CN202047576U - Novel scaffold - Google Patents

Novel scaffold Download PDF

Info

Publication number
CN202047576U
CN202047576U CN 201120073407 CN201120073407U CN202047576U CN 202047576 U CN202047576 U CN 202047576U CN 201120073407 CN201120073407 CN 201120073407 CN 201120073407 U CN201120073407 U CN 201120073407U CN 202047576 U CN202047576 U CN 202047576U
Authority
CN
China
Prior art keywords
scaffold
construction
connecting links
base
montant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120073407
Other languages
Chinese (zh)
Inventor
刘洪兴
胡伟
中国生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Science and Technology
Original Assignee
Jiangxi University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Science and Technology filed Critical Jiangxi University of Science and Technology
Priority to CN 201120073407 priority Critical patent/CN202047576U/en
Application granted granted Critical
Publication of CN202047576U publication Critical patent/CN202047576U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model brings forward a novel scaffold which comprises horizontal rods, vertical rods and pedestals. The horizontal rods comprise rod bodies and connecting links. The connecting links are used for connecting the rod bodies of the horizontal rods and the vertical rods. The vertical rods are connected with the pedestals. The adoption of the connecting links enables the structure to be simplified. During the mounting for the on-site construction, the novel scaffold of the utility model enables the construction efficiency to be greatly improved and the construction progress to be accelerated, and also exhibits safe and reliable properties. Moreover, the connecting links are composed of two parts with the same shape, so that the connecting links can be mutually replaced for using, thereby improving the utilization rate and saving the cost.

Description

A kind of new type scaffold
Technical field
The utility model relates to a kind of architectural furniture, particularly relates to a kind of simple to operate, safe and reliable new type scaffold.
Background technology
Nowadays in building operations, be unable to do without the use of scaffold, particularly the scaffold form that adopts in the exterior wall operation is varied.As the raise scaffold that adopts steel pipe and link thereof to set up, this raise scaffold adopts and rigidly fixes connection, need the constructor with one by one independently steel pipe build at the construction field (site), building and removing all needs instrument, difficulty height, efficient are low, influence construction speed.And for example make stressed support system with the lumps of wood, make support system or scaffold with aluminium wire colligation mao bamboon or round log for another example, there are many shortcomings in these support systems or scaffold, the raw material amount is bigger, effect is low for expending of having, the installation labour intensity that has is big, effort is time-consuming, the complex structure that has, cost height, damage easily, the stressed effect that has is not good, operating procedure is wayward, brings certain hidden danger to construction safety.
In addition, what the scaffold that building operations is used used all is steel pipe, and the outer end of steel pipe all exposes, and lacks a kind of measure of protection, thereby it is injured to cause the constructor to be scratched by steel pipe easily, makes troubles to construction, brings injury to the constructor.
In addition, steel pipe scaffold adopts fixed base more, and its advantage is that the pressure that scaffold is born passes to foundation or braced structures preferably, the steadiness height, but there is very big shortcoming simultaneously in it, and after setting up at whole scaffold system, the scaffold base can't be adjusted.When the generation depression of scaffold foundation or braced structures need change, just whole scaffold need be removed and set up again, strengthened the workload of construction, prolonged the cycle of construction, also improved the cost of construction simultaneously.
The utility model content
The purpose of this utility model is, overcomes the defective that existing scaffold exists, and a kind of novel scaffold is provided, and makes it simple in structure, safe and reliable, and assembly and disassembly is convenient, and the needs of being convenient to construct improve the efficient of construction.
The purpose of this utility model is again, overcomes the defective that existing scaffold exists, and a kind of novel scaffold is provided, and makes its constructor that avoids scratching, and reduces unnecessary loss in the work progress, for the constructor provides protection.
The purpose of this utility model also is, overcome the defective that existing scaffold exists, and provide a kind of novel scaffold, make it pressure that scaffold bore well not only can be passed to foundation or braced structures, but also can be when foundation or braced structures change, certain base regulating power is provided, and guarantees the safety and firmness of scaffold system.
For achieving the above object, the utility model proposes a kind of new type scaffold, be made of cross bar, montant and base, described cross bar is made of shaft and junction button, and described junction button is used to connect the shaft and the montant of cross bar, and described montant is connected with base.
On the basis of such scheme, for achieving the above object, can also comprise the sheath of a cylinder barrel shape, constitute by elastomeric material, can be socketed in the end of montant.
On the basis of such scheme, for achieving the above object, described base can be made of pole and base plate, and pole places the middle part of base plate.Described pole is designed to screw rod, which is provided with the sleeve pipe that inwall with matching is a female thread structure, sleeve pipe is provided with the adjusting handle.
After adopting technique scheme, the technique effect that the utility model can be obtained is:
1, adopts the design of junction button, simplify the structure; When installing at the construction field (site), improve efficiency of construction significantly, accelerating construction progress, simultaneously can guarantee the safe and reliable of scaffold, and, because junction button is made up of two identical parts of shape, can the phase trans-substitution during concrete the use, improved utilization rate, saved cost.
2, adopted the design of sheath, the protection constructor avoids the injury from steel pipe, and this design simultaneously also can be reused sheath, and a need finishes afterwards to take down from the end of each steel pipe in construction and gets final product, and helps the saving of construction cost.
3, adopted the design of screw rod, can be according to the different demands of construction stage, scaffold is carried out to a certain degree adjusting, and scaffold integral body is not affected greatly, avoid the repetition dismounting of scaffold, reduce workload, help accelerating construction progress, save construction cost.
Description of drawings
Fig. 1 is a structure chart of the present utility model;
Fig. 2 is the structure chart of the base of the utility model employing;
Fig. 3 is the structure chart of junction button.
1, cross bar; 2, montant; 3, base; 4, shaft; 5, junction button; 6, sheath; 7, pole; 8, base plate; 9, sleeve pipe; 10, regulate handle.
The specific embodiment
As shown in Figure 1, be structure chart of the present utility model.In the figure, cross bar 1 is made of shaft 4 and junction button 5, and described junction button 5 is used to connect the shaft 4 and the montant 2 of cross bar 1, and described montant 2 is connected with base 3.On the top of montant 2, be socketed with the sheath 6 of a cylinder barrel shape, constitute by elastomeric material.Simplify the structure of traditional scaffold on the one hand, and guaranteed the steadiness of self.When installing at the construction field (site), improve efficiency of construction significantly, accelerating construction progress, simultaneously can guarantee the safe and reliable of scaffold, and, because junction button is made up of two identical parts of shape, can the phase trans-substitution during concrete the use, improved utilization rate, saved cost.In addition, the design of flexible sheath, the protection constructor avoids the injury from steel pipe, and this design simultaneously also can be reused sheath, and a need finishes afterwards to take down from the end of each steel pipe in construction and gets final product, and also helps the saving of construction cost.
As shown in Figure 2, be the design of the base in the utility model, described base 3 is made of pole 7 and base plate 8, and pole 7 places the middle part of base plate 8.Described pole 7 is a screw rod, and which is provided with inwall with matching is the sleeve pipe 9 of female thread structure, and sleeve pipe is provided with regulates handle 10.Thereby the utility model not only can pass to foundation or braced structures by pole and base plate with the pressure that scaffold bore, can also be when foundation or braced structures change, by the adjusting of regulating handle sleeve pipe is moved up and down on pole, guarantee that scaffold is fixed on the foundation all the time, guarantee the safety and firmness of scaffold system.Can be according to the different demands of construction stage, scaffold is carried out to a certain degree adjusting, and scaffold integral body is not affected greatly, avoid the repetition dismounting of scaffold, reduce workload, help accelerating construction progress, save construction cost.
As shown in Figure 3, be the schematic diagram of junction button of the present utility model, adopt two same parts to constitute, be convenient to install.

Claims (4)

1. new type scaffold, constitute by cross bar (1), montant (2) and base (3), it is characterized in that, described cross bar (1) is made of shaft (4) and junction button (5), described junction button (5) is used to connect the shaft (4) and the montant (2) of cross bar (1), and described montant (2) is connected with base (3).
2. new type scaffold as claimed in claim 1 is characterized in that, also comprises the sheath (6) of a cylinder barrel shape, is made of elastomeric material, can be socketed in the end of montant (2).
3. new type scaffold as claimed in claim 1 is characterized in that, described base (3) is made of pole (7) and base plate (8), and pole (7) places the middle part of base plate (8).
4. new type scaffold as claimed in claim 3 is characterized in that, described pole (7) is a screw rod, which is provided with the sleeve pipe that inwall with matching is a female thread structure (9), and sleeve pipe is provided with regulates handle (10).
CN 201120073407 2011-03-21 2011-03-21 Novel scaffold Expired - Fee Related CN202047576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120073407 CN202047576U (en) 2011-03-21 2011-03-21 Novel scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120073407 CN202047576U (en) 2011-03-21 2011-03-21 Novel scaffold

Publications (1)

Publication Number Publication Date
CN202047576U true CN202047576U (en) 2011-11-23

Family

ID=44987889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120073407 Expired - Fee Related CN202047576U (en) 2011-03-21 2011-03-21 Novel scaffold

Country Status (1)

Country Link
CN (1) CN202047576U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720372A (en) * 2012-06-04 2012-10-10 中联世纪建设集团有限公司 Novel top bracing type edge protecting rack
CN102777021A (en) * 2012-07-30 2012-11-14 林淑琴 Height-adjustable scaffold
CN103343611A (en) * 2013-07-30 2013-10-09 南通亨特管业有限公司 Movable scaffold with regulating devices
CN103496434A (en) * 2013-09-23 2014-01-08 浙江海洋学院 Scaffold base used for ship
CN103590593A (en) * 2013-11-18 2014-02-19 何国忠 Assembly type building supporting frame
CN104389415A (en) * 2014-11-26 2015-03-04 樊守立 Scaffold
CN105016241A (en) * 2015-07-09 2015-11-04 叶欣 Steady portable combined type lifting equipment and use method thereof
CN106013766A (en) * 2016-06-22 2016-10-12 苏交科集团股份有限公司 Bearing support joint structure and assembling method
CN106223204A (en) * 2016-08-29 2016-12-14 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
CN107447970A (en) * 2016-05-30 2017-12-08 长葛市唯美装饰行 Suitable for the scaffold of construction and decoration construction
CN109818284A (en) * 2019-03-15 2019-05-28 国网河南省电力公司检修公司 1000kV extra-high voltage transformer low-voltage lead dismounts platform

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720372B (en) * 2012-06-04 2015-09-23 中联世纪建设集团有限公司 Novel formula of shoring faces frontier defense retaining frame
CN102720372A (en) * 2012-06-04 2012-10-10 中联世纪建设集团有限公司 Novel top bracing type edge protecting rack
CN102777021A (en) * 2012-07-30 2012-11-14 林淑琴 Height-adjustable scaffold
CN103343611A (en) * 2013-07-30 2013-10-09 南通亨特管业有限公司 Movable scaffold with regulating devices
CN103496434A (en) * 2013-09-23 2014-01-08 浙江海洋学院 Scaffold base used for ship
CN103496434B (en) * 2013-09-23 2016-07-06 浙江海洋学院 A kind of scaffold base peculiar to vessel
CN103590593B (en) * 2013-11-18 2016-06-29 何国忠 A kind of assembled architecture bracing frame
CN103590593A (en) * 2013-11-18 2014-02-19 何国忠 Assembly type building supporting frame
CN104389415A (en) * 2014-11-26 2015-03-04 樊守立 Scaffold
CN104389415B (en) * 2014-11-26 2016-08-24 樊守立 Scaffold
CN105016241A (en) * 2015-07-09 2015-11-04 叶欣 Steady portable combined type lifting equipment and use method thereof
CN107447970A (en) * 2016-05-30 2017-12-08 长葛市唯美装饰行 Suitable for the scaffold of construction and decoration construction
CN106013766A (en) * 2016-06-22 2016-10-12 苏交科集团股份有限公司 Bearing support joint structure and assembling method
CN106013766B (en) * 2016-06-22 2019-03-15 苏交科集团股份有限公司 Bearing support joint structure and assembling method
CN106223204A (en) * 2016-08-29 2016-12-14 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
CN109818284A (en) * 2019-03-15 2019-05-28 国网河南省电力公司检修公司 1000kV extra-high voltage transformer low-voltage lead dismounts platform
CN109818284B (en) * 2019-03-15 2020-05-08 国网河南省电力公司检修公司 1000kV extra-high voltage transformer low-voltage lead dismounting platform

Similar Documents

Publication Publication Date Title
CN202047576U (en) Novel scaffold
CN204934670U (en) A kind of electric drill auxiliary stand
CN204492134U (en) Be convenient to the height scaffolding installed
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN202731285U (en) Descending plate mold supporting structure
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN201588381U (en) Adjustable support frame for suspended floor
CN208251318U (en) A kind of light steel house of assembly type
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN204899034U (en) Prefabricated wall post
CN203684664U (en) Cast-in-place beam die for doors and windows
CN203795859U (en) Large formwork supporting structure for bare concrete shear wall
CN203050095U (en) Recoverable descending plate forming die
CN202925883U (en) Large size wooden formwork surrounding purlin device
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN205591507U (en) Scaffold frame of easily dismantling
CN204781435U (en) Novel shear wall structure
CN203977862U (en) A kind of concrete cylindrical construction fastening devices
CN201420400Y (en) Supporting structure of towering reticulated shell structure
CN203175037U (en) Internal formwork bracket for building
CN203626212U (en) Pier stud construction operation platform quick to disassemble and assemble
CN205134519U (en) Shock -resistant prefabricated balcony of light
CN203398635U (en) Bracing frame for replacing vibration damper
CN203961279U (en) A kind of supporting head of early tearing open
CN217400353U (en) Building templates bearing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20120321