CN108331002A CN201810071182.XA CN201810071182A CN108331002A CN 108331002 A CN108331002 A CN 108331002A CN 201810071182 A CN201810071182 A CN 201810071182A CN 108331002 A CN108331002 A CN 108331002A
Authority
CN
China
Prior art keywords
mattress
hole
foundation
composite pile
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810071182.XA
Other languages
Chinese (zh)
Other versions
CN108331002B (en
Inventor
刘坚
关永智
刘伟
刘红梅
谢小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ysd Surveying & Designing Co ltd
Original Assignee
Guangdong Ysd Surveying & Designing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Ysd Surveying & Designing Co ltd filed Critical Guangdong Ysd Surveying & Designing Co ltd
Priority to CN201810071182.XA priority Critical patent/CN108331002B/en
Publication of CN108331002A publication Critical patent/CN108331002A/en
Application granted granted Critical
Publication of CN108331002B publication Critical patent/CN108331002B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of design and construction method of ground mattress layer, ground mattress layer includes several and the one-to-one mattress of composite pile foundation, includes the following steps, drives piles and cut the earth:In Pile Installation Platform construction composite pile foundation, cut the earth from Pile Installation Platform to foundation plane;Excavate mattress hole:The edge of each composite pile foundation excavates mattress hole on foundation plane, then cuts part composite pile foundation so that the top of composite pile foundation is located at the hole bottom in mattress hole;Mattress plastic film mulch is filled:It is laid with anti-seepage geomembrane in mattress is cheated so that the inner wall that anti-seepage geomembrane is cheated with mattress is affixed, and anti-seepage geomembrane is extended mattress hole, is formed shirt rim at the near coal-mine edge in mattress hole, is then filled stone sand in mattress is cheated;It is final to be laid with building bottom plate.So that speed of application is obviously accelerated, while also saving cost.The present invention is applied to civil engineering foundation treatment technology field.

Description

A kind of design and construction method of ground mattress layer
Technical field
The present invention relates to civil engineering foundation treatment technology fields, more particularly to a kind of design of ground mattress layer Construction method.
Background technology
The composite foundation of hydraulic engineering application at present is more, and common composite foundation has cement mixing pile, cement, flyash broken Stone mar (CFG), rotary churning pile etc..The stress ratio being arranged between mattress layer adjustment stake soil is needed to make between composite foundation and basis The material of stake and the common stress of foundation soil, the stress concentration for reducing the bottom of foundation, mattress layer is usually middle sand, coarse sand, graded sand The preferable material of the water stabilities such as stone, rubble, water penetration.Hydraulic engineering is for along the building bottom of foundation compared with architectural engineering It is anti-to be impregnated with higher requirement.And mattress layer is typically completely laid on the bottom of foundation, if directly applying at this time anti-for the bottom of foundation It is impregnated with the engineering of requirement, mattress layer will become a leakage passage, and be had adverse effect on to antiseepage.For the anti-of mattress layer It oozes, existing frequently-used method is typically that impervious element is in addition arranged, and such as seals mattress in one week setting solid matter mixing pile of mattress layer Layer antiseepage, this will increase project cost and construction period.
Invention content
To solve the above-mentioned problems, the purpose of the present invention is to provide a kind of design and construction method of ground mattress layer, energy Enough simplify Anti-seeping technology, reduces project cost, accelerates the construction period.
The technical solution adopted in the present invention is:A kind of design and construction method of ground mattress layer, the ground mattress layer Including several and one-to-one mattress of composite pile foundation, include the following steps:
A. piling and shoveling:In Pile Installation Platform construction composite pile foundation, cut the earth from Pile Installation Platform to foundation plane;
B. mattress hole is excavated:The edge of each composite pile foundation excavates mattress hole on foundation plane, and it is compound then to cut part Pile foundation so that the top of composite pile foundation is located at the hole bottom in mattress hole;
C. mattress plastic film mulch is filled:It is laid with anti-seepage geomembrane in mattress is cheated so that the inner wall of anti-seepage geomembrane and mattress hole It is affixed, and anti-seepage geomembrane is extended into mattress hole, form shirt rim at the near coal-mine edge in mattress hole, the then filling in mattress is cheated Stone sand;
D. it is laid with building bottom plate:It is laid with concrete layer on foundation plane, and shirt rim is passed through into concrete layer, is then laid with Shirt rim is simultaneously connected by building bottom plate with building bottom plate.
As a further improvement of the above technical scheme, in step c, anti-seepage geomembrane is multilayered structure.
As a further improvement of the above technical scheme, it in step c, is laid on corresponding on the anti-seepage geomembrane in mattress hole The position on composite pile foundation top is equipped with folding region.
As a further improvement of the above technical scheme, it is equipped in step c, between the stone sand and anti-seepage geomembrane thin Layer sand.
As a further improvement of the above technical scheme, in step b, the near coal-mine range in mattress hole is more than composite pile foundation top The range of the upward 45° angle diffusion in portion.
As a further improvement of the above technical scheme, in step d, shirt rim passes through the width of remainder after concrete layer More than 100mm.
As a further improvement of the above technical scheme, closely knit by static pressure after filling stone sand in mattress hole in step b Or pass through vibro densification.
Beneficial effects of the present invention:By being equipped with individual mattress to each composite pile foundation, effective simplify prevents the present invention Ooze processing, and interfering with each other without a variety of piling machineries so that speed of application is obviously accelerated, while also saving cost.
Description of the drawings
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is overall structure figure of the present invention.
Specific implementation mode
The design and construction method of ground mattress layer as shown in Figure 1, the ground mattress layer include several and composite pile foundation 1 One-to-one mattress, includes the following steps:
A. piling and shoveling:In Pile Installation Platform construction composite pile foundation 1, cut the earth from Pile Installation Platform to foundation plane, Spacing between Pile Installation Platform and foundation plane is more than 500mm, in shoveling work, first passes through mechanical excavation to from foundation plane It is cut the earth to foundation plane using artificial also behind the position of 300~500mm;
B. mattress hole is excavated:The edge of each composite pile foundation excavates mattress hole on foundation plane, and it is compound then to cut part Pile foundation so that the top of composite pile foundation 1 is located at the hole bottom in mattress hole;
C. mattress plastic film mulch is filled:It is laid with anti-seepage geomembrane 31 in mattress is cheated so that anti-seepage geomembrane 31 and mattress hole Inner wall is affixed, and anti-seepage geomembrane 31 is extended mattress hole, is formed shirt rim at the near coal-mine edge in mattress hole, is then cheated in mattress Interior filling stone sand 32;
D. it is laid with building bottom plate 2:It is laid with concrete layer 4 on foundation plane, and shirt rim is passed through into concrete layer 4, then It is laid with building bottom plate 2 and shirt rim is connected with building bottom plate 2.
The present embodiment wraps up rubble by being equipped with individual mattress to each composite pile foundation 1 by anti-seepage geomembrane 31 Sand 32 forms mattress so that mattress becomes the package of a sealing, and seepage flow needs to pass through from package bottom, increases seepage paths, carry The anti-permeability of mattress is risen, and effectively simplifies Anti-seeping technology, and interfering with each other without a variety of piling machineries so that Speed of application is obviously accelerated, while also saving cost.
It is further preferred that in step c, anti-seepage geomembrane 31 is multilayered structure, the anti-seepage geomembrane 31 in the present embodiment For double-layer structure, the anti-permeability of mattress is further promoted.
It is further preferred that in step c, composite pile foundation top is corresponded on the anti-seepage geomembrane 31 that is laid in mattress hole Position is equipped with folding region 311, increases the thickness of 1 top anti-seepage geomembrane 31 of composite pile foundation by folding anti-seepage geomembrane 31, So that the anti-seepage geomembrane 31 at 1 top of composite pile foundation has certain deformation space, even if the antiseepage geotechnique at 1 top of composite pile foundation Film 31 badly will not influence whole anti-seepage effect by the thorn of composite pile foundation 1.
It is further preferred that in step c, it is equipped with thin layer sand 33 between the stone sand 32 and anti-seepage geomembrane 31, that is, exists It is laid with one layer of thinner gravel of granularity between anti-seepage geomembrane 31 and stone sand 32, prevents rubble from piercing anti-seepage geomembrane 31 bad, In the present embodiment, the thickness of 32 a diameter of 8~20mm of stone sand, thin layer sand 33 are 25mm.
It is further preferred that in step b, the near coal-mine range in mattress hole is more than the 45° angle diffusion upwards of 1 top of composite pile foundation Range, i.e. the diameter that the near coal-mine any width in mattress hole is both greater than composite pile foundation 1 receives twice mattress hole depth, this implementation The depth that mattress is cheated in example is 200mm or 300mm, and it is relatively high to settlement request that the mattress of hole depth 200mm is mainly used for building Position, such as pumping plant workshop or Power Plant basis;It is relatively high that the mattress of hole depth 300mm is mainly used for antiseepage requirement Levee body building basis prevents the case where bottom plate is with foundation void generation contact scour.
It is further preferred that in step d, shirt rim is more than 100mm across the width of remainder after concrete layer 4.Pacifying Geotechnological film edge will be first oozed before 2 reinforcing bar of dress building bottom plate to be flattened with cushion block, after the completion of reinforcement installation, then pour building bottom Plate 2 completes the construction on entire mattress layer basis.
Certainly, the invention is not limited in the above embodiment, those skilled in the art are without prejudice to the present invention Equivalent variations or replacement can be also made under the premise of spirit, these equivalent modifications or replacement are all contained in the application claim In limited range.

Claims (7)

1. a kind of design and construction method of ground mattress layer, which is characterized in that the ground mattress layer includes several and composite pile The one-to-one mattress of base, includes the following steps:
A. piling and shoveling:In Pile Installation Platform construction composite pile foundation, cut the earth from Pile Installation Platform to foundation plane;
B. mattress hole is excavated:The edge of each composite pile foundation excavates mattress hole on foundation plane, then cuts part composite pile foundation, So that the top of composite pile foundation is located at the hole bottom in mattress hole;
C. mattress plastic film mulch is filled:It being laid with anti-seepage geomembrane in mattress is cheated so that the inner wall that anti-seepage geomembrane is cheated with mattress is affixed, And anti-seepage geomembrane is extended into mattress hole, shirt rim is formed at the near coal-mine edge in mattress hole, then fills rubble in mattress is cheated Sand;
D. it is laid with building bottom plate:It is laid with concrete layer on foundation plane, and shirt rim is passed through into concrete layer, is then laid with building Shirt rim is simultaneously connected by object bottom plate with building bottom plate.
2. the design and construction method of ground mattress layer according to claim 1, it is characterised in that:In step c, anti-seepage geomembrane For multilayered structure.
3. the design and construction method of ground mattress layer according to claim 1, it is characterised in that:In step c, it is laid on mattress The position that composite pile foundation top is corresponded on anti-seepage geomembrane in hole is equipped with folding region.
4. according to claims 1 or 2 or the design and construction method of the 3 ground mattress layers, it is characterised in that:It is described in step c Thin layer sand is equipped between stone sand and anti-seepage geomembrane.
5. according to claims 1 or 2 or the design and construction method of the 3 ground mattress layers, it is characterised in that:In step b, mattress The near coal-mine range in hole is more than at the top of composite pile foundation the range of 45° angle diffusion upwards.
6. according to claims 1 or 2 or the design and construction method of the 3 ground mattress layers, it is characterised in that:In step d, shirt rim The width of remainder is more than 100mm after concrete layer.
7. according to claims 1 or 2 or the design and construction method of the 3 ground mattress layers, it is characterised in that:In step b, mattress It is closely knit or pass through vibro densification by static pressure after filling stone sand in hole.
CN201810071182.XA 2018-01-25 2018-01-25 Design and construction method of foundation mattress layer Active CN108331002B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810071182.XA CN108331002B (en) 2018-01-25 2018-01-25 Design and construction method of foundation mattress layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810071182.XA CN108331002B (en) 2018-01-25 2018-01-25 Design and construction method of foundation mattress layer

Publications (2)

Publication Number Publication Date
CN108331002A true CN108331002A (en) 2018-07-27
CN108331002B CN108331002B (en) 2020-04-21

Family

ID=62925797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810071182.XA Active CN108331002B (en) 2018-01-25 2018-01-25 Design and construction method of foundation mattress layer

Country Status (1)

Country Link
CN (1) CN108331002B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680701A (en) * 2019-02-01 2019-04-26 长江勘测规划设计研究有限责任公司 One kind is for pile foundation construction leakage preventing structure and construction method on dyke
CN112921947A (en) * 2021-03-23 2021-06-08 夏妙水 Foundation construction method in house building construction

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203546743U (en) * 2013-10-30 2014-04-16 上海勘测设计研究院 CFG pile composite foundation mattress layer
KR20140058951A (en) * 2012-11-07 2014-05-15 (주) 선암기술연구소 Caisson tube water-tight structure and under water structure construction method for soft ground
CN203716168U (en) * 2014-01-16 2014-07-16 黄河勘测规划设计有限公司 Toe slab foundation structure of deep covering layer of concrete face rockfill dam

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140058951A (en) * 2012-11-07 2014-05-15 (주) 선암기술연구소 Caisson tube water-tight structure and under water structure construction method for soft ground
CN203546743U (en) * 2013-10-30 2014-04-16 上海勘测设计研究院 CFG pile composite foundation mattress layer
CN203716168U (en) * 2014-01-16 2014-07-16 黄河勘测规划设计有限公司 Toe slab foundation structure of deep covering layer of concrete face rockfill dam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680701A (en) * 2019-02-01 2019-04-26 长江勘测规划设计研究有限责任公司 One kind is for pile foundation construction leakage preventing structure and construction method on dyke
CN112921947A (en) * 2021-03-23 2021-06-08 夏妙水 Foundation construction method in house building construction

Also Published As

Publication number Publication date
CN108331002B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN104863113A (en) Method for curing in-situ soil in situ and stirring device
CN101481911A (en) Construction method for special underground continuous wall
CN105421497A (en) Water-proof construction method for connected nodes of foundation slab and ground wall in composite surround system
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN108331002A (en) A kind of design and construction method of ground mattress layer
JP5232285B2 (en) Liquefaction countermeasure structure for ground improvement solid foundation and ground improvement solid foundation method
CN109853604A (en) A kind of static pressure waterpower suction open caisson construction method
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN111379267A (en) Water plugging method for solving water gushing at bottom of foundation pit
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
JPH09100524A (en) Development method of fill dam
CN207987943U (en) A kind of composite foundation mattress layer structure
CN109338909B (en) Integral pier reinforcing structure and construction method thereof
CN207567752U (en) A kind of sealing ditch constructing structure for place Soft Ground Improved By Vacuum Preloading processing of rockfilling
CN108611941B (en) Method for processing saturated high-fill roadbed
CN106567382A (en) Foundation pit curtain construction method in gravel layer
CN112921998A (en) Cofferdam enclosure slope-making foundation pit excavation method suitable for deep sludge covering layer
KR20110002175A (en) Lightweight material mounding structure and method for constructing the same
CN105350557A (en) Plastic water stop plate used as waterproof curtain
CN110629778A (en) Construction method for stopping leakage of waterproof curtain
US1602623A (en) Dam and method of constructing the same
CN112282798B (en) Tunnel surrounding rock advanced horizontal water-stopping grouting construction method
CN103966997A (en) Construction method for conducting foundation treatment through grouting engineering pile foundations with steel sleeves
CN111549809A (en) Water stopping method for sinking geotextile and lapping to form water stopping curtain by sleeve method
CN108547190A (en) A kind of method of ecological type immerseable embankment processing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant