CN208105179U - A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion - Google Patents

A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion Download PDF

Info

Publication number
CN208105179U
CN208105179U CN201820486232.6U CN201820486232U CN208105179U CN 208105179 U CN208105179 U CN 208105179U CN 201820486232 U CN201820486232 U CN 201820486232U CN 208105179 U CN208105179 U CN 208105179U
Authority
CN
China
Prior art keywords
reinforced
gabion
barricade
toe
reinforced gabion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820486232.6U
Other languages
Chinese (zh)
Inventor
杨志刚
宋元涛
刘强
邵建民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China No 15 Metallurgical Construction Group Co Ltd
Original Assignee
China No 15 Metallurgical Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China No 15 Metallurgical Construction Group Co Ltd filed Critical China No 15 Metallurgical Construction Group Co Ltd
Priority to CN201820486232.6U priority Critical patent/CN208105179U/en
Application granted granted Critical
Publication of CN208105179U publication Critical patent/CN208105179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is a kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion, including the reinforced gabion intercepted at intermountain drainage channel is arranged in, reinforced gabion includes rectangle cage made of stainless steel wire, it fills stone rear enclosed opening position and forms reinforced gabion ontology in rectangle cage top end opening position, the back side masonry of reinforced gabion has reinforced concrete band toe barricade, reinforced concrete band toe barricade main body is up-small and down-big trapezoidal, the reinforced concrete band toe barricade back side is equipped with the back toe for protruding into massif, reinforced concrete band toe barricade bottom surface is equipped with the tenon for protruding into massif, gap filling between reinforced gabion and reinforced concrete band toe barricade has clean rubble, several perforative drainpipes are equipped with inside reinforced concrete band toe barricade, height of the drainpipe close to reinforced gabion one end is higher than exposed junction to drain;The utility model is suitable for the improvement to existing intermountain drainage channel anti-slag drainage constructing structure.

Description

A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion
Technical field
It is specifically a kind of to have drainage steel bar mixed the utility model relates to building engineering structure Construction of Environment Protection field The combination unit of solidifying soil barricade and reinforced gabion.
Background technique
Only setting is several layers of at interception drainage channel as shown in Figure 1 for common intermountain drainage channel anti-slag drainage constructing structure Reinforced gabion 1, there are the following problems for this structure:1, the wire rope net surface periphery of reinforced gabion is without powerful skeleton, gabion sheet Body is also the cuboid of mutability, and resistance to deformation and anti-mud-rock flow impulse force are weak, by generating in intermountain drainage channel caused by heavy rain Mud-rock flow and flood impact be easy damage, influence appearance;2, local sedimentation and a large amount of alluviation sandstones, large size are withered after damaging Wood 2, it is difficult to clear up.
Summary of the invention
The purpose of this utility model provides a kind of with drainage steel bar aiming at the above-mentioned problems of the prior art The combination unit of concrete guard wall and reinforced gabion.
The concrete scheme of the utility model is:A kind of group with drainage steel bar concrete guard wall and reinforced gabion attaches together It sets, including the reinforced gabion intercepted at intermountain drainage channel is arranged in, the back side masonry of the reinforced gabion has reinforced concrete Soil zone toe barricade, the reinforced concrete band toe barricade main body are up-small and down-big trapezoidal, the reinforced concrete band toe barricade back side Equipped with the back toe for protruding into massif, reinforced concrete band toe barricade bottom surface is equipped with the tenon for protruding into massif, reinforced concrete band toe gear Portion is equipped with several drainpipes through wall within the walls, and height of the drainpipe close to reinforced gabion one end is higher than exposed junction to arrange Water.
Gap between reinforced gabion and reinforced concrete band toe barricade described in the utility model is using clean rubble filling It is full.
The exposed port part of drainpipe described in the utility model is equipped with steel wire.
Drainpipe described in the utility model is set as upper layer and lower layer, and spacing is 2m between two layers, and bottom drainpipe nozzle is high The back side toe 1m of reinforced concrete band toe barricade out.
The utility model Specific construction process is as follows:1, the construction reinforced bar concrete at selected interception intermountain drainage channel Band toe barricade, and the double drinking water stainless-steel pipe that 1m height placement spacing is 2m on platform back toe, exposed nozzle are done not Become rusty steel mesh Seal treatment;2, ridge water channel is backfilled after reinforced concrete band toe Retaining wall, and 3 layers of height are built before retaining wall Reinforced gabion;3, the lime stone rubble or cobblestone of uniform size of the gap filling cleaning between reinforced gabion and barricade inclined-plane Particle, filling are secured;4, two side heads of reinforced gabion build and securely anchor into the massif of left and right, limit lateral deformation.
The utility model has the following advantages that compared with prior art:1, good integrity, it is rigidity, stability of shock resistance, weather-proof Property, safety are good;2, reinforced gabion can reduce mud-rock flow and flood takes the impact failure of slag, and retaining wall provides rigidity and resistance Shape support and can sediment and filtering clear water, protect mountain under villager drinking water source.
Detailed description of the invention
Fig. 1 is prior art construction schematic diagram;
Fig. 2 is the utility model structure diagram;
In figure:1- reinforced gabion, 2- alluviation sandstone, large-scale dead wood, 3- cleaning rubble, 4- reinforced concrete band toe barricade, 5- massif, 6- carry on the back toe, 7- drainpipe, 8- steel wire, 9- tenon.
Specific embodiment
Referring to fig. 2, the present embodiment includes that the reinforced gabion 1 intercepted at intermountain drainage channel is arranged in, and reinforced gabion 1 includes Rectangle cage made of stainless steel wire, rectangle cage top end opening position fill stone rear enclosed opening position and form reinforced gabion The back side masonry of 1 ontology, the reinforced gabion 1 has reinforced concrete band toe barricade 4, the reinforced concrete band toe barricade 4 Main body be it is up-small and down-big trapezoidal, 4 back side of reinforced concrete band toe barricade is equipped with the back toe 6 for protruding into massif 5, reinforced concrete band 4 bottom surface of toe barricade is equipped with the tenon 9 for protruding into massif 5, is equipped with several drainings through wall inside reinforced concrete band toe barricade 4 Pipe 7, height of the drainpipe 7 close to 1 one end of reinforced gabion are higher than exposed junction to drain.
It is filled using clean rubble 3 in gap between reinforced gabion 1 described in the present embodiment and reinforced concrete band toe barricade 4 It is full.
The exposed port part of drainpipe 7 described in the present embodiment is equipped with steel wire 8.
Drainpipe 7 described in the present embodiment is set as upper layer and lower layer, and spacing is 2m between two layers, and bottom drainpipe nozzle is higher by The back side toe 1m of reinforced concrete band toe barricade 4.

Claims (4)

1. a kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion, including setting are intercepting intermountain draining Reinforced gabion at channel, it is characterized in that:The back side masonry of the reinforced gabion has reinforced concrete band toe barricade, the steel Reinforced concrete with toe barricade main body be it is up-small and down-big trapezoidal, the reinforced concrete band toe barricade back side is equipped with the back for protruding into massif Toe, reinforced concrete band toe barricade bottom surface are equipped with the tenon for protruding into massif, are equipped with several pass through inside reinforced concrete band toe barricade The drainpipe of wall penetration body, height of the drainpipe close to reinforced gabion one end are higher than exposed junction to drain.
2. a kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion according to claim 1, It is characterized in:Gap between the reinforced gabion and reinforced concrete band toe barricade is full using clean rubble filling.
3. a kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion according to claim 1, It is characterized in:The exposed port part of the drainpipe is equipped with steel wire.
4. a kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion according to claim 1, It is characterized in:The drainpipe is set as upper layer and lower layer, and spacing is 2m between two layers, and bottom drainpipe nozzle is higher by armored concrete Back side toe 1m with toe barricade.
CN201820486232.6U 2018-04-08 2018-04-08 A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion Expired - Fee Related CN208105179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820486232.6U CN208105179U (en) 2018-04-08 2018-04-08 A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820486232.6U CN208105179U (en) 2018-04-08 2018-04-08 A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion

Publications (1)

Publication Number Publication Date
CN208105179U true CN208105179U (en) 2018-11-16

Family

ID=64120859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820486232.6U Expired - Fee Related CN208105179U (en) 2018-04-08 2018-04-08 A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion

Country Status (1)

Country Link
CN (1) CN208105179U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016894A (en) * 2019-04-16 2019-07-16 丁桂平 Hydraulic engineering enclosure device
CN117418488A (en) * 2023-12-18 2024-01-19 中国石油大学(华东) Combined stone blocking wall construction method with energy consumption, shock absorption and drainage functions

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110016894A (en) * 2019-04-16 2019-07-16 丁桂平 Hydraulic engineering enclosure device
CN110016894B (en) * 2019-04-16 2021-04-30 宁夏盛康生态建设工程有限公司 Hydraulic engineering encloses fender device
CN117418488A (en) * 2023-12-18 2024-01-19 中国石油大学(华东) Combined stone blocking wall construction method with energy consumption, shock absorption and drainage functions

Similar Documents

Publication Publication Date Title
CN108425341B (en) Stepped landscape retaining wall for ecological river channel and construction method thereof
CN203373773U (en) Steel frame gabion retaining wall
CN208105179U (en) A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion
CN107165177B (en) A kind of side slope supporting construction method
CN104594297B (en) A kind of double face slab rock-fill dams and construction method thereof
CN106245585B (en) A kind of anti-ice erosion means of defence in Han Qu riverbanks
CN205530580U (en) System for collection is prevented osmosis membrane anchor, is cut flood and current as an organic whole
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN205205832U (en) Structure is propped in trading of underground building
CN204283438U (en) Portal supporting and protection structure
CN208749373U (en) A kind of Tunnel Gushing disposal plant
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN105241320B (en) A kind of both sides, Gao Dou valley, scenic spot bridge abutment controlled blasting and means of defence
CN209211392U (en) A kind of hydraulic engineering ecological protection protective slope
CN205475088U (en) Dykes and dams bank protection structure for hydraulic engineering
CN204212163U (en) Karst depression talus off-load reinforced structure
CN212052857U (en) Concrete buttress formula retaining wall structure permeates water
CN210368484U (en) Abrupt slope embankment fender protective structure
CN207348086U (en) A kind of retaining wall for hydraulic engineering
CN211735258U (en) Pile type rock-fill angle bead
CN107059892A (en) A kind of construction method for effectively preventing slopes from coming down
CN206680947U (en) Steel water stone separates blocking dam
CN202482830U (en) A high roller compacted concrete anti-seepage dam with the height of over 200 m
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN206800351U (en) A kind of Tailings Dam drains off floodwaters culvert

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181116

CF01 Termination of patent right due to non-payment of annual fee