CN108547190A - A kind of method of ecological type immerseable embankment processing - Google Patents

A kind of method of ecological type immerseable embankment processing Download PDF

Info

Publication number
CN108547190A
CN108547190A CN201810650647.7A CN201810650647A CN108547190A CN 108547190 A CN108547190 A CN 108547190A CN 201810650647 A CN201810650647 A CN 201810650647A CN 108547190 A CN108547190 A CN 108547190A
Authority
CN
China
Prior art keywords
wall cavity
stone
straight wall
backfill
tgxg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810650647.7A
Other languages
Chinese (zh)
Inventor
欧阳章智
王竹
吴振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201810650647.7A priority Critical patent/CN108547190A/en
Publication of CN108547190A publication Critical patent/CN108547190A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Abstract

The invention discloses a kind of methods of ecological type immerseable embankment processing, include the following steps:1)In embankment bottom casting concrete pedestal;2)It opens up several consolidation grouting holes and grout curtain hole downwards across concrete pedestal, and is in the milk respectively into consolidation grouting hole and grout curtain hole;3)Step 2)After grouting solidification, straight wall cavity is installed in the top of concrete pedestal, and undisturbed soil stone one is backfilled in straight wall cavity;4)In straight wall cavity, multilayer TGXG is arranged in side and top near water, is tamped with earthen backfill between adjacent TGXG;In straight wall cavity backwater side backfill stone;5)In TGXG, side backfill undisturbed soil stone two, the setting geotechnical grid above undisturbed soil stone two backfill planting plants after ploughing soil in geotechnical grid near water.The present invention has impervious body survivable, and service life is long, easy for construction, economizes on resources, the few feature of settlement of subgrade.

Description

A kind of method of ecological type immerseable embankment processing
Technical field
The present invention relates to a kind of method of embankment processing, especially a kind of method of ecological type immerseable embankment processing.
Background technology
Immerseable embankment refers to that road foundation is on the verge of river and lake, and roadbed is to meet flood control level to carry out high roadbed design.Design When immerseable embankment, saturated yielding shadow caused by infiltration, fluctuation in stage, wave invasion, current scour and underground water Yong Sheng should be fully considered It rings.
It is directed to the saturation roadbed antiseepage of reservoir location, presently, there are several administration ways:1)Antiseepage film process;2)Reinforcing bar is mixed Solidifying soil panel surface processing;3)Grout curtain.But the 1st)With 2)The processing mode of kind is only applicable to surface layer antiseepage, is easy to brokenly Bad, antiseepage film service life is relatively low;And the 3rd)Kind processing mode is only applicable to cut subgrade antiseepage, and construction is complicated, material utilization amount Greatly.And how ensureing that impervious body is located at the side that borders on the river and is neither easy to destroy, service life is long, and can meet embankment construction party Just, it economizes on resources, and it is a urgent problem that can also reduce settlement of subgrade.
Invention content
The object of the present invention is to provide a kind of methods of ecological type immerseable embankment processing.The present invention has impervious body not Destructible, service life is long, easy for construction, economizes on resources, the few feature of settlement of subgrade.
Technical scheme of the present invention:A kind of method of ecological type immerseable embankment processing, includes the following steps:
1)In embankment bottom casting concrete pedestal;
2)Open up several consolidation grouting holes and grout curtain hole downwards across concrete pedestal, and respectively to consolidation grouting hole and curtain Grouting in curtain grout hole;
3)Step 2)After grouting solidification, straight wall cavity is installed in the top of concrete pedestal, and original state is backfilled in straight wall cavity Native stone one;
4)In straight wall cavity, multilayer TGXG is arranged in side and top near water, is tamped with earthen backfill between adjacent TGXG; In straight wall cavity backwater side backfill stone;
5)In TGXG, side backfills undisturbed soil stone two near water, geotechnical grid is arranged above undisturbed soil stone two, in geotechnological lattice Planting plants after soil are ploughed in indoor backfill.
The method of ecological type immerseable embankment processing above-mentioned, step 2)In, the setting spacing in the consolidation grouting hole is 1- 3m。
The method of ecological type immerseable embankment processing above-mentioned, step 2)In, the setting spacing in the grout curtain hole is 0.5-1.5m。
The method of ecological type immerseable embankment processing above-mentioned, step 3)In, the straight wall cavity is assembled straight wall cavity, It is assembled by concrete slab.
The method of ecological type immerseable embankment processing above-mentioned, step 4)In, the spacing between the adjacent TGXG is 1.5-2.5m。
The method of ecological type immerseable embankment processing above-mentioned, step 4)In, the straight wall cavity backwater side first backfills stone Block forms rockfill area, and then backfill stone forms native stone back filled region.
The method of ecological type immerseable embankment processing above-mentioned, step 5)In, the inside of the geotechnical grid is equipped with lacing wire.
Beneficial effects of the present invention
The present invention forms compound by using the tensile property of the anti-permeability performance and TGXG of straight wall cavity and seepage proof curtain System reduces unilateral lake body water pressure to the adverse effect of embankment, makes impervious body using the ecological preferable principle of geotechnical grid It is survivable, extend the service life of impervious body;Meanwhile avoiding the differential settlement of high-fill roadbed.In addition, in not shadow Under the conditions of ringing construction speed, the original state earth rock material for making full use of periphery to excavate saves engineering material investment, improves material profit With rate, the waste of resource is reduced, the spirit for meeting national energy conservation and emission reduction requires.
Description of the drawings
Attached drawing 1 is the structural schematic diagram for the embankment that the present invention is handled.
Reference sign:1- consolidation groutings hole, 2- grout curtains hole, 3- straight wall cavitys, 4- undisturbed soils stone one, 5- enrockments Area, 6- geotechnical grids, 7- plough soil, 8- TGXG, 9- soil stones back filled region, 10- concrete pedestals, 11- undisturbed soils stone two, 12- Lacing wire.
Specific implementation mode
With reference to embodiment, the present invention is further illustrated, but is not intended as the foundation limited the present invention.
The embodiment of the present invention
A kind of method of ecological type immerseable embankment processing, steps are as follows:
1)Casting concrete pedestal 10, base thickness 50cm ~ 100cm in embankment bottom;
2)Several consolidation grouting holes 1 and grout curtain hole 2 are opened up downwards across concrete pedestal 10, and respectively to consolidation grouting hole 1 and grout curtain hole 2 in grouting;
3)After step 2 grouting solidification, the installation straight wall cavity 3 in the top of concrete pedestal 10, and backfill is former in straight wall cavity 3 Shape soil stone 1;
4)In straight wall cavity 3, multilayer TGXG 8 is arranged in side and top near water, is rammed with earthen backfill between adjacent TGXG 8 It is real;In 3 backwater side backfill stone of straight wall cavity;
5)In TGXG 8, side backfills undisturbed soil stone 2 11 near water, and geotechnical grid 6 is arranged above undisturbed soil stone 2 11, Planting plants after soil 7 are ploughed in backfill in geotechnical grid 6.
The native stone that scene is dug out when undisturbed soil stone 1 and undisturbed soil stone 2 11 choose construction.Treated, and roadbed is for example attached Shown in Fig. 1.
Further, in step 2, the setting spacing in the consolidation grouting hole 1 is 1-3m, is turned according to conventional consolidation grout hole Hole mode carries out.
Further, in step 2, the setting spacing in the grout curtain hole 2 is 0.5-1.5m, according to conventional grout curtain Hole turn hole mode carries out.
Further, in step 3, the straight wall cavity 3 is assembled straight wall cavity, assembled by concrete slab, is applied The simpler convenience of work.
Further, in step 4, the spacing between the adjacent TGXG 8 is 1.5-2.5m, sound construction, and section About material.
Further, in step 4,3 backwater side of the straight wall cavity first backfills stone and forms rockfill area 5, then backfills Native stone forms native stone back filled region 9.
Further, in step 5, the inside of the geotechnical grid 6 is equipped with lacing wire 12, and the structure of geotechnical grid 6 is more firm Gu.

Claims (7)

1. a kind of method of ecological type immerseable embankment processing, which is characterized in that include the following steps:
1)In embankment bottom casting concrete pedestal(10);
2)Across concrete pedestal(10)Several consolidation grouting holes are opened up downwards(1)With grout curtain hole(2), and respectively to consolidation Grout hole(1)With grout curtain hole(2)Interior grouting;
3)Step 2)After grouting solidification, in concrete pedestal(10)Top install straight wall cavity(3), and in straight wall cavity(3) Interior backfill undisturbed soil stone one(4);
4)In straight wall cavity(3)Multilayer TGXG is arranged in side and top near water(8), adjacent TGXG(8)Between with soil It is backfilling and compacted;In straight wall cavity(3)Backwater side backfill stone;
5)In TGXG(8)Side backfill undisturbed soil stone two near water(11), in undisturbed soil stone two(11)The geotechnological lattice of top setting Room(6), in geotechnical grid(6)Soil is ploughed in interior backfill(7)Planting plants afterwards.
2. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 2)In, it is described solid Tie grout hole(1)Setting spacing be 1-3m.
3. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 2)In, the curtain Curtain grout hole(2)Setting spacing be 0.5-1.5m.
4. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 3)In, it is described perpendicular Wall cavity(3)It is assembled by concrete slab for assembled straight wall cavity.
5. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 4)In, adjacent institute State TGXG(8)Between spacing be 1.5-2.5m.
6. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 4)In, it is described perpendicular Wall cavity(3)Backwater side first backfills stone and forms rockfill area(5), then backfill stone form native stone back filled region(9).
7. the method for ecological type immerseable embankment processing according to claim 1, it is characterised in that:Step 5)In, the soil Work cell compartment(6)Inside be equipped with lacing wire(12).
CN201810650647.7A 2018-06-22 2018-06-22 A kind of method of ecological type immerseable embankment processing Pending CN108547190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810650647.7A CN108547190A (en) 2018-06-22 2018-06-22 A kind of method of ecological type immerseable embankment processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810650647.7A CN108547190A (en) 2018-06-22 2018-06-22 A kind of method of ecological type immerseable embankment processing

Publications (1)

Publication Number Publication Date
CN108547190A true CN108547190A (en) 2018-09-18

Family

ID=63493913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810650647.7A Pending CN108547190A (en) 2018-06-22 2018-06-22 A kind of method of ecological type immerseable embankment processing

Country Status (1)

Country Link
CN (1) CN108547190A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897832A (en) * 2021-11-22 2022-01-07 长沙理工大学 Repairing structure and repairing method for water damage of geogrid reverse-wrapping embankment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10240171A1 (en) * 2002-08-30 2004-03-11 Jens Shi Flood protection dyke system inserts concrete wall deep into ground and of water-protective height plus grating stones to sides on gravel bed for grass etc to grow through as further dyke reinforcement and stability.
CN201627180U (en) * 2010-03-05 2010-11-10 中国水电顾问集团华东勘测设计研究院 Reinforced structure of large fault of dam foundation of gravity dam
CN104358270A (en) * 2014-12-03 2015-02-18 中国电建集团成都勘测设计研究院有限公司 High core wall rock-fill dam foundation seepage prevention structure on deep overburden layer
CN105297685A (en) * 2015-11-23 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Base concrete face rock fill dam and construction method thereof
CN206553848U (en) * 2017-01-21 2017-10-13 中铁二十局集团第一工程有限公司 Embankment section road surface edge structure
CN107354911A (en) * 2017-08-31 2017-11-17 郑州大学 A kind of ecological flexible geogrid reinforcement Wharf Construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10240171A1 (en) * 2002-08-30 2004-03-11 Jens Shi Flood protection dyke system inserts concrete wall deep into ground and of water-protective height plus grating stones to sides on gravel bed for grass etc to grow through as further dyke reinforcement and stability.
CN201627180U (en) * 2010-03-05 2010-11-10 中国水电顾问集团华东勘测设计研究院 Reinforced structure of large fault of dam foundation of gravity dam
CN104358270A (en) * 2014-12-03 2015-02-18 中国电建集团成都勘测设计研究院有限公司 High core wall rock-fill dam foundation seepage prevention structure on deep overburden layer
CN105297685A (en) * 2015-11-23 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Base concrete face rock fill dam and construction method thereof
CN206553848U (en) * 2017-01-21 2017-10-13 中铁二十局集团第一工程有限公司 Embankment section road surface edge structure
CN107354911A (en) * 2017-08-31 2017-11-17 郑州大学 A kind of ecological flexible geogrid reinforcement Wharf Construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113897832A (en) * 2021-11-22 2022-01-07 长沙理工大学 Repairing structure and repairing method for water damage of geogrid reverse-wrapping embankment

Similar Documents

Publication Publication Date Title
CN103410159B (en) Expansive soil cut slope support structure and construction method thereof
CN100480472C (en) Quick reinforcing method and reinforcing device for super soft weak soil
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN201245846Y (en) Clamshell excavator stirring concrete enclosure wall
CN105201001B (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN205012288U (en) Embankment dam pitch core -wall base
CN104234034B (en) After a kind of first draining, plugging plate holds the construction method of formula embankment
CN208136652U (en) Shallow-layer solidifies Piled Embankments
CN103015399A (en) Earthquake disaster reduction system for liquefiable foundation and foundation treatment method
CN106498959A (en) Gutter for deep overburden
CN105887606A (en) Heat-preservation and water-seepage compound type blind ditch of deep trench of severely cold and frozen earth area and construction method of heat-preservation and water-seepage compound type blind ditch
CN106884427A (en) Immersed tube tunnel and immersed tube tunnel changeover portion soft soil foundation reinforcing method under water
CN207537975U (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN110804994B (en) Reservoir dam construction method
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN108547190A (en) A kind of method of ecological type immerseable embankment processing
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN201778330U (en) Clay water-stop curtain wall
CN104695455B (en) High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof
CN208586481U (en) A kind of ecological type immerseable embankment
CN105002883A (en) Indirect hierarchical relay type drainage consolidation method of soft foundation
CN208279958U (en) A kind of saturation high-fill roadbed structure
CN113737722A (en) Have concurrently stone concrete barricade shore protection of view nature suitable for city river course
CN108611941B (en) Method for processing saturated high-fill roadbed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination