CN204530633U - The soft rock that a kind of subregion is arranged builds rock dam body - Google Patents

The soft rock that a kind of subregion is arranged builds rock dam body Download PDF

Info

Publication number
CN204530633U
CN204530633U CN201520090175.6U CN201520090175U CN204530633U CN 204530633 U CN204530633 U CN 204530633U CN 201520090175 U CN201520090175 U CN 201520090175U CN 204530633 U CN204530633 U CN 204530633U
Authority
CN
China
Prior art keywords
upstream
dam
rock
dam body
downstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520090175.6U
Other languages
Chinese (zh)
Inventor
符晓
黄维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201520090175.6U priority Critical patent/CN204530633U/en
Application granted granted Critical
Publication of CN204530633U publication Critical patent/CN204530633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The soft rock that the utility model relates to a kind of subregion layout builds rock dam body.The purpose of this utility model is to provide the soft rock that a kind of subregion arranges and builds rock dam body, have improve dam body stress state, coordinate dam zoning distortion, structure is simple, easy construction, the feature such as safe and reliable.The technical solution of the utility model is: the soft rock that a kind of subregion is arranged builds rock dam body, this dam body upstream side is followed successively by panel from outside to inside, bed course district and transition region I, upstream face base of dam place internal layer is upstream apron district, skin is Gai Chong district, upstream face base of dam periphery fissure has special bed course district, Transition Zone of Deformation is provided with in axis of dam position, the upstream side of Transition Zone of Deformation is with low compressibility, the rockfill area, upstream that the good upstream stockpile of grating fills, the downstream of Transition Zone of Deformation is the rockfill area, downstream of filling with soft rock material, Transition Zone of Deformation is by upstream stockpile and the soft rock material layering of rockfill area, downstream is overlapping fills, dam body bottommost is catchment.

Description

The soft rock that a kind of subregion is arranged builds rock dam body
Technical field
The soft rock that the utility model relates to a kind of subregion layout builds rock dam body, is applicable to Hydraulic and Hydro-Power Engineering.
Background technology
Early stage rock adopts dumped rockfill dam body, with the antiseepage such as wooden boards, steel facing.Because dam body filler adopts the construction method of throwing, generally not subregion.Along with the development of construction technique of earth and rock dam, rock introduces the concept of subregion from subregion earth and rockfill dam, and along with the development of computing technique, the zoning design of counter plate loose rock dam is also day by day perfect, the zoning design gradually standardization of rock.
In Hydraulic and Hydro-Power Engineering, when water retaining structure adopts Concrete Face Rockfill Dam, dam body should carry out subregion according to factors such as river valley orographic condition, material source, deformation properties, height of dam, construction and economic performances.Dam zoning should utilize building to excavate Jin Ba district as far as possible can use material source, and the water permeability in each district of enrockment dam body should increase from upstream toward downstream, and dam zoning should be conducive to Deformation control; And according to engineering experience, in order to improve dam body stress state and coordinate dam zoning distortion, then need the compatibility of deformation problem solving Concrete Face Rockfill Dam soft or hard rock.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned Problems existing, the soft rock providing a kind of subregion to arrange builds rock dam body, have improve dam body stress state, coordinate dam zoning distortion, structure is simple, easy construction, the feature such as safe and reliable.
The technical scheme that the utility model adopts is: the soft rock that a kind of subregion is arranged builds rock dam body, this dam body upstream side is followed successively by panel from outside to inside, bed course district and transition region I, upstream face base of dam place internal layer is upstream apron district, skin is Gai Chong district, upstream face base of dam periphery fissure has special bed course district, it is characterized in that: be provided with Transition Zone of Deformation in axis of dam position, the upstream side of Transition Zone of Deformation is with low compressibility, the rockfill area, upstream that the good upstream stockpile of grating fills, the downstream of Transition Zone of Deformation is the rockfill area, downstream of filling with soft rock material, Transition Zone of Deformation is by upstream stockpile and the soft rock material layering of rockfill area, downstream is overlapping fills, dam body bottommost is catchment.
Described Transition Zone of Deformation and the transition region II establishing 1 ~ 2m thick between rockfill area, downstream and catchment.
Described dam body downstream face is pitched work.
Stockpile every one deck filling-up thickness in described upstream is 80 ~ 90cm, and rockfill area, downstream soft rock material every layer of filling-up thickness is 30 ~ 40cm.
The beneficial effects of the utility model are: 1, the utility model is that the soft rock that a kind of subregion is arranged builds rock dam body, and rockfill area, dam body downstream adopts soft rock to fill, and can effectively utilize building excavated material, remarkable in economical benefits; 2, in the utility model, between rockfill area, upstream and downstream, Transition Zone of Deformation is set, namely adopts that upstream and downstream stockpiles is overlapping to be filled, have improve dam body stress state, coordinate dam zoning distortion, structure is simple, easy construction, the feature such as safe and reliable.
Accompanying drawing explanation
Fig. 1 is sectional drawing of the present utility model.
Detailed description of the invention
As shown in Figure 1, the soft rock that a kind of subregion of the present embodiment is arranged builds rock dam body, this Rockfill Dam is filled by rockfill area, upstream 4 and rockfill area, downstream 6 and forms, and stockpile every one deck filling-up thickness in upstream is 80 ~ 90cm, and soft rock material every layer of filling-up thickness is generally 30 ~ 40cm; Between rockfill area, upstream and downstream, the overlapping soft or hard rock that fills of layering forms Transition Zone of Deformation 5 (i.e. axis of dam position), for improving dam body stress figure, coordinating dam zoning distortion, fill the concrete ratio of soft or hard rock, scope determines according to field roll compaction test, dam body stress-strain analysis; In Transition Zone of Deformation, the bottommost of rockfill area, downstream arranges catchment 8, piles between stone-laying district 6 be provided with the thick transition region II of 1 ~ 2m 7 (soft or hard rock Transition Materials) in this catchment and Transition Zone of Deformation 5, downstream.
The dam material that rockfill area, upstream 4 adopts low compressibility, grating good fills, and is the main support body bearing horizontal load of rock; The upstream side of this rockfill area, upstream is equipped with transition region I 3, bed course district 2, panel 1 from inside to outside successively, under upstream face base of dam periphery fissure, arrange special bed course district 12, and lays upstream apron district 11 and Gai Chong district 10 successively in the outside of upstream face base of dam panel 1.
Rockfill area, downstream 6 adopts soft rock to fill under the prerequisite ensureing dam stabilization, and the downstream face in rockfill area, downstream 6 lays pitched work 9.
The present embodiment is for guaranteeing that deformation of concrete face rockfill dam is even, and the elastic modulus difference of upstream and downstream stockpile should control between 2 ~ 5 times.

Claims (4)

1. the soft rock of a subregion layout builds rock dam body, this dam body upstream side is followed successively by panel (1) from outside to inside, bed course district (2) and transition region I (3), upstream face base of dam place internal layer is upstream apron district (11), skin is Gai Chong district (10), upstream face base of dam periphery fissure has special bed course district (12), it is characterized in that: be provided with Transition Zone of Deformation (5) in axis of dam position, the upstream side of Transition Zone of Deformation is with low compressibility, the rockfill area, upstream (4) that the good upstream stockpile of grating fills, the downstream of Transition Zone of Deformation is the rockfill area, downstream (6) of filling with soft rock material, Transition Zone of Deformation (5) is by upstream stockpile and the soft rock material layering of rockfill area, downstream is overlapping fills, dam body bottommost is catchment (8).
2. the soft rock that subregion according to claim 1 is arranged builds rock dam body, it is characterized in that: described Transition Zone of Deformation (5) and the transition region II (7) establishing 1 ~ 2m thick between rockfill area, downstream (6) and catchment (8).
3. the soft rock that subregion according to claim 1 and 2 is arranged builds rock dam body, it is characterized in that: described dam body downstream face is pitched work (9).
4. the soft rock that subregion according to claim 1 and 2 is arranged builds rock dam body, and it is characterized in that: stockpile every one deck filling-up thickness in described upstream is 80 ~ 90cm, rockfill area, downstream soft rock material every layer of filling-up thickness is 30 ~ 40cm.
CN201520090175.6U 2015-02-06 2015-02-06 The soft rock that a kind of subregion is arranged builds rock dam body Active CN204530633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520090175.6U CN204530633U (en) 2015-02-06 2015-02-06 The soft rock that a kind of subregion is arranged builds rock dam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520090175.6U CN204530633U (en) 2015-02-06 2015-02-06 The soft rock that a kind of subregion is arranged builds rock dam body

Publications (1)

Publication Number Publication Date
CN204530633U true CN204530633U (en) 2015-08-05

Family

ID=53744656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520090175.6U Active CN204530633U (en) 2015-02-06 2015-02-06 The soft rock that a kind of subregion is arranged builds rock dam body

Country Status (1)

Country Link
CN (1) CN204530633U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120663A (en) * 2016-08-22 2016-11-16 中国水利水电第十工程局有限公司 A kind of CFRD
CN106120662A (en) * 2016-08-17 2016-11-16 中国电建集团西北勘测设计研究院有限公司 High-modulus rock-faced dam dam, a kind of local
CN106149640A (en) * 2016-08-25 2016-11-23 中国电建集团西北勘测设计研究院有限公司 Improve method and the double-drainage body rock of rock infiltration security
CN106284215A (en) * 2016-08-17 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of mixed dam
CN108589662A (en) * 2018-03-21 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of core wall rockfill dam
CN108951557A (en) * 2018-08-20 2018-12-07 云南省红河州水利水电勘察设计研究院 A kind of hydraulic engineering irrigates, flood control dam
CN111501759A (en) * 2020-04-28 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Layered filling structure and construction method for rockfill transition area of face dam
CN112903964A (en) * 2021-01-20 2021-06-04 长江水利委员会长江科学院 Side pressure test embedded sleeve hole forming method and equipment suitable for rockfill layer-by-layer filling

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120662A (en) * 2016-08-17 2016-11-16 中国电建集团西北勘测设计研究院有限公司 High-modulus rock-faced dam dam, a kind of local
CN106284215A (en) * 2016-08-17 2017-01-04 中国电建集团西北勘测设计研究院有限公司 A kind of mixed dam
CN106120663A (en) * 2016-08-22 2016-11-16 中国水利水电第十工程局有限公司 A kind of CFRD
CN106120663B (en) * 2016-08-22 2018-05-25 中国水利水电第十一工程局有限公司 A kind of concrete face rockfill dam
CN106149640A (en) * 2016-08-25 2016-11-23 中国电建集团西北勘测设计研究院有限公司 Improve method and the double-drainage body rock of rock infiltration security
CN108589662A (en) * 2018-03-21 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of core wall rockfill dam
CN108951557A (en) * 2018-08-20 2018-12-07 云南省红河州水利水电勘察设计研究院 A kind of hydraulic engineering irrigates, flood control dam
CN108951557B (en) * 2018-08-20 2023-09-08 云南省红河州水利水电勘察设计研究院 Irrigation and flood control dam for hydraulic engineering
CN111501759A (en) * 2020-04-28 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Layered filling structure and construction method for rockfill transition area of face dam
CN112903964A (en) * 2021-01-20 2021-06-04 长江水利委员会长江科学院 Side pressure test embedded sleeve hole forming method and equipment suitable for rockfill layer-by-layer filling

Similar Documents

Publication Publication Date Title
CN204530633U (en) The soft rock that a kind of subregion is arranged builds rock dam body
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN103758113B (en) A kind of grid encloses the anti-liquefied foundation reinforcement means of hoop
CN104631475A (en) Safe and fast construction method of down-traversing river shallow depth bored tunnel
CN201627180U (en) Reinforced structure of large fault of dam foundation of gravity dam
CN104120686A (en) High elastic die cushion type composite dam
CN105220654A (en) A kind of ruggedized construction of earth and rockfill dam and construction method thereof
CN202969393U (en) Ribbing load reduction structure of road high hill culvert
CN205382466U (en) Concrete face rockfill dam
CN102852121B (en) Artificial composite foundation for building clay core rock-fill dam on deep overburden and construction method for artificial composite foundation
CN204780933U (en) Shoring of trench landing stage system
CN104929133A (en) Deep foundation pit Larsen steel sheet pile bottom sloping support construction method
CN104863096A (en) Overlay construction method for repairing aged asphalt concrete seepage-prevention face plate
CN203716168U (en) Toe slab foundation structure of deep covering layer of concrete face rockfill dam
CN106368176B (en) The high dam structure being built on earth material scarcity area deeply covered layer
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN205604272U (en) Manger plate cofferdam
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN203904971U (en) Reinforcement cage protective device capable of controlling necking, bar leakage and mud inclusion of underground diaphragm wall
CN203795389U (en) Dam body sectioning structure of concrete face rockfill dam with large overburden depth
CN102900092A (en) Artificial composite foundation of concrete face rockfill dam built on deep and thick coverage layer and construction method of artificial composite foundation
CN105155470A (en) Self-healing anti-seepage structure for concrete faced rockfill dam
CN104790407B (en) A kind of method adjusting soil pressure impact
CN205000296U (en) Use concrete panel structure of high toe wall
CN205035780U (en) Wet tailing of piling accelerates drainage consolidation device and tailing storehouse drainage system step by step

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant