CN204456881U - Dismantling system of large-span building bailey frame - Google Patents

Dismantling system of large-span building bailey frame Download PDF

Info

Publication number
CN204456881U
CN204456881U CN201520087555.4U CN201520087555U CN204456881U CN 204456881 U CN204456881 U CN 204456881U CN 201520087555 U CN201520087555 U CN 201520087555U CN 204456881 U CN204456881 U CN 204456881U
Authority
CN
China
Prior art keywords
bailey
deck
beret truss
bailey bracket
structural layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520087555.4U
Other languages
Chinese (zh)
Inventor
仲鑫
朱金勇
靳伦德
张步爱
毛畅
董瑞兵
周雪莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201520087555.4U priority Critical patent/CN204456881U/en
Application granted granted Critical
Publication of CN204456881U publication Critical patent/CN204456881U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a demolish system of large-span housing construction bailey frame, including the structural layer, bailey frame, draw gear and slip steel pipe, the both ends of bailey frame prop up respectively on the structural layer of both sides, demolish system still includes to set up and shelve the roof beam between the structural layer of both sides, make bailey frame shelve the split of roof beam department and be two, be equipped with the slip steel pipe between first bailey piece group and the left structural layer, draw gear is located left structural layer and fixed with the left end of first bailey piece group, a plurality of concatenation bailey pieces are add to the right end of second bailey piece group, it is accurate to guarantee to shelve the number of bailey piece on the structural layer of right side one more than the unsettled number outside the structural layer of right side of second bailey piece group. The utility model discloses structurally newly-increased one shelves the roof beam, and is practical convenient. The laying beam is a structure which can be completed in early construction, the whole construction period is shortened, manpower is saved, the dismantling risk factor is greatly reduced, the operation of workers is safe and reliable, and the construction cost is reduced.

Description

A kind of dismounting system of large span building construction Bailey bracket
Technical field
The utility model relates to a kind of dismounting system, and particularly a kind of Bailey bracket for large span building construction removes system.
Background technology
At present, the mode arranging Zhongting in building is more and more general, the roof beam plated constructions such as such as, escalator in market.This structure carries out formwork as adopted traditional full hall console mode scaffold, not only sets up process comparatively complicated, particularly when beam and slab structure span is larger, time-consumingly especially takes material, and there is great potential safety hazard in work progress.At this moment be badly in need of a kind of safe and reliable formwork system and solve this problem, and Bailey bracket is as a kind of bottom support extensive use of support for shuttering, but for large span building construction, Bailey bracket is but subject to the lifting power of tower crane and many restrictions such as complete deck of having constructed when removing, and causes to remove Bailey bracket safely and effectively.
Utility model content
The purpose of this utility model is to provide a kind of dismounting system of large span building construction Bailey bracket, solve for large span building construction, Bailey bracket is subject to the lifting power of tower crane and the restriction of complete deck of having constructed when removing, and makes Bailey bracket cannot the technical problem of safe and effective dismounting.
For achieving the above object, the utility model adopts following technical scheme:
A kind of dismounting system of large span building construction Bailey bracket, comprise deck, draw-gear and slip steel pipe, the two ends, left and right of Bailey bracket to be removed are propped up respectively and are located on the deck of both sides, described dismounting system also comprises being arranged on shelves beam between structure on two sides layer, Bailey bracket to be removed is the first beret truss group and second beret truss group two parts shelving beam punishment, slip steel pipe is provided with between described first beret truss group and the deck in left side, described draw-gear be positioned at left side deck on and fix with the left part of the first beret truss group, make the first beret truss group under the effect of draw-gear on the deck in left side relative sliding, the right part of described second beret truss group has additional some splicing beret truss identical with Bailey bracket model, the number that splicing beret truss increases is to ensure that the beret truss number be shelved on the deck on right side is as the criterion than the many a slice of the unsettled number outside the deck on right side of the second beret truss group.
Described deck comprise structural column composition post net, set up at the online structure girder of post and structure secondary beam, the two ends of shelving beam to be set up on structural column and parallel with structure girder.
Described beam of shelving at least arranges one at interval of 9000mm along post net.
Described shelving between beam and Bailey bracket is provided with chock.
Described draw-gear is fixedly connected with structural column.
Compared with prior art the utility model has following characteristics and beneficial effect:
The bracing frame that the utility model adopts Bailey bracket and steel pipe frame to combine, structure shelves beam for newly-increased one, the calculating arrangement of reinforcement of this beam must through design accounting, beam disconnects Bailey truss and form beret truss group shelving, beret truss is spliced respectively in the end of beret truss group again, to ensure the many a slices compared with the beret truss of overhanging portion of the beret truss on structural plane, use in Chain block traction beret truss group to floor and remove, practical and convenient.Shelve the structure that completes when beam is construction in early stage, the overall reduction of erection time, save manpower, the very big hazards reducing dismounting, operative is safe and reliable and reduce construction cost.
The utility model can be widely used in the dismounting of large span Bailey bracket in Zhongting top structure form work engineering.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is schematic diagram before the utility model is removed.
Schematic diagram when Fig. 2 is the utility model dismounting.
Fig. 3 of the present utility modelly shelves beam plan view.
Reference numeral: 1-Bailey bracket, 1.1-first beret truss group, 1.2-second beret truss group, 2-chock, 3-slip steel pipe, 4-draw-gear to be removed, 5-shelves beam, 6-splices beret truss, 7-deck, 7.1-structural column, 7.2-structure girder, 7.3-structure secondary beam.
Detailed description of the invention
Embodiment is see shown in Fig. 1 ~ 3, a kind of dismounting system of large span building construction Bailey bracket, comprise deck 7, draw-gear 4 and slip steel pipe 3, the two ends, left and right of Bailey bracket 1 to be removed are propped up respectively and are located on the deck 7 of both sides, described dismounting system also comprises being arranged on shelves beam 5 between structure on two sides layer, Bailey bracket 1 to be removed is first beret truss group 1.1 and second beret truss group 1.2 two parts shelving beam 5 punishment, slip steel pipe 3 is provided with between described first beret truss group 1.1 and the deck in left side, described draw-gear 4 be positioned at left side deck on and fix with the left part of the first beret truss group 1.1, make the first beret truss group 1.1 under the effect of draw-gear 4 on the deck in left side relative sliding, the right part of described second beret truss group 1.2 has additional some splicing beret truss 6 identical with Bailey bracket model, the number that splicing beret truss increases is to ensure that the beret truss number be shelved on the deck on right side is as the criterion than the many a slice of the unsettled number outside the deck on right side of the second beret truss group 1.2.
Shown in Fig. 1 ~ 3, Bailey bracket in the present embodiment has 7, first beret truss group 1.1 has 4, second beret truss group 1.2 has 3, right side splicing beret truss 6 has 2, the beret truss number be shelved on the deck on right side is made to be 3, unsettled number outside the deck on right side 2.
Described deck 7 comprises post net that structural column 7.1 forms, sets up at the online structure girder 7.2 of post and structure secondary beam 7.3, and the two ends of shelving beam 5 to be set up on structural column 7.1 and parallel with structure girder 7.2.
Described beam 5 of shelving at least arranges one at interval of a=9000mm along post net.
Described shelving between beam 5 and Bailey bracket is provided with chock 2.
Described draw-gear 4 is fixedly connected with structural column 7.1.
The work progress of the present embodiment is as follows:
Step one: constructing structure layer, and apply simultaneously and shelve beam.
Step 2: first Bailey bracket is carried out on the ground entirety splicing, after disposable installation, Integral lifting is to correct position.
Step 3: utilize Bailey bracket to build concrete.
Step 4: remove Bailey bracket, adopt the mode of moving back to Bian Chai limit, both sides from centre to remove.
Step 5: go out to disconnect Bailey bracket shelving beam.
Step 6: the first beret truss group of first removing left side, first sets up splicing beret truss on right side, and splicing beret truss stretches in the deck on right side.
Step 7: draw-gear is Chain block, one end of Chain block is tied up on structural column, and the other end is fixed on the left part of the first beret truss group, utilizes Chain block to draw in the first beret truss group to deck and removes Bailey bracket.
Step 8: traction dismounting second beret truss group, removes complete.

Claims (5)

1. the dismounting system of a large span building construction Bailey bracket, comprise deck (7), draw-gear (4) and slip steel pipe (3), the two ends, left and right of Bailey bracket (1) to be removed prop up respectively be located at both sides deck (7) on, it is characterized in that: described dismounting system also comprises being arranged on shelves beam (5) between structure on two sides layer, Bailey bracket (1) to be removed is the first beret truss group (1.1) and second beret truss group (1.2) two parts shelving beam (5) punishment, slip steel pipe (3) is provided with between described first beret truss group (1.1) and the deck in left side, described draw-gear (4) be positioned at left side deck on and fix with the left part of the first beret truss group (1.1), make the first beret truss group (1.1) under the effect of draw-gear (4) on the deck in left side relative sliding, the right part of described second beret truss group (1.2) has additional some splicing beret truss (6) identical with Bailey bracket model, the number that splicing beret truss increases is to ensure that the beret truss number be shelved on the deck on right side is as the criterion than the many a slice of the unsettled number outside the deck on right side of the second beret truss group (1.2).
2. the dismounting system of a kind of large span building construction Bailey bracket according to claim 1, it is characterized in that: described deck (7) comprises post net that structural column (7.1) forms, sets up at the online structure girder (7.2) of post and structure secondary beam (7.3), and the two ends of shelving beam (5) are set up at structural column (7.1) upper and parallel with structure girder (7.2).
3. the dismounting system of a kind of large span building construction Bailey bracket according to claim 2, is characterized in that: described in shelve beam (5) and at least arrange one at interval of 9000mm along post net.
4. the dismounting system of a kind of large span building construction Bailey bracket according to claim 1, is characterized in that: described in shelve between beam (5) and Bailey bracket and be provided with chock (2).
5. the dismounting system of a kind of large span building construction Bailey bracket according to claim 1, is characterized in that: described draw-gear (4) is fixedly connected with structural column (7.1).
CN201520087555.4U 2015-02-09 2015-02-09 Dismantling system of large-span building bailey frame Expired - Fee Related CN204456881U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520087555.4U CN204456881U (en) 2015-02-09 2015-02-09 Dismantling system of large-span building bailey frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520087555.4U CN204456881U (en) 2015-02-09 2015-02-09 Dismantling system of large-span building bailey frame

Publications (1)

Publication Number Publication Date
CN204456881U true CN204456881U (en) 2015-07-08

Family

ID=53663788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520087555.4U Expired - Fee Related CN204456881U (en) 2015-02-09 2015-02-09 Dismantling system of large-span building bailey frame

Country Status (1)

Country Link
CN (1) CN204456881U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464066A (en) * 2015-12-29 2016-04-06 中国水利水电第八工程局有限公司 Construction method for detaching large-span high-fall Belfast truss with closed beam slab
CN106144929A (en) * 2016-06-28 2016-11-23 中国建筑第二工程局有限公司 Group hoist device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105464066A (en) * 2015-12-29 2016-04-06 中国水利水电第八工程局有限公司 Construction method for detaching large-span high-fall Belfast truss with closed beam slab
CN105464066B (en) * 2015-12-29 2017-03-29 中国水利水电第八工程局有限公司 The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed
CN106144929A (en) * 2016-06-28 2016-11-23 中国建筑第二工程局有限公司 Group hoist device and construction method

Similar Documents

Publication Publication Date Title
CN101775907A (en) Space truss structure aerial pairing integral slide installation method
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN202416184U (en) Construction device for formwork for longitudinal wet joint of box girder
CN202544854U (en) Lining trolley for subway station
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN202450762U (en) Construction lifting platform
CN202324616U (en) Triangular steel truss supporting formwork system with high-altitude big-overhanging structure
CN204456881U (en) Dismantling system of large-span building bailey frame
CN201627587U (en) Overhang operating platform fixedly connected onto complete sectional hydraulic trolley
CN203238948U (en) Hollow ultrahigh formwork profile steel platform
CN203113793U (en) Large formwork installation system of oblique structure
CN103774841A (en) Track type sliding formwork device
CN104131706B (en) The construction method of the two-layer connection structure of vertical reinforcement of concrete frame structure
CN110158486A (en) It is a kind of to set up the Bridge Erector and construction method for spelling wide beam
CN203701546U (en) Movable scaffold
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN205329640U (en) " T " supports symmetrical sliding formwork construction structures
CN103866699A (en) Rail-free type walking hanging basket
CN101575890A (en) Girder and profiled steel sheet concrete combined floor construction method without support of hack lever
CN202882375U (en) Elevator shaftway tool type scaffold operation platform
CN205116776U (en) Support access structure
CN201722937U (en) Sliding platform for installation of net rack
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN203924655U (en) Novel elevator shaft operating platform frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20160209

CF01 Termination of patent right due to non-payment of annual fee