CN110205934A - One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam - Google Patents

One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam Download PDF

Info

Publication number
CN110205934A
CN110205934A CN201910359442.8A CN201910359442A CN110205934A CN 110205934 A CN110205934 A CN 110205934A CN 201910359442 A CN201910359442 A CN 201910359442A CN 110205934 A CN110205934 A CN 110205934A
Authority
CN
China
Prior art keywords
screw rod
chuck
gantry crane
rail
silk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910359442.8A
Other languages
Chinese (zh)
Inventor
杨宇
何天贵
雷成龙
谢阳福
高军
黄鹏月
陆浩祥
余骏
谭俊
蒋德海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd, Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN201910359442.8A priority Critical patent/CN110205934A/en
Publication of CN110205934A publication Critical patent/CN110205934A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses one kind to set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, including gantry crane rail basis, gantry crane, the suspender for hoisting beam, support system, rail, slides silk top.The present invention can quickly and effectively adjust beam sections positioning by way of " gantry crane+suspender " combines, and can quickly be fallen frame by sliding silk top;Sliding silk top, rail, support system collectively constitute sliding system, and beam body can be completed by interim tensioning in the movement of track;Rotatable movable head setting, may make the application to adapt to the gradient of different beams by rotation;Jacking system is collectively constituted by screw rod, screw rod pullover, snap-gauge, and the absolute altitude of beam can be controlled by adjusting the length that screw rod be emerged above screw rod pullover;By the above special construction on sliding silk top, can save the time consumed by wet seam construction, external prestressing tensioning, it is smaller to device dependence, multiple work surfaces can be opened up simultaneously.

Description

One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam
Technical field
The invention belongs to precast segmental beam mounting technology fields, and in particular to one kind is used for precast segmental beam Support Method joggle beam Mobile assembled is set a roof beam in place system.
Background technique
It include Bridge Erector in place, bale handle, splicing, interim tensioning, the construction of wet seam, external prestressing using girder erection by bridging machine Tensioning, via hole;Construction period is generally 6-7 days, and such construction technology is larger to device dependence, is encountering the severe day such as sleet Gas, wet joint strength can not reach execution conditions temporally to influence the duration, carry on construction work at night more dangerous.So need using It sets a roof beam in place to Support Method, but the existing assembled system of setting a roof beam in place set a roof beam in place for Support Method is not mature enough, so that efficiency is lower.
During Support Method joggle beam, since beam body is divided into several segments, man-hour requirement is applied by several section assemblings At an entirety, this process need to smear splicing glue then between beam body there are a 30cm preset slot need at this time beam sections into One small-scale sliding of row, beam body aligning accuracy requires excessively high when splicing, is needed after the completion of beam body aligns at this time to absolute altitude It is finely adjusted, carries out falling frame after the completion of the spliced prestressed tensioning of beam body, the prior art not can solve such ask Topic.
We has developed a kind of for the mobile assembled frame of precast segmental beam Support Method joggle beam in order to solve problem above Girder system system.
Summary of the invention
The object of the invention is that provide a kind of for precast segmental beam Support Method joggle beam to solve the above-mentioned problems Mobile assembled is set a roof beam in place system.
The present invention through the following technical solutions to achieve the above objectives:
One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, comprising:
Gantry crane rail basis;Gantry crane rail basis pours on bridge pier two sides ground and is made, every gantry crane rail base A gantry crane rail is respectively mounted on plinth;
Gantry crane;Gantry crane is moveably mounted on gantry crane rail;
Suspender for hoisting beam;Suspender is moveably mounted on gantry crane;
Support system;Support system is mounted on bridge pier two sides;
Rail;A plurality of rail is mounted at the top of support system;
Slide silk top;Beam is placed on multiple sliding silk tops, and each sliding silk top correspondence is slided on a rail.
Specifically, sliding silk top includes:
Silk head;The lower end of silk head is provided with spherical groove;
Chuck;
Screw rod;Be formed as the spherical structure of evagination at the top of screw rod, spherical structure is nested into spherical groove and is formed as One rotatable movable head;It is formed with chuck notch in the spherical structure lower part of screw rod, chuck is sleeved on chuck notch, card The upper end of disk is fixedly connected with the bottom of silk head, and the size of chuck is for preventing movable head from disengaging;Below chuck notch The adjustment hole for adjusting screw rod level height is formed on screw rod;Outer silk is provided on screw rod outer wall below adjustment hole Mouthful;
Multiple snap-gauges;
Screw rod pullover;
More channel steels;More channel steels are parallel to each other and equal horizontal layout, and multiple snap-gauges are fixedly mounted between more channel steels And for fixing screw rod bushing head, screw rod pullover is vertically installed, and the inner wall of screw rod pullover is provided with internal sealing plug, and screw rod bushing headgear is mounted in On the external sealing plug of screw rod;
Multiple groups angle steel;Every group of angle steel includes two, and two angle steel form a sliding slot, and the upper end of a rail is mounted on two In the sliding slot that a angle steel is formed.
Preferably, chuck includes the first subcard disk and the second subcard disk, the shape phase of the first subcard disk and the second subcard disk Together, the first subcard disk and the second subcard disk are provided with semicircular indentations in side, and the first subcard disk is provided with semicircular indentations Side and the second subcard disk the side docking for being provided with semicircular indentations, and chuck notch is trapped among centre, the first subcard Disk and the second subcard armor at the radius of circular hole be less than the radius of spherical structure and the radius of spherical groove.
Preferably, snap-gauge is that two sub- snap-gauges are composed, and the side of each subcard plate is provided with semicircular indentations, two A sub- snap-gauge is provided with the side docking of semicircular indentations, and by screw rod bushing head circumference in centre.
The beneficial effects of the present invention are:
One kind of the invention is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam;
1, beam sections positioning can be quickly and effectively adjusted by way of " gantry crane+suspender " combines, by sliding silk top Frame can quickly be fallen;.
2, sliding silk top, rail, support system collectively constitute sliding system, and beam body can be completed by interim tensioning in track Movement;Rotatable movable head setting, may make the application to adapt to the gradient of different beams by rotation;Pass through screw rod, screw rod Pullover, snap-gauge collectively constitute jacking system, and the absolute altitude of beam can be controlled by adjusting the length that screw rod be emerged above screw rod pullover System;By the above special construction on sliding silk top, can save the time consumed by wet seam construction, external prestressing tensioning, it is right Device dependence is smaller, can open up multiple work surfaces simultaneously.
Detailed description of the invention
Fig. 1 is bracket assembly cross-sectional view;
Fig. 2 is bracket assembly skiagraph;
Fig. 3 is bracket assembly plan view;
Fig. 4 is the attachment structure schematic diagram of support system and sliding silk top in the application;
Fig. 5 is the structural schematic diagram that silk top is slid in the application;
Fig. 6 is the top view that silk top is slid in the application;
Fig. 7 is the structural schematic diagram of screw rod in the application;
Fig. 8 is the structural schematic diagram of silk head in the application;
Fig. 9 is the structural schematic diagram of snap-gauge in the application;
Figure 10 is the structural schematic diagram of chuck in the application;A is main view, and b is top view;
Figure 11 is the structural schematic diagram of screw rod pullover in the application.
In figure: 1. sliding silk tops;11. head;12. chuck;121. the first subcard disk;122. the second subcard disk;13. thread Bar;131. spherical structure;132. chuck notch;133. adjustment hole;134. external sealing plug;14. snap-gauge;141. semicircular indentations;15. Screw rod pullover;151. internal sealing plug;16. channel steel;17. angle steel;2. beam;21. suspender;3. support system;31. bracing members are basic;4. Gantry crane;41. gantry crane rail is basic;5. rail.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings:
Embodiment 1, as shown in Figs 1-4;
One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, comprising:
Gantry crane rail basis 41;Gantry crane rail basis 41 pours on bridge pier two sides ground and is made, every gantry hanger rail A gantry crane rail (not shown) is respectively mounted on road basis 41;
Gantry crane 4;Gantry crane 4 is moveably mounted on gantry crane rail;
Suspender 21 for hoisting beam 2;Suspender 21 is moveably mounted on gantry crane 4;
Support system 3;Support system 3 is mounted on bridge pier two sides;
Rail 5;A plurality of rail 5 is mounted on 3 top of support system;
Slide silk top 1;Beam 2 is placed on multiple sliding silk tops 1, and each sliding silk top 1 is corresponding sliding on a rail 5 It is dynamic.
Gantry crane 4 is 1.2 times that specified elevating capacity is greater than most heavy segment, and installing speed changer at movable motor can be more preferable Control gantry crane 4 walk rate with reach segment exactitude position purpose;
Suspender 21 is a kind of transverse and longitudinal gradient of adjustable beam 2 and can rotate ± 180 ° in the horizontal direction.
Gantry crane rail, rail 5 select 43 rails.
Embodiment 2, as shown in Figure 11-Figure 5;
The present embodiment the difference from embodiment 1 is that: sliding silk top 1 include:
Silk head 11;The lower end of silk head 11 is provided with spherical groove, and beam 2 is placed on the top of silk head 11;
Chuck 12;
Screw rod 13;The top of screw rod 13 is formed as the spherical structure 131 of evagination, and spherical structure 131 is nested into spherical groove In and be formed as a rotatable movable head;Chuck notch 132, chuck are formed in 131 lower part of spherical structure of screw rod 13 12 are sleeved on chuck notch 132, and the upper end of chuck 12 is fixedly connected with the bottom of silk head 11, and the size of chuck 12 is for preventing Only movable head disengages;The adjustment hole for adjusting 13 level height of screw rod is formed on screw rod 13 below chuck notch 132 133;External sealing plug 134 is provided on 13 outer wall of screw rod below adjustment hole 133;
Multiple snap-gauges 14;
Screw rod pullover 15;
More channel steels 16;More channel steels 16 are parallel to each other and equal horizontal layout, and multiple snap-gauges 14 are fixedly mounted on more slots Between steel 16 and for fixing screw rod bushing head 15, screw rod pullover 15 is vertically installed, and the inner wall of screw rod pullover 15 is provided with internal sealing plug 151, screw rod pullover 15 is sleeved on the external sealing plug 134 of screw rod 13;
Multiple groups angle steel 17;Every group of angle steel 17 includes two, and two angle steel 17 form a sliding slot, the upper end of a rail 5 It is mounted in a sliding slot of two angle steel 17 formation.
It is 1 11,1 chuck 12,4 of silk head of screw rod pullover 15,1 of screw rod 13,1 that the application, which preferably slides silk top 1, 16,4, the channel steel angle steel 17 of a sub- snap-gauge 14,2 composition, wherein angle steel 17 is vertically arranged with channel steel 16;
Screw rod 13 is steel product;
13 sleeve of screw rod is steel product;
Silk head 11 is the movable head that can be finely adjusted;
Chuck 12 is the steel product that silk head 11 limits;
Snap-gauge 14 is the steel product limited for 13 sleeve of screw rod;
Angle steel 17 is the sliding rail for sliding silk top 1;
Channel steel 16 is the pedestal for sliding silk top 1;
Sliding silk top 1, rail 5, support system 3 collectively constitute sliding system, and it is in-orbit can to complete 2 body of beam by interim tensioning The movement in road;Interim tensioning can allow channel steel 16 and the opposite sliding of rail 5, angle steel 17 to play position-limiting action.
Rotatable movable head setting, may make the application to adapt to the gradient of different beams 2 by rotation;Because rotatable The unique texture of movable head, so that when needing to adapt to the gradient of different beams 2, top shape of the meeting of silk head 11 relative to screw rod 13 At spherical structure 131 rotate;It is formed with gap between the matched suit of chuck 12 and chuck notch 132, silk head 11 There are gaps between inner side and the inner side of screw rod 13;
Jacking system is collectively constituted by screw rod 13, screw rod pullover 15, snap-gauge 14, the absolute altitude of beam 2 can be by adjusting screw rod 13 length for emerging 15 top of screw rod pullover are controlled;When needing to adjust, usually adjusting rod is inserted before putting beam 2 Enter adjustment hole 133, then remove and turn screw rod 13, remembers to obtain the purpose for screwing on screw rod 13, screwing off.
It is more convenient, accurate that the application can be such that the absolute altitude of 2 body of beam adjusts;De- frame speed is fast, can move energy in orbit The impact load faster generated when adjusting position and the interim tensioning of weakening;
For the application when installing to one section of beam 2, general support system 3 uses 24 bracing members bases 31, corresponding Ground is laid with 8 rail, 5,48 sliding silk tops 1 in support system 3, pours 2 gantry crane rail bases in 3 two sides of support system Plinth 41 is laid with gantry crane rail above, after gantry crane 4 is moved to designated position on gantry crane rail, will be saved by suspender 21 It is placed on above 4 silk tops after section pose adjustment is good and by segment, silk top is adjusted, 2 body of beam is supported steadily in place, and is right First segment is locked, and applies interim prestressing force with fining twisted steel after the completion of 2 splicing of beam sections, two neighboring segment, Loose segment carries out exactitude position by sliding rail 5 below silk top to realize that beam sections 2 are assembled.
Embodiment 3, as shown in Figure 10;
The present embodiment the difference from example 2 is that: chuck 12 includes the first subcard disk 121 and the second subcard disk 122, the One subcard disk 121 is identical with the shape of the second subcard disk 122, and the first subcard disk 121 and the second subcard disk 122 are arranged in side There are semicircular indentations 141, the first subcard disk 121 is provided with the side of semicircular indentations 141 and being provided with for the second subcard disk 122 The side of semicircular indentations 141 is docked, and chuck notch 132 is trapped among centre, the first subcard disk 121 and the second subcard disk 122 The radius of the circular hole surrounded is less than the radius of spherical structure 131 and the radius of spherical groove.
Embodiment 4, as shown in Figure 9;
The present embodiment the difference from example 2 is that: snap-gauge 14 be two sub- snap-gauges 14 be composed, each subcard plate 14 Side be provided with semicircular indentations 141, two sub- snap-gauges 14 are provided with the side docking of semicircular indentations 141, and by silk Rod set head 15 is trapped among centre.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the above embodiments and description only describe originals of the invention Reason, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appending claims and equivalents circle It is fixed.

Claims (4)

1. one kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam characterized by comprising
Gantry crane rail basis;Gantry crane rail basis pours on bridge pier two sides ground and is made, on the basis of every gantry crane rail It is respectively mounted a gantry crane rail;
Gantry crane;Gantry crane is moveably mounted on gantry crane rail;
Suspender for hoisting beam;Suspender is moveably mounted on gantry crane;
Support system;Support system is mounted on bridge pier two sides;
Rail;A plurality of rail is mounted at the top of support system;
Slide silk top;Beam is placed on multiple sliding silk tops, and each sliding silk top correspondence is slided on a rail.
2. it is according to claim 1 it is a kind of set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, it is special Sign is that sliding silk top includes:
Silk head;The lower end of silk head is provided with spherical groove;
Chuck;
Screw rod;Be formed as the spherical structure of evagination at the top of screw rod, spherical structure is nested into spherical groove and is formed as one Rotatable movable head;It is formed with chuck notch in the spherical structure lower part of screw rod, chuck is sleeved on chuck notch, chuck Upper end is fixedly connected with the bottom of silk head, and the size of chuck is for preventing movable head from disengaging;Screw rod below chuck notch On be formed with adjustment hole for adjusting screw rod level height;External sealing plug is provided on screw rod outer wall below adjustment hole;
Multiple snap-gauges;
Screw rod pullover;
More channel steels;More channel steels are parallel to each other and equal horizontal layout, and multiple snap-gauges are fixedly mounted between more channel steels and use In fixed screw rod bushing head, screw rod pullover is vertically installed, and the inner wall of screw rod pullover is provided with internal sealing plug, and screw rod bushing headgear is mounted in screw rod External sealing plug on;
Multiple groups angle steel;Every group of angle steel includes two, and two angle steel form a sliding slot, and the upper end of a rail is mounted on two angles In the sliding slot that steel is formed.
3. it is according to claim 2 it is a kind of set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, it is special Sign is: chuck includes the first subcard disk and the second subcard disk, and the shape of the first subcard disk and the second subcard disk is identical, the first son Chuck and the second subcard disk are provided with semicircular indentations in side, and the first subcard disk is provided with the side and of semicircular indentations The side docking for being provided with semicircular indentations of two subcard disks, and chuck notch is trapped among centre, the first subcard disk and the second son The radius for the circular hole that chuck surrounds is less than the radius of spherical structure and the radius of spherical groove.
4. it is according to claim 2 it is a kind of set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam, it is special Sign is: snap-gauge is that two sub- snap-gauges are composed, and the side of each subcard plate is provided with semicircular indentations, two sub- snap-gauges It is provided with the side docking of semicircular indentations, and by screw rod bushing head circumference in centre.
CN201910359442.8A 2019-04-30 2019-04-30 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam Pending CN110205934A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910359442.8A CN110205934A (en) 2019-04-30 2019-04-30 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910359442.8A CN110205934A (en) 2019-04-30 2019-04-30 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam

Publications (1)

Publication Number Publication Date
CN110205934A true CN110205934A (en) 2019-09-06

Family

ID=67786631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910359442.8A Pending CN110205934A (en) 2019-04-30 2019-04-30 One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam

Country Status (1)

Country Link
CN (1) CN110205934A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472284A (en) * 2020-04-30 2020-07-31 中建七局安装工程有限公司 Assembling method for cantilever of prefabricated segmental beam portal crane of urban viaduct
CN111576183A (en) * 2020-04-16 2020-08-25 中铁三局集团华东建设有限公司 Construction method for longitudinally moving and erecting box girder
CN112900280A (en) * 2021-02-02 2021-06-04 中铁四局集团第三建设有限公司 Bridge prefabricated bent cap installation in-place construction method and construction structure

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2083551A1 (en) * 1992-11-23 1994-05-24 Harold R. Minty Installation system for bridge girders
JPH1181244A (en) * 1997-09-05 1999-03-26 Sumiken Kiko Kk Bridge erecting device
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN101509228A (en) * 2008-12-17 2009-08-19 中交第二航务工程局有限公司 Large-block beam section three-dimensional positioning apparatus
CN102587291A (en) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder
CN203977296U (en) * 2014-06-30 2014-12-03 中铁二十四局集团有限公司路桥分公司 A kind of device for bridge equal proportion supertronic integral jacking
CN105463997A (en) * 2016-01-06 2016-04-06 上海同罡建筑工程有限公司 Erecting method for segmental beam
CN105648919A (en) * 2016-01-18 2016-06-08 中国铁建大桥工程局集团有限公司 Precast segment double-span circulating assembly construction method for prestressed concrete bridge
CN107285209A (en) * 2017-07-04 2017-10-24 杭州江润科技有限公司 A kind of Novel U-shaped erection equipment and its operating method
CN107524091A (en) * 2017-09-09 2017-12-29 中建八局第三建设有限公司 The constructing device and its construction method of erection of precast beams are carried out on existing road
WO2018000408A1 (en) * 2016-07-01 2018-01-04 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device
CN208323719U (en) * 2018-04-08 2019-01-04 贵州省公路工程集团有限公司 A kind of accurate regulating system of self-control precast beam longitudinal slope
CN210561730U (en) * 2019-04-30 2020-05-19 中铁八局集团第二工程有限公司 Beam splicing and moving assembled type beam erecting system for prefabricated segmental beam support method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2083551A1 (en) * 1992-11-23 1994-05-24 Harold R. Minty Installation system for bridge girders
JPH1181244A (en) * 1997-09-05 1999-03-26 Sumiken Kiko Kk Bridge erecting device
CN101509228A (en) * 2008-12-17 2009-08-19 中交第二航务工程局有限公司 Large-block beam section three-dimensional positioning apparatus
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN102587291A (en) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 Walking type multipoint pushing construction method and walking type multipoint pushing construction system for steel box girder
CN203977296U (en) * 2014-06-30 2014-12-03 中铁二十四局集团有限公司路桥分公司 A kind of device for bridge equal proportion supertronic integral jacking
CN105463997A (en) * 2016-01-06 2016-04-06 上海同罡建筑工程有限公司 Erecting method for segmental beam
CN105648919A (en) * 2016-01-18 2016-06-08 中国铁建大桥工程局集团有限公司 Precast segment double-span circulating assembly construction method for prestressed concrete bridge
WO2018000408A1 (en) * 2016-07-01 2018-01-04 中交武汉港湾工程设计研究院有限公司 Pile top pushing and positioning device
CN107285209A (en) * 2017-07-04 2017-10-24 杭州江润科技有限公司 A kind of Novel U-shaped erection equipment and its operating method
CN107524091A (en) * 2017-09-09 2017-12-29 中建八局第三建设有限公司 The constructing device and its construction method of erection of precast beams are carried out on existing road
CN208323719U (en) * 2018-04-08 2019-01-04 贵州省公路工程集团有限公司 A kind of accurate regulating system of self-control precast beam longitudinal slope
CN210561730U (en) * 2019-04-30 2020-05-19 中铁八局集团第二工程有限公司 Beam splicing and moving assembled type beam erecting system for prefabricated segmental beam support method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576183A (en) * 2020-04-16 2020-08-25 中铁三局集团华东建设有限公司 Construction method for longitudinally moving and erecting box girder
CN111472284A (en) * 2020-04-30 2020-07-31 中建七局安装工程有限公司 Assembling method for cantilever of prefabricated segmental beam portal crane of urban viaduct
CN112900280A (en) * 2021-02-02 2021-06-04 中铁四局集团第三建设有限公司 Bridge prefabricated bent cap installation in-place construction method and construction structure

Similar Documents

Publication Publication Date Title
CN110205934A (en) One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam
CN101664762B (en) Ultra-large type memorial archway side-standing rotating installation technology
CN103556817B (en) Side wall concrete construction method employing side wall trolley
CN102587281A (en) Walking type multi-point jacking-pushing construction method
CN108677720A (en) Lifting Equipment and lifting components jack erection construction technique
CN110306445A (en) Incremental launching device and bridge incremental launching method for bridge incremental launching construction
CN112482243A (en) Large cantilever steel truss transverse dragging construction fabricated deviation rectifying device and construction method
CN210712392U (en) Quick fine tuning device of ballastless track board
CN114438905A (en) Walking type sliding and pushing construction method and device for bridge construction
CN109374396B (en) Hydraulic vertical rotation experiment platform for anchor plate fatigue test
CN208733477U (en) A kind of large-tonnage steel box beam thrustor and pushing tow system
CN207775734U (en) A kind of balance regulator of single-cantilever assembly
CN108691277A (en) The three-dimensional adjustment tooling positioned in erection process for precast segment spliced girder
CN206768627U (en) A kind of pushing tow, erecting device for bridge rotating rear support
CN103147405A (en) Method for erecting steel girder of cable-stayed bridge with diagonal main trusses
CN208632979U (en) The three-dimensional adjustment tooling positioned in erection process for precast segment spliced girder
CN210561730U (en) Beam splicing and moving assembled type beam erecting system for prefabricated segmental beam support method
CN112082780B (en) Test section device for test of high-speed train on-axle driving system under earthquake action
CN215976895U (en) Self-balancing type inverted T-shaped front auxiliary supporting leg of three-leg bridge girder erection machine
CN103343626B (en) The T-shaped support slide installation method of template Elements of Space Grid Truss and structure thereof
CN101852066A (en) Device and method for arranging track of drilling machine
CN109763512B (en) Vertical equipment adjustable foundation platform of angle steel tower
CN211113199U (en) Pre-assembly equipment for segmental beam
CN112144403A (en) Beam lifting station suitable for steel box girder web plate change and pushing process thereof
CN201770946U (en) Pushing mechanism for broad-bridge-deck steel box girder with single longitudinal partition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination