CN203716168U - Toe slab foundation structure of deep covering layer of concrete face rockfill dam - Google Patents

Toe slab foundation structure of deep covering layer of concrete face rockfill dam Download PDF

Info

Publication number
CN203716168U
CN203716168U CN201420026829.4U CN201420026829U CN203716168U CN 203716168 U CN203716168 U CN 203716168U CN 201420026829 U CN201420026829 U CN 201420026829U CN 203716168 U CN203716168 U CN 203716168U
Authority
CN
China
Prior art keywords
covering layer
deep covering
foundation
construction
toe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420026829.4U
Other languages
Chinese (zh)
Inventor
邢建营
姜苏阳
李远程
郭其峰
李泽民
曹国利
李鑫
卢玲
韩健
包芬芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201420026829.4U priority Critical patent/CN203716168U/en
Application granted granted Critical
Publication of CN203716168U publication Critical patent/CN203716168U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a toe slab foundation structure of a deep covering layer of a concrete face rockfill dam. The toe slab foundation structure comprises a toe slab structure which is arranged on the deep covering layer; a plurality of high pressure jet grouting piles are separately arranged on the deep covering layer; the toe slab structure is arranged on a composite foundation which is formed by the high pressure jet grouting piles and the deep covering layer through a cushion layer; the upstream side of the toe slab structure is connected with a cut-off wall through a connecting plate; the downstream side of the toe slab structure is connected with a concrete slab. According to the toe slab foundation structure of the deep covering layer of the concrete face rockfill dam, the composite foundation which is formed by the high pressure jet grouting piles and the deep covering layer is adopted and accordingly the modulus of deformation of the foundation can be effectively improved, the non-uniformity of the deformation of the foundation can be reduced, mass work amount is saved, the construction period is greatly shortened, the construction investment is reduced, and the benefit of the construction development is improved and meanwhile the construction process of the high pressure jet grouting piles is mature, the construction speed is high, and the pile length, the pile diameter and the pile spacing can be adjusted according to the construction needs and the characteristics of the deep covering layer to meet the construction safety and deformation requirements.

Description

Concrete Face Rockfill Dam deep covering layer plinth foundation structure
Technical field
The utility model relates to based process field, especially relates to Concrete Face Rockfill Dam deep covering layer plinth foundation structure.
Background technology
On deep alluvion foundation, build Concrete Face Rockfill Dam, especially the Concrete Face Rockfill Dam that the covering layer degree of depth is greater than 30m and comprises weak intercalated layer, measures of foundation treatment becomes a key issue that determines Dam Designs in Last quality, and it can directly affect investment and the construction period of dam.Want under the prerequisite that guarantees engineering safety, to reduce to greatest extent excavated volume, reduce and fill material, must solve the processing problem on covering layer basis, make to be out of shape unlikely structural safety and the anti-seepage effect that affects dam in larger and inhomogenous covering layer basis.Current conventional way is that covering layer is excavated, and the method for excavating not only extends the engineering construction duration, thereby and excavates covering layer and will increase excavated volume and backfill amount increase construction investment.
Summary of the invention
The utility model object is to overcome the deficiencies in the prior art, and a kind of simple in structure, Concrete Face Rockfill Dam deep covering layer plinth foundation structure that treatment effect is good is provided.
For achieving the above object, the utility model can be taked following technical proposals:
Concrete Face Rockfill Dam deep covering layer plinth foundation structure described in the utility model, comprise the toe board structure being arranged on deep covering layer, on described deep covering layer, be arranged at intervals with a plurality of high-pressure rotary jet grouting piles, described toe board structure is arranged on the composite foundation of high-pressure rotary jet grouting pile and deep covering layer composition by bed course, the upstream side of described toe board structure is connected with impervious wall by junction plate, and its downstream is connected with concrete slab.
Described bed course is hardcore bed.
The utility model advantage is the composite foundation by adopting high-pressure rotary jet grouting pile and deep covering layer to form, can effectively improve the inhomogeneity of basic modulus of deformation, reduction foundation deformation, compare with conventional based process structure, no longer need to excavate deep covering layer, saved great amount of work are, greatly shorten the duration, reduced construction investment, improved the development benefit of engineering; And Construction Technique of High Pressure Revolving Spraying is ripe, and speed of application is fast, can adjust that stake is long according to the characteristic of requirement of engineering and deep covering layer, stake footpath and pile spacing, make it to meet engineering safety and deformation requirements.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, Concrete Face Rockfill Dam deep covering layer plinth foundation structure described in the utility model, comprise the toe board structure 2 being arranged on deep covering layer 1, on described deep covering layer 1, be arranged at intervals with a plurality of high-pressure rotary jet grouting piles 3, can adjust that the stake of high-pressure rotary jet grouting pile 3 is long according to the characteristic of height of dam, deep covering layer 1 and result of calculation, stake footpath, pile spacing make it to meet requirement of engineering; Described toe board structure 2 is arranged on the composite foundation of high-pressure rotary jet grouting pile 3 and deep covering layer 1 composition by bed course 4, and described bed course 4 can adopt hardcore bed; The upstream side of described toe board structure 2 is connected with impervious wall 6 by junction plate 5, forms seepage prevention for deep covering system, and the downstream of toe board structure 2 is connected with concrete slab 7, forms the above seepage control system of the loose rock dam dam foundation, thereby forms complete seepage control system.

Claims (2)

1. a Concrete Face Rockfill Dam deep covering layer plinth foundation structure, comprise the toe board structure (2) being arranged on deep covering layer (1), it is characterized in that: on described deep covering layer (1), be arranged at intervals with a plurality of high-pressure rotary jet grouting piles (3), described toe board structure (2) is arranged on the composite foundation of high-pressure rotary jet grouting pile (3) and deep covering layer (1) composition by bed course (4), the upstream side of described toe board structure (2) is connected with impervious wall (6) by junction plate (5), and its downstream is connected with concrete slab (7).
2. Concrete Face Rockfill Dam deep covering layer plinth foundation structure according to claim 1, is characterized in that: described bed course (4) is hardcore bed.
CN201420026829.4U 2014-01-16 2014-01-16 Toe slab foundation structure of deep covering layer of concrete face rockfill dam Expired - Lifetime CN203716168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420026829.4U CN203716168U (en) 2014-01-16 2014-01-16 Toe slab foundation structure of deep covering layer of concrete face rockfill dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420026829.4U CN203716168U (en) 2014-01-16 2014-01-16 Toe slab foundation structure of deep covering layer of concrete face rockfill dam

Publications (1)

Publication Number Publication Date
CN203716168U true CN203716168U (en) 2014-07-16

Family

ID=51155337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420026829.4U Expired - Lifetime CN203716168U (en) 2014-01-16 2014-01-16 Toe slab foundation structure of deep covering layer of concrete face rockfill dam

Country Status (1)

Country Link
CN (1) CN203716168U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389294A (en) * 2014-11-26 2015-03-04 禹顺生态建设有限公司 Concrete faced rockfill dam on deep covering layer and construction method
CN107881987A (en) * 2017-11-30 2018-04-06 中国电建集团成都勘测设计研究院有限公司 Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN108331002A (en) * 2018-01-25 2018-07-27 广东粤水电勘测设计有限公司 A kind of design and construction method of ground mattress layer
CN110055934A (en) * 2018-11-21 2019-07-26 中铁十一局集团第六工程有限公司 A kind of high water level earth and rockfill dam Construction of plastic concrete cut-off wall method
CN113832921A (en) * 2020-06-24 2021-12-24 中国电建集团华东勘测设计研究院有限公司 Construction method and structure of core-wall dam heightened face-plate rock-fill dam combined with toe-plate foundation treatment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104389294A (en) * 2014-11-26 2015-03-04 禹顺生态建设有限公司 Concrete faced rockfill dam on deep covering layer and construction method
CN107881987A (en) * 2017-11-30 2018-04-06 中国电建集团成都勘测设计研究院有限公司 Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN108331002A (en) * 2018-01-25 2018-07-27 广东粤水电勘测设计有限公司 A kind of design and construction method of ground mattress layer
CN110055934A (en) * 2018-11-21 2019-07-26 中铁十一局集团第六工程有限公司 A kind of high water level earth and rockfill dam Construction of plastic concrete cut-off wall method
CN113832921A (en) * 2020-06-24 2021-12-24 中国电建集团华东勘测设计研究院有限公司 Construction method and structure of core-wall dam heightened face-plate rock-fill dam combined with toe-plate foundation treatment

Similar Documents

Publication Publication Date Title
CN203716168U (en) Toe slab foundation structure of deep covering layer of concrete face rockfill dam
CN204530633U (en) The soft rock that a kind of subregion is arranged builds rock dam body
CN204023501U (en) A remove dangerous and consolidate prevention of seepage processing structure for earth and rockfill dam
CN205012288U (en) Embankment dam pitch core -wall base
CN204023578U (en) Retaining Structure with Double-row Piles
CN104060619B (en) Construction method and structure of hydraulic core-wall rockfill dam without cofferdams
CN103526721B (en) A kind of permeable pile foundation groynes
CN204282308U (en) Gabion composite dam adapting to deep covering layer
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN103132497B (en) Treatment method of deep karst large-flow underground karst cave
CN205382466U (en) Concrete face rockfill dam
CN204435430U (en) A kind of reverse row being applicable to upstream type Tailings Dam oozes system and upstream type Tailings Dam
CN103243721B (en) Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition
CN102071675A (en) Soft soil foundation consolidation method combining drainage pile loading prepressing and deep mixing piles
CN203878532U (en) Processing structure for deep, steep and inclined fault crack
CN203307776U (en) Concrete face rock fill dam toe board structure
CN204098016U (en) Slip casting air cushion plug
CN203080558U (en) Direct-type high-pressure grout curtain connection structure in thin lining-grouting cave
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN103966981B (en) Force transferring structure and the construction method thereof of arch dam is built on weathering rock mass
CN204212168U (en) Dam water retaining structure for jointly building dam by utilizing karst cave
CN106192909A (en) A kind of rock reducing panel stress strain level and method
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN205369167U (en) Back -up sand gravel material weir dam body is thrown to aquatic
CN103485312B (en) Construction technology for converging compacted concrete dam and riverbed foundation surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: YELLOW RIVER ENGINEERING CONSULTING Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140716