CN204496013U - Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine - Google Patents

Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine Download PDF

Info

Publication number
CN204496013U
CN204496013U CN201520138093.4U CN201520138093U CN204496013U CN 204496013 U CN204496013 U CN 204496013U CN 201520138093 U CN201520138093 U CN 201520138093U CN 204496013 U CN204496013 U CN 204496013U
Authority
CN
China
Prior art keywords
focus
development machine
wave detector
data acquisition
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520138093.4U
Other languages
Chinese (zh)
Inventor
李术才
宋杰
刘斌
许新骥
聂利超
刘征宇
任玉晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201520138093.4U priority Critical patent/CN204496013U/en
Application granted granted Critical
Publication of CN204496013U publication Critical patent/CN204496013U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model discloses active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine, the development machine main body comprising development machine cutterhead and be connected with described cutterhead, be provided with master-control room in development machine main body, in master-control room, be provided with controller and hyperchannel seismic data Acquisition Instrument; Development machine cutterhead and development machine body front end are respectively equipped with Seismic Source System; Data acquisition system (DAS) is provided with according to certain spatial observation mode at rear, development machine body of work face; Controller is connected with hyperchannel seismic data Acquisition Instrument, Seismic Source System and data acquisition system (DAS) respectively, and hyperchannel seismic data Acquisition Instrument is connected with data acquisition system (DAS); The utility model beneficial effect: the fast and flexible realizing focus and detector system is arranged automatically, take full advantage of the development machine repair time, drastically increase the work efficiency of Geological Advanced Prediction, do not disturb normal construction, save time cost and financial cost.

Description

Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine
Technical field
The utility model relates to the Geological Advanced Prediction field in rock tunnel(ling) machine work progress, particularly relates to active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine.
Background technology
Compared with traditional drill bursting construction, the significant advantages such as rock tunnel(ling) machine construction has " driving speed is fast, cavitation quality is high, overall economic efficiency is high, construction safety civilized ", the developed countries such as Japan, the U.S., Europe adopt the tunnel ratio of tunneler construction more than 80%, and along with the development of China's tunnel construction, rock tunnel(ling) machine also will more and more be applied.Meanwhile, numerous engineering practice shows, the adaptability of rock tunnel(ling) machine to geologic condition is poor, gushing water dash forward the geologic hazard such as mud, landslide and the card machine of bringing out thus even the major accident such as fatal crass bring significant challenge to rock tunnel(ling) machine safe construction.For avoiding geologic hazard in tunneler construction and security incident, the most effective solution adopts Geological Prediction Technology exactly, pre-establishes rational Disposal Measures and construction prediction scheme according to detecting the development machine workplace front adverse geological condition obtained.
At present, impressive progress and good effect is achieved both at home and abroad in the theory and technology of drill bursting construction tunnel geological detection, but the forward probe theory and means of practicability and effectiveness pays close attention to unsolved difficult problem for a long time both at home and abroad in TBM construction tunnel, its basic reason is that TBM construction environment is very complicated.TBM has complicated metal construction and electrician's system, occupy development end rear major part tunnel space, its driving speed is very fast, procedure connection is tight, cause " electromagnetic interference (EMI) is very serious; available observation space is very narrow and small, allows that detection time is tightlier urged ", cause traditional geophysical method to be suitable for well.
Mainly there is following problem in existing 3-D seismics advance geology exploration device:
1. observed pattern is simple, does not adopt effective three dimensions observed pattern, is difficult to the accurate wave field information obtaining surrounding rock body, causes ore body locating in space effect poor, easily occurs failing to report, misrepresents deliberately and the problem such as wrong report.
2. for not affect rock tunnel(ling) machine normal construction, seismic event forward probe needs to utilize the development machine repair time (about 2 hours every days) to detect as far as possible, this just proposes requirement to the efficiency of seismic event forward probe, thus a kind of rapid installation device for tunneler construction tunnel is lacked, when causing detecting, efficiency is lower,, affect the normal construction of development machine.
3. the robotization of seismic data process needs to improve further, and three-dimensional imaging, ore body locating in space and detection accuracy thereof have much room for improvement.
Utility model content
The purpose of this utility model is exactly to solve the problem, propose active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine, this device can need the wave detector number of work and the position in tunnel by unrestricted choice as required, independent assortment, convenient, flexible, the geological data of different shake inspection distance can be obtained simultaneously, be conducive to obtaining side's velocity distribution accurately in face of son, thus front of tunnel heading anomalous body is accurately located.
To achieve these goals, the utility model adopts following technical scheme:
Active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine, the development machine main body comprising development machine cutterhead and be connected with described cutterhead, be provided with master-control room in described development machine main body, in master-control room, be provided with controller and hyperchannel seismic data Acquisition Instrument; Described development machine cutterhead and development machine body front end are respectively equipped with Seismic Source System; Data acquisition system (DAS) is provided with according to certain spatial observation mode at rear, described development machine body of work face; Described controller is connected with hyperchannel seismic data Acquisition Instrument, Seismic Source System and data acquisition system (DAS) respectively, and hyperchannel seismic data Acquisition Instrument is connected with data acquisition system (DAS);
Seismic Source System and data acquisition system (DAS) are delivered in corresponding tunnel wall by controller respectively; When the pressure that Seismic Source System touches tunnel wall reaches certain value, namely focus contacts with tunnel wall well; Meanwhile, when the pressure that data acquisition system (DAS) touches tunnel wall reaches certain value, the wave detector of data acquisition system (DAS) and tunnel wall automatic coupling.
Described Seismic Source System comprises: workplace focus array and abutment wall focus array;
Described workplace focus array is arranged on development machine cutterhead, and symmetrical along development machine cutter head center; Described abutment wall focus array is positioned at the front end of development machine main body.
Described abutment wall focus array comprises: vibroseis, seismic source pressure sensor, focus hydraulically extensible bar and focus import and export hatch door;
Described abutment wall focus array is positioned on focus running gear, and focus running gear comprises circular slip ring focus guide rail and the track along tunnel axis; Have sawtooth above described circular slip ring focus track, focus is free to slide thereon, simultaneously can 360 ° rotate freely;
Described focus is imported and exported hatch door and is positioned on development machine cutterhead, described vibroseis and seismic source pressure sensor are arranged on the top of focus hydraulically extensible bar, vibroseis is connected with hyperchannel seismic data Acquisition Instrument by loop trigger, and seismic source pressure sensor is connected with controller respectively with focus hydraulically extensible bar.
Described focus hydraulically extensible bar adopts hollow design, and described focus imports and exports hatch door under the control of the controller according to the draw-in groove motion preset, can realize the opening and closing that focus is imported and exported.
Described data acquisition system (DAS) comprises: hatch door imported and exported by the three-component seismometer of automatic coupling, wave detector running gear, wave detector pressure transducer, wireless data transmitter, wave detector hydraulically extensible bar and wave detector;
Described wave detector is imported and exported hatch door and is positioned on development machine, and wave detector pressure transducer is arranged in the three-component seismometer of automatic coupling, and the three-component seismometer of automatic coupling is connected on wave detector running gear by wave detector hydraulically extensible bar; The three-component seismometer of automatic coupling is placed on three xsects in the certain limit of development machine workplace rear with space manner by wave detector running gear;
The three-component seismometer of described automatic coupling is connected with wireless data transmitter, wireless data transmitter and the communication of hyperchannel seismic data Acquisition Instrument, wave detector pressure transducer is connected with controller respectively with wave detector hydraulically extensible bar, wave detector imports and exports hatch door under the control of the controller according to the draw-in groove motion preset, and realizes the opening and closing that wave detector is imported and exported.
The three-component seismometer of described automatic coupling is designed to the circular arc similar with tunnel wall shape, in addition side and is connected piston and pressure transducer near tunnel wall side, after piston, couplant is housed, in the middle of three-component seismometer and piston, is reserved with couplant passage; When wave detector and tunnel wall contact acquire a certain degree, the couplant after piston can flow out from couplant passage under the effect of the pressure automatically, and three-component seismometer is coupled better with tunnel wall.
The beneficial effects of the utility model are:
(1) the utility model obtains the problem of the accurate distribution of front of tunnel heading country rock velocity of wave for straight line class observed pattern method, the basis considering the existing internal measurements of rock tunnel(ling) machine and Effect on Detecting proposes a kind of three dimensions observed pattern, hypocenter distributing is on face and abutment wall, wave detector is positioned on the differing heights of three sections, the wave detector number of work and the position in tunnel can be needed by unrestricted choice as required in real work, independent assortment, convenient, flexible, simultaneously circular guideway can guide rail slide anteroposterior vertically, freely arranges.The geological data of different shake inspection distance can be obtained simultaneously, be conducive to obtaining side's velocity distribution accurately in face of son, thus front of tunnel heading anomalous body is accurately located.
(2) the utility model is for the actual conditions of rock tunnel(ling) machine inside, adopt a kind of running gear comprising circular guideway and axial guidance, the fast and flexible realizing focus and detector system is arranged automatically, take full advantage of the development machine repair time, drastically increase the work efficiency of Geological Advanced Prediction, do not disturb normal construction, save time cost and financial cost.
(3) the utility model proposes a kind of three-component seismometer system of automatic coupling.Wave detector is designed to circular arc near the side in tunnel, facilitates wave detector to be coupled with tunnel wall.Preformed hole in the middle of three-component seismometer simultaneously, when wave detector touch tunnel wall pressure reach certain value time, controller can obtain feedback and stop hydraulic work system, couplant (butter or vaseline) is extruded from the middle reserved passageway of wave detector under the effect of the pressure simultaneously, and wave detector is coupled well with tunnel wall.Drastically increase layout efficiency.
Accompanying drawing explanation
Fig. 1 is active source 3-D seismics advance geology exploration device overall schematic;
Fig. 2 is active source 3-D seismics advance geology exploration device abutment wall focus array schematic diagram;
Fig. 3 is active source 3-D seismics advance geology exploration device data acquisition system (DAS) structural representation;
Fig. 4 is active source 3-D seismics advance geology exploration device three dimensions observed pattern cutterhead focus arrangenent diagram;
Fig. 5 is active source 3-D seismics advance geology exploration device detector structure schematic diagram;
Fig. 6 is active source 3-D seismics advance geology exploration apparatus structure schematic diagram;
A kind of three dimensions observed pattern schematic diagram that Fig. 7 (a) recommends for active source 3-D seismics advance geology exploration device;
Fig. 7 (b) arranges schematic diagram for active source 3-D seismics advance geology exploration device focus and wave detector;
Fig. 8 is active source 3-D seismics advance geology exploration device focus structural representation.
Wherein, 1. Seismic Source System, 2. workplace focus array, 3. abutment wall focus array, 4. data acquisition system (DAS), 5. pseudo-random code vibroseis, 6. seismic source pressure sensor, 7. focus hydraulically extensible bar, 8. focus guide rail, 9. three-component seismometer, 10. wireless data transmitter, 11. wave detector hydraulically extensible bars, 12. wave detector pressure transducers, 13. wave detector guide rails, 14. workplace vibroseiss, 16. springs, 17. preformed holes, 18. pistons, 19. couplants, 20. focus shells, 21. shock exciting rods, 22. backing plates, 23. pressure transducers, 24. circuit controllers, 25. coils.
Embodiment:
Below in conjunction with accompanying drawing and embodiment, the utility model is described further:
Active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine construction, as shown in Figure 1, is provided with master-control room, is provided with controller and hyperchannel seismic data Acquisition Instrument in master-control room in development machine main body; Development machine cutterhead and development machine body front end are provided with Seismic Source System 1; Data acquisition system (DAS) 4 is provided with according to certain spatial observation mode within the scope of development machine workplace rear 25 ~ 35m.Controller controls the work of hyperchannel seismic data Acquisition Instrument, Seismic Source System, data acquisition system (DAS) etc.During work, controller controls Seismic Source System 1 and impulses, control data acquisition system 4 preparation for acquiring data, hyperchannel seismic data Acquisition Instrument prepare to receive data simultaneously, and after impulsing, the data of collection are transferred to hyperchannel seismic data Acquisition Instrument by data acquisition system (DAS) 4.The geological data collected, adopt automatic seismic data processing technique, the hybrid three-dimensional depth migration method utilizing the pre-stack depth migration of Kirchoff integral method, reflectance spectrum imaging and Fresnel volume to offset to combine carries out migration imaging process to the data gathered, and obtains 3-D seismics imaging results.
Seismic Source System 1 comprises pseudo-random code vibroseis 5, focus running gear, seismic source pressure sensor 6, loop trigger, focus hydraulically extensible bar 7 and focus and imports and exports hatch door, and is divided into workplace focus array 2 and abutment wall focus array 3 according to position difference.Focus is imported and exported hatch door and is positioned on development machine cutterhead.
Workplace focus array 2 is placed on development machine cutterhead, on cutterhead, reserved 4 vibroseis 14 array explosive source devices are imported and exported, and as shown in Figure 4,4 epicenter excitations and transmission arrangements are in cutter head, symmetrical about cutter head center, the distance about 2 ~ 3m of distance cutter head center.
Abutment wall focus array 3 is positioned on focus running gear, as shown in Figure 2, focus running gear utilizes existing development machine inner space, design a circular slip ring guide rail and a track along tunnel axis, have sawtooth above concentric stroking loop orbit, focus can be free to slide thereon, simultaneously can 360 ° rotate freely, focus has two, two focus alternations, saves the working time.Described abutment wall focus array 3 excites 8 times at abutment wall, at development machine main body shield rear, (distance face is about 5m) each side has 4, and be distributed on two xsects, first xsect is apart from development machine workplace distance about 5m, and the second cross-sectional distance development machine workplace is apart from about 7m.
Pseudorandomcode vibroseis 5 and seismic source pressure sensor 6 are arranged on focus hydraulically extensible bar 7 top, pseudorandomcode vibroseis 5 one aspect is directly connected with hyperchannel seismic data Acquisition Instrument, link circuit trigger on the other hand, the loop trigger other end is connected with hyperchannel seismic data Acquisition Instrument, seismic source pressure sensor 6 is connected with controller respectively with focus hydraulically extensible bar 7, wherein, focus hydraulically extensible bar 7 adopts hollow design mode, and above-mentioned connection wire can from central extraction.Focus imports and exports hatch door under the control of the controller according to the draw-in groove motion preset, can realize the opening and closing that focus is imported and exported.
Data acquisition system (DAS) 4 as shown in Figure 3, comprise the three-component seismometer 9 of automatic coupling, wave detector running gear, wave detector pressure transducer 12, wireless data transmitter 10, wave detector hydraulically extensible bar 11 and wave detector and import and export hatch door, wave detector to be placed in by wave detector running gear with space manner on three xsects within the scope of development machine workplace rear 25 ~ 35m: the first cross-sectional distance development machine workplace is about 25m, arranges 5 wave detectors; Second cross-sectional distance development machine workplace is about 30m, arranges 5 wave detectors; 3rd cross-sectional distance development machine workplace is about 35m, arranges 5 wave detectors.
Three-component seismometer 9 structure of automatic coupling as shown in Figure 5, adopts the automatic coupling realizing three-component seismometer 9 and tunnel wall in two ways: be 1. designed to the circular arc similar to tunnel wall shape near tunnel wall side, be conducive to being coupled with the contact in tunnel; 2. side connects piston 18 and wave detector pressure transducer 12 in addition, and couplant 19 is housed after piston 18.Couplant 19 passage has been reserved with in the middle of three-component seismometer 9, piston 18.When wave detector 9 acquires a certain degree with tunnel wall contact, the couplant 19 after piston 18 can flow out from couplant passage under the effect of the pressure automatically, and three-component seismometer 9 is coupled better with tunnel wall.Designed by above-mentioned two thus realize the automatic coupling of three-component seismometer 9 and tunnel wall.
As shown in Figure 6, the three-component seismometer 9 of automatic coupling is connected with wireless data transmitter 10 by wire, wireless data transmitter 10 is connected by wireless telecommunications form with hyperchannel seismic data Acquisition Instrument, wave detector pressure transducer 12 is connected with controller respectively with wave detector hydraulically extensible bar 11, wherein, wave detector hydraulically extensible bar 11 adopts hollow design mode, and above-mentioned connection wire can from central extraction.Hatch door imported and exported by wave detector under the control of the controller according to the draw-in groove motion preset, can realize the opening and closing that wave detector is imported and exported.
Controller can control the motion of focus hydraulically extensible bar 7, wave detector hydraulically extensible bar 11, wave detector import and export hatch door and focus running gear, wave detector running gear, and can accept the feedback regulation of seismic source pressure sensor 6 and wave detector pressure transducer 12.
Hyperchannel seismic data Acquisition Instrument is connected with wireless data transmitter 10 by wireless telecommunications form, the hyperchannel Real-time Collection of seismic event information can be realized, store and process, simultaneously, hyperchannel seismic data Acquisition Instrument can also control the vibrations of pseudo-random code vibroseis 5, and receives the feedback information of pseudo-random code vibroseis 5 by loop trigger.
The problem of the accurate distribution of front of tunnel heading country rock velocity of wave cannot be obtained for straight line class observed pattern, the basis considering the existing internal measurements of rock tunnel(ling) machine and Effect on Detecting proposes a kind of three dimensions observed pattern, and Fig. 7 (a) and Fig. 7 (b) is a kind of active source 3-D seismics advance geology exploration device three dimensions observed pattern schematic diagram of recommending of the utility model and focus and detector position schematic diagram respectively.S represents focus position, and R represents wave detector position.
Three dimensions observed pattern comprises focus layout and arranges with wave detector.Focus comprises workplace focus array 2 and abutment wall focus array 3.Workplace focus array 2 is placed on development machine cutterhead, has 4, symmetrical about cutter head center, the distance about 2 ~ 3m of distance cutter head center; Abutment wall focus array 3 is positioned on the circular guideway of focus running gear, impulse position in development machine main body shield rear (distance face is about 5m) left and right sides symmetric position, every side has 4, be distributed on two tunnel cross sectional, first xsect is apart from development machine workplace distance about 5m, and the second cross-sectional distance development machine workplace is apart from about 7m.Wave detector to be placed on three xsects within the scope of development machine workplace rear 25 ~ 35m by running gear in spatial observation mode: the first cross-sectional distance development machine workplace 25m, arranges 5 wave detectors; Second cross-sectional distance development machine workplace 30m, arranges 5 wave detectors; 3rd cross-sectional distance development machine workplace 35m, arranges 5 wave detectors.Each xsect all arranges 5 wave detectors, can be free to slide, and generally lays respectively at vault (1), haunch (2), arch springing (2), forms the layout in space, can obtain the geological data of different detection distance.The wave detector of work (a kind of spatial observation mode utilizing 10 wave detectors preferably as recommended in specific embodiment) can be needed by unrestricted choice as required in real work, independent assortment, convenient, flexible, simultaneously circular guideway can guide rail slide anteroposterior vertically, freely arranges.By above-mentioned layout, complete the three-dimensional spatial arrangement of active source 3-D seismics advance geology exploration method and device in rock tunnel(ling) machine work progress.Can need the wave detector number of work and the position in tunnel, independent assortment by unrestricted choice as required in real work, convenient, flexible, simultaneously circular guideway can guide rail slide anteroposterior vertically, freely arranges.The geological data of different shake inspection distance can be obtained simultaneously, be conducive to obtaining side's velocity distribution accurately in face of son, thus front of tunnel heading anomalous body is accurately located.
Active source 3-D seismics advance geology exploration device focus structure is as Fig. 8, and primarily of focus shell 20, shock exciting rod 21, backing plate 22, pressure transducer 23, circuit controller 24, coil 25 forms.The break-make of circuit controller 24 control coil 25 electric current during work, thus shock exciting rod 21 is seesawed, beat backing plate 22, complete and once impulse.
For not affecting rock tunnel(ling) machine normal construction, the utility model utilizes two hours repair times of its every day to detect, therefore a kind of quick supporting installation device for tunneler construction tunnel and method are proposed, for the actual conditions of rock tunnel(ling) machine inside, design a kind of running gear, comprise circular guideway and the guide rail along tunnel axis, abutment wall focus array and data acquisition system (DAS) are installed on circular guideway.During work, after first controller controls the circular guideway of focus (or wave detector) guide rail slides into particular location vertically, focus (or wave detector) slides into assigned address along circular guideway, then hydraulic actuator work, focus is delivered in corresponding tunnel wall, focus is equipped with pressure transducer near tunnel wall side, when focus touch tunnel wall pressure reach certain value time, hyperchannel main frame can obtain feedback and stop hydraulic work system, and namely focus contacts with tunnel wall well; The hydraulic actuator of wave detector also works simultaneously, is delivered to by three-component seismometer in corresponding tunnel wall.Wave detector is equipped with pressure transducer near tunnel wall side, when wave detector touch tunnel wall pressure reach certain value time, controller obtains feedback and stops hydraulic work system, couplant (butter or vaseline) is extruded from the middle reserved passageway of wave detector under the effect of the pressure simultaneously, realizes wave detector and tunnel wall automatic coupling.In rock tunnel(ling) machine work progress, the three dimensions of active source 3-D seismics advance geology exploration method and device has been arranged fast.The fast and flexible achieving focus and detector system is arranged automatically, takes full advantage of the development machine repair time, drastically increases the work efficiency of Geological Advanced Prediction, does not disturb normal construction, has saved time cost and financial cost.
Active source 3-D seismics advance geology exploration method in the rock tunnel(ling) machine work progress of application said apparatus system, mainly comprises the following steps:
Step 1, after development machine quits work, open controller, control the work of acquisition system fast-supporting device, specific works mode is: control wave detector import and export hatch door and open, the tunnel wall direction of the three-component seismometer of automatic coupling towards correspondence is slowly sent by wave detector hydraulically extensible bar, when contact between three-component seismometer and tunnel wall reaches certain value, wave detector pressure transducer carries out feedback regulation to controller, stop the motion of wave detector hydraulically extensible bar, under pressure effect, couplant flows out simultaneously, wave detector has been coupled with tunnel wall, the three-dimensional total space achieving three-component seismometer like this within the scope of development machine workplace rear 25 ~ 35m is arranged fast.
Step 2, controller controls to impulse and the work of acquisition system fast-supporting device, specific works mode is: first control focus hydraulically extensible bar and outwards slowly sent by pseudo-random code vibroseis, when contact between pseudo-random code focus and development machine workplace or tunnel wall reaches certain value, seismic source pressure sensor carries out feedback regulation to controller, stops the motion of focus hydraulically extensible bar.
Step 3, open hyperchannel seismic data Acquisition Instrument, select suitable pseudo-random code signal as required, control pseudo-random code vibroseis successively and start vibrations, excite and produce broad-band teleseismic ripple, meanwhile, loop trigger triggers hyperchannel seismic data Acquisition Instrument and sends acquisition instructions to multiple wireless data transmitter simultaneously.
Step 4, the seismic event produced in step 3 reflects after running into wave impedance interface, gathered by the three-component seismometer that the total space three-dimensional within the scope of development machine workplace rear 25 ~ 35m is arranged, and send to hyperchannel seismic data Acquisition Instrument via respective wireless data transmitter.
Repeat step 3,4, until 12 pseudo-random code vibroseiss all work one time, accordingly, each three-component seismometer collects 12 seismic event vibration signals, and these signal all classifications are stored in hyperchannel seismic data Acquisition Instrument.
Step 5, operatively seismic wave data collecting instrument processes automatically to the seismic event information collected, and obtains the geological condition in development machine workplace front.
Step 6, the p-and s-wave velocity model that combining step 5 obtains and depth shift seismic section, and the running parameter such as thrust size, driving speed when excavating in conjunction with development machine, obtain the geological condition of development machine workplace front rock mass and corresponding mechanics parameter thereof, realize the advanced prediction of geological anomalous body.
By reference to the accompanying drawings embodiment of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.

Claims (6)

1. active source 3-D seismics advance geology exploration device in a rock tunnel(ling) machine, the development machine main body comprising development machine cutterhead and be connected with described cutterhead, it is characterized in that, in described development machine main body, be provided with master-control room, in master-control room, be provided with controller and hyperchannel seismic data Acquisition Instrument; Described development machine cutterhead and development machine body front end are respectively equipped with Seismic Source System; Data acquisition system (DAS) is provided with according to certain spatial observation mode at rear, described development machine body of work face; Described controller is connected with hyperchannel seismic data Acquisition Instrument, Seismic Source System and data acquisition system (DAS) respectively, and hyperchannel seismic data Acquisition Instrument is connected with data acquisition system (DAS).
2. active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine as claimed in claim 1, it is characterized in that, described Seismic Source System comprises: workplace focus array and abutment wall focus array;
Described workplace focus array is arranged on development machine cutterhead, and symmetrical along development machine cutter head center; Described abutment wall focus array is positioned at the front end of development machine main body.
3. active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine as claimed in claim 2, it is characterized in that, described abutment wall focus array comprises: vibroseis, seismic source pressure sensor, focus hydraulically extensible bar and focus import and export hatch door;
Described abutment wall focus array is positioned on focus running gear, and focus running gear comprises circular slip ring focus guide rail and the track along tunnel axis; Have sawtooth above described circular slip ring focus track, focus is free to slide thereon, simultaneously can 360 ° rotate freely;
Described focus is imported and exported hatch door and is positioned on development machine cutterhead, described vibroseis and seismic source pressure sensor are arranged on the top of focus hydraulically extensible bar, vibroseis is connected with hyperchannel seismic data Acquisition Instrument by loop trigger, and seismic source pressure sensor is connected with controller respectively with focus hydraulically extensible bar.
4. active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine as claimed in claim 3, it is characterized in that, described focus hydraulically extensible bar adopts hollow design, described focus imports and exports hatch door under the control of the controller according to the draw-in groove motion preset, can realize the opening and closing that focus is imported and exported.
5. active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine as claimed in claim 1, it is characterized in that, described data acquisition system (DAS) comprises: hatch door imported and exported by the three-component seismometer of automatic coupling, wave detector running gear, wave detector pressure transducer, wireless data transmitter, wave detector hydraulically extensible bar and wave detector;
Described wave detector is imported and exported hatch door and is positioned on development machine, and wave detector pressure transducer is arranged in the three-component seismometer of automatic coupling, and the three-component seismometer of automatic coupling is connected on wave detector running gear by wave detector hydraulically extensible bar; The three-component seismometer of automatic coupling is placed on three xsects in the certain limit of development machine workplace rear with space manner by wave detector running gear;
The three-component seismometer of described automatic coupling is connected with wireless data transmitter, wireless data transmitter and the communication of hyperchannel seismic data Acquisition Instrument, wave detector pressure transducer is connected with controller respectively with wave detector hydraulically extensible bar, wave detector imports and exports hatch door under the control of the controller according to the draw-in groove motion preset, and realizes the opening and closing that wave detector is imported and exported.
6. active source 3-D seismics advance geology exploration device in a kind of rock tunnel(ling) machine as claimed in claim 5, it is characterized in that, the three-component seismometer of described automatic coupling is designed to the circular arc similar with tunnel wall shape, in addition side and is connected piston and pressure transducer near tunnel wall side, after piston, couplant is housed, in the middle of three-component seismometer and piston, is reserved with couplant passage; When wave detector and tunnel wall contact acquire a certain degree, the couplant after piston can flow out from couplant passage under the effect of the pressure automatically, and three-component seismometer is coupled better with tunnel wall.
CN201520138093.4U 2015-03-11 2015-03-11 Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine Expired - Fee Related CN204496013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520138093.4U CN204496013U (en) 2015-03-11 2015-03-11 Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520138093.4U CN204496013U (en) 2015-03-11 2015-03-11 Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine

Publications (1)

Publication Number Publication Date
CN204496013U true CN204496013U (en) 2015-07-22

Family

ID=53575316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520138093.4U Expired - Fee Related CN204496013U (en) 2015-03-11 2015-03-11 Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine

Country Status (1)

Country Link
CN (1) CN204496013U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106019359A (en) * 2016-05-17 2016-10-12 浪潮集团有限公司 Earthquake prediction system based on neural network
CN107085235A (en) * 2017-04-13 2017-08-22 北京同度工程物探技术有限公司 A kind of earthquake forward probe system and method applied to development machine
CN107271128A (en) * 2017-06-29 2017-10-20 西南交通大学 It is a kind of to simulate the experimental rig that the changing of the relative positions of reversed fault stick-slip triggers Chi-chi earthquake
CN108107467A (en) * 2017-12-28 2018-06-01 中国地质大学(武汉) A kind of tunnel geological forecast automatic monitoring system
CN111580154A (en) * 2020-06-05 2020-08-25 中铁工程装备集团有限公司 Controllable seismic source geological prediction system by using acoustic method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106019359A (en) * 2016-05-17 2016-10-12 浪潮集团有限公司 Earthquake prediction system based on neural network
CN107085235A (en) * 2017-04-13 2017-08-22 北京同度工程物探技术有限公司 A kind of earthquake forward probe system and method applied to development machine
CN107271128A (en) * 2017-06-29 2017-10-20 西南交通大学 It is a kind of to simulate the experimental rig that the changing of the relative positions of reversed fault stick-slip triggers Chi-chi earthquake
CN108107467A (en) * 2017-12-28 2018-06-01 中国地质大学(武汉) A kind of tunnel geological forecast automatic monitoring system
CN111580154A (en) * 2020-06-05 2020-08-25 中铁工程装备集团有限公司 Controllable seismic source geological prediction system by using acoustic method
CN111580154B (en) * 2020-06-05 2023-04-18 中铁工程装备集团有限公司 Controllable seismic source geological forecasting system by adopting acoustic method

Similar Documents

Publication Publication Date Title
CN104678426B (en) Active source 3-D seismics advance geology exploration device and method in rock tunnel(ling) machine
CN204496013U (en) Active source 3-D seismics advance geology exploration device in rock tunnel(ling) machine
CN104678428B (en) Rock tunnel(ling) machine breaks rock focus and active source 3-D seismics associating forward probe system
CN104678427B (en) Rock tunnel(ling) machine breaks rock focus 3-D seismics forward probe device and method
CN104747184B (en) Measurement-while-drilling method and device for three-dimensional wave velocity imaging of rock mass in front of tunnel face
CN103713335B (en) Comprehensive advance geological detection system carried by tunnel boring machine
CN203037864U (en) Forward three-dimensional induced polarization method advanced detection apparatus system for TBM construction tunnel
CN103076635B (en) Advanced detection system and method for TBM (Tunnel Boring Machine) tunnel construction based on forward three-dimensional induced polarization
CN105676279B (en) A kind of earthquake reflective data acquisition method using geophone offsets such as concentric circles
WO2016141630A1 (en) Tunnel boring machine rock breaking seismic source and active source three-dimensional seismic combined advanced detection system
CN103777247B (en) Transient electromagnetic radar detection system and detection method
WO2015103721A1 (en) Comprehensive advance geological detection system mounted on tunnel boring machine
CN203658603U (en) Comprehensive advanced geological detection system carried by tunnel boring machine
CN106443766A (en) 3 dimensional tunnel earthquake advance seismic method
CN102879805A (en) Borehole-based and ground combined seismic wave space exploration method
CN104181581A (en) Earthquake wave underground construction space observation system and method based on random arrangement
CN105804763B (en) Across the hole CT boulders detection system of advanced 3 D resistivity and detection method that shield excavation machine is carried
CN105334541A (en) Portable resistivity method advanced forecasting system and method applicable to TBM
CN204496014U (en) Rock tunnel(ling) machine breaks rock focus and active source 3-D seismics associating forward probe system
CN106907145A (en) A kind of apparent resistivity measuring system and method with brill advanced prediction
CN107065023A (en) A kind of detection system gathered based on space multistory transient electromagnetic data above and below well
CN105301645B (en) A kind of shield construction method for forecasting advanced geology and system
CN106154310A (en) A kind of Portable city geologic anomaly seismic acquisition system and method
CN111722279A (en) TBM rock breaking seismic source seismic detection device and method based on ground-tunnel combination
CN103630938A (en) Imaging system and imaging method for well earthquake using hammer head of down-hole hammer as focus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20160311