CN108547190A - A kind of method of ecological type immerseable embankment processing - Google Patents
A kind of method of ecological type immerseable embankment processing Download PDFInfo
- Publication number
- CN108547190A CN108547190A CN201810650647.7A CN201810650647A CN108547190A CN 108547190 A CN108547190 A CN 108547190A CN 201810650647 A CN201810650647 A CN 201810650647A CN 108547190 A CN108547190 A CN 108547190A
- Authority
- CN
- China
- Prior art keywords
- wall cavity
- stone
- straight wall
- backfill
- tgxg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
Abstract
The invention discloses a kind of methods of ecological type immerseable embankment processing, include the following steps:1)In embankment bottom casting concrete pedestal;2)It opens up several consolidation grouting holes and grout curtain hole downwards across concrete pedestal, and is in the milk respectively into consolidation grouting hole and grout curtain hole;3)Step 2)After grouting solidification, straight wall cavity is installed in the top of concrete pedestal, and undisturbed soil stone one is backfilled in straight wall cavity;4)In straight wall cavity, multilayer TGXG is arranged in side and top near water, is tamped with earthen backfill between adjacent TGXG;In straight wall cavity backwater side backfill stone;5)In TGXG, side backfill undisturbed soil stone two, the setting geotechnical grid above undisturbed soil stone two backfill planting plants after ploughing soil in geotechnical grid near water.The present invention has impervious body survivable, and service life is long, easy for construction, economizes on resources, the few feature of settlement of subgrade.
Description
Technical field
The present invention relates to a kind of method of embankment processing, especially a kind of method of ecological type immerseable embankment processing.
Background technology
Immerseable embankment refers to that road foundation is on the verge of river and lake, and roadbed is to meet flood control level to carry out high roadbed design.Design
When immerseable embankment, saturated yielding shadow caused by infiltration, fluctuation in stage, wave invasion, current scour and underground water Yong Sheng should be fully considered
It rings.
It is directed to the saturation roadbed antiseepage of reservoir location, presently, there are several administration ways:1)Antiseepage film process;2)Reinforcing bar is mixed
Solidifying soil panel surface processing;3)Grout curtain.But the 1st)With 2)The processing mode of kind is only applicable to surface layer antiseepage, is easy to brokenly
Bad, antiseepage film service life is relatively low;And the 3rd)Kind processing mode is only applicable to cut subgrade antiseepage, and construction is complicated, material utilization amount
Greatly.And how ensureing that impervious body is located at the side that borders on the river and is neither easy to destroy, service life is long, and can meet embankment construction party
Just, it economizes on resources, and it is a urgent problem that can also reduce settlement of subgrade.
Invention content
The object of the present invention is to provide a kind of methods of ecological type immerseable embankment processing.The present invention has impervious body not
Destructible, service life is long, easy for construction, economizes on resources, the few feature of settlement of subgrade.
Technical scheme of the present invention:A kind of method of ecological type immerseable embankment processing, includes the following steps:
1)In embankment bottom casting concrete pedestal;
2)Open up several consolidation grouting holes and grout curtain hole downwards across concrete pedestal, and respectively to consolidation grouting hole and curtain
Grouting in curtain grout hole;
3)Step 2)After grouting solidification, straight wall cavity is installed in the top of concrete pedestal, and original state is backfilled in straight wall cavity
Native stone one;
4)In straight wall cavity, multilayer TGXG is arranged in side and top near water, is tamped with earthen backfill between adjacent TGXG;
In straight wall cavity backwater side backfill stone;
5)In TGXG, side backfills undisturbed soil stone two near water, geotechnical grid is arranged above undisturbed soil stone two, in geotechnological lattice
Planting plants after soil are ploughed in indoor backfill.
The method of ecological type immerseable embankment processing above-mentioned, step 2)In, the setting spacing in the consolidation grouting hole is 1-
3m。
The method of ecological type immerseable embankment processing above-mentioned, step 2)In, the setting spacing in the grout curtain hole is
0.5-1.5m。
The method of ecological type immerseable embankment processing above-mentioned, step 3)In, the straight wall cavity is assembled straight wall cavity,
It is assembled by concrete slab.
The method of ecological type immerseable embankment processing above-mentioned, step 4)In, the spacing between the adjacent TGXG is
1.5-2.5m。
The method of ecological type immerseable embankment processing above-mentioned, step 4)In, the straight wall cavity backwater side first backfills stone
Block forms rockfill area, and then backfill stone forms native stone back filled region.
The method of ecological type immerseable embankment processing above-mentioned, step 5)In, the inside of the geotechnical grid is equipped with lacing wire.
Beneficial effects of the present invention
The present invention forms compound by using the tensile property of the anti-permeability performance and TGXG of straight wall cavity and seepage proof curtain
System reduces unilateral lake body water pressure to the adverse effect of embankment, makes impervious body using the ecological preferable principle of geotechnical grid
It is survivable, extend the service life of impervious body;Meanwhile avoiding the differential settlement of high-fill roadbed.In addition, in not shadow
Under the conditions of ringing construction speed, the original state earth rock material for making full use of periphery to excavate saves engineering material investment, improves material profit
With rate, the waste of resource is reduced, the spirit for meeting national energy conservation and emission reduction requires.
Description of the drawings
Attached drawing 1 is the structural schematic diagram for the embankment that the present invention is handled.
Reference sign:1- consolidation groutings hole, 2- grout curtains hole, 3- straight wall cavitys, 4- undisturbed soils stone one, 5- enrockments
Area, 6- geotechnical grids, 7- plough soil, 8- TGXG, 9- soil stones back filled region, 10- concrete pedestals, 11- undisturbed soils stone two, 12-
Lacing wire.
Specific implementation mode
With reference to embodiment, the present invention is further illustrated, but is not intended as the foundation limited the present invention.
The embodiment of the present invention
A kind of method of ecological type immerseable embankment processing, steps are as follows:
1)Casting concrete pedestal 10, base thickness 50cm ~ 100cm in embankment bottom;
2)Several consolidation grouting holes 1 and grout curtain hole 2 are opened up downwards across concrete pedestal 10, and respectively to consolidation grouting hole
1 and grout curtain hole 2 in grouting;
3)After step 2 grouting solidification, the installation straight wall cavity 3 in the top of concrete pedestal 10, and backfill is former in straight wall cavity 3
Shape soil stone 1;
4)In straight wall cavity 3, multilayer TGXG 8 is arranged in side and top near water, is rammed with earthen backfill between adjacent TGXG 8
It is real;In 3 backwater side backfill stone of straight wall cavity;
5)In TGXG 8, side backfills undisturbed soil stone 2 11 near water, and geotechnical grid 6 is arranged above undisturbed soil stone 2 11,
Planting plants after soil 7 are ploughed in backfill in geotechnical grid 6.
The native stone that scene is dug out when undisturbed soil stone 1 and undisturbed soil stone 2 11 choose construction.Treated, and roadbed is for example attached
Shown in Fig. 1.
Further, in step 2, the setting spacing in the consolidation grouting hole 1 is 1-3m, is turned according to conventional consolidation grout hole
Hole mode carries out.
Further, in step 2, the setting spacing in the grout curtain hole 2 is 0.5-1.5m, according to conventional grout curtain
Hole turn hole mode carries out.
Further, in step 3, the straight wall cavity 3 is assembled straight wall cavity, assembled by concrete slab, is applied
The simpler convenience of work.
Further, in step 4, the spacing between the adjacent TGXG 8 is 1.5-2.5m, sound construction, and section
About material.
Further, in step 4,3 backwater side of the straight wall cavity first backfills stone and forms rockfill area 5, then backfills
Native stone forms native stone back filled region 9.
Further, in step 5, the inside of the geotechnical grid 6 is equipped with lacing wire 12, and the structure of geotechnical grid 6 is more firm
Gu.
Claims (7)
1. a kind of method of ecological type immerseable embankment processing, which is characterized in that include the following steps:
1)In embankment bottom casting concrete pedestal(10);
2)Across concrete pedestal(10)Several consolidation grouting holes are opened up downwards(1)With grout curtain hole(2), and respectively to consolidation
Grout hole(1)With grout curtain hole(2)Interior grouting;
3)Step 2)After grouting solidification, in concrete pedestal(10)Top install straight wall cavity(3), and in straight wall cavity(3)
Interior backfill undisturbed soil stone one(4);
4)In straight wall cavity(3)Multilayer TGXG is arranged in side and top near water(8), adjacent TGXG(8)Between with soil
It is backfilling and compacted;In straight wall cavity(3)Backwater side backfill stone;
5)In TGXG(8)Side backfill undisturbed soil stone two near water(11), in undisturbed soil stone two(11)The geotechnological lattice of top setting
Room(6), in geotechnical grid(6)Soil is ploughed in interior backfill(7)Planting plants afterwards.
2. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 2)In, it is described solid
Tie grout hole(1)Setting spacing be 1-3m.
3. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 2)In, the curtain
Curtain grout hole(2)Setting spacing be 0.5-1.5m.
4. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 3)In, it is described perpendicular
Wall cavity(3)It is assembled by concrete slab for assembled straight wall cavity.
5. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 4)In, adjacent institute
State TGXG(8)Between spacing be 1.5-2.5m.
6. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 4)In, it is described perpendicular
Wall cavity(3)Backwater side first backfills stone and forms rockfill area(5), then backfill stone form native stone back filled region(9).
7. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 5)In, the soil
Work cell compartment(6)Inside be equipped with lacing wire(12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810650647.7A CN108547190A (en) | 2018-06-22 | 2018-06-22 | A kind of method of ecological type immerseable embankment processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810650647.7A CN108547190A (en) | 2018-06-22 | 2018-06-22 | A kind of method of ecological type immerseable embankment processing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108547190A true CN108547190A (en) | 2018-09-18 |
Family
ID=63493913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810650647.7A Pending CN108547190A (en) | 2018-06-22 | 2018-06-22 | A kind of method of ecological type immerseable embankment processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108547190A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113897832A (en) * | 2021-11-22 | 2022-01-07 | 长沙理工大学 | Repairing structure and repairing method for water damage of geogrid reverse-wrapping embankment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10240171A1 (en) * | 2002-08-30 | 2004-03-11 | Jens Shi | Flood protection dyke system inserts concrete wall deep into ground and of water-protective height plus grating stones to sides on gravel bed for grass etc to grow through as further dyke reinforcement and stability. |
CN201627180U (en) * | 2010-03-05 | 2010-11-10 | 中国水电顾问集团华东勘测设计研究院 | Reinforced structure of large fault of dam foundation of gravity dam |
CN104358270A (en) * | 2014-12-03 | 2015-02-18 | 中国电建集团成都勘测设计研究院有限公司 | High core wall rock-fill dam foundation seepage prevention structure on deep overburden layer |
CN105297685A (en) * | 2015-11-23 | 2016-02-03 | 中国电建集团贵阳勘测设计研究院有限公司 | Base concrete face rock fill dam and construction method thereof |
CN206553848U (en) * | 2017-01-21 | 2017-10-13 | 中铁二十局集团第一工程有限公司 | Embankment section road surface edge structure |
CN107354911A (en) * | 2017-08-31 | 2017-11-17 | 郑州大学 | A kind of ecological flexible geogrid reinforcement Wharf Construction method |
-
2018
- 2018-06-22 CN CN201810650647.7A patent/CN108547190A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10240171A1 (en) * | 2002-08-30 | 2004-03-11 | Jens Shi | Flood protection dyke system inserts concrete wall deep into ground and of water-protective height plus grating stones to sides on gravel bed for grass etc to grow through as further dyke reinforcement and stability. |
CN201627180U (en) * | 2010-03-05 | 2010-11-10 | 中国水电顾问集团华东勘测设计研究院 | Reinforced structure of large fault of dam foundation of gravity dam |
CN104358270A (en) * | 2014-12-03 | 2015-02-18 | 中国电建集团成都勘测设计研究院有限公司 | High core wall rock-fill dam foundation seepage prevention structure on deep overburden layer |
CN105297685A (en) * | 2015-11-23 | 2016-02-03 | 中国电建集团贵阳勘测设计研究院有限公司 | Base concrete face rock fill dam and construction method thereof |
CN206553848U (en) * | 2017-01-21 | 2017-10-13 | 中铁二十局集团第一工程有限公司 | Embankment section road surface edge structure |
CN107354911A (en) * | 2017-08-31 | 2017-11-17 | 郑州大学 | A kind of ecological flexible geogrid reinforcement Wharf Construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113897832A (en) * | 2021-11-22 | 2022-01-07 | 长沙理工大学 | Repairing structure and repairing method for water damage of geogrid reverse-wrapping embankment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410159B (en) | Expansive soil cut slope support structure and construction method thereof | |
CN100480472C (en) | Quick reinforcing method and reinforcing device for super soft weak soil | |
CN101270579B (en) | Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit | |
CN201245846Y (en) | Clamshell excavator stirring concrete enclosure wall | |
CN105201001B (en) | Composite seepage preventing structure for large karst cave in karst region and construction method thereof | |
CN203393530U (en) | Anti-floating lightweight high-fill embankment structure | |
CN205012288U (en) | Embankment dam pitch core -wall base | |
CN104234034B (en) | After a kind of first draining, plugging plate holds the construction method of formula embankment | |
CN208136652U (en) | Shallow-layer solidifies Piled Embankments | |
CN103015399A (en) | Earthquake disaster reduction system for liquefiable foundation and foundation treatment method | |
CN106498959A (en) | Gutter for deep overburden | |
CN105887606A (en) | Heat-preservation and water-seepage compound type blind ditch of deep trench of severely cold and frozen earth area and construction method of heat-preservation and water-seepage compound type blind ditch | |
CN106884427A (en) | Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water | |
CN207537975U (en) | Deep covering layer top panel Rockfill Dam based moisture barrier structure | |
CN110804994B (en) | Reservoir dam construction method | |
CN103276717B (en) | The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation | |
CN108547190A (en) | A kind of method of ecological type immerseable embankment processing | |
CN107881987A (en) | Deep covering layer top panel Rockfill Dam based moisture barrier structure | |
CN201778330U (en) | Clay water-stop curtain wall | |
CN104695455B (en) | High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof | |
CN208586481U (en) | A kind of ecological type immerseable embankment | |
CN105002883A (en) | Indirect hierarchical relay type drainage consolidation method of soft foundation | |
CN208279958U (en) | A kind of saturation high-fill roadbed structure | |
CN113737722A (en) | Have concurrently stone concrete barricade shore protection of view nature suitable for city river course | |
CN108611941B (en) | Method for processing saturated high-fill roadbed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |