CN204097882U - For the assembling combined steel pipe mounting system of bridge engineering - Google Patents
For the assembling combined steel pipe mounting system of bridge engineering Download PDFInfo
- Publication number
- CN204097882U CN204097882U CN201420534366.2U CN201420534366U CN204097882U CN 204097882 U CN204097882 U CN 204097882U CN 201420534366 U CN201420534366 U CN 201420534366U CN 204097882 U CN204097882 U CN 204097882U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- mounting system
- assembling
- junction plate
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 81
- 239000010959 steel Substances 0.000 title claims abstract description 81
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 7
- 238000000034 method Methods 0.000 abstract description 13
- 239000000463 material Substances 0.000 abstract description 10
- 239000000203 mixture Substances 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 230000008859 change Effects 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000011900 installation process Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 229920001084 poly(chloroprene) Polymers 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a kind of assembling combined steel pipe mounting system for bridge engineering, this mounting system includes many root posts steel pipe, flanged plate and junction plate, flanged plate is arranged on column steel pipe two ends, flanged plate is provided with multiple reinforcing rib be connected with column steel pipe, junction plate is symmetricly set on the periphery of the upper and lower part of column steel pipe, be provided with stull channel-section steel and diagonal brace channel-section steel between every two root post steel pipes, and be bolted on junction plate.Beneficial effect is assembling combined steel pipe mounting system good stability, and basic composition unit is a Pin, adds support stability between Pin and Pin by stull and diagonal brace.Save consumptive material, adopt assembling erection method, avoid the technique be welded to connect, assembled efficient and convenient.In mounting system, all rod members are detachable, and the rod member of same position can substitute mutually; Technique with bolts, makes assembled more convenient.Avoid repeated removal and again set up the situation of support, effectively protect assembling rod member, improve the utilization rate of material.
Description
Technical field
The utility model relates to a kind of assembling combined steel pipe mounting system for bridge engineering, can be widely used in all kinds bridge installation process.Assembling combined steel pipe mounting system also can be used for bridge superstructure local failure, when particularly having a slice or two panels beam to need to change, and needs to change old bridge neoprene bearing, in order to race against time to reinstatement works, need to set up support quickly and safely, form work plane, so that engineering construction.
Background technology
Current China bridge emergent rob logical in the application of war preparedness bridge more, but war preparedness bridge is more applied to setting up of bed rearrangement bridge, and for bridge superstructure local failure, when particularly having a slice or two panels beam to need to change, war preparedness bridge not only cost is high, nor too applicable.Be that section bar is welded in the past, and made support reach desirable strength and height, obviously do not only time-consuming like this, also cause the waste of material, material can not be allowed to reuse.
Summary of the invention
For Problems existing in above-mentioned technology, the object that the utility model provides is a kind of assembling combined steel pipe mounting system for bridge engineering, be beneficial to reduce the spillage of material that medium-height trestle installed by bridge, improve the utilization rate of material, simultaneously can conveniently assemble and set up steel pipe support in the emergency repair task changed by utilizing the Combined machining of existing conventional goods and materials to solve beam body, to reach flexible Application, fast reaction, emergency repair in time protect logical object.
For achieving the above object, the technical scheme that the utility model adopts is to provide a kind of assembling combined steel pipe mounting system for bridge engineering, wherein: this mounting system includes many root posts steel pipe, flanged plate and junction plate, flanged plate is arranged on column steel pipe two ends, flanged plate is provided with multiple reinforcing rib be connected with column steel pipe, junction plate is symmetricly set on the periphery of the upper and lower part of column steel pipe, be provided with stull channel-section steel and diagonal brace channel-section steel between every two root post steel pipes, and be bolted on junction plate.
The beneficial effects of the utility model are:
1. assembled efficient and convenient.In sectional shelf-unit, all rod members are detachable, and the rod member of same position can substitute mutually; Technique with bolts, makes assembled convenient, compares, avoid the welded connection technology between rod member with traditional support of setting up, and while protecting rod member, also greatly reduces the time that support is set up.
2. good stability.The basic composition unit of assembling combined steel pipe mounting system is a Pin, and length and width can reach the requirement of bridge by increasing Pin number, short transverse reaches requirement by the steel pipe support increasing 1m, 2.5m, 5m.The bowl button support that this assembling combined steel pipe support is more traditional, rigidity enhances, and peace is torn open and facilitated, and the utility model adds support stability by stull and diagonal brace simultaneously.
3. save consumptive material.Adopt assembling combined steel pipe mounting system of the present utility model, compare with traditional bridge support erection method, have following advantage:
(1) the utility model one group of steel pipe support can be applied in the installation of polytype bridge, demolishing process, and traditional bowl fastening type support is being set up in process, and because rod member itself is thinner, bearing capacity is limited, sets up time-consuming.The steel pipe support that the utility model is bolted can meet scaffolding height fast, single steel pipe support intensity, good rigidity simultaneously, higher load bearing requirements can be met, adopt this steel pipe support can repeated application, save the consumptive material setting up support greatly.
(2) the utility model adopts the erection method of Flange joint, avoids the technique be welded to connect, effectively protects assembling rod member, avoid welding loss.Improve the utilization rate of material, reduce cost.This mounting system can not only repeatedly be applied in the installation of various types of bridge, bridge rush-repair process repeatedly, and have easy and simple to handle, set up quick, easy to adjust, be convenient to preserve.
Accompanying drawing explanation
Fig. 1 is the front view of the utility model assembling combined steel pipe mounting system;
Fig. 2 is the elevation of the utility model assembling combined steel pipe mounting system.
In figure:
1. flanged plate 2. reinforcing rib 3. column steel pipe
4. junction plate 5. stull channel-section steel 6. diagonal brace channel-section steel
Detailed description of the invention
Be illustrated below in conjunction with the structure of accompanying drawing to the assembling combined steel pipe mounting system for bridge engineering of the present utility model.
Assembling combined steel pipe mounting system for bridge engineering of the present utility model is by each composition rod member of steel pipe support used in bridge installation process, the combinable rod member of assembling is processed in design, technique with bolts, the column steel pipe 3 of steel pipe support is designed with flanged plate and junction plate, reach support height requirement by flanged plate 1, reach stent length and width requirement by junction plate 4.Can assemble assembled by assembling easily, the height that can regulate steel pipe support easily with bolts, can be widely used in the installation process of different types of rridges.
As shown in Figure 1, 2, the structure of the assembling combined steel pipe mounting system for bridge engineering of the present utility model is, this mounting system includes many root posts steel pipe 3, flanged plate 1 and junction plate 4, flanged plate 1 is arranged on column steel pipe 3 two ends, flanged plate 1 is provided with multiple reinforcing rib 2 be connected with column steel pipe 3, junction plate 4 is symmetricly set on the periphery of the upper and lower part of column steel pipe 3, stull channel-section steel 5 and diagonal brace channel-section steel 6 is provided with between every two root post steel pipes 3, and be bolted on junction plate 4, increase the stability of mounting system.
Assembling combined steel pipe mounting system function for bridge engineering of the present utility model is achieved in that
The flanged plate 1 of the assembling combined steel pipe mounting system for bridge engineering of the present utility model is welded on column steel pipe 3, the uniform flanged plate 1 that is welded on of reinforcing rib 2 is with on column steel pipe 3, the connection of two column steel pipes 3 is realized by bolt and flanged plate 1, junction plate 4 four direction is welded on column steel pipe 3, realizes the connection respectively at column steel pipe 3 of stull channel-section steel 5 and diagonal brace channel-section steel 6.
In fig. 2, column steel pipe 3 has the various ways such as 1m, 2.5m, 5m, and two ends are all welded with flanged plate 1, and two flanged plates 1 are to being bolted together.Stull channel-section steel 5 and diagonal brace channel-section steel 6 are all linked together by junction plate 4 and column steel pipe 3, and such four root post steel pipes 3 can form a Pin.The connected node place of each rod member of composition mounting system is carried out Exact Design, technique with bolts, each rod member is made into combinable modular rod member, and rod member is undertaken assembled easily by burnished bolt hole, and the rod member of same position can phase trans-substitution.
According to structural bearing capacity and stability requirement, designing four root post steel pipes 3 is the technique that a Pin arranges.Column steel pipe 3 adopts circular tube structure, and the termination, upper and lower part of each column steel pipe 3 arranges flanged plate 1.Double column support connects into an entirety by stull channel-section steel 5 and diagonal brace channel-section steel 6, as a module, matches reach bridge requirement height with other column steel pipes 3; Be connected by stull according to the width of bridge between each Pin and Pin is horizontal, the strutting system that finally formation one is stable, carries out bridge construction installation.
Adopt the assembling combined steel pipe mounting system for bridge engineering of the present utility model, when bridge construction and line style change, need only by each for steel pipe support system assembling fittings together, and then according to the length of bridge and highly determine holder combination form, and assemble reinforcing again.Assembling combined steel pipe mounting system bowl fastening type support more in the past, dismounting is rapid, and good rigidity, reduces the proportion of goods damageds, and decreases cost of labor, should use easily.
Claims (1)
1. the assembling combined steel pipe mounting system for bridge engineering, it is characterized in that: described mounting system includes many root posts steel pipe (3), flanged plate (1) and junction plate (4), flanged plate (1) is arranged on column steel pipe (3) two ends, flanged plate (1) is provided with multiple reinforcing rib (2) be connected with column steel pipe (3), junction plate (4) is symmetricly set on the upper of column steel pipe (3), the periphery of bottom, stull channel-section steel (5) and diagonal brace channel-section steel (6) is provided with between every two root post steel pipes (3), and be bolted on junction plate (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420534366.2U CN204097882U (en) | 2014-09-17 | 2014-09-17 | For the assembling combined steel pipe mounting system of bridge engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420534366.2U CN204097882U (en) | 2014-09-17 | 2014-09-17 | For the assembling combined steel pipe mounting system of bridge engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204097882U true CN204097882U (en) | 2015-01-14 |
Family
ID=52266325
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420534366.2U Expired - Fee Related CN204097882U (en) | 2014-09-17 | 2014-09-17 | For the assembling combined steel pipe mounting system of bridge engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204097882U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463997A (en) * | 2016-01-06 | 2016-04-06 | 上海同罡建筑工程有限公司 | Erecting method for segmental beam |
CN107419668A (en) * | 2017-09-04 | 2017-12-01 | 广西路桥工程集团有限公司 | Knotted rope platform |
CN108128320A (en) * | 2017-12-29 | 2018-06-08 | 成都森川科技股份有限公司 | A kind of multi-functional automatic passing over of neutral section ground sensor vehicular detection device stent |
CN109252445A (en) * | 2018-05-28 | 2019-01-22 | 广西路建工程集团有限公司 | Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method |
CN109440650A (en) * | 2018-11-22 | 2019-03-08 | 上海市基础工程集团有限公司 | Modular rack system and construction method suitable for urban viaduct Fast Installation |
CN114808714A (en) * | 2022-04-25 | 2022-07-29 | 北京五洲鼎盛科技有限公司 | Assembled support and intelligent hydraulic jacking type installation method thereof |
-
2014
- 2014-09-17 CN CN201420534366.2U patent/CN204097882U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105463997A (en) * | 2016-01-06 | 2016-04-06 | 上海同罡建筑工程有限公司 | Erecting method for segmental beam |
CN107419668A (en) * | 2017-09-04 | 2017-12-01 | 广西路桥工程集团有限公司 | Knotted rope platform |
CN108128320A (en) * | 2017-12-29 | 2018-06-08 | 成都森川科技股份有限公司 | A kind of multi-functional automatic passing over of neutral section ground sensor vehicular detection device stent |
CN109252445A (en) * | 2018-05-28 | 2019-01-22 | 广西路建工程集团有限公司 | Cast-in-situ Beam assembled Large Diameter Pipeline steel pipe support structure and its construction method |
CN109440650A (en) * | 2018-11-22 | 2019-03-08 | 上海市基础工程集团有限公司 | Modular rack system and construction method suitable for urban viaduct Fast Installation |
CN114808714A (en) * | 2022-04-25 | 2022-07-29 | 北京五洲鼎盛科技有限公司 | Assembled support and intelligent hydraulic jacking type installation method thereof |
CN114808714B (en) * | 2022-04-25 | 2024-01-30 | 北京五洲鼎盛科技有限公司 | Assembled bracket and intelligent hydraulic jacking type mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204097882U (en) | For the assembling combined steel pipe mounting system of bridge engineering | |
CN203034773U (en) | Assembly type operating platform with variable diameter | |
CN103243818B (en) | The connected node of a kind of concrete column and girder steel | |
CN207919899U (en) | A kind of steel core concrete column flange sleeve bindiny mechanism | |
CN103216010A (en) | Steel pipe column-H-shaped beam joint adopting shape memory alloy bolts | |
CN216616236U (en) | Anti-seismic type building steel structure of high-rise building | |
CN208441237U (en) | A kind of beam column of steel structure | |
CN102261043A (en) | Assembled steel pipe upright post system | |
CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
CN203247717U (en) | Connecting node of concrete column and steel beam | |
CN201943388U (en) | Combination type platform structure | |
CN202209046U (en) | Wall connecting rod for external scaffold | |
CN102864746A (en) | Bearing frame for bridge construction | |
CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
CN104805911A (en) | Node system for laminated wood space structure | |
CN210597599U (en) | Assembled building frame | |
CN204139334U (en) | Girder steel and steel column weld temporary connecting structure entirely | |
CN203783106U (en) | Hanging assembling moving platform | |
CN202913356U (en) | Load-bearing frame for bridge construction | |
CN202627190U (en) | Steel structure beam support | |
CN207314848U (en) | A kind of aluminum alloy mould plate integral assembling holding clamp and formwork structure | |
CN206028597U (en) | Processingequipment and system of processing of steel reinforcement cage | |
CN104234189A (en) | Four-pipe truss structure of prefabricated house | |
CN201620592U (en) | Scaffold double-steel-pipe welding base | |
CN213805820U (en) | Assembled steel construction of public building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150114 |