CN105463997A - Erecting method for segmental beam - Google Patents

Erecting method for segmental beam Download PDF

Info

Publication number
CN105463997A
CN105463997A CN201610001949.2A CN201610001949A CN105463997A CN 105463997 A CN105463997 A CN 105463997A CN 201610001949 A CN201610001949 A CN 201610001949A CN 105463997 A CN105463997 A CN 105463997A
Authority
CN
China
Prior art keywords
beam sections
support
erection method
prefabricated section
erection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610001949.2A
Other languages
Chinese (zh)
Inventor
王海
赵殿峰
董海涛
王海洋
刘震
闫洋洋
邢振欢
李志盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Original Assignee
SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD filed Critical SHANGHAI TONGGANG BUILDING ENGINEERING CO LTD
Priority to CN201610001949.2A priority Critical patent/CN105463997A/en
Publication of CN105463997A publication Critical patent/CN105463997A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an erecting method for a segmental beam. The erecting method for the segmental beam comprises the following steps of (1) arranging a bracket on the operation surface of the segmental beam to be erected; (2) using hoisting equipment to hoist precast blocks to the bracket in a bridge span to be erected in sequence; (3) splicing the precast blocks on the bracket; and (4) after the segmental beam is spliced, removing the bracket to the next adjacent span and repeating the steps until the rest segmental beams are erected. According to the invention, as the hoisting equipment and a steel framework work together during erecting, the erecting method for the segmental beam has the advantages of low manufacturing cost, high economic efficiency and convenient mounting and transportation. As steel members of the steel framework are connected with each other through bolts, the steel framework is convenient to mount and demount and can be recycled. As the precast blocks of the segmental beam are located by using the hoisting equipment and a three-dimensional jack, the erecting method is convenient to operate.

Description

A kind of erection method of beam sections
Technical field
The present invention relates to the erection method of beam sections.
Background technology
Precast Concrete Segmental Bridges technique, simplified summary is exactly: whole Kong Liang is divided into the little sections being convenient to transport for long-distance, after precasting yard is prefabricated, moves the scene of setting a roof beam in place to, and by special Segmental assembling bridge-erecting machine assembled pore-forming piecemeal, hole-specifically construction is until terminate.
General erection uses highway or railway bridge erecting erecting, application number be 201410317256.5 application for a patent for invention a kind of prefabricated subsection beam bridge formation machine and segment installation method are disclosed, the girder of Bridge Erector is arranged support mechanism, the longitudinal prestressing stretch-draw of beam sections and being assembled in support mechanism is carried out, control the longitudinal line style precision of each beam sections by the transverse shifting of support mechanism, control the vertical line style precision of each beam sections by the vertical lifting of support mechanism.But Bridge Erector input cost is very large, less economical, install with transport inconvenient.
Summary of the invention
The problems referred to above that object of the present invention exists to solve prior art, provide a kind of erection method of beam sections.
To achieve these goals, technical scheme of the present invention is as follows:
An erection method for beam sections, comprises the steps:
(1) treating that erection beam sections scope of operation place arranges support;
(2) use crane gear successively by prefabricated section handling to waiting to set up on the support in spanning;
(3) carry out on support assembled;
(4) after segment installation completes, striking, to adjacent next across place repeat above-mentioned steps to complete all the other beam sections erection.
Described support is made up of firm component, with bolts between described firm component.
Described firm component comprises bracing members, stull, diagonal brace and Two bors d's oeuveres i iron.。
Bracing members top is located at by described Two bors d's oeuveres i iron, and described stull is located between Two bors d's oeuveres i iron and bracing members.
Described bracing members is perpendicular to ground, and bracing members spacing distance is equal, and described diagonal brace is located between adjacent steel support.
The basis of described support adopts precast plate basis, and the pre-buried threaded reinforcing bar of precast plate, with frame bottom bolt.
Described segment installation is implemented as: measurement and positioning first prefabricated section, by the first prefabricated section and the second prefabricated section coupling face coating adhesive, applies the solidification of interim prestressing force jam-packed, so repeats, assembled extremely originally across tail boom successively, the girder pre-stressed steel bundle of this bridge of stretch-draw.
Described measurement and positioning first prefabricated section is implemented as, and arranges three-dimensional jack, adjust its position by three-dimensional jack and crane gear under prefabricated section.
The invention has the beneficial effects as follows:
The present invention uses lifting gear and Steel Structure to coordinate erection, and cost is low, and economy is high, convenient installation and transport.With bolts between the firm component of Steel Structure, be convenient to peace and tear open and can recycle.Use the prefabricated section of lifting gear and three-dimensional jack location beam sections, easy to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of support of the present invention;
Fig. 3 is the structural representation before n to n+3 bridge pier beam sections of the present invention erection;
Fig. 4 is the structural representation that n to n+1 bridge pier beam sections of the present invention has been set up;
Fig. 5 is the structural representation that n+1 to n+3 bridge pier of the present invention arranges support;
Fig. 6 is the structural representation that n+1 to n+2 bridge pier segment installation of the present invention completes;
Fig. 7 is the structural representation of crane gear of the present invention to n+2 to n+3 bridge pier prefabricated section to be hung;
Fig. 8 is the structural representation that n+1 to n+2 bridge pier support of the present invention is dismantled afterwards and n+2 to n+3 bridge pier segment installation completes;
Fig. 9 is the structural representation that n to n+3 bridge pier beam sections of the present invention has been set up.
Detailed description of the invention
For making to have a better understanding and awareness architectural feature of the present invention and effect of reaching, coordinating detailed description in order to preferred embodiment and accompanying drawing, being described as follows:
N, n+1, n+2, n+3 in Fig. 3-Fig. 9 are the serial number of waiting to set up beam sections bridge pier, in Fig. 6-Fig. 81,2,3,4,5,6,7,8, m is the serial number of prefabricated section in beam sections.
As shown in Figures 1 to 9, the erection method of a kind of beam sections of the present invention, comprises the steps:
(1) treating that erection beam sections scope of operation place arranges support.
Before arranging support, check construction substructure, levelling of the land is constructed, measurement and positioning basic plane position and absolute altitude.Beam sections spanning to be assembled and adjacent next across place's construction lift equipment, at support erection beam sections scope of operation place, be equipped with the crane gear across full width bridge, be responsible for this scope of operation place for beam, lifting operation.In the present embodiment, crane gear is crane.
Support is made up of firm component, and be steel structure support, firm component is divided into bracing members 1, stull 3, diagonal brace 2 and Two bors d's oeuveres i iron 4, with bolts between firm component.On-the-spot peace is torn open conveniently, can repeatedly fall to use.In the present embodiment, bracing members 1 is spiral steel pipe bolt, the quantity of spiral steel pipe is set according to antenna height, the bottom of bracing members 1 is by flange and precast plate bolt, precast plate adopts C30 precast plate, for cast in situs, the pre-buried threaded reinforcing bar of precast plate, so as with bracing members 1 bottom flange bolt.Bracing members 1 interval is evenly longitudinally arranged, and adjacent steel arranges scissor diagonal brace 2 between supporting 1, with bolts between diagonal brace 2 and bracing members 1, can by arranging angle steel or channel-section steel realization on bracing members 1.Bracing members 1 upper end horizontally set stull 3, in stull 3 and interval, bracing members 1 corresponding position arranges Two bors d's oeuveres i iron 4, to strengthen the stability of support.
(2) use crane gear successively by prefabricated section 6 handling to waiting to set up on the support in spanning.
With Beam transportation vehicle, beam sections is transported to n+3 bridge pier place, with crane gear lifting, then by beam sections handling to spanning to be assembled.All the other prefabricated sections 6 are placed successively according to the method from n+1 pier to n+2 pier.
(3) carry out on support assembled.
During segment installation, use three-dimensional jack 5 at the bottom of crane gear and beam, first Measurement accuracy locates No. 1 block, after No. 1 block is in place, 1, bonding adhesive is smeared in No. 2 Block-matching faces, No. 2 blocks are mated with it locate and apply interim prestressing force jam-packed and solidify, repeat above step assembled extremely originally across tail boom successively.
(4) after segment installation completes, striking, to adjacent next across place repeat above-mentioned steps to complete all the other beam sections erection.
The girder pre-stressed steel bundle of cable stay bridge, removes n+1 to n+2 across support, switches, and repeat step (1) to (3) operation, assembled lower spanning inner segments beam, until complete all the other bridge constructions.
More than show and describe the advantage of the general principle of invention, principal character and invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; the just principle of the present invention described in above-described embodiment and manual; the present invention also has various changes and modifications without departing from the spirit and scope of the present invention, and these changes and improvements all fall in claimed scope of the present invention.The protection domain of application claims is defined by appending claims and equivalent thereof.

Claims (8)

1. an erection method for beam sections, comprises the steps:
(1) treating that erection beam sections scope of operation place arranges support;
(2) use crane gear successively by prefabricated section handling to waiting to set up on the support in spanning;
(3) carry out on support assembled;
(4) after segment installation completes, striking, to adjacent next across place repeat above-mentioned steps to complete all the other beam sections erection.
2. the erection method of beam sections as claimed in claim 1, it is characterized in that, described support is made up of firm component, with bolts between described firm component.
3. the erection method of beam sections as claimed in claim 2, it is characterized in that, described firm component comprises bracing members, stull, diagonal brace and Two bors d's oeuveres i iron.
4. the erection method of beam sections as claimed in claim 3, it is characterized in that, bracing members top is located at by described Two bors d's oeuveres i iron, and described stull is located between Two bors d's oeuveres i iron and bracing members.
5. the erection method of beam sections as claimed in claim 3, it is characterized in that, described bracing members is perpendicular to ground, and bracing members spacing distance is equal, and described diagonal brace is located between adjacent steel support.
6. the erection method of the beam sections as described in any one of claim 1 to 5, is characterized in that, the basis of described support adopts precast plate basis, and the pre-buried threaded reinforcing bar of precast plate, with frame bottom bolt.
7. the erection method of beam sections as claimed in claim 1, it is characterized in that, described segment installation is implemented as: measurement and positioning first prefabricated section, by the first prefabricated section and the second prefabricated section coupling face coating adhesive, apply the solidification of interim prestressing force jam-packed, repetition like this, assembled extremely originally across tail boom successively, the girder pre-stressed steel bundle of this bridge of stretch-draw.
8. the erection method of beam sections as claimed in claim 7, it is characterized in that, described measurement and positioning first prefabricated section is implemented as, and arranges three-dimensional jack, adjust its position by three-dimensional jack and crane gear under prefabricated section.
CN201610001949.2A 2016-01-06 2016-01-06 Erecting method for segmental beam Pending CN105463997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610001949.2A CN105463997A (en) 2016-01-06 2016-01-06 Erecting method for segmental beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610001949.2A CN105463997A (en) 2016-01-06 2016-01-06 Erecting method for segmental beam

Publications (1)

Publication Number Publication Date
CN105463997A true CN105463997A (en) 2016-04-06

Family

ID=55602118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610001949.2A Pending CN105463997A (en) 2016-01-06 2016-01-06 Erecting method for segmental beam

Country Status (1)

Country Link
CN (1) CN105463997A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110205934A (en) * 2019-04-30 2019-09-06 中铁八局集团第二工程有限公司 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam
CN111119071A (en) * 2020-01-16 2020-05-08 中建七局安装工程有限公司 Construction method for assembling precast concrete segment box girder
CN111188276A (en) * 2020-01-17 2020-05-22 中铁电气化局集团有限公司 Segmental beam sliding and assembling construction method
CN111877162A (en) * 2020-07-01 2020-11-03 中铁大桥局集团第五工程有限公司 Assembling construction method for prefabricated segment box girder support of urban viaduct
CN112095477A (en) * 2020-09-17 2020-12-18 中国十七冶集团有限公司 Construction method of prefabricated segmental beam

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL9500354A (en) * 1995-02-23 1996-10-01 Lastra Breda B V Method for positioning a construction element, and device for this method
CN201665819U (en) * 2010-03-16 2010-12-08 中国第一冶金建设有限责任公司 Detachable modularization temporary support used for installing steel box girder road surface
CN102995561A (en) * 2011-09-19 2013-03-27 曹新恒 Universal bridge cast-in-place support
CN203144908U (en) * 2013-03-25 2013-08-21 南通市风云市政工程有限公司 Supporting system of urban steel box beam viaduct construction
CN203346800U (en) * 2013-07-11 2013-12-18 中国建筑第六工程局有限公司 Support for cast-in-place box girder
CN204097882U (en) * 2014-09-17 2015-01-14 天津天佳市政公路工程有限公司 For the assembling combined steel pipe mounting system of bridge engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL9500354A (en) * 1995-02-23 1996-10-01 Lastra Breda B V Method for positioning a construction element, and device for this method
CN201665819U (en) * 2010-03-16 2010-12-08 中国第一冶金建设有限责任公司 Detachable modularization temporary support used for installing steel box girder road surface
CN102995561A (en) * 2011-09-19 2013-03-27 曹新恒 Universal bridge cast-in-place support
CN203144908U (en) * 2013-03-25 2013-08-21 南通市风云市政工程有限公司 Supporting system of urban steel box beam viaduct construction
CN203346800U (en) * 2013-07-11 2013-12-18 中国建筑第六工程局有限公司 Support for cast-in-place box girder
CN204097882U (en) * 2014-09-17 2015-01-14 天津天佳市政公路工程有限公司 For the assembling combined steel pipe mounting system of bridge engineering

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
卢新宇: "自制地面移动式节段拼装梁架桥设备的设计与应用", 《四川建材》 *
李龙: "支架法节段拼装简支箱梁施工技术", 《国防交通工程与技术》 *
董文奇: "组合支架在曲线箱梁节段拼装施工中的应用", 《山西建筑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110205934A (en) * 2019-04-30 2019-09-06 中铁八局集团第二工程有限公司 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam
CN111119071A (en) * 2020-01-16 2020-05-08 中建七局安装工程有限公司 Construction method for assembling precast concrete segment box girder
CN111188276A (en) * 2020-01-17 2020-05-22 中铁电气化局集团有限公司 Segmental beam sliding and assembling construction method
CN111877162A (en) * 2020-07-01 2020-11-03 中铁大桥局集团第五工程有限公司 Assembling construction method for prefabricated segment box girder support of urban viaduct
CN112095477A (en) * 2020-09-17 2020-12-18 中国十七冶集团有限公司 Construction method of prefabricated segmental beam

Similar Documents

Publication Publication Date Title
CN102154988B (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN105463997A (en) Erecting method for segmental beam
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN102605719B (en) Construction method for splicing and erecting concrete precast beam sections
CN109778700B (en) Cast-in-place trough beam three-point sliding pushing construction method for crossing existing road
JP2008274586A (en) Pillar head construction method
CN102220741B (en) Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines
CN103774560B (en) The curved bridge construction engineering method of suspension type cast-in-situ template
CN112030772A (en) Rapid construction method of continuous rigid frame bridge
CN210049103U (en) High-grade high-speed highway bracket spanned by large-span cast-in-place box girder
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN113585828A (en) Installation method of large-span inverted triangular pipe truss slope roof workshop
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN106948267A (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN112211112A (en) Steel box girder installation method adopting double-guide-girder erection machine on existing bridge
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN109797657B (en) Cast-in-situ bridge template support system device and bridge cast-in-situ construction method
CN107313628A (en) A kind of basic digging-free assembled tower-type space garage and its construction method
CN203729211U (en) Suspension type curved bridge panel cast-in-situ formwork
CN114214920B (en) Large-span double-layer built-up steel truss arch bridge and construction method thereof
CN215629392U (en) Wide equipment is pieced together to prefabricated case roof beam
CN114263114A (en) Construction system and construction method of large-section steel box girder
CN111119065B (en) Steel-concrete composite beam support-free construction process
CN210315235U (en) Three-working-face bridge girder erection machine capable of realizing longitudinal and transverse assembly
CN104818675A (en) Assembling method of rebar segments

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160406