is double-deck simple and easy high ferro platform, and the simple and easy high ferro platform of every one deck in the simple and easy high ferro platform of bilayer of described quick handling car comprises car platform, the car departures platform that enters the station; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car is three layers of simple and easy high ferro platform, and the simple and easy high ferro platform of every one deck in three layers of simple and easy high ferro platform of described quick handling car comprises car platform, the car departures platform that enters the station; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the car of the simple and easy high ferro platform of the described quick handling car platform that enters the station comprises the car track of waiting.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car is provided with to enter the station car and the shooting to departures car and Data Enter device, to climbing up or sail out of shooting and the Data Enter device of car of high speed train.
A simple and easy high ferro platform for quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car drives into station district, car free walker in car free walker and rolls away from each car parking stall in station district and be labeled with sequence number.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car comprises the car intelligence group system that enters the station that is provided with, and drives into station district be provided with car which car parking stall each car that enters the station should the enter intelligent group billboard that enters the station in car free walker.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car can complete that the car that arrives at a station sails out of high speed train and the car that enters the station is climbed up the process of high speed train fast, thereby, the simple and easy high ferro platform of handling car is particularly suitable for promoting the use of under following four kinds of environment as the supporting technology of car high ferro fast freight system fast: 1, public backbones high ferro network, transports car fast for long-range or very long range high speed railway; 2, the intercity high ferro network between each provincial capital and surrounding cities, transports car fast for inter-city high-speed rail; 3, in big city or super large Establishing Urban city car high ferro fast freight network, thoroughly solving urban traffic blocking world-famous puzzle; 4, the high ferro Operation Network that the city car high ferro fast freight network three large high ferro Operation Networks of intercity high ferro network, big city or super large Establishing Urban between public backbones high ferro network, each provincial capital and surrounding cities is all integrated with and network;
Quick convenient, the simple and easy high ferro platform of described quick handling car can make car like that quick and facilitate can be as the upper and lower passenger train of passenger in the time of upper and lower high speed train time, this fast simple and easy high ferro platform of handling car can utilize high speed railway intensive, transport car rapidly, under normal circumstances, drive car handles affairs from surrounding cities to provincial capital, car is run through section, 100KM express highway+40KM provincial capital and is approximately needed two hours, if change by car take high speed train run through same mileage need only about 30 minutes;
At present, global high ferro is only for passenger traffic, the high ferro overwhelming majority of China is all in lossing state, reason is just that a large amount of capacity of high ferro is idle, the simple and easy high ferro platform place in operation of described quick handling car can fully excavate the idle capacity of high ferro, high ferro is made a profit instead of suffering a loss, be conducive to the outlet of China's high ferro complete set technology;
Energy-efficient, it is to make locomotive wheel turns by power that the locomotive engine of train travels forward, and what between wheel turns and track, produce is cliding friction; The wheel of the high-speed train body of fully loaded car also rolls on track, is friction of rolling between them; In the ordinary course of things, large 40 times to 60 times than force of rolling friction of force of sliding frictions, if the amount of the energy that the high speed train of fully loaded 100 cars is consumed and 100 cars whiles travel on highway, the total amount of the consumed energy is compared, estimate by the most conservative actual energy consumption, the former is only the latter's 1/10;
What high ferro was used is electric energy, and electric energy is clear energy sources, and electric energy can obtain by hydropower, wind-power electricity generation, solar electrical energy generation, nuclear energy power generation number of ways; Mostly car is to use oil or the non-renewable energy of natural fuels, and can discharge a large amount of vehicle exhausts, only taking roadlice exhaust emissions as example, scientific research shows, the exhaust emissions total amount of roadlice to the contribution rate of haze in air 20%~30%, if after car changes and take high speed train, can make the exhaust emissions amount of roadlice reduce 30%~40%, thereby, the simple and easy high ferro platform of described quick handling car or a great energy-saving environment protection engineering.
Compared with prior art, its beneficial effect is the simple and easy high ferro platform of a kind of quick handling car of the present invention;
1, fast convenient, the simple and easy high ferro platform of described quick handling car can make car quick and convenient can be as the upper and lower passenger train of passenger in the time of upper and lower high speed train time, this fast simple and easy high ferro platform of handling car can utilize high speed railway intensive, transport car rapidly, under normal circumstances, drive car handles affairs from surrounding cities to provincial capital, car is run through section, 100KM express highway+40KM city and is approximately needed two hours, if change by car take high speed railway run through same mileage need only 30 minutes.
2, can make high ferro thoroughly make a profit instead of suffering a loss, at present, global high ferro is only for passenger traffic, the high ferro overwhelming majority of China is all in lossing state, reason is just that a large amount of capacity of high ferro is idle, and make the high ferro technology of China be difficult to promote in the whole world in the high ferro achievement present situation of lossing state for a long time, the simple and easy high ferro platform place in operation of handling car can fully excavate the idle capacity of high ferro fast, high ferro is thoroughly made a profit instead of suffering a loss, thereby be greatly conducive to the outlet of the high ferro complete set technology of China's independent intellectual property right.
3, energy-efficient, it is to make locomotive wheel turns by power that the locomotive engine that loads and unloads fast the high speed train of car travels forward, and what between wheel turns and track, produce is cliding friction; The wheel of the train body of fully loaded car also rolls on track, is friction of rolling between them; We know, in the ordinary course of things, large 40 times to 60 times than force of rolling friction of force of sliding frictions, so slide much laborsaving at ground surface object than pushing away object, fast the force of sliding friction between locomotive engine wheel and the track of the high speed train of handling car is greater than the force of rolling friction of the high-speed train body of the fully loaded car of tens joints, and the locomotive engine that loads and unloads fast the high speed train of car just can draw the high-speed train body that tens joints are fully loaded with car and advance; When car travels on highway, the drive wheel of car and the friction on ground are cliding frictions, and the flower wheel of car and the friction on ground are friction of rollings, when car is absorbed in when muddy, the drive wheel of car rotates there will be and skids and earth is ground to zanjon, and flower wheel but can not rotate; If the amount of the energy that the high speed train of fully loaded 100 cars is consumed and 100 cars travel simultaneously on highway, the total amount of the consumed energy is compared, and presses the most conservative estimation, and the former is only the latter's 1/10.
4, be beneficial to environmental protection.What high ferro was used is electric energy, and electric energy is clear energy sources, and electric energy can obtain by number of ways such as hydropower, wind-power electricity generation, solar electrical energy generation, nuclear energy power generations; Mostly car is to use the non-renewable energy such as oil, and can discharge a large amount of vehicle exhausts, thereby, the simple and easy high ferro platform of described quick handling car or a great energy-saving environment protection engineering.
5, can ensure that car still can go on a journey under the severe weather conditions such as thick fog, heavy rain and ice and snow.Aircraft airport, express highway must be closed under the severe weather conditions such as thick fog, heavy rain and ice and snow, car is realized the high ferro fast freight of car by the simple and easy high ferro platform of quick handling car, can greatly improve anti-disaster performance and the safety performance of car operation.
6, the simple and easy high ferro platform place in operation that loads and unloads fast car can be shared the operating pressure of a part of express highway, can reduce blocking up of express highway, widens the running distance between vehicle on expressway, reduces the generation of car accident.
Brief description of the drawings
Fig. 1 loads and unloads the simple and easy high ferro platform planar view of car fast.
The double-layer high-speed train that Fig. 2 transports car fast loads car schematic diagram.
Fig. 3 car number of group notice board that enters the station.
In figure: 1. the car platform that enters the station, 2. car free walker drives into station district, 3. wait track, 4. car departures platform of car, 5. car free walker is rolled station district away from, 6. transports fast the high speed train of car, 7. car, 8. car parking stall, 9. railway track, 10. the car number of the group notice board that enters the station.
The invention will be further described below in conjunction with the detailed description of the invention of the quick simple and easy high ferro platform of handling car for detailed description of the invention.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car 7 is double-deck simple and easy high ferro platforms, and the simple and easy high ferro platform of every one deck in the simple and easy high ferro platform of bilayer of described quick handling car comprises car platform 1, the car departures platform 4 that enters the station; Described car platform 1, the car departures platform 4 that enters the station is separately positioned on the both sides of same railway 9 or same high speed train 6; Described car enter the station platform 1 comprise car free walker drive into station district 2; Described car departures platform 4 comprises that car free walker rolls district 5, station away from.
A kind of simple and easy high ferro platform of quick handling car, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, the main points of its technical scheme are, the car of the simple and easy high ferro platform of described quick handling car 7 platform 1 that enters the station comprises the car track 3 of waiting.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car 7 is provided with to enter the station car and the shooting to departures car and Data Enter device, to climbing up or sail out of shooting and the Data Enter device of car of high speed train.
A simple and easy high ferro platform for quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car drives into district 2, station, car free walker in car free walker and rolls away from each car parking stall 8 in district 5, station and be labeled with sequence number.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car comprises the car intelligence group system that enters the station that is provided with, and drives into district 2, station be provided with car which car parking stall 8 each car 7 that enters the station should the enter intelligent group billboard 10 that enters the station in car free walker.
A kind of simple and easy high ferro platform of quick handling car, the main points of its technical scheme are, the simple and easy high ferro platform of described quick handling car can complete that the car that arrives at a station sails out of high speed train and the car that enters the station is climbed up the process of high speed train fast, thereby, the simple and easy high ferro platform of handling car is particularly suitable for promoting the use of under following four kinds of environment as the supporting technology of car high ferro fast freight system fast: 1, public backbones high ferro network, transports car fast for long-range or very long range high speed railway; 2, the intercity high ferro network between each provincial capital and surrounding cities, transports car fast for inter-city high-speed rail; 3, in big city or super large Establishing Urban city car high ferro fast freight network, thoroughly solving urban traffic blocking world-famous puzzle; 4, the high ferro Operation Network that the city car high ferro fast freight network three large high ferro Operation Networks of intercity high ferro network, big city or super large Establishing Urban between public backbones high ferro network, each provincial capital and surrounding cities is all integrated with and network;
Quick convenient, the simple and easy high ferro platform of described quick handling car can make car like that quick and facilitate can be as the upper and lower passenger train of passenger in the time of upper and lower high speed train time, this fast simple and easy high ferro platform of handling car can utilize high speed railway intensive, transport car rapidly, under normal circumstances, drive car handles affairs from surrounding cities to provincial capital, car is run through section, 100KM express highway+40KM provincial capital and is approximately needed two hours, if change by car take high speed train run through same mileage need only about 30 minutes;
At present, global high ferro is only for passenger traffic, the high ferro overwhelming majority of China is all in lossing state, reason is just that a large amount of capacity of high ferro is idle, the simple and easy high ferro platform place in operation of described quick handling car can fully excavate the idle capacity of high ferro, high ferro is made a profit instead of suffering a loss, be conducive to the outlet of China's high ferro complete set technology;
Energy-efficient, it is to make locomotive wheel turns by power that the locomotive engine of train travels forward, and what between wheel turns and track, produce is cliding friction; The wheel of the high-speed train body of fully loaded car also rolls on track, is friction of rolling between them; In the ordinary course of things, large 40 times to 60 times than force of rolling friction of force of sliding frictions, if the amount of the energy that the high speed train of fully loaded 100 cars is consumed and 100 cars whiles travel on highway, the total amount of the consumed energy is compared, estimate by the most conservative actual energy consumption, the former is only the latter's 1/10;
What high ferro was used is electric energy, and electric energy is clear energy sources, and electric energy can obtain by hydropower, wind-power electricity generation, solar electrical energy generation, nuclear energy power generation number of ways; Mostly car is to use oil or the non-renewable energy of natural fuels, and can discharge a large amount of vehicle exhausts, only taking roadlice exhaust emissions as example, scientific research shows, the exhaust emissions total amount of roadlice to the contribution rate of haze in air 20%~30%, if after car changes and take high speed train, can make the exhaust emissions amount of roadlice reduce 30%~40%, thereby, the simple and easy high ferro platform of described quick handling car or a great energy-saving environment protection engineering.

Claims (8)

1. one kind is loaded and unloaded the simple and easy high ferro platform of car fast, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, it is characterized in that, the simple and easy high ferro platform of described quick handling car comprises car platform, the car departures platform that enters the station; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
2. one kind is loaded and unloaded the simple and easy high ferro platform of car fast, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, it is characterized in that, the simple and easy high ferro platform of described quick handling car is double-deck simple and easy high ferro platform, and the simple and easy high ferro platform of every one deck in the simple and easy high ferro platform of bilayer of described quick handling car comprises car platform, the car departures platform that enters the station; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
3. one kind is loaded and unloaded the simple and easy high ferro platform of car fast, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, it is characterized in that, the simple and easy high ferro platform of described quick handling car is three layers of simple and easy high ferro platform, and the simple and easy high ferro platform of every one deck in three layers of simple and easy high ferro platform of described quick handling car comprises car platform, the car departures platform that enters the station; Described car platform, the car departures platform that enters the station is separately positioned on the both sides of same railway or same high speed train; Described car enter the station platform comprise car free walker drive into station district; Described car departures platform comprises that car free walker rolls station district away from.
4. according to the simple and easy high ferro platform of a kind of quick handling car described in claim 1 or 2 or 3, it is a kind of simple and easy high ferro platform that makes car can sail out of fast and climb up high speed train, it is characterized in that, the car of the simple and easy high ferro platform of the described quick handling car platform that enters the station comprises the car track of waiting.
5. according to the simple and easy high ferro platform of a kind of quick handling car described in claim 1 or 2 or 3, it is characterized in that, the simple and easy high ferro platform of described quick handling car is provided with entering the station car and to the departures shooting of car and Data Enter device, to climbing up or sail out of shooting and the Data Enter device of car of high speed train.
6. according to the simple and easy high ferro platform of a kind of quick handling car described in claim 1 or 2 or 3, it is characterized in that, the simple and easy high ferro platform of described quick handling car, drives into station district, car free walker in car free walker and rolls away from each car parking stall in station district and be labeled with sequence number.
7. according to the simple and easy high ferro platform of a kind of quick handling car described in claim 1 or 2 or 3, it is characterized in that, the simple and easy high ferro platform of described quick handling car comprises the car intelligence group system that enters the station that is provided with, and drives into station district be provided with car which car parking stall each car that enters the station should the enter intelligent group billboard that enters the station in car free walker.
8. according to the simple and easy high ferro platform of a kind of quick handling car described in claim 1 or 2 or 3, it is characterized in that, the simple and easy high ferro platform of described quick handling car can complete that the car that arrives at a station sails out of high speed train and the car that enters the station is climbed up the process of high speed train fast, thereby, the simple and easy high ferro platform of handling car is particularly suitable for promoting the use of under following four kinds of environment as the supporting technology of car high ferro fast freight system fast: 1, public backbones high ferro network, transports car fast for long-range or very long range high speed railway; 2, the intercity high ferro network between each provincial capital and surrounding cities, transports car fast for inter-city high-speed rail; 3, in big city or super large Establishing Urban city car high ferro fast freight network, thoroughly solving urban traffic blocking world-famous puzzle; 4, the high ferro Operation Network that the city car high ferro fast freight network three large high ferro Operation Networks of intercity high ferro network, big city or super large Establishing Urban between public backbones high ferro network, each provincial capital and surrounding cities is all integrated with and network;
Quick convenient, the simple and easy high ferro platform of described quick handling car can make car like that quick and facilitate can be as the upper and lower passenger train of passenger in the time of upper and lower high speed train time, this fast simple and easy high ferro platform of handling car can utilize high speed railway intensive, transport car rapidly, under normal circumstances, open that car is done from surrounding cities to provincial capital, thing, car is run through section, 100KM express highway+40KM provincial capital and is approximately needed two hours, if change by car take high speed train run through same mileage need only about 30 minutes;
At present, global high ferro is only for passenger traffic, the high ferro overwhelming majority of China is all in lossing state, reason is just that a large amount of capacity of high ferro is idle, the simple and easy high ferro platform place in operation of described quick handling car can fully excavate the idle capacity of high ferro, high ferro is made a profit instead of suffering a loss, be conducive to the outlet of China's high ferro complete set technology;
Energy-efficient, it is to make locomotive wheel turns by power that the locomotive engine of train travels forward, and what between wheel turns and track, produce is cliding friction; The wheel of the high-speed train body of fully loaded car also rolls on track, is friction of rolling between them; In the ordinary course of things, large 40 times to 60 times than force of rolling friction of force of sliding frictions, if the amount of the energy that the high speed train of fully loaded 100 cars is consumed and 100 cars whiles travel on highway, the total amount of the consumed energy is compared, estimate by the most conservative actual energy consumption, the former is only the latter's 1/10;
What high ferro was used is electric energy, and electric energy is clear energy sources, and electric energy can obtain by hydropower, wind-power electricity generation, solar electrical energy generation, nuclear energy power generation number of ways; Mostly car is to use oil or the non-renewable energy of natural fuels, and can discharge a large amount of vehicle exhausts, only taking roadlice exhaust emissions as example, scientific research shows, the exhaust emissions total amount of roadlice to the contribution rate of haze in air 20%~30%, if after car changes and take high speed train, can make the exhaust emissions amount of roadlice reduce 30%~40%, thereby, the simple and easy high ferro platform of described quick handling car or a great energy-saving environment protection engineering.
CN201410252467.5A 2014-02-25 2014-06-02 Simple high-speed rail station capable of quickly loading and unloading cars Pending CN104002819A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410252467.5A CN104002819A (en) 2014-06-02 2014-06-02 Simple high-speed rail station capable of quickly loading and unloading cars
PCT/CN2015/000104 WO2015127827A1 (en) 2014-02-25 2015-02-16 Urban high-speed railway automobile rapid transport system for transporting automobile using high-speed railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410252467.5A CN104002819A (en) 2014-06-02 2014-06-02 Simple high-speed rail station capable of quickly loading and unloading cars

Publications (1)

Publication Number Publication Date
CN104002819A true CN104002819A (en) 2014-08-27

Family

ID=51363795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410252467.5A Pending CN104002819A (en) 2014-02-25 2014-06-02 Simple high-speed rail station capable of quickly loading and unloading cars

Country Status (1)

Country Link
CN (1) CN104002819A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015127827A1 (en) * 2014-02-25 2015-09-03 郭晓勤 Urban high-speed railway automobile rapid transport system for transporting automobile using high-speed railway
CN105416300A (en) * 2015-11-23 2016-03-23 郭卫康 Method for saving investment of high-speed rail platform and increasing number of cars loaded on high-speed rail train
CN107933586A (en) * 2015-02-09 2018-04-20 郭卫康 The method for the car pivot stud that the bullet train that a kind of high speed transports car uses

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3584584A (en) * 1968-05-08 1971-06-15 Gen Am Transport Combination railway and passenger automobile transportation system and parts thereof
DE3616484A1 (en) * 1986-05-15 1987-11-19 Schlimm Norbert Dipl Ing System for loading and unloading motor vehicles and loads onto and from a rail vehicle
DE4240785A1 (en) * 1992-07-15 1994-01-20 Gottfried Perdolt Railway system for combined road - rail traffic - uses double car transporter, which has double wheel sets, to move on two adjacent railway tracks
DE4334987A1 (en) * 1993-10-14 1995-04-20 Grimm Karl Heinz Dipl Ing Loading and unloading system for railway waggons for achieving combined road/rail goods traffic
CN1731453A (en) * 2005-07-22 2006-02-08 深圳市来吉智能科技有限公司 Method and system for intelligent loading/unloading lot guiding and charging management of three-dimensional carbarn
CN101872548A (en) * 2009-04-23 2010-10-27 黄柏霞 Truck space guiding system and method based on images
CN102930744A (en) * 2012-11-16 2013-02-13 北京天一众合科技股份有限公司 Parking plot guiding and reverse vehicle tracking method for parking lot
US20130160671A1 (en) * 2011-12-23 2013-06-27 Don Clark Transit vehicle for ferrying roadway vehicles, passengers, cargo and commuters

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3584584A (en) * 1968-05-08 1971-06-15 Gen Am Transport Combination railway and passenger automobile transportation system and parts thereof
DE3616484A1 (en) * 1986-05-15 1987-11-19 Schlimm Norbert Dipl Ing System for loading and unloading motor vehicles and loads onto and from a rail vehicle
DE4240785A1 (en) * 1992-07-15 1994-01-20 Gottfried Perdolt Railway system for combined road - rail traffic - uses double car transporter, which has double wheel sets, to move on two adjacent railway tracks
DE4334987A1 (en) * 1993-10-14 1995-04-20 Grimm Karl Heinz Dipl Ing Loading and unloading system for railway waggons for achieving combined road/rail goods traffic
CN1731453A (en) * 2005-07-22 2006-02-08 深圳市来吉智能科技有限公司 Method and system for intelligent loading/unloading lot guiding and charging management of three-dimensional carbarn
CN101872548A (en) * 2009-04-23 2010-10-27 黄柏霞 Truck space guiding system and method based on images
US20130160671A1 (en) * 2011-12-23 2013-06-27 Don Clark Transit vehicle for ferrying roadway vehicles, passengers, cargo and commuters
CN102930744A (en) * 2012-11-16 2013-02-13 北京天一众合科技股份有限公司 Parking plot guiding and reverse vehicle tracking method for parking lot

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015127827A1 (en) * 2014-02-25 2015-09-03 郭晓勤 Urban high-speed railway automobile rapid transport system for transporting automobile using high-speed railway
CN107933586A (en) * 2015-02-09 2018-04-20 郭卫康 The method for the car pivot stud that the bullet train that a kind of high speed transports car uses
CN105416300A (en) * 2015-11-23 2016-03-23 郭卫康 Method for saving investment of high-speed rail platform and increasing number of cars loaded on high-speed rail train

Similar Documents

Publication Publication Date Title
CN107933571B (en) A kind of car high-speed rail fast freight proprietary information is integrated and control system
CN104002819A (en) Simple high-speed rail station capable of quickly loading and unloading cars
CN104828033A (en) Motor vehicle in-situ steering device and method for train platform
CN103935368B (en) A kind of car industrial railway platform of quick transport car
CN107914725B (en) A kind of method that the automatic locking that train uses fastens car
CN105059290B (en) A kind of method that double crawler belts laterally quickly transfer car
CN103879416A (en) High-speed train capable of realizing quick transporting of cars
CN104002826A (en) Train with wide carriages
CN104044597A (en) High-speed train provided with driver and passenger rest rooms for rapidly transporting cars
CN105035111B (en) A kind of device and method that double crawler belts that train uses laterally quickly transfer car
CN104766468A (en) Super-intelligent remote control traffic system
CN101259846A (en) Intelligent traffic for combining highway and railway
CN103935287A (en) Device and method for locking car on automobile or train fast
CN105035095A (en) Double-track device and method for horizontal and quick car transfer used for train platform
CN103953214A (en) Device and method for quickly locking saloon car on fixed parking stall of electric vehicle or train
CN204801781U (en) Device of car is transversely transferred fast to two tracks that train used
CN204801780U (en) Device of car is transversely transferred fast to two tracks
CN205169546U (en) Device of car is transversely transferred fast to two tracks that train platform used
CN115320391A (en) Intelligent power grid electric vehicle, operation system and control method
CN103879417A (en) High-speed train capable of realizing quick locking and quick transporting of cars
CN1994795A (en) An express freight method and apparatus thereof
CN104828101A (en) Motor vehicle in-situ steering device and method for train
CN206327232U (en) Electronic load car rapid transit system (RTS)
CN108116296B (en) Electric vehicle-carrying shortcut transport system
CN104074107A (en) Wide-gauge railway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140827

RJ01 Rejection of invention patent application after publication