CN104989090A - Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit - Google Patents

Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit Download PDF

Info

Publication number
CN104989090A
CN104989090A CN201510249940.9A CN201510249940A CN104989090A CN 104989090 A CN104989090 A CN 104989090A CN 201510249940 A CN201510249940 A CN 201510249940A CN 104989090 A CN104989090 A CN 104989090A
Authority
CN
China
Prior art keywords
pedal
crossbeam
vertical supporting
montant
inspection platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510249940.9A
Other languages
Chinese (zh)
Other versions
CN104989090B (en
Inventor
张成华
江涛
刘聪
张才军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI BAILIANHE PUMPED STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Original Assignee
HUBEI BAILIANHE PUMPED STORAGE Co Ltd
State Grid Corp of China SGCC
State Grid Xinyuan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI BAILIANHE PUMPED STORAGE Co Ltd, State Grid Corp of China SGCC, State Grid Xinyuan Co Ltd filed Critical HUBEI BAILIANHE PUMPED STORAGE Co Ltd
Priority to CN201510249940.9A priority Critical patent/CN104989090B/en
Publication of CN104989090A publication Critical patent/CN104989090A/en
Application granted granted Critical
Publication of CN104989090B publication Critical patent/CN104989090B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides an assembled aluminium alloy scaffold maintenance platform used for a hydropower station unit. The cross section of the maintenance platform is in the shape of a regular hexagon; the maintenance platform comprises vertical bracing frames, crossbeams, a pedal and guardrails; six vertical bracing frames are arranged, and form a rectangular framework structure, and each vertical bracing frame comprises an inner vertical bar, an outer vertical bar, and cross bars connected between the inner vertical bar and the outer vertical bar; each crossbeam is fixedly connected between two adjacent vertical bracing frames, and the crossbeams connect and fix the vertical bracing frames to form a regular hexagonal prism framework structure; six guardrails are arranged, two sides of each guardrail are provided with spring locks, each guardrail is installed on the extension positions of the tops of two adjacent outer vertical bars, and the six guardrails form a regular hexagon together. The assembled aluminium alloy scaffold maintenance platform gives consideration to flexibility and safety of maintenance work, and is humanized in design, the maintenance efficiency is improved, and the safety of maintenance workers can be well guaranteed.

Description

A kind of for the pin-connected panel aluminium alloys scaffold inspection platform in Hydropower Plant
Technical field
The invention provides a kind of aluminium alloys scaffold inspection platform, particularly relating to a kind of pin-connected panel platform for overhauling Hydropower Plant main shaft, flange and generator accessory structure.
Background technology
China is vast in territory, river is numerous, hydroelectric generation is the current topmost power supply source of China, and current China has the very many power stations of quantity, and position the most key in power station is no more than unit.The main shaft of Hydropower Plant is generally high-quality steel integral hollow structure, and its Main Function is transmitting torque, and conventional major axis diameter is 1150mm.The flange diameter of the generator motor macro-axis on unit water wheel chamber top and the large shaft connection place of pump turbine is 1900mm, and flange connections top is generator motor and accessory structure thereof, and both are about about 2m at the discrepancy in elevation.
Between turn(a)round, need to carry out dismantling and maintaining for the adpting flange of the unit macro-axis of water wheel chamber and the generator accessory structure of its upper end.Therefore need to build inspection platform at unit macro-axis place, so that staff carries out routine maintenance work at unit macro-axis place.But current inspection platform all has some shortcomings, as cost is high, installing/dismounting inconvenience, complex structure deadweight is comparatively large, and does not save space, and maintainer up and down not easily.
Summary of the invention
The invention provides a kind of for the pin-connected panel aluminium alloys scaffold inspection platform in Hydropower Plant, solve the deficiency in background technology, this inspection platform has taken into account flexibility and the safety of service work simultaneously, overall construction design hommization, the operating efficiency both having improved maintenance also effectively ensure that the safety of service work personnel.
Realizing the technical scheme that above-mentioned purpose of the present invention adopts is:
A kind of for the pin-connected panel aluminium alloys scaffold inspection platform in Hydropower Plant, the cross section of described inspection platform is regular hexagon, comprise vertical supporting frame, crossbeam, pedal and guardrail, vertical supporting erection is equipped with the six roots of sensation, its entirety is rectangular frame structure, the cross bar comprising interior montant, outer montant and be connected between interior montant and outer montant, and the top of outer montant upwards extends, the bottom of interior montant is to downward-extension, and the cross bar being positioned at vertical supporting frame the top inwards extends; Described six roots of sensation vertical supporting frame is with the main shaft of unit for the center of circle radially distributes, and the angle between two adjacent vertical supporting framves is 60 degree;
Described crossbeam is fixedly connected between two adjacent vertical supporting framves, crossbeam is divided into crossbeam A, crossbeam B and crossbeam C tri-kinds, the two ends of its middle cross beam A are horizontally fixed between the outer montant of two adjacent vertical supporting framves respectively by fastener, the two ends of crossbeam B to be horizontally fixed in two adjacent vertical supporting framves between montant respectively by fastener, between the outer montant that the two ends of crossbeam C are horizontally fixed on two adjacent vertical supporting framves respectively by fastener and interior montant, vertical supporting frame is connected into positive six prism frame constructions by described crossbeam;
Described guardrail is provided with six, and the both sides of guardrail are provided with Spring lock catch, and guardrail is installed on extension site, the top place of two adjacent outer montants by Spring lock catch, and six described guardrails surround regular hexagon jointly;
Described pedal is divided into six groups, often organize pedal to be all made up of pedal A and pedal B, pedal A and pedal B is all in isosceles trapezoid shape, both lower base angles are 60 degree, and both two waists are provided with hook, the length that pedal B goes to the bottom is identical with the length of the upper base of pedal A, and pedal A is arranged between the cross bar of two adjacent vertical supporting top of the trellis by hook; Pedal B is arranged between the extending part of the cross bar of two adjacent vertical supporting top of the trellis by hook, the upper base of pedal B is arc-shaped, its radian is π/3, and the upper base of six pedal B surrounds a circular vacancy jointly, and the main shaft of described unit is arranged in described circular vacancy.
Described crossbeam A is identical with the quantity of crossbeam B, and be 4 layers and amount to 24, described crossbeam C is provided with two-layer, and 12 every layer amount to 24.
The interior montant of described vertical supporting frame and the bottom of outer montant are provided with adjustable support foot.
Going to the bottom of described pedal A is provided with the baseboard of projection with the upper bottom of pedal B.
Also be provided with cat ladder in described inspection platform, described cat ladder be provided with the hook that can be mounted on crossbeam.
Also be provided with horizontal fixed bar in described inspection platform, described horizontal fixed bar is provided with the six roots of sensation, and its one end is fixedly connected with vertical supporting frame, and the other end withstands on the body of wall of Hydropower Plant room, and this end is provided with adjustable feet.
Compared with prior art the present invention has the following advantages: the invention provides a kind of aluminium alloys scaffold inspection platform, aluminium alloys scaffold inspection platform is enclosed in set main shaft circumferential periphery.Its overall structure is combined type trussed construction, respectively to uniform force, solid and reliable, and braced structures is sufficient, durable; Its each composition component as: cross bar, vertical rod, pedal are general part, set up position and have interchangeability, and material is excellent level aluminum alloy materials.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of aluminium alloys scaffold inspection platform provided by the invention;
Fig. 2 is the structural representation of vertical supporting frame;
Fig. 3 is the structural representation of guardrail;
Fig. 4 is the structural representation of pedal A;
Fig. 5 is the structural representation of pedal B;
Fig. 6 is the assembly drawing of pedal A and pedal B;
Fig. 7 is the structural representation of cat ladder;
In figure: 1-vertical supporting frame, montant in 2-, the outer montant of 3-, 4-cross bar, 5-crossbeam, 6-guardrail, 7-pedal A, 8-pedal B, 9-link up with, 10-adjustable support foot, 11-baseboard, 12-cat ladder, the horizontal fixed bar of 13-.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, detailed specific description is done to the present invention, but protection scope of the present invention is not limited to following examples.
As shown in Figure 1, its cross section is regular hexagon to the overall structure of aluminium alloys scaffold inspection platform provided by the present invention, comprises vertical supporting frame 1, crossbeam 5, pedal and guardrail 6.Wherein vertical supporting frame 1 is provided with the six roots of sensation, its entirety is rectangular frame structure, as shown in Figure 2, the cross bar 4 comprising interior montant 2, outer montant 3 and be connected between interior montant 2 and outer montant 3, the top of outer montant 3 upwards extends, the bottom of interior montant 2 is to downward-extension, and the cross bar 4 being positioned at vertical supporting frame 1 the top inwards extends; Described six roots of sensation vertical supporting frame is with the main shaft of unit for the center of circle radially distributes, and the angle between two adjacent vertical supporting framves 1 is 60 degree.The interior montant 2 of described vertical supporting frame 1 and the bottom of outer montant 3 are provided with adjustable support foot 10.
Described crossbeam 5 is fixedly connected between two adjacent vertical supporting framves 1, crossbeam 5 is divided into crossbeam A, crossbeam B and crossbeam C tri-kinds, the two ends of its middle cross beam A are horizontally fixed between the outer montant 3 of two adjacent vertical supporting framves respectively by fastener, the two ends of crossbeam B to be horizontally fixed in two adjacent vertical supporting framves between montant 2 respectively by fastener, between the outer montant that the two ends of crossbeam C are horizontally fixed on two adjacent vertical supporting framves respectively by fastener and interior montant, vertical supporting frame is connected into positive six prism frame constructions by described crossbeam.Crossbeam A described in the present embodiment is identical with the quantity of crossbeam B, and be 4 layers and amount to 24, described crossbeam C is provided with two-layer, and 12 every layer amount to 24.
Described guardrail 6 is provided with six, and as shown in Figure 3, the both sides of guardrail 6 are provided with Spring lock catch to its structure, and guardrail 6 is installed on extension site, the top place of two adjacent outer montants 3 by Spring lock catch, and six described guardrails surround regular hexagon jointly.
Described pedal is divided into six groups, often organize pedal to be all made up of pedal A7 and pedal B8, both structures as shown in Figure 4, Figure 5 and Figure 6, pedal A7 and pedal B8 is all in isosceles trapezoid shape, both lower base angles are 60 degree, and both two waists are provided with hook 9, the length that pedal B goes to the bottom is identical with the length of the upper base of pedal A, and going to the bottom of described pedal A is provided with the baseboard 11 of projection with the upper bottom of pedal B.Pedal A is arranged between the cross bar of two adjacent vertical supporting top of the trellis by hook; Pedal B is arranged between the extending part of the cross bar of two adjacent vertical supporting top of the trellis by hook, the upper base of pedal B is arc-shaped, its radian is π/3, and the upper base of six pedal B surrounds a circular vacancy jointly, and the main shaft of described unit is arranged in described circular vacancy.
Cat ladder 12 is also provided with, as shown in Figure 7 in described inspection platform.Described cat ladder 12 is provided with the hook that can be mounted on crossbeam.
Also be provided with horizontal fixed bar 13 in described inspection platform, described horizontal fixed bar 13 is provided with the six roots of sensation, and its one end is fixedly connected with vertical supporting frame 1, and the other end withstands on the body of wall of Hydropower Plant room, and this end is provided with adjustable feet.
Aluminium alloys scaffold inspection platform provided by the present invention is when needs continue to increase podium level and pedal layer, operate in accordance with the following methods, first according to as shown in Figure 2, increase by one section of vertical supporting frame is continued above vertical supporting frame, then, after adopting crossbeam fixing, mount guardrail and pedal group, the number of plies of pedal and the increase of podium level can be completed, as shown in Figure 1, namely the scaffold of aluminium alloys shown in Fig. 1 inspection platform is provided with two-layer aluminum alloy pedal.

Claims (6)

1. one kind for the pin-connected panel aluminium alloys scaffold inspection platform in Hydropower Plant, it is characterized in that: the cross section of described inspection platform is regular hexagon, comprise vertical supporting frame, crossbeam, pedal and guardrail, vertical supporting erection is equipped with the six roots of sensation, its entirety is rectangular frame structure, the cross bar comprising interior montant, outer montant and be connected between interior montant and outer montant, the top of outer montant upwards extends, the bottom of interior montant is to downward-extension, and the cross bar being positioned at vertical supporting frame the top inwards extends; Described six roots of sensation vertical supporting frame is with the main shaft of unit for the center of circle radially distributes, and the angle between two adjacent vertical supporting framves is 60 degree;
Described crossbeam is fixedly connected between two adjacent vertical supporting framves, crossbeam is divided into crossbeam A, crossbeam B and crossbeam C tri-kinds, the two ends of its middle cross beam A are horizontally fixed between the outer montant of two adjacent vertical supporting framves respectively by fastener, the two ends of crossbeam B to be horizontally fixed in two adjacent vertical supporting framves between montant respectively by fastener, between the outer montant that the two ends of crossbeam C are horizontally fixed on two adjacent vertical supporting framves respectively by fastener and interior montant, vertical supporting frame is connected into positive six prism frame constructions by described crossbeam;
Described guardrail is provided with six, and the both sides of guardrail are provided with Spring lock catch, and guardrail is installed on extension site, the top place of two adjacent outer montants by Spring lock catch, and six described guardrails surround regular hexagon jointly;
Described pedal is divided into six groups, often organize pedal to be all made up of pedal A and pedal B, pedal A and pedal B is all in isosceles trapezoid shape, both lower base angles are 60 degree, and both two waists are provided with hook, the length that pedal B goes to the bottom is identical with the length of the upper base of pedal A, and pedal A is arranged between the cross bar of two adjacent vertical supporting top of the trellis by hook; Pedal B is arranged between the extending part of the cross bar of two adjacent vertical supporting top of the trellis by hook, the upper base of pedal B is arc-shaped, its radian is π/3, and the upper base of six pedal B surrounds a circular vacancy jointly, and the main shaft of described unit is arranged in described circular vacancy.
2. pin-connected panel aluminium alloys scaffold inspection platform according to claim 1, is characterized in that: described crossbeam A is identical with the quantity of crossbeam B, and be 4 layers and amount to 24, described crossbeam C is provided with two-layer, and 12 every layer amount to 24.
3. pin-connected panel aluminium alloys scaffold inspection platform according to claim 1, is characterized in that: the interior montant of described vertical supporting frame and the bottom of outer montant are provided with adjustable support foot.
4. pin-connected panel aluminium alloys scaffold inspection platform according to claim 1, is characterized in that: going to the bottom of described pedal A is provided with the baseboard of projection with the upper bottom of pedal B.
5. pin-connected panel aluminium alloys scaffold inspection platform according to claim 1, is characterized in that: be also provided with cat ladder in described inspection platform, described cat ladder is provided with the hook that can be mounted on crossbeam.
6. pin-connected panel aluminium alloys scaffold inspection platform according to claim 1, it is characterized in that: in described inspection platform, be also provided with horizontal fixed bar, described horizontal fixed bar is provided with the six roots of sensation, its one end is fixedly connected with vertical supporting frame, the other end withstands on the body of wall of Hydropower Plant room, and this end is provided with adjustable feet.
CN201510249940.9A 2015-05-15 2015-05-15 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform Active CN104989090B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510249940.9A CN104989090B (en) 2015-05-15 2015-05-15 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510249940.9A CN104989090B (en) 2015-05-15 2015-05-15 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform

Publications (2)

Publication Number Publication Date
CN104989090A true CN104989090A (en) 2015-10-21
CN104989090B CN104989090B (en) 2017-03-15

Family

ID=54300971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510249940.9A Active CN104989090B (en) 2015-05-15 2015-05-15 A kind of for Hydropower Plant in pin-connected panel aluminium alloy scaffold inspection platform

Country Status (1)

Country Link
CN (1) CN104989090B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781088A (en) * 2016-05-03 2016-07-20 泰兴市第建筑安装工程有限公司 Floor type scaffold of ultrahigh chemical tower
CN105887881A (en) * 2016-05-25 2016-08-24 中交第航务工程局有限公司 Pile cutting platform for steel pipe composite pile
CN106592943A (en) * 2016-12-19 2017-04-26 罗逍 Constructing method for scaffold with triangular prism structure
CN107165395A (en) * 2017-07-14 2017-09-15 成都翰道科技有限公司 A kind of scaffold
CN109057319A (en) * 2018-08-22 2018-12-21 大唐环境产业集团股份有限公司 A kind of full hall console mode scaffold in cylindrical structure inside
CN110919617A (en) * 2019-11-29 2020-03-27 国网福建省电力有限公司 Hydropower station main shaft overturning maintenance platform and working method thereof
CN111441565A (en) * 2020-03-18 2020-07-24 航天海鹰(哈尔滨)钛业有限公司 Lifting device for limited space operation of hot isostatic pressing machine and use method
CN114293755A (en) * 2021-12-01 2022-04-08 中国五冶集团有限公司 Outer scaffold frame of deep inspection shaft

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2506729Y (en) * 2001-07-13 2002-08-21 于国杰 Multi-functional insert disk type scaffold
CN102808503A (en) * 2011-05-31 2012-12-05 陈道斌 Bearing platform
GB2494379A (en) * 2011-08-17 2013-03-13 Graham Fogarty Telescopic scaffolding transom
US20130098709A1 (en) * 2011-10-24 2013-04-25 The Gsi Group, Llc Catwalk for a grain bin or the like and a plank used in the construction thereof
AU2013100896A4 (en) * 2013-02-11 2013-08-01 4 Ken Pty Ltd Method and system for oblique scaffold connection
CN203626212U (en) * 2013-10-19 2014-06-04 中建八局第二建设有限公司 Pier stud construction operation platform quick to disassemble and assemble
CN203755625U (en) * 2014-03-25 2014-08-06 中国建筑第四工程局有限公司 Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column
CN104533071A (en) * 2014-12-31 2015-04-22 广西路建工程集团有限公司 Concrete cylinder annular formwork-attached scaffold and construction method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2506729Y (en) * 2001-07-13 2002-08-21 于国杰 Multi-functional insert disk type scaffold
CN102808503A (en) * 2011-05-31 2012-12-05 陈道斌 Bearing platform
GB2494379A (en) * 2011-08-17 2013-03-13 Graham Fogarty Telescopic scaffolding transom
US20130098709A1 (en) * 2011-10-24 2013-04-25 The Gsi Group, Llc Catwalk for a grain bin or the like and a plank used in the construction thereof
AU2013100896A4 (en) * 2013-02-11 2013-08-01 4 Ken Pty Ltd Method and system for oblique scaffold connection
CN203626212U (en) * 2013-10-19 2014-06-04 中建八局第二建设有限公司 Pier stud construction operation platform quick to disassemble and assemble
CN203755625U (en) * 2014-03-25 2014-08-06 中国建筑第四工程局有限公司 Concrete pouring platform for use in rotary drilling pile with reversed steel pipe column
CN104533071A (en) * 2014-12-31 2015-04-22 广西路建工程集团有限公司 Concrete cylinder annular formwork-attached scaffold and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781088A (en) * 2016-05-03 2016-07-20 泰兴市第建筑安装工程有限公司 Floor type scaffold of ultrahigh chemical tower
CN105887881A (en) * 2016-05-25 2016-08-24 中交第航务工程局有限公司 Pile cutting platform for steel pipe composite pile
CN106592943A (en) * 2016-12-19 2017-04-26 罗逍 Constructing method for scaffold with triangular prism structure
CN107165395A (en) * 2017-07-14 2017-09-15 成都翰道科技有限公司 A kind of scaffold
CN109057319A (en) * 2018-08-22 2018-12-21 大唐环境产业集团股份有限公司 A kind of full hall console mode scaffold in cylindrical structure inside
CN109057319B (en) * 2018-08-22 2023-09-19 大唐环境产业集团股份有限公司 Cylindrical structure inside full hall floor type scaffold
CN110919617A (en) * 2019-11-29 2020-03-27 国网福建省电力有限公司 Hydropower station main shaft overturning maintenance platform and working method thereof
CN110919617B (en) * 2019-11-29 2022-05-13 国网福建省电力有限公司 Hydropower station main shaft overturning maintenance platform and working method thereof
CN111441565A (en) * 2020-03-18 2020-07-24 航天海鹰(哈尔滨)钛业有限公司 Lifting device for limited space operation of hot isostatic pressing machine and use method
CN114293755A (en) * 2021-12-01 2022-04-08 中国五冶集团有限公司 Outer scaffold frame of deep inspection shaft

Also Published As

Publication number Publication date
CN104989090B (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN104989090A (en) Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
EP1876316B1 (en) Prefabricated modular tower
CN106481060B (en) Operating platform and hanging method for tower
US10047725B2 (en) Ladder attachment system for a wind turbine
US20130174509A1 (en) Platform assembly for a wind turbine tower
CN104481194B (en) A kind of flip-chip method of vertical type tubular equipment
CN208009863U (en) A kind of tool-type pier stud construction operation platform device
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN104612908A (en) Wind power generation tower cylinder platform and wind power generation tower cylinder
CN201943388U (en) Combination type platform structure
US11905923B2 (en) Wind turbine tower segment for a wind turbine tower and method
CN206753087U (en) A kind of lighting roof operating platform structure
CN214366539U (en) Segment type tower drum annular platform, segment type tower drum and wind generating set
CN112228286B (en) Tower and vertical axis wind power generation device
CN205713036U (en) High pier over-form construction platform
JP4476096B2 (en) Construction method of large high-rise wind farm
CN203961318U (en) A kind of underground nuclear power station reactor cavern containment dome installation structure
CN204001887U (en) Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN208396032U (en) A kind of new steel structure node convenient for round tube stiffened column reinforcement construction
CN103388336B (en) Main purline part for inner support
CN100585113C (en) The method of climbing system for building construction throwing over barrier
CN219528353U (en) Mixed tower segment installation operation platform
CN105003074A (en) Commercial building construction system and construction method thereof
CN216072819U (en) Tower crane base attached to side of steel shell concrete cable tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant