CN203626212U - Pier stud construction operation platform quick to disassemble and assemble - Google Patents

Pier stud construction operation platform quick to disassemble and assemble Download PDF

Info

Publication number
CN203626212U
CN203626212U CN201320670082.1U CN201320670082U CN203626212U CN 203626212 U CN203626212 U CN 203626212U CN 201320670082 U CN201320670082 U CN 201320670082U CN 203626212 U CN203626212 U CN 203626212U
Authority
CN
China
Prior art keywords
rods
welded
operation platform
pier stud
walkway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320670082.1U
Other languages
Chinese (zh)
Inventor
李军
许珂
孙庚�
张勇
常林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201320670082.1U priority Critical patent/CN203626212U/en
Application granted granted Critical
Publication of CN203626212U publication Critical patent/CN203626212U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a pier stud construction operation platform quick to disassemble and assemble. The pier stud construction operation platform is composed of a main supporting frame, an H-shaped supporting frame, a protective device, a connecting device, walkway plates and a crawling ladder. The main supporting frame is composed of cross rods and vertical rods, the cross rods and the vertical rods are fixed through welding to form a stand-column-type framework, and the crawling ladder is arranged on the cross rods in a welded mode. The H-shaped supporting frame is formed by walkway plate supporting rods and reinforcing rods, the walkway plate supporting rods are welded to the vertical rods of the main supporting frame and located at the outer ends of the vertical rods, the upper ends of reinforcing rods and the lower ends of the reinforcing rods are welded with the upper walkway plate supporting rods and the lower walkway plate supporting rods respectively to form an H shape, and the walkway plates are laid at the upper ends of the walkway plate supporting rods. The pier stud construction operation platform quick to disassemble and assemble can be hoisted and fixed as a whole, the construction speed is effectively increased, the material transfer period is shortened, the construction cost is lowered and the construction safety is guaranteed.

Description

一种快速拆装式墩柱施工操作平台A quick disassembly type pier column construction operation platform

技术领域technical field

本实用新型涉及建筑领域,具体地说是一种快速拆装式墩柱施工操作平台。The utility model relates to the construction field, in particular to a quick disassembly type pier column construction operation platform.

背景技术Background technique

在墩柱施工时,传统施工中通常采用钢管脚手架对每根墩柱搭设操作平台,该方法存在以下缺点:这种操作平台由立杆、横杆、扫地杆组合而成,搭设进度缓慢;每根墩柱施工完成后需拆除,并将材料移至下个墩柱重新搭设,导致钢管等周转材料的周转周期过长、投入大大增加;钢管脚手架稳定性差,安全系数小,存在较大的安全隐患。因此墩柱施工时需要采用一种更为简便、安全的操作平台。In the construction of pier columns, steel pipe scaffolding is usually used in traditional construction to build an operation platform for each pier column. This method has the following disadvantages: the operation platform is composed of vertical poles, horizontal poles, and sweeping poles, and the erection progress is slow; After the construction of the first pier column is completed, it needs to be dismantled, and the material is moved to the next pier column to be erected again, which leads to a long turnover period of the steel pipe and other turnover materials and greatly increases the investment; Hidden danger. Therefore, it is necessary to adopt a simpler and safer operating platform during pier construction.

发明内容Contents of the invention

本实用新型的目的是克服现有技术中存在的不足,提供一种对墩柱施工时更加方便、快捷,而且安全的快速拆装式墩柱施工操作平台。The purpose of the utility model is to overcome the deficiencies in the prior art, and to provide a more convenient, fast and safe quick-detachable pier construction operation platform for pier construction.

本实用新型的技术方案是按以下方式实现的:一种快速拆装式墩柱施工操作平台,由主支撑架、工字形支撑架、防护装置、连接装置、走道板和爬梯构成,所述主支撑架由横杆和立杆组成,采用多个横杆和立杆焊接固定形成立柱式框架,爬梯焊接在横杆上;所述工字形支撑架由走道板托杆和加固杆组成,走道板托杆焊接在主支撑架的立杆上,位于立杆的外端,加固杆上、下两端与上、下的走道板托杆焊接,形成工字型,在走道板托杆上端铺设走道板;所述防护装置由主防护杆和辅助防护杆组成,主防护杆两端焊接于加固杆上,辅助防护杆的顶端焊接于主防护杆上,底端焊接与横杆上。The technical scheme of the utility model is realized in the following manner: a quick dismountable pier column construction operation platform is composed of a main support frame, an I-shaped support frame, a protective device, a connecting device, a walkway plate and a climbing ladder. The support frame is composed of cross bars and vertical bars, which are welded and fixed by multiple cross bars and vertical bars to form a column frame, and the ladder is welded on the cross bars; The supporting rod is welded on the vertical rod of the main support frame and is located at the outer end of the vertical rod. The upper and lower ends of the reinforcement rod are welded with the upper and lower aisle board supporting rods to form an I-shaped, and the aisle is laid on the upper end of the aisle board supporting rod The protection device is composed of a main protection rod and an auxiliary protection rod, the two ends of the main protection rod are welded on the reinforcement rod, the top end of the auxiliary protection rod is welded on the main protection rod, and the bottom end is welded on the cross bar.

所述连接装置由管法兰和固定螺栓组成,上下相邻节段操作平台通过管法兰和固定螺栓连接固定形成整体。可满足不同高度施工需要,每个墩柱施工完成后,将操作平台分节段整体吊装至下个墩柱,重新连接固定成整体。The connecting device is composed of pipe flanges and fixing bolts, and the upper and lower adjacent segment operating platforms are connected and fixed by the pipe flanges and fixing bolts to form a whole. It can meet the construction needs of different heights. After the construction of each pier column is completed, the operation platform is hoisted to the next pier column in sections, and reconnected and fixed into a whole.

本实用新型的优点是:快速拆装式墩柱施工操作平台和现有技术相比,可分节段整体吊装固定,有效加快施工速度,缩短材料周转周期,降低施工成本,确保施工安全,而且本实用新型具有设计合理、结构简单、易于操作等特点,因而,具有很好的使用价值。The utility model has the advantages that: compared with the prior art, the fast dismantling pier column construction operation platform can be hoisted and fixed as a whole in sections, effectively speeding up the construction speed, shortening the material turnover period, reducing the construction cost, and ensuring construction safety. The utility model has the characteristics of reasonable design, simple structure, easy operation, etc., and thus has good use value.

附图说明Description of drawings

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型的连接装置示意图;Fig. 2 is the schematic diagram of the connecting device of the present utility model;

1——横杆;2——立杆;3——加固杆;4——走道板;5——主防护杆;6——辅助防护杆;7——走道板托杆;8——爬梯;9——管法兰;10——固定螺栓。1—crossbar; 2—vertical pole; 3—reinforcing rod; 4—walkway plate; 5—main protective bar; 6—auxiliary protective bar; 7—walkway plate support rod; 8—ladder ; 9—pipe flange; 10—fixing bolt.

具体实施方式Detailed ways

下面结合具体实施例和说明书附图对本实用新型作进一步说明。此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。Below in conjunction with specific embodiment and accompanying drawing, the utility model is further described. The specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.

实施例:如图1、图2所示,快速拆装式墩柱施工操作平台,其主支撑架由横杆1和立杆2组成,采用多根横杆1和立杆2通过焊接固定,构成立柱式框架,横杆1采用上、下两排结构,爬梯8焊接在横杆1上。在主支撑架的外端设置工字形支撑架,工字型支撑架由上、下两根走道板托杆7和加固杆3焊接成工字型,并将走道板托杆7焊接在主支撑架的立杆2上,然后在走道板托杆7上端铺设走道板4。Embodiment: As shown in Fig. 1 and Fig. 2, the quick disassembly type pier column construction operation platform, its main support frame is composed of a cross bar 1 and a vertical bar 2, and a plurality of cross bars 1 and vertical bars 2 are fixed by welding. A column frame is formed, the cross bar 1 adopts an upper and lower row structure, and the ladder 8 is welded on the cross bar 1 . Set the I-shaped support frame at the outer end of the main support frame. The I-shaped support frame is welded into an I-shaped by the upper and lower aisle plate support rods 7 and the reinforcement rod 3, and the aisle plate support rod 7 is welded to the main support. On the vertical bar 2 of the frame, the walkway slab 4 is laid on the walkway slab supporting rod 7 upper ends.

在主支撑支架上设置有防护装置,由主防护杆5和辅助防护杆6组成,主防护杆5的两端焊接于左、右加固杆3上,辅助防护杆6为L型,顶端焊接于主防护杆5上,底端焊接在横杆1上。A protective device is arranged on the main support bracket, which is composed of a main protective bar 5 and an auxiliary protective bar 6. The two ends of the main protective bar 5 are welded on the left and right reinforcement bars 3, and the auxiliary protective bar 6 is L-shaped, and the top end is welded on On the main protective bar 5, the bottom end is welded on the cross bar 1.

在立杆2的两端设置有连接装置,用于两两平台间组装连接。平台连接装置由管法兰9和固定螺栓10组成,上下相邻节段操作平台通过管法兰9和固定螺栓10将立杆2连接固定形成整体。组装式连接的操作平台,可以满足不同高度的施工需要。在每个墩柱施工完成后,将操作平台分节段整体吊装至下个墩柱,重新连接各平台固定成整体,即可进行下一个墩柱施工,方便快捷。Connecting devices are provided at both ends of the pole 2 for assembly and connection between two platforms. The platform connection device is composed of pipe flanges 9 and fixing bolts 10, and the upper and lower adjacent segment operation platforms connect and fix the vertical poles 2 through the pipe flanges 9 and fixing bolts 10 to form a whole. The assembled and connected operation platform can meet the construction needs of different heights. After the construction of each pier column is completed, the operation platform is hoisted to the next pier column as a whole in sections, and the platforms are reconnected and fixed into a whole, and the next pier column construction can be carried out, which is convenient and quick.

本实用新型的快速拆装式墩柱施工操作平台,其加工制作非常简单方便;可多个任意组装,适用不同高度施工;其安装快捷方便,施工效率高,结构稳定,安全性高。The quick disassembly type pier column construction operation platform of the utility model is very simple and convenient to manufacture; it can be assembled arbitrarily, and is suitable for construction at different heights; it is quick and convenient to install, high in construction efficiency, stable in structure and high in safety.

Claims (2)

1. a quickly dismantled pier stud construction operation platform, it is characterized in that: formed by main backstop, I-shaped bracing frame, protector, linkage, walkway board and cat ladder, described main backstop is made up of cross bar (1) and vertical rod (2), adopt multiple cross bars (1) and vertical rod (2) to be welded and fixed and form column framework, cat ladder (8) is welded on cross bar (1); Described I-shaped bracing frame is made up of walkway board pressure pin (7) and reinforced pole (3), walkway board pressure pin (7) is welded in the vertical rod (2) of main backstop, be positioned at the outer end of vertical rod (2), reinforced pole (3) upper/lower terminal and the welding of upper and lower walkway board pressure pin (7), form I shape, lay walkway board (4) in walkway board pressure pin (7) upper end; Described protector is made up of main fender rod (5) and auxiliary fender rod (6), main fender rod (5) two ends are welded on reinforced pole (3), it is upper that the top of auxiliary fender rod (6) is welded in main fender rod (5), on bottom welding and cross bar (1).
2. the quickly dismantled pier stud construction operation platform of one according to claim 1, it is characterized in that: described linkage is made up of pipe flange (9) and set bolt (10), neighbouring sections operating platform is connected and fixed and is formed entirety by pipe flange (9) and set bolt (10).
CN201320670082.1U 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble Expired - Fee Related CN203626212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320670082.1U CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320670082.1U CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Publications (1)

Publication Number Publication Date
CN203626212U true CN203626212U (en) 2014-06-04

Family

ID=50812703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320670082.1U Expired - Fee Related CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Country Status (1)

Country Link
CN (1) CN203626212U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989090A (en) * 2015-05-15 2015-10-21 国家电网公司 Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
CN110615528A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotary type net contact body device, biological rotating disc pool and sewage treatment equipment
CN117385757A (en) * 2023-10-30 2024-01-12 江苏省交通工程集团有限公司 A vase pier construction and assembly operation platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989090A (en) * 2015-05-15 2015-10-21 国家电网公司 Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
CN104989090B (en) * 2015-05-15 2017-03-15 国家电网公司 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform
CN110615528A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotary type net contact body device, biological rotating disc pool and sewage treatment equipment
CN110615523A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type netted contact body carousel work platform
CN110615527A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type net contact steel structure support
CN117385757A (en) * 2023-10-30 2024-01-12 江苏省交通工程集团有限公司 A vase pier construction and assembly operation platform

Similar Documents

Publication Publication Date Title
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN104372967B (en) A kind of cooling stack inclined strut structure and construction method thereof
CN206428986U (en) A kind of detachable turnover type support jig
CN103758024B (en) Quickly disassembled steel structure pedestrian bridge
CN104878695B (en) Viaduct cover beam shaping bottom die support and application method thereof
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN204357167U (en) A kind of cooling stack inclined strut structure
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN103470063B (en) From promoting protection canopy
CN104164889B (en) Demountable tower crane foundation
CN206928642U (en) A kind of safety and environmental protection movable formwork support
CN204825660U (en) Bent cap staple bolt device
CN202577162U (en) Combined-type steel pipe bracket
CN211421793U (en) A shaped steel operating platform
CN211644382U (en) Tower crane attached stay bar walkway platform system
CN205445090U (en) High strength wind resistance electric power iron tower
CN206736745U (en) Goods-shelf type pier shaft external scaffolding
CN203347214U (en) Novel portable ladder stand of high speed railway
CN204590563U (en) A kind of Novel dismountable scaffold
CN107476200B (en) A structure and method for misalignment of a full hall bracket
CN206873494U (en) A kind of operating platform for narrow space on the outside of barricade
CN204781885U (en) Novel crown cornice shaped steel operation platform that encorbelments
CN207392709U (en) A kind of ladder cage formula combined scaffold
CN205206325U (en) Movable inwall template mount

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20161019