CN203626212U - Pier stud construction operation platform quick to disassemble and assemble - Google Patents
Pier stud construction operation platform quick to disassemble and assemble Download PDFInfo
- Publication number
- CN203626212U CN203626212U CN201320670082.1U CN201320670082U CN203626212U CN 203626212 U CN203626212 U CN 203626212U CN 201320670082 U CN201320670082 U CN 201320670082U CN 203626212 U CN203626212 U CN 203626212U
- Authority
- CN
- China
- Prior art keywords
- rods
- welded
- operation platform
- pier stud
- walkway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑领域,具体地说是一种快速拆装式墩柱施工操作平台。The utility model relates to the construction field, in particular to a quick disassembly type pier column construction operation platform.
背景技术Background technique
在墩柱施工时,传统施工中通常采用钢管脚手架对每根墩柱搭设操作平台,该方法存在以下缺点:这种操作平台由立杆、横杆、扫地杆组合而成,搭设进度缓慢;每根墩柱施工完成后需拆除,并将材料移至下个墩柱重新搭设,导致钢管等周转材料的周转周期过长、投入大大增加;钢管脚手架稳定性差,安全系数小,存在较大的安全隐患。因此墩柱施工时需要采用一种更为简便、安全的操作平台。In the construction of pier columns, steel pipe scaffolding is usually used in traditional construction to build an operation platform for each pier column. This method has the following disadvantages: the operation platform is composed of vertical poles, horizontal poles, and sweeping poles, and the erection progress is slow; After the construction of the first pier column is completed, it needs to be dismantled, and the material is moved to the next pier column to be erected again, which leads to a long turnover period of the steel pipe and other turnover materials and greatly increases the investment; Hidden danger. Therefore, it is necessary to adopt a simpler and safer operating platform during pier construction.
发明内容Contents of the invention
本实用新型的目的是克服现有技术中存在的不足,提供一种对墩柱施工时更加方便、快捷,而且安全的快速拆装式墩柱施工操作平台。The purpose of the utility model is to overcome the deficiencies in the prior art, and to provide a more convenient, fast and safe quick-detachable pier construction operation platform for pier construction.
本实用新型的技术方案是按以下方式实现的:一种快速拆装式墩柱施工操作平台,由主支撑架、工字形支撑架、防护装置、连接装置、走道板和爬梯构成,所述主支撑架由横杆和立杆组成,采用多个横杆和立杆焊接固定形成立柱式框架,爬梯焊接在横杆上;所述工字形支撑架由走道板托杆和加固杆组成,走道板托杆焊接在主支撑架的立杆上,位于立杆的外端,加固杆上、下两端与上、下的走道板托杆焊接,形成工字型,在走道板托杆上端铺设走道板;所述防护装置由主防护杆和辅助防护杆组成,主防护杆两端焊接于加固杆上,辅助防护杆的顶端焊接于主防护杆上,底端焊接与横杆上。The technical scheme of the utility model is realized in the following manner: a quick dismountable pier column construction operation platform is composed of a main support frame, an I-shaped support frame, a protective device, a connecting device, a walkway plate and a climbing ladder. The support frame is composed of cross bars and vertical bars, which are welded and fixed by multiple cross bars and vertical bars to form a column frame, and the ladder is welded on the cross bars; The supporting rod is welded on the vertical rod of the main support frame and is located at the outer end of the vertical rod. The upper and lower ends of the reinforcement rod are welded with the upper and lower aisle board supporting rods to form an I-shaped, and the aisle is laid on the upper end of the aisle board supporting rod The protection device is composed of a main protection rod and an auxiliary protection rod, the two ends of the main protection rod are welded on the reinforcement rod, the top end of the auxiliary protection rod is welded on the main protection rod, and the bottom end is welded on the cross bar.
所述连接装置由管法兰和固定螺栓组成,上下相邻节段操作平台通过管法兰和固定螺栓连接固定形成整体。可满足不同高度施工需要,每个墩柱施工完成后,将操作平台分节段整体吊装至下个墩柱,重新连接固定成整体。The connecting device is composed of pipe flanges and fixing bolts, and the upper and lower adjacent segment operating platforms are connected and fixed by the pipe flanges and fixing bolts to form a whole. It can meet the construction needs of different heights. After the construction of each pier column is completed, the operation platform is hoisted to the next pier column in sections, and reconnected and fixed into a whole.
本实用新型的优点是:快速拆装式墩柱施工操作平台和现有技术相比,可分节段整体吊装固定,有效加快施工速度,缩短材料周转周期,降低施工成本,确保施工安全,而且本实用新型具有设计合理、结构简单、易于操作等特点,因而,具有很好的使用价值。The utility model has the advantages that: compared with the prior art, the fast dismantling pier column construction operation platform can be hoisted and fixed as a whole in sections, effectively speeding up the construction speed, shortening the material turnover period, reducing the construction cost, and ensuring construction safety. The utility model has the characteristics of reasonable design, simple structure, easy operation, etc., and thus has good use value.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为本实用新型的连接装置示意图;Fig. 2 is the schematic diagram of the connecting device of the present utility model;
1——横杆;2——立杆;3——加固杆;4——走道板;5——主防护杆;6——辅助防护杆;7——走道板托杆;8——爬梯;9——管法兰;10——固定螺栓。1—crossbar; 2—vertical pole; 3—reinforcing rod; 4—walkway plate; 5—main protective bar; 6—auxiliary protective bar; 7—walkway plate support rod; 8—ladder ; 9—pipe flange; 10—fixing bolt.
具体实施方式Detailed ways
下面结合具体实施例和说明书附图对本实用新型作进一步说明。此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。Below in conjunction with specific embodiment and accompanying drawing, the utility model is further described. The specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
实施例:如图1、图2所示,快速拆装式墩柱施工操作平台,其主支撑架由横杆1和立杆2组成,采用多根横杆1和立杆2通过焊接固定,构成立柱式框架,横杆1采用上、下两排结构,爬梯8焊接在横杆1上。在主支撑架的外端设置工字形支撑架,工字型支撑架由上、下两根走道板托杆7和加固杆3焊接成工字型,并将走道板托杆7焊接在主支撑架的立杆2上,然后在走道板托杆7上端铺设走道板4。Embodiment: As shown in Fig. 1 and Fig. 2, the quick disassembly type pier column construction operation platform, its main support frame is composed of a cross bar 1 and a
在主支撑支架上设置有防护装置,由主防护杆5和辅助防护杆6组成,主防护杆5的两端焊接于左、右加固杆3上,辅助防护杆6为L型,顶端焊接于主防护杆5上,底端焊接在横杆1上。A protective device is arranged on the main support bracket, which is composed of a main
在立杆2的两端设置有连接装置,用于两两平台间组装连接。平台连接装置由管法兰9和固定螺栓10组成,上下相邻节段操作平台通过管法兰9和固定螺栓10将立杆2连接固定形成整体。组装式连接的操作平台,可以满足不同高度的施工需要。在每个墩柱施工完成后,将操作平台分节段整体吊装至下个墩柱,重新连接各平台固定成整体,即可进行下一个墩柱施工,方便快捷。Connecting devices are provided at both ends of the
本实用新型的快速拆装式墩柱施工操作平台,其加工制作非常简单方便;可多个任意组装,适用不同高度施工;其安装快捷方便,施工效率高,结构稳定,安全性高。The quick disassembly type pier column construction operation platform of the utility model is very simple and convenient to manufacture; it can be assembled arbitrarily, and is suitable for construction at different heights; it is quick and convenient to install, high in construction efficiency, stable in structure and high in safety.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320670082.1U CN203626212U (en) | 2013-10-19 | 2013-10-19 | Pier stud construction operation platform quick to disassemble and assemble |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320670082.1U CN203626212U (en) | 2013-10-19 | 2013-10-19 | Pier stud construction operation platform quick to disassemble and assemble |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203626212U true CN203626212U (en) | 2014-06-04 |
Family
ID=50812703
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320670082.1U Expired - Fee Related CN203626212U (en) | 2013-10-19 | 2013-10-19 | Pier stud construction operation platform quick to disassemble and assemble |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203626212U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104989090A (en) * | 2015-05-15 | 2015-10-21 | 国家电网公司 | Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit |
| CN110615528A (en) * | 2018-09-25 | 2019-12-27 | 青海洁神环境能源产业有限公司 | Three-dimensional rotary type net contact body device, biological rotating disc pool and sewage treatment equipment |
| CN117385757A (en) * | 2023-10-30 | 2024-01-12 | 江苏省交通工程集团有限公司 | A vase pier construction and assembly operation platform |
-
2013
- 2013-10-19 CN CN201320670082.1U patent/CN203626212U/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104989090A (en) * | 2015-05-15 | 2015-10-21 | 国家电网公司 | Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit |
| CN104989090B (en) * | 2015-05-15 | 2017-03-15 | 国家电网公司 | A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform |
| CN110615528A (en) * | 2018-09-25 | 2019-12-27 | 青海洁神环境能源产业有限公司 | Three-dimensional rotary type net contact body device, biological rotating disc pool and sewage treatment equipment |
| CN110615523A (en) * | 2018-09-25 | 2019-12-27 | 青海洁神环境能源产业有限公司 | Three-dimensional rotation type netted contact body carousel work platform |
| CN110615527A (en) * | 2018-09-25 | 2019-12-27 | 青海洁神环境能源产业有限公司 | Three-dimensional rotation type net contact steel structure support |
| CN117385757A (en) * | 2023-10-30 | 2024-01-12 | 江苏省交通工程集团有限公司 | A vase pier construction and assembly operation platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102839678B (en) | Structure for improving rigidity and stability of foundation pit steel support | |
| CN104372967B (en) | A kind of cooling stack inclined strut structure and construction method thereof | |
| CN206428986U (en) | A kind of detachable turnover type support jig | |
| CN103758024B (en) | Quickly disassembled steel structure pedestrian bridge | |
| CN104878695B (en) | Viaduct cover beam shaping bottom die support and application method thereof | |
| CN206873307U (en) | Movable type bridge justifies pier stud work high above the ground operating platform | |
| CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
| CN204357167U (en) | A kind of cooling stack inclined strut structure | |
| CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
| CN103470063B (en) | From promoting protection canopy | |
| CN104164889B (en) | Demountable tower crane foundation | |
| CN206928642U (en) | A kind of safety and environmental protection movable formwork support | |
| CN204825660U (en) | Bent cap staple bolt device | |
| CN202577162U (en) | Combined-type steel pipe bracket | |
| CN211421793U (en) | A shaped steel operating platform | |
| CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
| CN205445090U (en) | High strength wind resistance electric power iron tower | |
| CN206736745U (en) | Goods-shelf type pier shaft external scaffolding | |
| CN203347214U (en) | Novel portable ladder stand of high speed railway | |
| CN204590563U (en) | A kind of Novel dismountable scaffold | |
| CN107476200B (en) | A structure and method for misalignment of a full hall bracket | |
| CN206873494U (en) | A kind of operating platform for narrow space on the outside of barricade | |
| CN204781885U (en) | Novel crown cornice shaped steel operation platform that encorbelments | |
| CN207392709U (en) | A kind of ladder cage formula combined scaffold | |
| CN205206325U (en) | Movable inwall template mount |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140604 Termination date: 20161019 |