CN203977296U - A kind of device for bridge equal proportion supertronic integral jacking - Google Patents
A kind of device for bridge equal proportion supertronic integral jacking Download PDFInfo
- Publication number
- CN203977296U CN203977296U CN201420354812.1U CN201420354812U CN203977296U CN 203977296 U CN203977296 U CN 203977296U CN 201420354812 U CN201420354812 U CN 201420354812U CN 203977296 U CN203977296 U CN 203977296U
- Authority
- CN
- China
- Prior art keywords
- oil cylinder
- bridge
- hydraulic lifting
- lifting oil
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of device for bridge equal proportion supertronic integral jacking, be positioned at and treat jacking bridge bottom, it is characterized in that described device comprises hydraulic lifting oil cylinder, Convenient jack and PLC synchronous control system, described hydraulic lifting oil cylinder is connected with described PLC synchronous control system respectively with described Convenient jack, and wherein said hydraulic lifting oil cylinder pushing end has the ball head structure of variable-angle.The utility model has the advantages that, by utilizing the jacking speed of PLC synchronous control system control Convenient jack and hydraulic lifting oil cylinder, can avoid the bridge collapse accident causing in the time that hydraulic lifting oil cylinder breaks down, improve safety, and make bridge realize equal proportion integral jacking; Be arranged at the ball head structure of the variable-angle at hydraulic lifting oil cylinder top, in jacking process, can keep vertical relation with bridge all the time, avoid due to the caused local stress of out of plumb relation between hydraulic lifting oil cylinder and bridge.
Description
Technical field
The utility model relates to bridge jacking device, is specifically related to a kind of device for bridge equal proportion supertronic integral jacking.
Background technology
The railroad bridge that bridge jacking originates from the 1950's sets up, is shifted, and, starts for integral bridge synchronization of jacking up because building moves the develop rapidly of thing displacement technology in the nineties.Along with the development of computer and universal, bridge jacking technology also obtains develop rapidly, is widely used, and becomes an important technological means.But the case of bridge jacking equal altitudes jacking is more, the supertronic jacking case of the different supertronic jacking, particularly continuous box girder of top lifting height is less.Domestic bridge supertronic engineering continuous box girder mostly is 20 meters and is no more than 150 meters across footpath or total length, and top lifting height is no more than 4 meters.Single pier jacking weight is about 1000 tons, lighter.It underpins mode and mostly is case beam bottom and sets up steel distribution beam, underpins stressed transmission indefinite, and cost is high, underpins safety factor low.In jacking process, mainly by hydraulic jack.Without safety precautions, once jack is revealed, consequence is unimaginable.Jacking control mostly is synchronization of jacking up, and because pad bearing height can not be made thinner classification, supertronic mostly is by pier and repeatedly carries out, and can not reach equal proportion synchronization of jacking up, puts in place simultaneously.
Summary of the invention
The purpose of this utility model is according to above-mentioned the deficiencies in the prior art part, a kind of device for bridge equal proportion supertronic integral jacking is provided, this device is by arranging the ball head structure of variable-angle at hydraulic lifting oil cylinder top, to solve the hydraulic lifting oil cylinder and the local stress of top bridge out of plumb to structure generation that cause due to slope change in jacking process, by on hydraulic lifting oil cylinder side, tunnel jack being set, there is the accident of jacking bridge collapse to avoid hydraulic lifting oil cylinder to break down simultaneously.
The utility model object realizes and being completed by following technical scheme:
A kind of device for bridge equal proportion supertronic integral jacking, be positioned at and treat jacking bridge bottom, it is characterized in that described device comprises hydraulic lifting oil cylinder, Convenient jack and PLC synchronous control system, described hydraulic lifting oil cylinder is connected with described PLC synchronous control system respectively with described Convenient jack, and wherein said hydraulic lifting oil cylinder pushing end has the ball head structure of variable-angle.
Described ball head structure comprises bulb and takes over a business, described bulb is hemispherical, described bulb upper surface with described in take over a business to be connected and fixed, the push rod top of described hydraulic lifting oil cylinder has the groove matching with the land portions shape of described bulb, described bulb and described push rod are connected and fixed by bolt, described bolt be positioned at the bolt hole matched in clearance on described bulb.
Describedly take over a business to be fixed on described bulb, its upper surface is horizontal plane.
The gap length of described matched in clearance is not more than 5 ° and is as the criterion to realize the corner of described bulb.
The utility model has the advantages that, by utilizing the jacking speed of PLC synchronous control system control Convenient jack and hydraulic lifting oil cylinder, can avoid the bridge collapse accident causing in the time that hydraulic lifting oil cylinder breaks down, improve safety, and make bridge realize equal proportion integral jacking; Be arranged at the ball head structure of the variable-angle at hydraulic lifting oil cylinder top, in jacking process, can keep vertical relation with bridge all the time, avoid due to the caused local stress of out of plumb relation between hydraulic lifting oil cylinder and bridge.
Brief description of the drawings
Fig. 1 is lift-up device schematic diagram in the utility model;
Fig. 2 is hydraulic lifting cylinder structure schematic diagram in the utility model.
Detailed description of the invention
Feature of the present utility model and other correlated characteristic are described in further detail by embodiment below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As Fig. 1-2, in figure, mark 1-10 is respectively: bridge 1, hydraulic lifting oil cylinder 2, Convenient jack 3, substructure 4, PLC synchronous control system 5, hole 6, top cover 7, bolt 8, bulb 9, push rod 10.
Embodiment: as shown in Figure 1, 2, the present embodiment is specifically related to a kind of device for bridge equal proportion supertronic integral jacking, this lift-up device is between bridge 1 and substructure 4, mainly formed by hydraulic lifting oil cylinder 2, Convenient jack 3 and PLC synchronous control system 5, hydraulic lifting oil cylinder 2 is connected with PLC synchronous control system 5 respectively with Convenient jack 3, and PLC synchronous control system 5 is for controlling the jacking speed of Convenient jack 3 with hydraulic lifting oil cylinder 2.
As shown in Figure 1, 2, hydraulic lifting oil cylinder 2 is active Lifting Equipment, and whole active jacking system is made up of some hydraulic lifting oil cylinders 2, so that powerful top lift to be provided.This active jacking system is connected by oil pipe, therefore each hydraulic lifting oil cylinder 2 can play a role jointly in the time of jacking.In the time arranging hydraulic lifting oil cylinder 2, must be symmetrically arranged, stressed evenly to ensure top bridge 1, prevent that top concrete local pressure from producing crack.Push rod 10 tops of hydraulic lifting oil cylinder 2 are with rotating ball head structure, this ball head structure comprises the bulb 9 being connected and fixed with push rod 10 and is fixed on the top cover 7 on bulb 9, this bulb 9 is hemispherical, there is the hemispherical groove matching with bulb 9 shapes at push rod 10 tops, bulb 9 is arranged in the hemispherical groove of push rod 10, and be connected and fixed through bolt 8, bolt 8 runs through in the hemispherical groove that screw 6 on bulb 9 enters push rod 10 and tightens fixing, it should be noted that, screw 6 apertures on bulb 9 are slightly larger than the diameter of bolt 8, be between bolt 8 and bulb 9, to be matched in clearance, so that bulb 9 has certain angular transformation space, the gap length of this matched in clearance is not more than 5 degree and is as the criterion to realize the corner of bulb 9.When jacking along with the variation of the gradient, hydraulic lifting oil cylinder 2 with top bridge 1 by the vertical out of plumb that becomes, now the ball head structure at hydraulic lifting oil cylinder 2 tops, along with the angle of the bulb 9 on cylinder top is adjusted in the variation of bridge 1 gradient automatically, makes the top cover 7 on bulb 9 perpendicular with bridge 1 all the time.The jack and the local stress of superstructure out of plumb to structure generation that adopt this hydraulic lifting oil cylinder 2 with ball head structure to solve to cause due to slope change in jacking process.
As shown in Figure 1, hydraulic lifting oil cylinder 2, in the time of jacking bridge, may occur letting out in hydraulic pressure, oil pipe burst etc. is unexpected, will cause immeasurable security incident, or even cave-in accident can occur bridge 1.Therefore be also provided with Convenient jack 3 in the present embodiment between bridge 1 and substructure 4, in order to still can effectively support top jacking bridge 1 in the time that the oil pressure of hydraulic lifting oil cylinder 2 suddenly disappears, to avoid 1 landing of top bridge.This Convenient jack 3 is carried by fro hydraulic driving machinery, and stroke can have 0mm~150mm electrodeless rotation, can meet the support needs that equal proportion supertronic jacking stroke does not wait.Convenient jack 3 inside also can adopt the mode of mechanical whorl to carry, and bear the load on top by the elastic deformation of mechanical whorl, while supposing that hydraulic jack goes wrong, can provide reliable mechanical support.
As shown in Figure 1, PLC synchronous control system 5 is connected with hydraulic lifting oil cylinder 2 and Convenient jack 3 simultaneously, and it is mainly made up of several parts such as computer control system (computer, computer software, operating desk, electric control box etc.), detecting sensors (displacement transducer, power sensor).PLC synchronous control system 5 is gathered jacking data and by Internet Transmission, is controlled both synchronizations of jacking up as calculated after the computational analysis of machine control system by the detecting sensor being arranged on hydraulic lifting oil cylinder 2 and Convenient jack 3.
As shown in Figure 1, 2, device in the present embodiment is specifically for bridge equal proportion supertronic integral jacking, therefore below the two ends of bridge 1, be provided with this device, control hydraulic lifting oil cylinder 2 jackings at bridge 1 two ends by PLC synchronous control system 5, in jacking process, adopt the consistent control principle of angular velocity, according to the difference of each pier jacking amount, equal proportion arranges the jacking velocity amplitude of each pier, reaches the object of all pier stud synchronizations of jacking up.
Claims (4)
1. the device for bridge equal proportion supertronic integral jacking, be positioned at and treat jacking bridge bottom, it is characterized in that described device comprises hydraulic lifting oil cylinder, Convenient jack and PLC synchronous control system, described hydraulic lifting oil cylinder is connected with described PLC synchronous control system respectively with described Convenient jack, and wherein said hydraulic lifting oil cylinder pushing end has the ball head structure of variable-angle.
2. a kind of device for bridge equal proportion supertronic integral jacking according to claim 1, it is characterized in that described ball head structure comprises bulb and takes over a business, described bulb is hemispherical, described bulb upper surface with described in take over a business to be connected and fixed, the push rod top of described hydraulic lifting oil cylinder has the groove matching with the land portions shape of described bulb, described bulb and described push rod are connected and fixed by bolt, described bolt be positioned at the bolt hole matched in clearance on described bulb.
3. a kind of device for bridge equal proportion supertronic integral jacking according to claim 2, takes over a business to be fixed on described bulb described in it is characterized in that, its upper surface is horizontal plane.
4. a kind of device for bridge equal proportion supertronic integral jacking according to claim 2, the gap length that it is characterized in that described matched in clearance is not more than 5 ° and is as the criterion to realize the corner of described bulb.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420354812.1U CN203977296U (en) | 2014-06-30 | 2014-06-30 | A kind of device for bridge equal proportion supertronic integral jacking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420354812.1U CN203977296U (en) | 2014-06-30 | 2014-06-30 | A kind of device for bridge equal proportion supertronic integral jacking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203977296U true CN203977296U (en) | 2014-12-03 |
Family
ID=51974754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420354812.1U Active CN203977296U (en) | 2014-06-30 | 2014-06-30 | A kind of device for bridge equal proportion supertronic integral jacking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203977296U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908637A (en) * | 2016-06-17 | 2016-08-31 | 贵州路桥集团有限公司 | Walking pushing system |
CN105951603A (en) * | 2016-06-17 | 2016-09-21 | 柳州黔桥工程材料有限公司 | Pushing and lifting device of walking type pushing system |
CN106012853A (en) * | 2016-06-17 | 2016-10-12 | 柳州黔桥工程材料有限公司 | Walking type jacking and pushing construction method |
CN106087773A (en) * | 2016-06-17 | 2016-11-09 | 贵州路桥集团有限公司 | The assembling unit excessively of stride pushing tow system |
CN108342988A (en) * | 2018-02-09 | 2018-07-31 | 重庆三峡学院 | A kind of frictional slip energy-consumption shock-absorption device of multispan simply supported beam |
CN110205934A (en) * | 2019-04-30 | 2019-09-06 | 中铁八局集团第二工程有限公司 | One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam |
CN113830698A (en) * | 2021-09-02 | 2021-12-24 | 安徽省路桥工程集团有限责任公司 | Highway bridge slope-regulating jacking device and using method thereof |
CN114232518A (en) * | 2021-12-28 | 2022-03-25 | 中国建筑土木建设有限公司 | Method for large-altitude-difference reverse slope adjustment of urban bridge |
-
2014
- 2014-06-30 CN CN201420354812.1U patent/CN203977296U/en active Active
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908637A (en) * | 2016-06-17 | 2016-08-31 | 贵州路桥集团有限公司 | Walking pushing system |
CN105951603A (en) * | 2016-06-17 | 2016-09-21 | 柳州黔桥工程材料有限公司 | Pushing and lifting device of walking type pushing system |
CN106012853A (en) * | 2016-06-17 | 2016-10-12 | 柳州黔桥工程材料有限公司 | Walking type jacking and pushing construction method |
CN106087773A (en) * | 2016-06-17 | 2016-11-09 | 贵州路桥集团有限公司 | The assembling unit excessively of stride pushing tow system |
CN108342988A (en) * | 2018-02-09 | 2018-07-31 | 重庆三峡学院 | A kind of frictional slip energy-consumption shock-absorption device of multispan simply supported beam |
CN108342988B (en) * | 2018-02-09 | 2019-07-19 | 重庆三峡学院 | A kind of frictional slip energy-consumption shock-absorption device of multispan simply supported beam |
CN110205934A (en) * | 2019-04-30 | 2019-09-06 | 中铁八局集团第二工程有限公司 | One kind is set a roof beam in place system for the mobile assembled of precast segmental beam Support Method joggle beam |
CN113830698A (en) * | 2021-09-02 | 2021-12-24 | 安徽省路桥工程集团有限责任公司 | Highway bridge slope-regulating jacking device and using method thereof |
CN113830698B (en) * | 2021-09-02 | 2023-03-07 | 安徽省路桥工程集团有限责任公司 | Highway bridge slope-regulating jacking device and using method thereof |
CN114232518A (en) * | 2021-12-28 | 2022-03-25 | 中国建筑土木建设有限公司 | Method for large-altitude-difference reverse slope adjustment of urban bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203977296U (en) | A kind of device for bridge equal proportion supertronic integral jacking | |
CN107841957A (en) | A kind of large-tonnage steel box beam thrustor, pushing tow system and pushing method | |
CN104060835B (en) | Lifting-sliding construction method for single plane truss | |
CN205346674U (en) | Over -and -under type stand cantilever crane | |
CN107031790A (en) | Three-dimensional adjustment instrument closes up large-scale total group of segment process method | |
CN103967284B (en) | The steel column installation method of reserved stigma docking | |
CN201757714U (en) | Ground anchor type static load testing device | |
CN209669706U (en) | A kind of bridge construction three-dimensional synchronous push equipment | |
CN202755456U (en) | Building jacking system | |
CN105155418A (en) | Construction method for bridge horizontal movement | |
CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
CN102635070B (en) | Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge | |
CN202954289U (en) | Pier bottom arrangement structure for pushing continuous rigid framework bridge for springing after midspan closure | |
CN103362080B (en) | Sound barrier bolton equipment | |
CN102877412A (en) | Method of pre-assembly in integral erecting way of steel tower | |
CN203065095U (en) | Slag pot lifting device | |
CN104060838B (en) | A kind of vestibule divides into groups aerial group to Method for Installation | |
CN103215895A (en) | Novel uplink curve moving framework | |
CN203834448U (en) | Novel six-leg platform jacket | |
CN104480959A (en) | General tower crane supporting base | |
CN204690595U (en) | A kind of multi-point self-balancing hydraulic pressure slide carriage device for large-scale component slippage | |
CN203188123U (en) | Hydraulic jack device for lowering whole bridge anticollision steel cofferdam synchronously | |
CN203463039U (en) | Hydraulic elevator turning driver | |
CN203938396U (en) | A kind of engineering hanging device | |
CN203101030U (en) | Multi-hydraulic cylinder combined large-sized hydraulic testing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |