CN205000296U - Use concrete panel structure of high toe wall - Google Patents
Use concrete panel structure of high toe wall Download PDFInfo
- Publication number
- CN205000296U CN205000296U CN201520580170.1U CN201520580170U CN205000296U CN 205000296 U CN205000296 U CN 205000296U CN 201520580170 U CN201520580170 U CN 201520580170U CN 205000296 U CN205000296 U CN 205000296U
- Authority
- CN
- China
- Prior art keywords
- toe wall
- toe
- slope
- wall
- concrete panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Abstract
The utility model relates to an use concrete panel structure of high toe wall. The utility model aims at providing an use concrete panel structure of high toe wall improves atress and deformation condition, the holistic stability of increase panel of toe board for the security and the reliability of engineering operation are strengthened. The utility model provides a: an use concrete panel structure of high toe wall, has concrete panel, establishes at the peripheral toe board of this panel to and the enrockment layer of concrete panel below, the toe board excavation of arranging along the massif side slope forms 1: 0.5 side slope, be equipped with the toe wall of balance weight formula between this side slope and the concrete panel, the toe wall leans on concrete panel one side to be the outside slope that enlarges in bottom, and the toe wall leans on side slope one side to be the balance weight platform to become the recess that the section is down trapezoidal form with the side domatic, it has the stone slag charge to backfill in the recess, concrete panel meets and arranged the stagnant water system in the joint line who forms with the toe wall is perpendicular.
Description
Technical field
The utility model relates to a kind of concrete surface plated construction applying High-toe wall.Mainly be applicable in Concrete Face Rockfill Dam engineering due to the factors such as geology orographic condition cause toe board can not the similar engineering of smooth-going setting.
Background technology
In Concrete Face Rockfill Dam engineering, the requirement of toe board to basis is higher, and " Concrete Face Rockfill Dam design specifications " (DL/T5016-2011) specifies: toe board should be placed in hard, not erosion and the weak weathering that can be in the milk, weak off-load on fresh matrix.But in Practical Project, due to the impact of geology orographic condition, toe board regional area basis possibility cutting depth is comparatively large, and then makes the toe board at this position can not smooth-goingly be connected with periphery toe board; The fluctuating that toe board foundation plane is larger simultaneously brings certain impact to the monolithic stability of panel.
Summary of the invention
The technical problems to be solved in the utility model is: for above-mentioned Problems existing, a kind of concrete surface plated construction applying High-toe wall is provided, improve the stability of the stressed of toe board and deformation condition, increase panels en bloc, the safety of engineering operation and reliability are strengthened.
The technical scheme that the utility model adopts is: a kind of concrete surface plated construction applying High-toe wall, there is concrete slab, be located at the toe board of this panel periphery, and the heap rock layers below concrete slab, it is characterized in that: along the slope, side of the toe board excavation formation 1:0.5 that massif side slope is arranged, between this slope, side and concrete slab, be provided with the toe wall of load retaining wall; Described toe wall is the slope that bottom outwards expands by concrete slab side, and toe wall is weight platform by side, slope, side, and becomes section to be the groove of inverted trapezoidal shape with side domatic, and in groove, backfill has rock ballast material; Described concrete slab and toe wall vertical connection are also furnished with water-stopping system in the connecting sewing formed.
Between described heap rock layers and concrete slab, be furnished with bitumen sand cushion near toe wall place.
The bottom of described toe wall is provided with the vertical dowel arranged, one end of this dowel is welded on the reinforcing bar bottom toe wall, and the length that the other end gos deep into basement rock below toe wall is more than or equal to 5m, and arrangement pitch is 1 ~ 2m.
The gradient that described toe wall expanding reach connects with heap rock layers is 1:N, N=0.3 ~ 0.7.
Described water-stopping system comprises the base copper sealing be embedded in connecting sewing, middle part rubber bar, stitches embedded underfill material, and is arranged on the surface watertight seal in this connecting sewing top V-type groove; Described surface watertight seal comprises the antiseepage protective cover sheet on SR filler in the rubber bar of V-type trench bottom, V-type groove and top layer.
The beneficial effects of the utility model are: the setting of High-toe wall in the utility model, make the axis of toe board more smooth-going, improve the stressed of toe board and deformation condition; In addition, the setting of High-toe wall, adds the lateral rigidity support of concrete slab and the resistance to overturning of panel, the safety of engineering operation and reliability is strengthened.
Accompanying drawing explanation
Accompanying drawing 1 is the utility model floor map.
Accompanying drawing 2 is generalized sections of the present utility model.
Accompanying drawing 3 is office of the present utility model section portion schematic diagrames.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the present embodiment is a kind of concrete surface plated construction and construction method of applying High-toe wall, this structure comprises heap rock layers 12 below by concrete slab 6, concrete slab, is arranged in the toe board 10 of concrete slab 6 periphery, and excavates along the toe board 10 that massif side slope is arranged the slope, side 9 forming 1:0.5; The toe wall 1 of load retaining wall is set between concrete slab 6 and slope, side 9, and between heap rock layers 12 and concrete slab 6, arranges bitumen sand cushion 11 near toe wall 1 place.
In the present embodiment, toe wall 1 is that bottom outwards expands by concrete slab 6 side and the gradient connected with heap rock layers 12 is the slope of 1:N, N=0.3 ~ 0.7, and the top on slope should ensure connection orthogonal with concrete slab 6 as far as possible; Toe wall 1 is weight platform by side, slope, side 9, and becomes section to be the groove of inverted trapezoidal shape with side domatic, and it is closely knit that this groove adopts rock ballast material 8 to backfill; Toe wall 1 connects with concrete slab 6 in the connecting sewing that formed and is furnished with water-stopping system; Vertical welding dowel 2 on toe wall 1 base foundation reinforcing bar, the arrangement pitch of this dowel 2 is 1 ~ 2m, and the length going deep into basement rock below toe wall is not less than 5m.
As shown in Figure 3, water-stopping system comprises the base copper sealing 3 be embedded in connecting sewing, middle part rubber bar 4, stitches embedded underfill material 5, and is arranged on the surface watertight seal 7 in this connecting sewing top V-type groove; Surface watertight seal 7 comprises the antiseepage protective cover sheet on SR filler in the rubber bar of V-type trench bottom, V-type groove and top layer.
The Specific construction step of the present embodiment is as follows:
A. the anchoring of toe wall 1: toe wall 1 is set between concrete slab 6 and slope, side 9, for guaranteeing the stability of toe wall 1, dowel 2 zygodactyl wall 1 is adopted to carry out anchoring, dowel 2 should be firm with toe wall 1 base foundation reinforcement welding, generally dowel 2 arrangement pitch is 1 ~ 2m, and the length that dowel 2 gos deep into basement rock below toe wall 1 is not less than 5m;
B. the building of toe wall 1: after toe wall 1 base foundation excavation reaches designing requirement, (design size of toe wall 1 should be determined as calculated to carry out concrete pouring construction according to the design size of toe wall 1, during computational analysis, not only to consider that the stress of self is with stable, also should consider the resistance to overturning of toe wall, concrete slab and toe board etc. simultaneously); Toe wall 1 adopts load retaining wall structure, adopts rock ballast material 8 to backfill closely knit, thus add the stability of toe wall and entirety between its weight platform and slope, side 9; Toe wall 1 should ensure orthogonal with concrete slab 6 by the top of piling slope, rock layers 12 1 side as far as possible, thus make both contact and fully stressed, the bottom on slope, face is connect with heap rock layers 12 and the slope outwards expanded, the gradient is 1:N, N=0.3 ~ 0.7, is convenient to the construction rolling of dam material at toe wall position piling rock layers 12;
C. sealing and caulking material filling: arrange bitumen sand cushion 11 near toe wall 1 place above heap rock layers 12, after the construction of this bitumen sand cushion, install base copper sealing 3, middle part rubber bar 4 and stitch embedded underfill material 5 in the connecting sewing that toe wall 1 and concrete slab 6 are formed, the setting of middle part rubber bar 4 is mainly the stop safe water strengthening toe wall 1 site boundary seam;
D. the building of concrete slab 6: carry out building of concrete slab 6 according to the thickness of design, at base copper sealing 3 position, should strengthen vibrating, guarantee the concrete density in sealing position, the construction technology level of site operation personnel should be strengthened simultaneously, ensure the damage that can not cause base copper sealing 3 in construction;
E. surface watertight seal 7 is constructed: arrange surface watertight seal 7 in the top V-type groove of the connecting sewing formed at toe wall 1 and concrete slab 6, and surface watertight seal 7 comprises the antiseepage protective cover sheet etc. on SR filler in the rubber bar of V-type trench bottom, V-type groove, top layer; Wherein the construction of surface watertight seal 7 should be carried out after bottom concrete strength reaches 70% of design strength, full and closely knit in order to ensure SR filler, and SR plug is filled out and should be adopted mechanical execution.
Claims (5)
1. apply the concrete surface plated construction of High-toe wall for one kind, there is concrete slab (6), be located at the toe board (10) of this panel periphery, and the heap rock layers (12) of concrete slab (6) below, it is characterized in that: along the slope, side (9) of toe board (10) the excavation formation 1:0.5 that massif side slope is arranged, between this slope, side and concrete slab (6), be provided with the toe wall (1) of load retaining wall; Described toe wall (1) is the slope that bottom outwards expands by concrete slab (6) side, toe wall is weight platform by slope, side (9) side, and becoming section to be the groove of inverted trapezoidal shape with side domatic, in groove, backfill has rock ballast material (8); Described concrete slab (6) and toe wall (1) vertical connection are also furnished with water-stopping system in the connecting sewing formed.
2. the concrete surface plated construction of application High-toe wall according to claim 1, it is characterized in that: between described heap rock layers (12) and concrete slab (6), be furnished with bitumen sand cushion (11) near toe wall (1) place.
3. the concrete surface plated construction of application High-toe wall according to claim 1 and 2, it is characterized in that: the bottom of described toe wall (1) is provided with the vertical dowel (2) arranged, one end of this dowel is welded on the reinforcing bar bottom toe wall, the length that the other end gos deep into basement rock below toe wall is more than or equal to 5m, and arrangement pitch is 1 ~ 2m.
4. the concrete surface plated construction of application High-toe wall according to claim 3, is characterized in that: the gradient that described toe wall (1) expanding reach connects with heap rock layers (12) is 1:N, N=0.3 ~ 0.7.
5. the concrete surface plated construction of application High-toe wall according to claim 4, it is characterized in that: described water-stopping system comprises the base copper sealing (3) be embedded in connecting sewing, middle part rubber bar (4), stitches embedded underfill material (5), and is arranged on the surface watertight seal (7) in this connecting sewing top V-type groove; Described surface watertight seal (7) comprises the antiseepage protective cover sheet on SR filler in the rubber bar of V-type trench bottom, V-type groove and top layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520580170.1U CN205000296U (en) | 2015-08-04 | 2015-08-04 | Use concrete panel structure of high toe wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520580170.1U CN205000296U (en) | 2015-08-04 | 2015-08-04 | Use concrete panel structure of high toe wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205000296U true CN205000296U (en) | 2016-01-27 |
Family
ID=55157193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520580170.1U Withdrawn - After Issue CN205000296U (en) | 2015-08-04 | 2015-08-04 | Use concrete panel structure of high toe wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205000296U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105064289A (en) * | 2015-08-04 | 2015-11-18 | 中国电建集团华东勘测设计研究院有限公司 | Concrete panel structure applied to high-toe wall and construction method |
CN108517890A (en) * | 2018-04-09 | 2018-09-11 | 钱继春 | A kind of high-quality and efficient toe wall construction technology |
-
2015
- 2015-08-04 CN CN201520580170.1U patent/CN205000296U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105064289A (en) * | 2015-08-04 | 2015-11-18 | 中国电建集团华东勘测设计研究院有限公司 | Concrete panel structure applied to high-toe wall and construction method |
CN108517890A (en) * | 2018-04-09 | 2018-09-11 | 钱继春 | A kind of high-quality and efficient toe wall construction technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10941659B2 (en) | I-shaped water-retaining dam for underground reservoir in coal mine | |
CN103967031B (en) | A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof | |
CN102392458B (en) | Piling beam cofferdam construction method used for bare rock foundation construction in water | |
CN108360547B (en) | Bridge composite foundation suitable for deep water and strong earthquake conditions | |
CN203213136U (en) | Caisson and pile combined foundation of consolidated subsoil | |
CN103422510B (en) | Steel pipe frame type cofferdam structure and construction method | |
CN104947682A (en) | Foundation pit support construction method and device thereof | |
CN104120686A (en) | High elastic die cushion type composite dam | |
CN111305282A (en) | Subway station anti-floating system in weak water-rich stratum and construction method thereof | |
JP5471797B2 (en) | Seismic reinforcement structure of revetment structure and existing revetment structure | |
CN104863096A (en) | Overlay construction method for repairing aged asphalt concrete seepage-prevention face plate | |
CN202865855U (en) | Stabilizing plate type anchoring pile retaining structure | |
CN202787334U (en) | Sealing structure of deep well casing used during tunnel construction | |
CN205000296U (en) | Use concrete panel structure of high toe wall | |
CN205134342U (en) | Large -tonnage list double -walled combines steel cofferdam | |
CN207092107U (en) | A kind of anti-subsidence structure using diaphram wall | |
CN106223355A (en) | A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box | |
CN206448285U (en) | Without bottom concrete combined type cofferdam under the conditions of formation geology | |
JP3918461B2 (en) | Construction method for underwater foundation | |
CN204715364U (en) | A kind of foundation pit support device | |
CN203113335U (en) | Counterfort type U-type groove retaining structure | |
CN105064289A (en) | Concrete panel structure applied to high-toe wall and construction method | |
CN204898700U (en) | Bridge foundation structure | |
CN210369069U (en) | Joint anti structure of floating of karst area foundation ditch | |
CN109356101B (en) | Dam foundation seepage-proofing structure in ultra-deep coverage layer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160127 Effective date of abandoning: 20170322 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20160127 Effective date of abandoning: 20170322 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |