CN203626212U - Pier stud construction operation platform quick to disassemble and assemble - Google Patents

Pier stud construction operation platform quick to disassemble and assemble Download PDF

Info

Publication number
CN203626212U
CN203626212U CN201320670082.1U CN201320670082U CN203626212U CN 203626212 U CN203626212 U CN 203626212U CN 201320670082 U CN201320670082 U CN 201320670082U CN 203626212 U CN203626212 U CN 203626212U
Authority
CN
China
Prior art keywords
rods
welded
pier stud
operation platform
construction operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320670082.1U
Other languages
Chinese (zh)
Inventor
李军
许珂
孙庚�
张勇
常林林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201320670082.1U priority Critical patent/CN203626212U/en
Application granted granted Critical
Publication of CN203626212U publication Critical patent/CN203626212U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a pier stud construction operation platform quick to disassemble and assemble. The pier stud construction operation platform is composed of a main supporting frame, an H-shaped supporting frame, a protective device, a connecting device, walkway plates and a crawling ladder. The main supporting frame is composed of cross rods and vertical rods, the cross rods and the vertical rods are fixed through welding to form a stand-column-type framework, and the crawling ladder is arranged on the cross rods in a welded mode. The H-shaped supporting frame is formed by walkway plate supporting rods and reinforcing rods, the walkway plate supporting rods are welded to the vertical rods of the main supporting frame and located at the outer ends of the vertical rods, the upper ends of reinforcing rods and the lower ends of the reinforcing rods are welded with the upper walkway plate supporting rods and the lower walkway plate supporting rods respectively to form an H shape, and the walkway plates are laid at the upper ends of the walkway plate supporting rods. The pier stud construction operation platform quick to disassemble and assemble can be hoisted and fixed as a whole, the construction speed is effectively increased, the material transfer period is shortened, the construction cost is lowered and the construction safety is guaranteed.

Description

A kind of quickly dismantled pier stud construction operation platform
Technical field
The utility model relates to building field, specifically a kind of quickly dismantled pier stud construction operation platform.
Background technology
In the time that pier stud is constructed, in tradition construction, conventionally adopt steel pipe scaffold to set up operating platform to every pier stud, there is following shortcoming in the method: this operating platform is combined by vertical rod, cross bar, the bar of sweeping the floor, and sets up progress slow; Every pier stud needs after having constructed to remove, and material is moved to next pier stud again sets up, and causes the turn around time of the circulation materials such as steel pipe long, large increasing has high input; Steel pipe scaffold poor stability, safety factor is little, has larger potential safety hazard.Therefore pier stud is executed man-hour requirement and is adopted a kind of more easy, safe operating platform.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, convenient, quick while providing one to construct to pier stud, and the quickly dismantled pier stud construction operation platform of safety.
The technical solution of the utility model realizes in the following manner: a kind of quickly dismantled pier stud construction operation platform, formed by main backstop, I-shaped bracing frame, protector, linkage, walkway board and cat ladder, described main backstop is made up of cross bar and vertical rod, adopt multiple cross bars and vertical rod to be welded and fixed and form column framework, cat ladder is welded on cross bar; Described I-shaped bracing frame is made up of walkway board pressure pin and reinforced pole, walkway board pressure pin is welded in the vertical rod of main backstop, is positioned at the outer end of vertical rod, reinforced pole upper/lower terminal and the welding of upper and lower walkway board pressure pin, form I shape, lay walkway board in walkway board pressure pin upper end; Described protector is made up of main fender rod and auxiliary fender rod, and main fender rod two ends are welded on reinforced pole, and the top of auxiliary fender rod is welded on main fender rod, on bottom welding and cross bar.
Described linkage is made up of pipe flange and set bolt, and neighbouring sections operating platform is connected and fixed and is formed entirety by pipe flange and set bolt.Can meet differing heights construction needs, after each pier stud has been constructed, segmented operating platform integral hoisting, to next pier stud, be reconnected and is fixed into entirety.
The utility model has the advantages that: quickly dismantled pier stud construction operation platform compared to the prior art, can segmented integral hoisting fix, effectively accelerate speed of application, shorten material turn around time, reduce construction cost, guarantee construction safety, and the utlity model has the features such as reasonable in design, simple in structure, easy operating, thereby, there is good use value.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is linkage schematic diagram of the present utility model;
1---cross bar; 2---vertical rod; 3---reinforced pole; 4---walkway board; 5---main fender rod; 6---auxiliary fender rod; 7---walkway board pressure pin; 8---cat ladder; 9---pipe flange; 10---set bolt.
The specific embodiment
Below in conjunction with specific embodiment and Figure of description, the utility model is described in further detail.Specific embodiment described herein is only in order to explain the utility model, and is not used in restriction the utility model.
Embodiment: as shown in Figure 1 and Figure 2, quickly dismantled pier stud construction operation platform, its main backstop is made up of cross bar 1 and vertical rod 2, adopt many cross bars 1 and vertical rod 2 by being welded and fixed, form column framework, cross bar 1 adopts upper and lower two row's structures, and cat ladder 8 is welded on cross bar 1.In the outer end of main backstop, I-shaped bracing frame is set, I-shaped support frame is welded into I shape by upper and lower two walkway board pressure pins 7 and reinforced pole 3, and walkway board pressure pin 7 is welded in the vertical rod 2 of main backstop, then lay walkway board 4 in walkway board pressure pin 7 upper ends.
On main supporting bracket, be provided with protector, be made up of main fender rod 5 and auxiliary fender rod 6, the two ends of main fender rod 5 are welded on left and right reinforced pole 3, and auxiliary fender rod 6 is L-type, and top is welded on main fender rod 5, and bottom is welded on cross bar 1.
Two ends in vertical rod 2 are provided with linkage, for assembly and connection between platform between two.Platform linkage is made up of pipe flange 9 and set bolt 10, and neighbouring sections operating platform is connected and fixed vertical rod 2 to form entirety by pipe flange 9 and set bolt 10.The operating platform that assembly type connects, can meet the construction needs of differing heights.After each pier stud has been constructed, segmented operating platform integral hoisting, to next pier stud, is reconnected to each platform and is fixed into entirety, can carry out next pier stud construction, convenient and swift.
Quickly dismantled pier stud construction operation platform of the present utility model, its processing and fabricating is very simple and convenient; Can multiple Optional assemblings, be suitable for differing heights construction; Its convenience quick for installation, efficiency of construction is high, and Stability Analysis of Structures is safe.

Claims (2)

1. a quickly dismantled pier stud construction operation platform, it is characterized in that: formed by main backstop, I-shaped bracing frame, protector, linkage, walkway board and cat ladder, described main backstop is made up of cross bar (1) and vertical rod (2), adopt multiple cross bars (1) and vertical rod (2) to be welded and fixed and form column framework, cat ladder (8) is welded on cross bar (1); Described I-shaped bracing frame is made up of walkway board pressure pin (7) and reinforced pole (3), walkway board pressure pin (7) is welded in the vertical rod (2) of main backstop, be positioned at the outer end of vertical rod (2), reinforced pole (3) upper/lower terminal and the welding of upper and lower walkway board pressure pin (7), form I shape, lay walkway board (4) in walkway board pressure pin (7) upper end; Described protector is made up of main fender rod (5) and auxiliary fender rod (6), main fender rod (5) two ends are welded on reinforced pole (3), it is upper that the top of auxiliary fender rod (6) is welded in main fender rod (5), on bottom welding and cross bar (1).
2. the quickly dismantled pier stud construction operation platform of one according to claim 1, it is characterized in that: described linkage is made up of pipe flange (9) and set bolt (10), neighbouring sections operating platform is connected and fixed and is formed entirety by pipe flange (9) and set bolt (10).
CN201320670082.1U 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble Expired - Fee Related CN203626212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320670082.1U CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320670082.1U CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Publications (1)

Publication Number Publication Date
CN203626212U true CN203626212U (en) 2014-06-04

Family

ID=50812703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320670082.1U Expired - Fee Related CN203626212U (en) 2013-10-19 2013-10-19 Pier stud construction operation platform quick to disassemble and assemble

Country Status (1)

Country Link
CN (1) CN203626212U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989090A (en) * 2015-05-15 2015-10-21 国家电网公司 Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
CN110615527A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type net contact steel structure support

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989090A (en) * 2015-05-15 2015-10-21 国家电网公司 Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
CN104989090B (en) * 2015-05-15 2017-03-15 国家电网公司 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform
CN110615527A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type net contact steel structure support
CN110615523A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotation type netted contact body carousel work platform
CN110615528A (en) * 2018-09-25 2019-12-27 青海洁神环境能源产业有限公司 Three-dimensional rotary type net contact body device, biological rotating disc pool and sewage treatment equipment

Similar Documents

Publication Publication Date Title
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN212689520U (en) Quick butt-joint type operation platform
CN104372967A (en) Raking prop structure used for natural draft cooling tower and construction method thereof
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN204357167U (en) A kind of cooling stack inclined strut structure
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN202755370U (en) Structure for improving rigidity and stability of foundation pit steel support
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN202899639U (en) Concrete column structure
CN206428986U (en) A kind of detachable turnover type support jig
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN203361631U (en) Variable-diameter fabricated sliding mode platform of sliding mode system
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN107476200B (en) Full-hall support staggered overlapping structure and method
CN203808486U (en) Steel pipe scaffold follow-up platform
CN105649317A (en) Fixing mechanism for cantilever I-beam
CN204590563U (en) A kind of Novel dismountable scaffold
CN205444689U (en) High -order bracing transition mast structure
CN205224579U (en) Steel framework template and self -supporting truss board combination concrete quick detach system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20161019

CF01 Termination of patent right due to non-payment of annual fee