CN201943388U - Combination type platform structure - Google Patents

Combination type platform structure Download PDF

Info

Publication number
CN201943388U
CN201943388U CN 201120063438 CN201120063438U CN201943388U CN 201943388 U CN201943388 U CN 201943388U CN 201120063438 CN201120063438 CN 201120063438 CN 201120063438 U CN201120063438 U CN 201120063438U CN 201943388 U CN201943388 U CN 201943388U
Authority
CN
China
Prior art keywords
beams
collar tie
connector
bed board
cycle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120063438
Other languages
Chinese (zh)
Inventor
李永生
王文武
郭亚红
何茂林
王晓东
杨建东
张玉玺
由方书
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Changqing Technology Engineering Co Ltd
Original Assignee
Xian Changqing Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Changqing Technology Engineering Co Ltd filed Critical Xian Changqing Technology Engineering Co Ltd
Priority to CN 201120063438 priority Critical patent/CN201943388U/en
Application granted granted Critical
Publication of CN201943388U publication Critical patent/CN201943388U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a combination type platform structure. Two inner ring beams and two outer ring beams are in a semicircular shape, the inner ring beams are disposed on the inner sides of the outer ring beams, the end face of one inner ring beam is connected to the end face of one outer ring beam through two edge beams to form a semicircular ring, the other inner ring beam is connected to the other outer ring beam through two edge beams to form the other semicircular ring. The two semicircular rings are connected through two connecting plates to form a circular frame structure, a planking is fixedly connected to the surface of the circular frame structure, more than four support beams are uniformly welded below the planking and between the inner ring beams and the outer ring beams, strengthening ribs are welded between every two support beams and below the planking, and the direction of the strengthening ribs is the same as that of the support beams. The support beams extend out of the side of the inner ring beams to be connected to a support plate through connecting parts, the support plate is fixedly connected to a base plate along an axial direction, and the base plate is fixedly connected to equipment. The upper end of a vertical column is connected to an armrest and a guard rail in a bolting mode, the lower end of the vertical column is sleeved by a fixing tube, the fixing tube is fixed on the outer ring beams through connecting parts, and more than four vertical columns are fixed on the outer ring beams.

Description

The combined console structure
Technical field
The utility model relates to the operating platform structure that a kind of plant equipment is used, and especially vertical sledge is installed the combined console structure of standby piecemeal.
Background technology
When we are equipped with in the installing of the vertical sledge of supply, be the needs of technological operation, often must be equipped with corresponding operating platform, sometimes or even the circular platform of whole circle, these are necessary to the client.But mostly traditional platform is that integral solder forms, if finish fully at the scene, it is bad not only to be shaped, and the construction trouble, needs to be equipped with more instrument, can't satisfy the requirement neat, attractive in appearance of client's outward appearance; If integral solder is finished in factory, be shaped, but cause too much trouble to transportation, sometimes, even need singly even up the vehicle of platform, increased cost of transportation; Satisfy above-mentioned purpose for reaching, we have adopted the combined console structure, the way of manufacturing in the factory, trial assembly, the assembling of on-the-spot secondary, so both can utilize the frock in the factory building, platform and integrally is shaped, and outward appearance is neat, and on-the-spot secondary installing when debugging, workload is few as much as possible, reduces the intensity and the difficulty of on-the-spot service.
Summary of the invention
The purpose of this utility model is the combined operation platform structure that a kind of practicality is provided, simply can satisfies the demand.This platform structure is simple, makes full use of all kinds of frocks and aid in the factory, finishes most work in factory building, and on-the-spot secondary installing of just carrying out necessity has reduced on-the-spot labour hour and labour intensity.
The technical solution of the utility model is: the combined console structure, it is characterized in that: it comprises backing plate, reinforcing rib, gripper shoe, connector, brace summer, bed board, cycle beam, side bar, interior collar tie beam, handrail, guardrail, column, stationary pipes, junction plate, collar tie beam and cycle beam are semicircle in described, respectively there are two, interior collar tie beam is arranged on the inboard of cycle beam, their end face is connected to become semi-round ring shape by two side bars, collar tie beam and cycle beam and two side bars connect into another semi-round ring shape in another, two semi-round ring shapes connect into the annular frame construction by two fishplate bars, bed board be fixedly connected on frame construction above, below the bed board, evenly be welded with 4 above brace summers between the inside and outside collar tie beam, between per two brace summers, be welded with reinforcing rib below the bed board, the direction of reinforcing rib is with the brace summer unanimity; Brace summer stretches out by connector in interior collar tie beam side and links to each other with gripper shoe, and gripper shoe is fixedlyed connected with backing plate vertically, and backing plate is fixedly connected on the equipment; The upper end of column is fixed with handrail, guardrail, and the lower end of column is with stationary pipes, and stationary pipes is fixed on the cycle beam by connector, and cycle beam is fixed with 4 with upper pillar stand.
Connector between described brace summer and the gripper shoe is two width of cloth connecting bolt and attaching nuts.
Connector between described stationary pipes and the cycle beam is set bolt and hold-down nut.
Described bed board is a steel plate.
The beneficial effects of the utility model are: after adopting this combined console structure, platform can all processing and manufacturings in factory, and with the equipment trial assembly.Owing to adopted fabricated structure, after the platform trial assembly finishes, can remove, do not influence the follow-up work of equipment, as heat treatment, transportation etc.This platform and equipment no-float, dismounting is simple, convenient transportation, it is time saving and energy saving that recover at the scene, reduced on-the-spot work difficulty and service time, and service fee is reduced, and improved the whole competitiveness that the sledge installing is equipped with.
Description of drawings
Below in conjunction with the embodiment accompanying drawing the utility model is described further, but not as to qualification of the present utility model:
Fig. 1 is the structural representation of the utility model embodiment;
Fig. 2 is brace summer among Fig. 1, gripper shoe connection layout;
Fig. 3 is landing beam among Fig. 1, column, stationary pipes connection layout;
Fig. 4 is the connection layout of side bar and inside and outside collar tie beam and junction plate among Fig. 1;
Fig. 5 is the A-A sectional drawing of Fig. 4.
Among the figure: 1. backing plate; 2. reinforcing rib; 3. gripper shoe; 4. connecting bolt; 5. attaching nut's 6. brace summers; 7. bed board; 8. cycle beam; 9. side bar; 10. interior collar tie beam; 11. handrail; 12. guardrail; 13. column; 14. stationary pipes; 15. set bolt; 16. hold-down nut; 17. junction plate; 18. pan head screw; 19. equipment.
The specific embodiment
The structure that is not described in detail in an embodiment, its structure is identical with existing known structure.
Embodiment 1
As Fig. 1, Fig. 2, Fig. 4, shown in Figure 5: the combined console structure, it is characterized in that: it comprises backing plate 1, reinforcing rib 2, gripper shoe 3, connector, brace summer 6, bed board 7, cycle beam 8, side bar 9, interior collar tie beam 10, handrail 11, guardrail 12, column 13, stationary pipes 14, junction plate 17, collar tie beam 10 and cycle beam 8 are semicircle in described, respectively there are two, interior collar tie beam 10 is arranged on the inboard of cycle beam 8, their end face is connected to become semi-round ring shape by two side bars 9, collar tie beam 10 and cycle beam 8 and two side bars 9 connect into another semi-round ring shape in another, two semi-round ring shapes connect into the annular frame construction by two fishplate bars 17, bed board 7 be fixedly connected on frame construction above, below the bed board 7, evenly be welded with 8 brace summers 6 between the inside and outside collar tie beam, between per two brace summers 6, be welded with reinforcing rib 2 below the bed board 7, the direction of reinforcing rib 2 is with brace summer 6 unanimities; Brace summer 6 stretches out by connector in interior collar tie beam side and links to each other with gripper shoe 3, and gripper shoe 3 is fixedlyed connected with backing plate 1 vertically, and backing plate 1 is fixedly connected on the equipment 19; The upper end of column 13 is fixed with handrail 11, guardrail 12, and the lower end of column 13 is with stationary pipes 14, and stationary pipes 14 is fixed on the cycle beam 8 by connector, and cycle beam 8 is fixed with 11 columns 13.
Embodiment 2
As shown in Figures 2 and 3, what embodiment 2 and embodiment 1 were different is: the connector between described brace summer 6 and the gripper shoe 3 is two width of cloth connecting bolts 4 and attaching nut 5, connects with two secondary bolts, except fixedly connected, plays the effect of rotating of preventing simultaneously.Connector between described stationary pipes 14 and the cycle beam 8 is set bolt 15 and hold-down nut 16.Described bed board 7 is a steel plate.Every junction plate 17 is fixed on the side bar 9 with 4 pan head screws 18 respectively, to prevent potential safety hazard.
The number of brace summer, column is not limited only to numerical value among the embodiment in the foregoing description, can also be other value more than 4.
Installation process of the present utility model is such, at first is backing plate 1 is fixedly connected on the equipment 19; Gripper shoe 3 is fixedly connected on the backing plate 1; Handrail 11 and railing 12 are fixedly connected sequentially in the upper end of column 13, and require to increase by second root post, repeat said process, until forming semicircular structure, fixedly connected last root post according to the spacing of setting.10,8 and two side bars 9 of inside and outside collar tie beam connect successively, form semicircle frame construction, and brace summer 6 is fixedlyed connected with inside and outside collar tie beam, bed board 7 is fixedly connected on above the framework by equidistant requirement, and between per two brace summers, increase reinforcing rib 2, fixedly connected with bed board.The lower end of stationary pipes 14 with column is connected and fixed.The column that connects, handrail, Fence structure link together with cycle beam with set bolt 15 and hold-down nut 16 at the stationary pipes place.A plurality of brace summers support the good overall structure of combinations thereof, with two width of cloth connecting bolts 4, attaching nut 5 is fixedlyed connected brace summer with junction plate good, repeats this process, finish until all brace summers of this half platform are connected with junction plate.With same step, install second half circular platform of equipment.At last spread junction plate 17, and fastening with pan head screw 18 in the junction of two circular platforms.
After installing, operating personnel can safeguard equipment on the annular platform.
The unloading process of this utility model is just opposite with installation process, at first take off pan head screw 18, take down junction plate 17, lay down connector between brace summer 6 and the gripper shoe 3 successively, and pull down the two halves platform in turn, lay down the connector between stationary pipes and the cycle beam at last, finish the dismantlement work of column, handrail, guardrail and semicircle platform.Platform after taking apart does not fully take up space, convenient transportation.Behind the scene, only need assembling to get final product.
As required, we can dismantle combined console from equipment, also can remove the column handrail from platform, and this just greatly facilitates transportation.Cause all is that bolt connects each other, so, when on-the-spot secondary is assembled, only need crane to cooperate, the workman just can finish the secondary installing work of whole platform very easily.

Claims (4)

1. combined console structure, it is characterized in that: it comprises backing plate (1), reinforcing rib (2), gripper shoe (3), connector, brace summer (6), bed board (7), cycle beam (8), side bar (9), interior collar tie beam (10), handrail (11), guardrail (12), column (13), stationary pipes (14), junction plate (17), collar tie beam (10) and cycle beam (8) are semicircle in described, respectively there are two, interior collar tie beam (10) is arranged on the inboard of cycle beam (8), their end face is connected to become semi-round ring shape by two side bars (9), collar tie beam (10) and cycle beam (8) and two side bars (9) connect into another semi-round ring shape in another, two semi-round ring shapes connect into the annular frame construction by two fishplate bars (17), bed board (7) be fixedly connected on frame construction above, below the bed board (7), evenly be welded with 4 above brace summers (6) between the inside and outside collar tie beam, between per two brace summers (6), be welded with reinforcing rib (2) below the bed board (7), the same brace summer of direction (6) unanimity of reinforcing rib (2); Brace summer (6) stretches out by connector in interior collar tie beam side and links to each other with gripper shoe (3), and gripper shoe (3) is fixedlyed connected with backing plate (1) vertically, and backing plate (1) is fixedly connected on the equipment (19); The upper end of column (13) is fixed with handrail (11), guardrail (12), and the lower end of column (13) is with stationary pipes (14), and stationary pipes (14) is fixed on the cycle beam (8) by connector, and cycle beam (8) is fixed with 4 with upper pillar stand (13).
2. combined console structure according to claim 1 is characterized in that: the connector between described brace summer (6) and the gripper shoe (3) is two width of cloth connecting bolts (4) and attaching nut (5).
3. combined console structure according to claim 1 is characterized in that: the connector between described stationary pipes (14) and the cycle beam (8) is set bolt (15) and hold-down nut (16).
4. combined console structure according to claim 1 is characterized in that: described bed board (7) is a steel plate.
CN 201120063438 2011-03-11 2011-03-11 Combination type platform structure Expired - Fee Related CN201943388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120063438 CN201943388U (en) 2011-03-11 2011-03-11 Combination type platform structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120063438 CN201943388U (en) 2011-03-11 2011-03-11 Combination type platform structure

Publications (1)

Publication Number Publication Date
CN201943388U true CN201943388U (en) 2011-08-24

Family

ID=44470737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120063438 Expired - Fee Related CN201943388U (en) 2011-03-11 2011-03-11 Combination type platform structure

Country Status (1)

Country Link
CN (1) CN201943388U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031966A (en) * 2011-09-30 2013-04-10 华东电网有限公司富春江水力发电厂 Main shaft maintenance platform for water turbine and electric generator
CN107762240A (en) * 2017-10-20 2018-03-06 河海大学 A kind of data-adjustable transmits the arranging device of wire
CN108211435A (en) * 2018-03-21 2018-06-29 北京市市政工程设计研究总院有限公司 A kind of accelerator with novel inclined-tube support
CN108747069A (en) * 2018-07-02 2018-11-06 中国五冶集团有限公司 A kind of installation method of tower body equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031966A (en) * 2011-09-30 2013-04-10 华东电网有限公司富春江水力发电厂 Main shaft maintenance platform for water turbine and electric generator
CN103031966B (en) * 2011-09-30 2015-05-27 国家电网公司 Main shaft maintenance platform for water turbine and electric generator
CN107762240A (en) * 2017-10-20 2018-03-06 河海大学 A kind of data-adjustable transmits the arranging device of wire
CN108211435A (en) * 2018-03-21 2018-06-29 北京市市政工程设计研究总院有限公司 A kind of accelerator with novel inclined-tube support
CN108211435B (en) * 2018-03-21 2024-05-10 北京市市政工程设计研究总院有限公司 Mechanical stirring clarification tank with inclined tube support
CN108747069A (en) * 2018-07-02 2018-11-06 中国五冶集团有限公司 A kind of installation method of tower body equipment

Similar Documents

Publication Publication Date Title
CN102817484B (en) Heavy multifunctional combined supporting frame
CN201943388U (en) Combination type platform structure
CN204386134U (en) The attached mould scaffold of a kind of concrete cylindrical hoop
CN104989090A (en) Assembled aluminium alloy scaffold maintenance platform used for hydropower station unit
CN204097882U (en) For the assembling combined steel pipe mounting system of bridge engineering
CN102535646A (en) Multidirectional error-adjustable node suitable for suspend-dome space structure
CN205777580U (en) A kind of automatic lifting discharging platform
CN203947756U (en) Exterior wall protective frame
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
KR101412860B1 (en) operating method of scaffolding device of corner part
CN204139631U (en) The guard rail of building site fast demountable
CN104389415B (en) Scaffold
CN201347616Y (en) Split type steel welding operation platform
CN102864746A (en) Bearing frame for bridge construction
CN214366539U (en) Segment type tower drum annular platform, segment type tower drum and wind generating set
CN102561195B (en) Assembled wire strand bracket
CN104533071A (en) Concrete cylinder annular formwork-attached scaffold and construction method thereof
CN105625737B (en) A kind of method for improving movable protective platform railing installation accuracy
CN110512852A (en) Assembled riding track
KR200404035Y1 (en) A fixed frame for food- plate, and a fixed inspection equipment for bridges
CN210177367U (en) Weak support system suitable for installation of steel structure of high tower steel-concrete combined beam
CN203390492U (en) Suspension supporting platform for detaching and installing large-scale diesel engine crankshaft bearing
CN203034914U (en) Demountable rail structure
CN204235099U (en) Hydraulic turbine connecting shaft bolt disassembly platform frock
CN205629900U (en) Equip equipment motor dismounting device that became invalid under running state

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20150311