CN102720372B - Novel formula of shoring faces frontier defense retaining frame - Google Patents

Novel formula of shoring faces frontier defense retaining frame Download PDF

Info

Publication number
CN102720372B
CN102720372B CN201210179808.1A CN201210179808A CN102720372B CN 102720372 B CN102720372 B CN 102720372B CN 201210179808 A CN201210179808 A CN 201210179808A CN 102720372 B CN102720372 B CN 102720372B
Authority
CN
China
Prior art keywords
leading screw
support bar
shoring
otic placode
frontier defense
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210179808.1A
Other languages
Chinese (zh)
Other versions
CN102720372A (en
Inventor
刘锡林
顾浩斌
杨博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA UNION CENTURY BUILDING GROUP Co Ltd
Original Assignee
CHINA UNION CENTURY BUILDING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA UNION CENTURY BUILDING GROUP Co Ltd filed Critical CHINA UNION CENTURY BUILDING GROUP Co Ltd
Priority to CN201210179808.1A priority Critical patent/CN102720372B/en
Publication of CN102720372A publication Critical patent/CN102720372A/en
Application granted granted Critical
Publication of CN102720372B publication Critical patent/CN102720372B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of building operations and face frontier defense retaining frame with shoring formula, comprise: otic placode (1), connecting rod (2) and support bar (3), it is characterized in that: described protective frame system comprises the equipment of shoring, described in shore equipment be leading screw (4); Wherein connecting rod (2) and support bar (3) link together, and support bar (3) one end and otic placode (1) weld together, and the other end is that leading screw (4) inserts wherein; Leading screw and support bar connecting place cover have jackscrew nut (8), and jackscrew nut is socketed on leading screw along screw thread; The other end and another otic placode of leading screw (4) weld together.Frontier defense retaining frame of facing of the present invention solves traditional type and faces frontier defense retaining frame easily by peculation problem, safe and reliable; Easy to operate, save manpower, improve production efficiency and benefit, make use of idle surplus material rationally and effectively, decrease waste and scrap waste, saved cost, and can be recycled, served the effect of sustainable use.

Description

Novel formula of shoring faces frontier defense retaining frame
Technical field
The invention belongs to building operations protection field, specifically, the present invention relates to a kind of building operations and shore formula face frontier defense retaining frame with facing frontier defense retaining frame, particularly one.
Background technology
Construction work site operation face frontier defense protect time, construction hole common specification is 1.0m, 1.2m, 1.5m, 1.8m, 2.7m.Along with the continuous increase of fixed corporate assets, create many leaving unused at the short and small steel pipe long less than 1m of storehouse.These idle goods and materials of Appropriate application, turn waste into wealth, tool is of great significance.
At present, traditional fastener steel tube is set up formula and is faced frontier defense and protect and there is more potential safety hazard, concrete manifestation is easily diverted the larger potential safety hazard of generation by people in manufacturing process at the construction field (site), also may operation is more easily causes careless and inadvertent situation etc. owing to setting up, and waste of manpower, material resources.
For the problems referred to above, the invention provides and a kind ofly novel shore formula protective frame, idle discarded material is utilized to make, not only solve traditional type to face frontier defense retaining frame and the problem such as easily to be diverted, improve safety, and it is easy to operate, more in work progress, save cost, decrease the waste of waste and scrap etc., and sustainable use.
Summary of the invention:
The invention provides a kind of building operations and face frontier defense retaining frame with shoring formula, utilizing idle discarded tube material, in traditional defense frame, adding leading screw as shoring equipment, the protection of the console mode of protective frame is changed into and shores formula protection, saved materials'use amount.
A kind of building construction is the object of the present invention is to provide to face frontier defense retaining frame with shoring formula.This object is achieved by following technical solution:
A kind of building operations faces frontier defense retaining frame with shoring formula, and comprising: otic placode, connecting rod and support bar, wherein said protective frame also comprises the equipment of shoring, described in shore equipment be leading screw; Wherein connecting rod and support bar link together, and support bar one end and otic placode weld together, and the other end is that leading screw inserts wherein, and leading screw and support bar connecting place cover have jackscrew nut, and jackscrew nut is socketed on leading screw along screw thread; The other end of leading screw and another otic placode weld together.
Wherein, can be connected by any applicable mode between connecting rod with support bar, such as: rivet interlacement, welding or by suitable parts such as sleeve pipe connection etc.
Wherein, top or the sidepiece preferred weld at described connecting rod two ends have sleeve pipe, and support bar links together through sleeve pipe and connecting rod.
The both sides that described support bar welds with otic placode can be welded stiffener such as triangle iron plate and be reinforced.
Wherein, described leading screw can use common engineering leading screw, and choose the leading screw position in jackscrew, leading screw length range is between 30-50cm; Leading screw diameter range is between 20mm-30mm.
The both sides that described leading screw welds with otic placode can be welded stiffener such as triangle iron plate and be reinforced.
By adding leading screw, the protection of the console mode of protective frame being changed into and shores formula.Leading screw and support bar connecting place cover have jackscrew nut, and jackscrew nut is socketed on leading screw along screw thread.In actual use, can this nut be passed through thus adjusting screw, reach the free adjustment effect of support bar on certain length, the length of support bar is made to be adjustable, realize more easily supporting fixing effect, neatly for the construction hole of different size, material usage can be saved.
Described otic placode raw thickness is 5mm-10mm, the iron plate that preferred 5mm is thick.Otic placode blocks body of wall and makes protective frame not easily movable in the middle of window opening; Leading screw withstands body of wall and protective frame is not easily moved up and down in the middle of window opening.At the scene in actual installation, make otic placode block body of wall, adjusting screw length makes it firmly fix.
Described connecting rod can use the steel pipe of curtailment 1m, such as 50-90 centimetre, preferably 70 centimeters; Sleeve pipe can use diameter 60mm-70mm, the steel pipe of preferred 65mm.
Select described support bar steel pipe and otic placode to make its size be suitable for window opening size, such as, support bar adopts the steel pipe of 1500mm, and otic placode is 250mm, and this size can be used for the wide window opening of the thick body of wall of 200mm, 250mm, 1500mm.
Beneficial effect of the present invention is that formula protective frame is shored in employing, solves traditional type and faces frontier defense retaining frame and the problem such as easily to be diverted, improve security protection coefficient to greatest extent; Make use of idle surplus material rationally and effectively, decrease waste and scrap waste, saved cost, improve production efficiency and benefit, and can be recycled, served the effect of sustainable use.
Such as, face frontier defense protect use 120 days, every floor 50 windows with each, Mei Dong building 30 floor calculates, and tradition faces frontier defense retaining frame and concrete correction data of facing frontier defense retaining frame cost compare of the present invention is as shown in the table.
Concrete expense calculates and refers to following table:
From the data shown in upper table, formula of shoring of the present invention is faced frontier defense retaining frame and has greatly been saved cost of production.
Accompanying drawing illustrates:
Fig. 1 is protective frame overall schematic.
Fig. 2 is support bar sectional drawing.
Fig. 3 otic placode schematic diagram: a otic placode front view, b otic placode side view.
Fig. 4 is connecting rod schematic diagram.
Fig. 5 is scheme of installation.
Description of reference numerals:
1-otic placode; 2-connecting rod; 3-support bar; 4-leading screw; 5-sleeve pipe; 6-stiffener; 7-structure wall; 8-jackscrew nut.
Detailed description of the invention:
Below in conjunction with accompanying drawing 1-5, formula of shoring of the present invention is faced frontier defense retaining frame and is described in detail.Described scheme is only exemplary, does not form limitation of the scope of the invention.
1, otic placode makes:
Get four pieces, the thick 80mm × 300mm iron plate of 5mm, make the otic placode 1 of the wide 250mm of central plate, the wide 20mm of side board.
2, connecting rod and sleeve pipe make:
Get 50-90 centimetre steel pipe two, be cut into the center-pole of equivalent size, intercept 10 centimeters long diameter 65mm steel pipes four as sleeve pipe 5, every two sleeve pipes are welded on center-pole two ends respectively and make connecting rod 2.Warning coating is brushed above connecting rod and sleeve pipe.
3, support bar makes:
(1) get the steel pipe two of corresponding window opening width as support bar 3, its one end is welded with the otic placode 1 completed in step (1), and welding both sides are got two pieces, little triangle iron plate and carried out reinforcing welding as stiffener 6; (2) get two common leading screws 4, one end is welded with the otic placode 1 made in step (1), and welding both sides are got two pieces, little triangle iron plate and carried out reinforcing welding.Brush warning coating above support bar.
4, system is installed:
First the support bar 3 welded in step (3) is inserted in the connecting rod 2 welded in step (2), again one end of leading screw 4 is inserted into the other end of support bar 3 steel pipe, leading screw and support bar connecting place cover have jackscrew nut 8, make protective frame support system.
5, in-site installation:
The protective frame support system completed is placed to Lin Bianchuandong place, by jackscrew nut 8 adjusting screw 4, until support system and window opening body of wall 7 are shored firmly.

Claims (6)

1. a building operations faces frontier defense retaining frame with shoring formula, comprise: otic placode (1), connecting rod (2) and support bar (3), it is characterized in that: described protective frame system comprises the equipment of shoring, described in shore equipment be leading screw (4); Wherein connecting rod (2) and support bar (3) link together, and support bar (3) one end and otic placode (1) weld together, and the other end is that leading screw (4) inserts wherein; Leading screw and support bar connecting place cover have jackscrew nut (8), and jackscrew nut is socketed on leading screw along screw thread; The other end and another otic placode of leading screw (4) weld together; Described connecting rod (2) and support bar (3) by rivet interlacement, weld or linked together by sleeve pipe; The top at described connecting rod (2) two ends or sidepiece are welded with sleeve pipe (5), and support bar (3) links together through sleeve pipe (5) and connecting rod (2); Otic placode blocks body of wall and makes protective frame not easily movable in the middle of window opening; Leading screw withstands body of wall and protective frame is not easily moved up and down in the middle of window opening.
2. building operations according to claim 1 faces frontier defense retaining frame with shoring formula, it is characterized in that: the both sides that described leading screw welds with otic placode are welded stiffener (6) and reinforced.
3. building operations according to claim 2 faces frontier defense retaining frame with shoring formula, it is characterized in that: described stiffener is triangle iron plate.
4. the building operations according to claim 1,2 or 3 faces frontier defense retaining frame with shoring formula, it is characterized in that: the both sides that described gripper shoe is welded with otic placode are welded stiffener (6) and reinforced.
5. according to claim 3ly face frontier defense retaining frame, it is characterized in that: described stiffener is triangle iron plate.
6. building operations according to claim 1 faces frontier defense retaining frame with shoring formula, it is characterized in that: described connecting rod, sleeve pipe and support bar have anti-collision alarm paste or anti-collision alarm coating.
CN201210179808.1A 2012-06-04 2012-06-04 Novel formula of shoring faces frontier defense retaining frame Expired - Fee Related CN102720372B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210179808.1A CN102720372B (en) 2012-06-04 2012-06-04 Novel formula of shoring faces frontier defense retaining frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210179808.1A CN102720372B (en) 2012-06-04 2012-06-04 Novel formula of shoring faces frontier defense retaining frame

Publications (2)

Publication Number Publication Date
CN102720372A CN102720372A (en) 2012-10-10
CN102720372B true CN102720372B (en) 2015-09-23

Family

ID=46946223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210179808.1A Expired - Fee Related CN102720372B (en) 2012-06-04 2012-06-04 Novel formula of shoring faces frontier defense retaining frame

Country Status (1)

Country Link
CN (1) CN102720372B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111451799B (en) * 2020-04-15 2021-06-04 吉安鼎丰建设工程有限公司 Steel structure bridge reinforcing structure and manufacturing and processing method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2551716Y (en) * 2002-06-25 2003-05-21 陈建丰 Scaffold
CN2594377Y (en) * 2002-02-07 2003-12-24 师小平 Double disassembled formwork supporting operation platform
CN201003287Y (en) * 2007-01-09 2008-01-09 中建八局第一建设有限公司 Template support frame
CN201103247Y (en) * 2007-10-23 2008-08-20 中冶京唐建设有限公司 Adjustable steel support
CN201526155U (en) * 2009-05-11 2010-07-14 张恒亮 External protection device of scaffold
CN202047576U (en) * 2011-03-21 2011-11-23 江西理工大学 Novel scaffold
CN202131781U (en) * 2011-04-28 2012-02-01 通州建总集团有限公司 Adjustable edge opening protective device
CN202194395U (en) * 2011-07-28 2012-04-18 中建一局集团建设发展有限公司 Tool type edge protector rack

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2594377Y (en) * 2002-02-07 2003-12-24 师小平 Double disassembled formwork supporting operation platform
CN2551716Y (en) * 2002-06-25 2003-05-21 陈建丰 Scaffold
CN201003287Y (en) * 2007-01-09 2008-01-09 中建八局第一建设有限公司 Template support frame
CN201103247Y (en) * 2007-10-23 2008-08-20 中冶京唐建设有限公司 Adjustable steel support
CN201526155U (en) * 2009-05-11 2010-07-14 张恒亮 External protection device of scaffold
CN202047576U (en) * 2011-03-21 2011-11-23 江西理工大学 Novel scaffold
CN202131781U (en) * 2011-04-28 2012-02-01 通州建总集团有限公司 Adjustable edge opening protective device
CN202194395U (en) * 2011-07-28 2012-04-18 中建一局集团建设发展有限公司 Tool type edge protector rack

Also Published As

Publication number Publication date
CN102720372A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
CN204139327U (en) Gas concrete out-hung panel waves node
CN102720372B (en) Novel formula of shoring faces frontier defense retaining frame
CN203669398U (en) Tool type standardized and telescopic construction portal protection apparatus
CN203701432U (en) Positioning clamp for horizontal steel reinforcements of shearing wall
CN202047580U (en) Bolt pin type wall connecting piece for scaffold
CN204401802U (en) The connected node of concrete column and girder steel
CN207944710U (en) The narrow expansion joint Split form reinforcement system of shear wall structure
CN204001802U (en) A kind of fence assembly and adopt this fence assembly and the construction protection railing that forms
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN205077887U (en) Novel elevartor shaft guard gate
CN204623801U (en) A kind of scaffold clamp
CN206769214U (en) A kind of positioning for building, sealing, protection integrated positioning bar
CN205532212U (en) Adjustable easily fixable formula guard gate
CN217326519U (en) Concrete building ground elevation control device
CN211313423U (en) A high-efficient recycle mortar device for building by laying bricks or stones when plastering
CN104746871B (en) A kind of steel form truss structure of swallow-tail form large-sized concrete pier stud
CN202645031U (en) Building construction guardrail
CN104110090B (en) A kind of multi-use architecture module and combination thereof
CN209353695U (en) Concrete blocking apparatus
CN202645033U (en) Building operation guardrail adopting clamping ring type fixing pieces
CN107201826A (en) A kind of new type formwork reinforcement tools
CN204826194U (en) Higher huge steel construction of security
CN202645030U (en) Building construction guardrail adopting steel bar ring fixing pieces
CN203531244U (en) Steel wire mesh template for construction of post-cast strips or construction joints
CN207469513U (en) A kind of precast concrete Exterior Wall Components with locating piece

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Xilin

Inventor after: Gu Haobin

Inventor after: Yang Bo

Inventor before: Liu Xilin

Inventor before: Gu Haobin

Inventor before: Yang Bo

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

CF01 Termination of patent right due to non-payment of annual fee