CN104389415B - scaffold - Google Patents
scaffold Download PDFInfo
- Publication number
- CN104389415B CN104389415B CN201410689452.5A CN201410689452A CN104389415B CN 104389415 B CN104389415 B CN 104389415B CN 201410689452 A CN201410689452 A CN 201410689452A CN 104389415 B CN104389415 B CN 104389415B
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- frame
- steel
- scaffold
- step plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了脚手架,用于建筑施工技术领域,包括外立杆、内立杆和踏步板装置,连接方管两端加工有圆弧部,外立杆和内立杆之间通过连接方管的圆弧部连接后焊接成支撑架;支撑架的外立杆或者内立杆内设置有对接管;支撑架在垂直方向通过对接管连接,支撑架在水平方向通过踏步板装置连接;踏步板装置包括踏步板边框、直角钢和钢板,踏步板边框两端分别设置有卡件一和卡件二;踏步板边框通过卡件一和卡件二和直角钢连接;两个踏步板边框内设置有钢板。本发明结构简单,安全性高、稳固性高,通过卡件和对接加固件的设置,使脚手架安装、拆卸操作方便,而且整体结构可降低脚手架30%‑40%的材料成本和节约45%‑60%的劳动力,大大降低了成本和提高了效率。
The invention discloses a scaffold, which is used in the technical field of building construction, and comprises an outer pole, an inner pole and a step board device, two ends of a connecting square pipe are processed with arc parts, and the outer pole and the inner pole are connected by connecting the square pipe The arc parts of the arcs are connected and welded into a support frame; the outer pole or inner pole of the support frame is provided with a butt joint; the support frame is connected by a butt joint in the vertical direction, and the support frame is connected by a step plate device in the horizontal direction; the step plate The device includes a tread plate frame, right-angle steel and steel plates, and the two ends of the tread plate frame are respectively provided with a clamp one and a clamp two; the tread plate frame is connected with the right-angle steel through the clamp one and clamp two; There are steel plates. The invention has the advantages of simple structure, high safety and high stability. Through the setting of clips and butt joint reinforcements, the installation and disassembly of the scaffold are convenient, and the overall structure can reduce the material cost of the scaffold by 30%-40% and save 45%- 60% of the labor force, greatly reducing costs and improving efficiency.
Description
技术领域 technical field
本发明涉及建筑施工技术领域,尤其涉及脚手架。 The invention relates to the technical field of building construction, in particular to scaffolding.
背景技术 Background technique
脚手架是指施工现场为工人操作提供安全防护并解决垂直和水平运输而搭设的各种脚手架。建筑界的通用术语,指建筑工地上用在外墙、内部装修或层高较高无法直接施工的地方。主要为了施工人员上下干活安全或外围安全网围护及高空安装构件等,说白了就是搭设架子,脚手架制作材料通常有:竹、木、钢管或合成材料等。有些工程也用脚手架当模板支撑使用,此外在广告业、市政、交通路桥、矿山等部门也广泛被使用。 Scaffolding refers to all kinds of scaffolding set up on the construction site to provide safety protection for workers and solve vertical and horizontal transportation. The generic term on building circle, refers to building site be used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height. It is mainly for the safety of construction workers working up and down or the surrounding safety net enclosure and high-altitude installation components. Some projects also use scaffolding as formwork support, and it is also widely used in advertising, municipal administration, traffic roads and bridges, mines and other departments.
目前,普通脚手架上设置有很多不同规格的扣件,比如十字扣件、转向扣件和直接扣件,由于扣件种类多,就会造成扣件的丢失、损坏和安装不便;而且踏步板一般采用毛竹安全笆,具有容易损坏、周转性差、不能多次重复使用、安全性差的缺陷;塑料安全网易损坏、易粉化、不能多次重复使用,还有的是普通脚手架采用的剪刀撑存在临边拆装的安全风险,从而整体上造成普通的脚手架在安装、拆卸的过程中,劳动强度大,效率低,需要的人工大,扣件、安全网、竹笆易损耗、损坏,材料成本也高。 At present, there are many fasteners of different specifications on ordinary scaffolding, such as cross fasteners, steering fasteners and direct fasteners. Due to the variety of fasteners, fasteners will be lost, damaged and inconvenient to install; The use of moso bamboo safety fence has the defects of easy damage, poor turnover, inability to be reused many times, and poor safety; the plastic safety net is easy to be damaged, easy to pulverize, and cannot be reused for many times, and the scissors used in ordinary scaffolding are dismantled at the edge As a result, the installation and disassembly of ordinary scaffolding is labor-intensive, low-efficiency, and requires a lot of labor. Fasteners, safety nets, and bamboo fences are easy to wear and tear, and the cost of materials is also high.
发明内容 Contents of the invention
本发明目的是提供一种脚手架,具有零部件少、不易损坏和丢失,结构简单,安全性高、稳固性高,安装、拆卸操作方便、可重复使用,成本低和工作效率高的特点。 The purpose of the present invention is to provide a scaffold, which has the characteristics of few parts, not easy to be damaged and lost, simple structure, high safety, high stability, convenient installation and disassembly, reusable, low cost and high work efficiency.
本发明的方案如下:脚手架,包括外立杆、内立杆、连接方管和踏步板装置,所述连接方管两端加工有圆弧部,外立杆和内立杆之间通过连接方管的圆弧部连接后焊接成支撑架;所述支撑架的外立杆或者内立杆内设置有对接管;支撑架之间在垂直方向通过对接管连接,内立杆上的对接管连接后在内立杆外设置对接加固件进行固定,所述对接加固件为两个半圆固定扣通过螺栓连接而成,支撑架之间在水平方向通过踏步板装置连接;所述踏步板装置包括踏步板边框、直角钢和钢板,踏步板边框一端设置有卡件一,另一端设置有卡件二;踏步板边框通过卡件一、卡件二与直角钢连接;两个踏步板边框内设置有钢板。 The scheme of the present invention is as follows: Scaffolding includes an outer pole, an inner pole, a connecting square tube and a step plate device, the two ends of the connecting square tube are processed with arc parts, and the outer pole and the inner pole are connected through a connecting square. The arc parts of the tubes are connected and welded into a support frame; the outer pole or the inner pole of the support frame is provided with a butt joint tube; the support frames are connected in the vertical direction through the butt joint tube, and the butt joint tube on the inner pole is connected Afterwards, a butt joint reinforcing piece is set outside the inner vertical rod for fixing, and the said butt joint reinforcement is formed by connecting two semicircular fixing buckles through bolts, and the support frames are connected in the horizontal direction by a step plate device; the step plate device includes a step Plate frame, right-angle steel and steel plate, one end of the tread plate frame is provided with clamp one, and the other end is provided with clamp two; the tread plate frame is connected with the right-angle steel through clamp one and clamp two; steel plate.
所述支撑架外侧上设置有水平方向的扶手和45度倾斜设置的斜撑。 The outer side of the support frame is provided with horizontal handrails and 45-degree oblique bracing.
所述支撑架外侧设置有安全网框,安全网框内设置有钢丝网。 A safety net frame is arranged on the outside of the support frame, and a steel wire mesh is arranged inside the safety net frame.
所述外立杆和内立杆下面设置丝杆高度调节器,所述丝杆高度调节器包括底座、丝杆和丝帽;底座和丝杆固定,丝杆穿过丝帽后分别连接在外立杆和内立杆下面,用于调节水平度。 A screw height adjuster is arranged below the outer pole and the inner pole, and the screw height adjuster includes a base, a screw and a screw cap; the base and the screw are fixed, and the screw passes through the screw cap and is connected to the outer stand Below the pole and inner pole for leveling.
所述直角钢两端设置有钢板卡件,直角钢上还设置有槽钢卡件;所述钢板之间设置有添心钢。 The two ends of the right-angle steel are provided with steel plate clips, and the right-angle steel is also provided with channel steel clips; the steel plates are provided with heart-filling steel.
所述外立杆内侧设置有角钢边框,角钢边框一面两端设置有切槽,其中一个切槽旁边设置有防干涉槽。 The inner side of the outer pole is provided with an angle steel frame, and both ends of one side of the angle steel frame are provided with cutting grooves, and an anti-interference groove is arranged beside one of the cutting grooves.
所述支撑架上的对接加固件一高一低间隔一根立杆设置。 The butt joint reinforcements on the support frame are set at intervals of a vertical pole, one high and one low.
所述连接方管下面设置有三角形支撑块,连接方管和内立杆内侧连接,内立杆外侧焊接有半圆扁铁包箍。 A triangular support block is arranged below the connecting square pipe, the connecting square pipe is connected to the inner side of the inner vertical rod, and a semicircular flat iron hoop is welded on the outer side of the inner vertical rod.
本发明有益效果: Beneficial effects of the present invention:
(1)本脚手架结构简单,通过工厂批量加工焊接、卡件和连接加固件进行连接、固定,比市面上常规脚手架使用不同规格的十字扣件、转向扣件和直接扣件具有不易损坏、不易丢失、可重复多次保养和便于运输更换,可多次使用,可节约大量的材料成本和维护保养运输费用; (1) The structure of this scaffold is simple, and it is connected and fixed by welding, clips and connecting reinforcements in batches in the factory. Lost, repeated maintenance and easy transportation and replacement, can be used many times, can save a lot of material costs and maintenance and transportation costs;
(2)脚手架采用安全网框内设置有钢丝网的安全网,可杜绝使用常规塑料安全网、毛竹安全笆,具有使用寿命高,可周转性强,具有防火的特点,保证安全性; (2) The scaffold adopts a safety net with a steel wire mesh in the safety net frame, which can eliminate the use of conventional plastic safety nets and moso bamboo safety fences. It has a long service life, strong turnover, and has the characteristics of fire prevention to ensure safety;
(3)脚手架结构简单,采用踏步板装置,使施工人员在钢板上如履平地,平稳、安全,从而提高施工质量和加快施工进度; (3) The structure of the scaffold is simple, and the step plate device is adopted, so that the construction personnel can walk on the steel plate as if walking on the ground, stable and safe, thereby improving the construction quality and speeding up the construction progress;
(4)钢丝网、扶手、斜撑和整体的设置结构拆卸、安装方便,可以避免普通的脚手架设计的剪刀撑临边装拆的安全风险; (4) The steel wire mesh, handrails, diagonal braces and the overall setting structure are easy to disassemble and install, which can avoid the safety risk of the scissors braces designed for ordinary scaffolding when they are installed and disassembled;
(5)免用了常规安全网、竹笆片,从而具备了一定的防火性能。 (5) The use of conventional safety nets and bamboo fences is avoided, so that it has a certain fireproof performance.
附图说明 Description of drawings
图1为本发明脚手架俯视图; Fig. 1 is the plan view of scaffold of the present invention;
图2为脚手架主视图; Fig. 2 is the front view of the scaffold;
图3为内外立杆对接示意图; Figure 3 is a schematic diagram of the butt joint of the inner and outer poles;
图4为连接方管和内外立杆连接结构示意图; Fig. 4 is a schematic diagram of the connection structure between the square pipe and the inner and outer poles;
图5为连接方管结构示意图; Fig. 5 is the structural schematic diagram of connecting square pipe;
图6为扁铁包箍结构示意图; Fig. 6 is the structural representation of flat iron hoop;
图7为设置在内立杆内的对接管结构示意图; Fig. 7 is a schematic diagram of the structure of the butt joint arranged in the inner pole;
图8为外立杆上的对接加固件结构示意图; Fig. 8 is a structural schematic diagram of the butt joint reinforcement on the outer pole;
图9为踏步板装置结构示意图; Fig. 9 is a schematic structural view of the tread plate device;
图10为踏步板边框结构示意图; Fig. 10 is a schematic diagram of the frame structure of the tread plate;
图11为钢丝网结构示意图; Fig. 11 is a schematic diagram of steel wire mesh structure;
图12为角钢边框结构示意图; Fig. 12 is a schematic diagram of the angle steel frame structure;
图13为角钢边框安装结构示意图; Figure 13 is a schematic diagram of the installation structure of the angle steel frame;
图14为钢丝网优化结构示意图; Fig. 14 is a schematic diagram of steel wire mesh optimization structure;
其中:1、外立杆; 2、内立杆; 3、踏步板装置; 4、安全网框; 5、斜撑; 6、扶手;7、对接加固件;8、底座;9、丝杆;10、丝帽;11、扁铁包箍;12、连接方管;13、三角形支撑块;14、螺丝孔;15、踏步板边框;16、钢板卡件;17、槽钢卡件;18、直角钢;19、钢板;20、添心钢;21、卡件一;22、卡件二;23、角钢边框;24、切槽;25、钢丝网;26、对接管;27、加强板;28、防干涉槽;29、墙体;701、半圆固定扣;702、固定扣锁紧板。 Among them: 1. Outer pole; 2. Inner pole; 3. Step plate device; 4. Safety net frame; 5. Diagonal brace; 6. Handrail; 7. Butt joint reinforcement; 8. Base; 10. Wire cap; 11. Flat iron hoop; 12. Connecting square pipe; 13. Triangular support block; 14. Screw hole; 15. Step board frame; 16. Steel plate clamp; 17. Channel steel clamp; 18. Right-angle steel; 19. Steel plate; 20. Timing steel; 21. Clamp one; 22. Clamp two; 23. Angle steel frame; 24. Grooving; 25. Steel wire mesh; 28, anti-interference groove; 29, body of wall; 701, semicircular fixed buckle; 702, fixed buckle locking plate.
具体实施方式 detailed description
下面结合实施例对本发明做进一步说明。 The present invention will be further described below in conjunction with embodiment.
如图1、图2、图3和图9所示,脚手架,包括外立杆1、内立杆2、连接方管12和踏步板装置3,所述连接方管12两端加工有圆弧部,外立杆1和内立杆2之间通过连接方管12的圆弧部连接后焊接成支撑架,圆弧部连接更方便、稳固,焊接时更轻松,强度更高;所述支撑架的外立杆1或者内立杆2内设置有对接管26,对接管26可以设置在支撑架的外立杆1和内立杆2的上端,这样和上面的支撑架的外立杆1和内立杆2套接,也可以设置在外立杆1和内立杆2的下端,这样和下面的支撑架的外立杆1和内立杆2套接;支撑架之间在垂直方向通过对接管26连接,螺丝穿过内立杆2和对接管26上的螺丝孔14连接后在内立杆2外设置对接加固件7进行固定,所述对接加固件7为两个半圆固定扣701通过螺栓连接而成,支撑架之间在水平方向通过踏步板装置3连接;所述踏步板装置3包括踏步板边框15、直角钢18和钢板19,踏步板边框15一端设置有卡件一21,另一端设置有卡件二22;卡件一21和卡件二22开口端与踏步板边框15下表面平齐;踏步板边框15通过卡件一21、卡件二22与直角钢18连接;两个踏步板边框15内设置有钢板19。 As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 9, the scaffolding includes an outer pole 1, an inner pole 2, a connecting square pipe 12 and a step plate device 3, and the two ends of the connecting square pipe 12 are processed with arcs part, the outer pole 1 and the inner pole 2 are welded into a support frame after connecting the arc portion of the square tube 12, the arc portion is connected more conveniently and stably, and the welding is easier and the strength is higher; the support The outer pole 1 or the inner pole 2 of the frame is provided with a butt joint 26, and the butt joint 26 can be arranged on the upper end of the outer pole 1 and the inner pole 2 of the support frame, so as to be compatible with the outer pole 1 of the above support frame. It is socketed with the inner pole 2, and can also be arranged at the lower end of the outer pole 1 and the inner pole 2, so that it is socketed with the outer pole 1 and the inner pole 2 of the lower support frame; the support frames pass through in the vertical direction The butt joint 26 is connected, the screw passes through the inner vertical rod 2 and the screw hole 14 on the butt joint 26 to connect, and then the butt joint reinforcement 7 is set outside the inner vertical rod 2 for fixing. The butt joint reinforcement 7 is two semicircular fixing buckles 701 It is formed by bolt connection, and the support frames are connected in the horizontal direction through the tread plate device 3; the tread plate device 3 includes a tread plate frame 15, a right-angle steel 18 and a steel plate 19, and one end of the tread plate frame 15 is provided with a clip 21 , the other end is provided with two clips 22; the open ends of clip one 21 and clip two 22 are flush with the lower surface of the tread plate frame 15; ; There are steel plates 19 inside the frame 15 of the two treads.
进一步的,如图3所示,可以在支撑架的两个连接方管12之间设置有可活动连接方管12,连接方管12通过对接加固件7与内立杆2和外立杆1连接,该对接加固件7是由半圆固定扣701和固定扣锁紧板702通过螺栓固定,可以根据墙体29施工不同高度,来调节螺栓控制连接方管12的高度,从而控制踏步板装置3的高度。 Further, as shown in FIG. 3 , a movable connection square pipe 12 can be arranged between the two connection square pipes 12 of the support frame, and the connection square pipe 12 is connected to the inner vertical rod 2 and the outer vertical rod 1 through the butt joint reinforcement member 7 connection, the butt reinforcement 7 is fixed by a semicircular fixed buckle 701 and a fixed buckle locking plate 702 through bolts, and the bolts can be adjusted to control the height of the connected square pipe 12 according to the different heights of the wall 29, thereby controlling the tread plate device 3 the height of.
进一步的,如图1、图11和图14所示,所述支撑架上设置有水平方向的扶手6和倾斜设置的斜撑5,施工人员容易上脚手架,而且可以避免普通的脚手架设计的剪刀撑临边装拆的安全风险;另外可以在带有斜撑5的支撑架另外两个角设置两个加强板27;也可以不用斜撑5,换成在支撑架四个角设置四个加强板27。每个支撑架内的最上方和最下方的扶手6设置成中间部分的扶手6的一半宽度,从而两个支撑架连接后,整体扶手6从外观上看起来是大小相同,比较美观。 Further, as shown in Fig. 1, Fig. 11 and Fig. 14, the support frame is provided with horizontal handrails 6 and obliquely arranged diagonal braces 5, so that the construction personnel can easily get on the scaffold, and can avoid the scissors of the common scaffold design. The safety risk of mounting and dismounting near the side of the brace; in addition, two reinforcement plates 27 can be provided at the other two corners of the support frame with the diagonal brace 5; Plate 27. The uppermost and lowermost handrails 6 in each support frame are set to half the width of the middle part of the handrail 6, so that after the two support frames are connected, the overall handrail 6 looks the same in size and is more beautiful.
进一步的,如图1和图11所示,所述支撑架外侧设置有安全网框4,安全网框4内设置有钢丝网25,可以有效防止施工人员的安全,同时防止高空坠物造成的风险。 Further, as shown in Figure 1 and Figure 11, a safety net frame 4 is arranged on the outside of the support frame, and a steel wire mesh 25 is arranged inside the safety net frame 4, which can effectively prevent the safety of construction personnel and prevent accidents caused by falling objects. risk.
进一步的,如图3所示,所述外立杆1和内立杆2下面设置丝杆高度调节器,所述丝杆高度调节器包括底座8、丝杆9和丝帽10;底座8和丝杆9固定,丝杆9穿过丝帽10后分别连接在外立杆1和内立杆2下面,可以调节丝帽10来调节丝杆9,控制外立杆1和内立杆2的高度,解决地面不平的情况,一般丝杆高度调节器的高度设置为350mm,底座8设置成8mm厚,丝杆9的直径设置为40mm。 Further, as shown in Figure 3, a screw height adjuster is provided below the outer pole 1 and the inner pole 2, and the screw height adjuster includes a base 8, a screw 9 and a screw cap 10; the base 8 and the The screw 9 is fixed, and the screw 9 passes through the screw cap 10 and is respectively connected under the outer pole 1 and the inner pole 2. The screw cap 10 can be adjusted to adjust the screw 9 to control the height of the outer pole 1 and the inner pole 2 , To solve the situation of uneven ground, generally the height of the screw height adjuster is set to 350mm, the base 8 is set to 8mm thick, and the diameter of the screw mandrel 9 is set to 40mm.
进一步的,如图9所示,所述直角钢18两端设置有钢板卡件16,所述钢板卡件16超出直角钢18外侧30mm,直角钢18上还设置有槽钢卡件17;所述钢板19之间设置有添心钢20,使踏步板装置3平整,如同室内一般,槽钢卡件17错开设置,并和添心钢20对齐,可以使踏步板装置3对接稳固,而且不会干涉,直角钢18可设置成780mm长,宽度52mm,踏步板装置3长度1445mm,适宜现行脚手架的长度比例,周转、通用性强。 Further, as shown in Figure 9, the two ends of the right-angle steel 18 are provided with steel plate clamps 16, the steel plate clamps 16 exceed the outside of the right-angle steel 18 by 30mm, and the right-angle steel 18 is also provided with a channel steel clamp 17; Heart-filling steel 20 is arranged between the steel plates 19, so that the tread plate device 3 is flat, as in the room, the channel steel clips 17 are staggered and arranged, and aligned with the heart-filling steel 20, so that the tread plate device 3 can be docked firmly without Will interfere, the right-angle steel 18 can be set to 780mm long, 52mm wide, step plate device 3 length 1445mm, suitable for the length ratio of the existing scaffolding, turnover, strong versatility.
进一步的,如图11、图12和图13所示,所述外立杆1内侧设置有角钢边框23,角钢边框23一面两端设置有切槽24,其中一个切槽24旁边设置有防干涉槽28,角钢边框23放置于外立杆和连接方管处三角支撑块位置,连接方便,不会产生干涉。 Further, as shown in Fig. 11, Fig. 12 and Fig. 13, an angle steel frame 23 is arranged on the inner side of the outer pole 1, and both ends of one side of the angle steel frame 23 are provided with cutouts 24, and one side of the cutout 24 is provided with an anti-interference The groove 28 and the angle steel frame 23 are placed on the triangular support block at the outer pole and the connecting square pipe, which is convenient for connection and will not interfere.
进一步的,如图1所示,所述支撑架上的对接加固件7一高一低间隔一根立杆设置,在脚手架规范立杆对接不能在同一水平线上,必须要错位对接。 Further, as shown in FIG. 1 , the butt joint reinforcements 7 on the support frame are set at intervals of one vertical pole at a height and one low height, and the vertical pole joints cannot be on the same horizontal line in scaffolding specifications, and must be misplaced butt joints.
进一步的,如图3和图4所示,所述连接方管12下面设置有三角形支撑块13,连接方管12和内立杆2内侧连接,内立杆2外侧焊接有半圆扁铁包箍11,三角形支撑块13可以使支撑架更稳定,支撑性更好,而半圆扁铁包箍11使支撑架之间连接的更稳定。 Further, as shown in Fig. 3 and Fig. 4, a triangular support block 13 is arranged under the connecting square pipe 12, the connecting square pipe 12 is connected to the inner side of the inner vertical rod 2, and the outer side of the inner vertical rod 2 is welded with a semicircular flat iron hoop 11. The triangular support block 13 can make the support frame more stable and support better, and the semicircular flat iron hoop 11 makes the connection between the support frames more stable.
本脚手架整体设计简单、合理,结构件相对常规脚手架更少,对接加固件7和对接管26的设置使该脚手架更稳定,周转、通用性更好,踏步板装置3使施工人员行走在上面更平稳、搭建、拆卸更容易,通过对比实验进行数据分析,可降低脚手架30%-40%的材料成本和节约45%-60%的劳动力,大大降低了成本和提高了效率,解决了施工搭设成本高、拆卸不便,周转、通用性差的问题,而且解决了拆卸人员紧缺和人力成本增高的问题。 The overall design of the scaffold is simple and reasonable, and there are fewer structural parts than conventional scaffolds. The setting of the butt joint reinforcement 7 and the butt joint 26 makes the scaffold more stable, with better turnover and versatility. The step board device 3 makes it easier for construction workers to walk on it. It is stable, easier to build and disassemble, and data analysis through comparative experiments can reduce the material cost of scaffolding by 30%-40% and save labor by 45%-60%, which greatly reduces costs and improves efficiency, and solves the cost of construction and erection High, inconvenient disassembly, poor turnover, and poor versatility, and solve the problems of shortage of dismantling personnel and increased labor costs.
尽管上文对本发明的具体实施方式给予了详细描述和说明,但是应该指明的是,我们可以依据本发明的构想对上述实施方式进行各种等效改变和修改,其所产生的功能作用仍未超出说明书所涵盖的精神时,均应在本发明的保护范围内。 Although the specific embodiments of the present invention have been described and illustrated in detail above, it should be pointed out that we can make various equivalent changes and modifications to the above-mentioned embodiments according to the concept of the present invention, and the functional effects produced by it are still the same. Anything beyond the spirit covered by the specification shall be within the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410689452.5A CN104389415B (en) | 2014-11-26 | 2014-11-26 | scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410689452.5A CN104389415B (en) | 2014-11-26 | 2014-11-26 | scaffold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104389415A CN104389415A (en) | 2015-03-04 |
| CN104389415B true CN104389415B (en) | 2016-08-24 |
Family
ID=52607367
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410689452.5A Expired - Fee Related CN104389415B (en) | 2014-11-26 | 2014-11-26 | scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104389415B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107013050B (en) * | 2017-04-21 | 2020-05-01 | 五冶集团上海有限公司 | Stepping system |
| CN107035129B (en) * | 2017-04-21 | 2020-05-05 | 五冶集团上海有限公司 | Adjustable stepping system |
| CN107035128B (en) * | 2017-04-21 | 2020-05-05 | 五冶集团上海有限公司 | Stepping device |
Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS56112236U (en) * | 1980-01-31 | 1981-08-29 | ||
| WO1983003868A1 (en) * | 1982-04-22 | 1983-11-10 | Bo Allan Hjelm | Scaffolding system |
| JPS6327641U (en) * | 1986-08-07 | 1988-02-23 | ||
| CN2166178Y (en) * | 1993-08-03 | 1994-05-25 | 张鸿勋 | Scaffold pedal frame and its dust-proof life-saving net combination device |
| JP2001159236A (en) * | 1999-12-03 | 2001-06-12 | Sumitomo Forestry Co Ltd | Bracket scaffolding treads |
| CN2551716Y (en) * | 2002-06-25 | 2003-05-21 | 陈建丰 | Scaffold |
| CN2911085Y (en) * | 2006-06-16 | 2007-06-13 | 刘文博 | Support for structuring hight-weight composite wall |
| CN202047576U (en) * | 2011-03-21 | 2011-11-23 | 江西理工大学 | Novel scaffold |
| CN202441042U (en) * | 2012-02-09 | 2012-09-19 | 江苏金厦建设集团有限公司 | Novel steel pipe scaffold |
| CN203514749U (en) * | 2013-10-17 | 2014-04-02 | 刘建平 | High-intensity scaffold |
| CN203531344U (en) * | 2013-10-18 | 2014-04-09 | 浙江固华脚手架工程有限公司 | Tool type scaffold |
| CN203783098U (en) * | 2014-04-21 | 2014-08-20 | 北京市政建设集团有限责任公司 | Operating platform supporting tower |
| CN204252504U (en) * | 2014-11-26 | 2015-04-08 | 樊守立 | Scaffold |
-
2014
- 2014-11-26 CN CN201410689452.5A patent/CN104389415B/en not_active Expired - Fee Related
Patent Citations (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS56112236U (en) * | 1980-01-31 | 1981-08-29 | ||
| WO1983003868A1 (en) * | 1982-04-22 | 1983-11-10 | Bo Allan Hjelm | Scaffolding system |
| JPS6327641U (en) * | 1986-08-07 | 1988-02-23 | ||
| CN2166178Y (en) * | 1993-08-03 | 1994-05-25 | 张鸿勋 | Scaffold pedal frame and its dust-proof life-saving net combination device |
| JP2001159236A (en) * | 1999-12-03 | 2001-06-12 | Sumitomo Forestry Co Ltd | Bracket scaffolding treads |
| CN2551716Y (en) * | 2002-06-25 | 2003-05-21 | 陈建丰 | Scaffold |
| CN2911085Y (en) * | 2006-06-16 | 2007-06-13 | 刘文博 | Support for structuring hight-weight composite wall |
| CN202047576U (en) * | 2011-03-21 | 2011-11-23 | 江西理工大学 | Novel scaffold |
| CN202441042U (en) * | 2012-02-09 | 2012-09-19 | 江苏金厦建设集团有限公司 | Novel steel pipe scaffold |
| CN203514749U (en) * | 2013-10-17 | 2014-04-02 | 刘建平 | High-intensity scaffold |
| CN203531344U (en) * | 2013-10-18 | 2014-04-09 | 浙江固华脚手架工程有限公司 | Tool type scaffold |
| CN203783098U (en) * | 2014-04-21 | 2014-08-20 | 北京市政建设集团有限责任公司 | Operating platform supporting tower |
| CN204252504U (en) * | 2014-11-26 | 2015-04-08 | 樊守立 | Scaffold |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104389415A (en) | 2015-03-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102661019A (en) | Heat preservation and decoration integrated construction method for outer wall of building | |
| CN211622528U (en) | Basket type outer vertical surface scaffold inclined-pulling type I-steel cantilever beam | |
| CN104389415B (en) | scaffold | |
| CN108560895A (en) | A kind of adjustable type elevator shaft operating platform and its erection method | |
| CN110616735A (en) | Template system for retaining wall and construction method of retaining wall | |
| CN206859719U (en) | A kind of efficient assembled safety barrier for edge protection | |
| CN103774838B (en) | A kind of construction of lift well assembling safe operation platform and using method | |
| CN204753397U (en) | Temporary mounting hanger for steel box bridge | |
| CN204492133U (en) | A kind of easy insulated column construction tool frame | |
| CN202157581U (en) | Foundation-pit limb shaping protection device | |
| CN205742956U (en) | A kind of safe Hanging Basket for work high above the ground | |
| CN104675094A (en) | Detachable type movable scaffold platform | |
| CN112854719A (en) | Cantilever operating platform | |
| CN204552039U (en) | A kind of dismountable moving scaffolding platform | |
| CN218843816U (en) | Regularization stair face frontier defense guardrail | |
| CN207295477U (en) | A kind of bridge lower part construction safety protection column | |
| CN206591747U (en) | A kind of standard knot formula building site banister that can be recycled | |
| CN214785753U (en) | Scaffold convenient to dismantle installation | |
| CN205000618U (en) | Novel scaffold | |
| CN204850515U (en) | Steel construction faces limit protector | |
| CN207314793U (en) | Operating platform between a kind of regularization precast stair | |
| CN201261947Y (en) | Prefabricated safety channel | |
| CN205444741U (en) | Guardrail bar is prevented to scalable formula of installing and removing of general type | |
| CN209228085U (en) | A kind of floor edge safety protection device | |
| CN209907886U (en) | An adjustable prefabricated stair construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 |