CN204491519U - The anti-erosion protective slope structure of a kind of Channel slope - Google Patents

The anti-erosion protective slope structure of a kind of Channel slope Download PDF

Info

Publication number
CN204491519U
CN204491519U CN201420861529.8U CN201420861529U CN204491519U CN 204491519 U CN204491519 U CN 204491519U CN 201420861529 U CN201420861529 U CN 201420861529U CN 204491519 U CN204491519 U CN 204491519U
Authority
CN
China
Prior art keywords
water body
hedge
guardrail
macadam
slope structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420861529.8U
Other languages
Chinese (zh)
Inventor
胡优华
江录颖
陈凤娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAYI ECOLOGICAL LANDSCAPE ARCHITECTURE Co Ltd
Original Assignee
HUAYI ECOLOGICAL LANDSCAPE ARCHITECTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAYI ECOLOGICAL LANDSCAPE ARCHITECTURE Co Ltd filed Critical HUAYI ECOLOGICAL LANDSCAPE ARCHITECTURE Co Ltd
Priority to CN201420861529.8U priority Critical patent/CN204491519U/en
Application granted granted Critical
Publication of CN204491519U publication Critical patent/CN204491519U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The utility model relates to the anti-erosion protective slope structure of a kind of Channel slope, described protective slope structure is arranged between embankment and water body, described water body side is provided with deal pile, at deal pile, the hedge guardrail that bamboo works out is set away from water body side, hedge guardrail inserts in the mud of water bottom together with deal pile, at hedge guardrail, water body side is provided with macadam, macadam is covered with planting soil layer, the bottommost of described plantation soil layer is higher than the horizontal plane of water body.Described protective slope structure is provided with deal pile and hedge guardrail in water body, that reduces water body washes away erosion, the rubble that employing can reuse carries out bottom place mat, and lay planting soil up, not only realize zoology green-recovery, and rubble can reuse, cost is not high, is relatively applicable to the lax side slope of soil property.This protective slope structure cost is not high, and compliance is good, can realize zoology green-recovery, can effectively prevent erosion, and implementation result is good.

Description

The anti-erosion protective slope structure of a kind of Channel slope
Technical field
The utility model relates to the anti-erosion protective slope structure of a kind of Channel slope, belongs to the anti-erosion technical field in river course.
Background technology
In Channel slope protection process of construction, general employing concrete baffle plate or bulk stone are piled into protecting wall, this protective slope structure is reliable, but destruction is to a certain degree caused to the periphery ecosystem, and cost is higher, for the side slope that soil property is lax, existing protective slope structure is very unsuitable, and soil erosion problem still exists.
Utility model content
The utility model for the deficiency that prior art exists, provides a kind of Channel slope anti-erosion protective slope structure just.
For solving the problem, technical solution adopted in the utility model is as follows:
The anti-erosion protective slope structure of a kind of Channel slope, described protective slope structure is arranged between embankment and water body, described water body side is provided with deal pile, at deal pile, the hedge guardrail that bamboo works out is set away from water body side, hedge guardrail inserts in the mud of water bottom together with deal pile, at hedge guardrail, water body side is provided with macadam, macadam is covered with planting soil layer, the bottommost of described plantation soil layer is higher than the horizontal plane of water body.
As the improvement of technique scheme, between described macadam and hedge guardrail, spacing d is 10 ~ 20cm.
As the improvement of technique scheme, the fractured-rock layer thickness h bottom described plantation soil layer is no less than 20cm.
As the improvement of technique scheme, described between hedge guardrail and macadam, between macadam and plantation soil layer, and be also provided with geotechnological layer of cloth at the bottommost of macadam.
Compared with prior art, implementation result of the present utility model is as follows for the utility model:
Protective slope structure described in the utility model, deal pile and hedge guardrail is provided with in water body, that reduces water body washes away erosion, the rubble that employing can reuse carries out bottom place mat, and lay planting soil up, not only realize zoology green-recovery, and rubble can reuse, cost is not high, is relatively applicable to the lax side slope of soil property.This protective slope structure cost is not high, and compliance is good, can realize zoology green-recovery, can effectively prevent erosion, and implementation result is good.
Accompanying drawing explanation
Fig. 1 is protective slope structure schematic diagram described in the utility model.
Detailed description of the invention
Below in conjunction with specific embodiments content of the present utility model is described.
As shown in Figure 1, be protective slope structure schematic diagram described in the utility model.Protective slope structure described in the utility model is arranged between embankment 1 and water body 2, and what be used for protecting water body 2 pairs of embankments 1 washes away erosion.Water body 2 side is provided with deal pile 3, at deal pile 3, the hedge guardrail 4 that bamboo works out is set away from water body 2 side, hedge guardrail 4 inserts in the mud bottom water body 2 together with deal pile 3, and deal pile 3 plays the effect of fixing hedge guardrail 4, prevents the loose disintegration of protective slope structure.Hedge guardrail 4 reduces washing away of water body 2 pairs of embankments 1, and resistance to immersion, not easily corrosion-deformation.
At hedge guardrail 4, water body 2 side is provided with thick macadam 5, between macadam 5 and hedge guardrail 4, spacing d is 10 ~ 20cm, ensures that macadam 5 pairs of hedge guardrails 4 have good supporting role like this, and can not overwhelm hedge guardrail 4.Macadam 5 is covered with planting soil layer 6, can planting aquatic plants on plantation soil layer 6, the bottommost of described plantation soil layer 6 is higher than the horizontal plane of water body 2, and macadam 5 thickness h bottom plantation soil layer 6 is no less than 20cm, like this, not only effectively ensure the water eroding and flooding of water body 2 to plantation soil layer 6, and macadam 5 pairs of water systems carry out cleaning and filtering and retaining, are beneficial to the growth of water plant.
Protective slope structure described in the utility model, between hedge guardrail 4 and macadam 5, between macadam 5 and plantation soil layer 6, and be also provided with geotechnological layer of cloth 7 at the bottommost of macadam 5, geotechnological layer of cloth 7 between hedge guardrail 4 and macadam 5, reduces the erosion of water body 2 pairs of macadams 5.Geotechnological layer of cloth 7 between macadam 5 and plantation soil layer 6, filters water system in macadam 5, and is beneficial to its retaining.At the geotechnological layer of cloth 7 of the bottommost of macadam 5, convenient when ensureing to lay and clear up macadam 5, operation is simple, and operating efficiency is high, reduces embankment 1 to the impact of macadam 5 simultaneously as far as possible.
Obviously, those skilled in the art can carry out various change and modification to the utility model and not depart from spirit and scope of the present utility model.Like this, if these amendments of the present utility model and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model is also intended to comprise these change and modification.

Claims (4)

1. the anti-erosion protective slope structure of Channel slope, described protective slope structure is arranged between embankment (1) and water body (2), it is characterized in that, described water body (2) side is provided with deal pile (3), at deal pile (3), the hedge guardrail (4) that bamboo works out is set away from water body (2) side, hedge guardrail (4) inserts in the mud of water body (2) bottom together with deal pile (3), at hedge guardrail (4), water body (2) side is provided with macadam (5), macadam (5) is covered with planting soil layer (6), the bottommost of described plantation soil layer (6) is higher than the horizontal plane of water body (2).
2. the anti-erosion protective slope structure of a kind of Channel slope according to claim 1, is characterized in that, between described macadam (5) and hedge guardrail (4), spacing d is 10 ~ 20cm.
3. the anti-erosion protective slope structure of a kind of Channel slope according to claim 1, is characterized in that, macadam (5) thickness h of described plantation soil layer (6) bottom is no less than 20cm.
4. according to the described anti-erosion protective slope structure of a kind of Channel slope arbitrary in claims 1 to 3, it is characterized in that, described between hedge guardrail (4) and macadam (5), between macadam (5) and plantation soil layer (6), and be also provided with geotechnological layer of cloth (7) at the bottommost of macadam (5).
CN201420861529.8U 2014-12-31 2014-12-31 The anti-erosion protective slope structure of a kind of Channel slope Expired - Fee Related CN204491519U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420861529.8U CN204491519U (en) 2014-12-31 2014-12-31 The anti-erosion protective slope structure of a kind of Channel slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420861529.8U CN204491519U (en) 2014-12-31 2014-12-31 The anti-erosion protective slope structure of a kind of Channel slope

Publications (1)

Publication Number Publication Date
CN204491519U true CN204491519U (en) 2015-07-22

Family

ID=53570820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420861529.8U Expired - Fee Related CN204491519U (en) 2014-12-31 2014-12-31 The anti-erosion protective slope structure of a kind of Channel slope

Country Status (1)

Country Link
CN (1) CN204491519U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592513A (en) * 2016-12-08 2017-04-26 北京圣海林生态环境科技股份有限公司 Waterfront dike dam biological ecological protection method
CN108411856A (en) * 2018-03-16 2018-08-17 四川省水利科学研究院 A kind of river waste bank slope restoration of the ecosystem structure and method
CN114223449A (en) * 2021-11-09 2022-03-25 深圳中绿环境集团有限公司 Ecological restoration method for mangrove forest in difficult land
CN114875846A (en) * 2022-03-17 2022-08-09 朱学礼 Ecological ditch slope protection structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592513A (en) * 2016-12-08 2017-04-26 北京圣海林生态环境科技股份有限公司 Waterfront dike dam biological ecological protection method
CN108411856A (en) * 2018-03-16 2018-08-17 四川省水利科学研究院 A kind of river waste bank slope restoration of the ecosystem structure and method
CN108411856B (en) * 2018-03-16 2023-11-14 四川省水利科学研究院 Ecological restoration structure and method for river waste residue bank slope
CN114223449A (en) * 2021-11-09 2022-03-25 深圳中绿环境集团有限公司 Ecological restoration method for mangrove forest in difficult land
CN114223449B (en) * 2021-11-09 2023-11-10 深圳中绿环境集团有限公司 Ecological restoration method for mangrove forest in difficult site
CN114875846A (en) * 2022-03-17 2022-08-09 朱学礼 Ecological ditch slope protection structure

Similar Documents

Publication Publication Date Title
CN204491519U (en) The anti-erosion protective slope structure of a kind of Channel slope
CN202830872U (en) Ecological revetment capable of preventing soil erosion
CN103669398A (en) Integrated type road cutting retaining wall
CN104452656A (en) River channel segmental desilting construction method
CN104358230B (en) A kind of basin silt-proof desilting apparatus and method
CN204370372U (en) The ecological bank protection device of junked tire resistance to erosion
CN102561281A (en) Irrigation and drainage canal in coastal reclamation area
CN106320100B (en) A kind of processing railway bed is risen soil the technique of disease
CN205421050U (en) Railroad embankment river valley sand storm protection structure
CN208105179U (en) A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion
CN201687123U (en) Water-penetrating and soil-retaining humanized ecological brick and soil-retaining wall
CN104695379A (en) Ecological river channel revetment structure
CN203625928U (en) Integrated cutting retaining wall
CN205012282U (en) Novel ecology landscape bank protection system
CN205205916U (en) System is reformed transform to reservoir deposits crystallizing field river system
CN205152966U (en) Ecological concrete bank protection earth embankment
CN211312417U (en) Novel water conservancy construction slope protection structure
CN206090495U (en) Super large floater intercepting device before river course pump floodgate
CN209338223U (en) A kind of ecological canal
CN206015614U (en) V-shaped antifouling grid
CN202124843U (en) Flood discharge facility of slag blocking dam of tailing pond
CN203890954U (en) Submarine cable landing shoal scour prevention protection structure
CN204803844U (en) Ecological supporting construction of hydraulic engineering
CN211200125U (en) Side slope protection device for hydraulic and hydroelectric engineering
CN211446797U (en) Seawall ecological face guard structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20161231

CF01 Termination of patent right due to non-payment of annual fee