CN106223204A - A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method - Google Patents

A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method Download PDF

Info

Publication number
CN106223204A
CN106223204A CN201610741352.1A CN201610741352A CN106223204A CN 106223204 A CN106223204 A CN 106223204A CN 201610741352 A CN201610741352 A CN 201610741352A CN 106223204 A CN106223204 A CN 106223204A
Authority
CN
China
Prior art keywords
steel plate
chassis
construction
screw
leading screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610741352.1A
Other languages
Chinese (zh)
Inventor
李树齐
王天翔
刘俊杰
白玉柱
刘闯
顾飞
徐进
张健
孟祥辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Municipal Road & Bridge Engineering Co Ltd
Shenyang Municipal Group Co Ltd
Original Assignee
Shenyang Municipal Road & Bridge Engineering Co Ltd
Shenyang Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Municipal Road & Bridge Engineering Co Ltd, Shenyang Municipal Group Co Ltd filed Critical Shenyang Municipal Road & Bridge Engineering Co Ltd
Priority to CN201610741352.1A priority Critical patent/CN106223204A/en
Publication of CN106223204A publication Critical patent/CN106223204A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method, including upper steel plate, lower steel plate, screw, steel thimble and universal wheel.Screw has screwed leading screw and has fixed nut, and four screws are welded on lower steel plate by setting position.Upper steel plate is welded with crescent moon steel plate, and the screw opposite position at upper steel plate Yu lower steel plate is welded with steel thimble.The steel thimble of upper steel plate is sleeved on the screw of lower steel plate, and universal wheel is fixed on below lower steel plate by setting position, constitutes stretch-draw chassis.Its construction method includes being placed on lower steel plate Manual hydraulic jack;Job platform is set up;Tensioning equipment is installed at upper steel plate crescent moon steel plate;Jacking chassis;Tensioning construction.Large-sized prestress tensioning equipment is installed to high and narrow construction area by the present invention, carries out integral tension operation, makes whole bundle steel strand wires synchronous tension, it is ensured that consistent with bundle steel strand wires stretch value, it is ensured that tensioning construction quality.

Description

A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
Technical field
The present invention relates to bridge construction prestressing stretching technique field, particularly relate to a kind of prestressing force and draw high narrow region Auxiliary construction stretch-draw chassis and construction method.
Background technology
Along with era development, bridge Construction Technology is maked rapid progress, and prestress wire is in bridge and other Structural Engineerings Application also in fast development, stretching construction quality control becomes the emphasis in full-bridge service life, but owing to cast-in-situ box girder end is horizontal The structure stretching end positions such as beam are positioned at high and narrow construction area, and construction stretching equipment volume is big, heavy, it is difficult to reach predetermined Specify position, use small-sized tensioning equipment to carry out stretching single steel strand construction in the past, cause whole bundle steel strand tension asynchronous, Stretch value deviation is big, and construction quality is difficult to ensure that.My unit uses stretch-draw chassis high narrow region under beam of self reliant rebuilding to make to open Draw the equipment stretch-draw application and construction engineering method that carries out in place, actual in overpass engineering, effectively large-scale tensioning equipment is installed to Specify construction location, carry out prestress wire integral tension, it is ensured that steel strand tension precision controls, it is ensured that bridge Construction quality, and the security performance of bridge and service life.The present invention improves work efficiency, has ensured production product (bridge Beam) security function, there is significant economic benefit and social benefit.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of utilization stretch-draw chassis and is installed by large-sized prestress tensioning equipment To high and narrow construction area, carry out prestress wire integral tension operation, make whole bundle steel strand wires synchronous tension, it is ensured that with Bundle steel strand wires stretch value is consistent, it is ensured that the prestressing force of tensioning construction quality draws high narrow region aids construction stretching platform Car and construction method.
The technical scheme is that
A kind of prestressing force draws high narrow region aids construction stretching chassis, including upper steel plate, lower steel plate, crescent moon steel plate, taenidium Thick stick, leading screw fix nut, steel thimble and universal wheel.Described screw is four, has all screwed leading screw and has fixed nut, described Four screws are welded on lower steel plate by setting position.Above described upper steel plate, both sides are respectively welded crescent moon steel plate, Upper steel plate is welded with four steel thimbles with four screw opposite positions of lower steel plate.Four steel thimble suits of upper steel plate On four screws of lower steel plate, when upper steel plate ascending, descending, screw leading screw and fix nut and be fixed on steel thimble bottom, make Upper steel plate ascending, descending is to specifying position.Described universal wheel is four, and four universal wheels are fixed on below lower steel plate by setting position, Constitute prestressing force and draw high narrow region aids construction stretching chassis.
Prestressing force draws high the construction method of narrow region aids construction stretching chassis, including following method:
Nut fixed by leading screw on fastening screw, is placed on lower steel plate by Manual hydraulic jack, decontrols leading screw fastening Nut, presses Manual hydraulic jack jacking upper steel plate, after fall Manual hydraulic jack again, be repeated several times by, then at crescent moon steel Discharge tensioning equipment on plate, again press Manual hydraulic jack, rise, fall, check whether and disclosure satisfy that jacking requirement, close After lattice, the upper steel plate of jacking is dismantled standby;
Job platform is set up, and utilizes original box beam support bowl button support used to carry out job platform and sets up, set up operation horizontal Platform height to match with chassis hoisting depth, and leaves enough personnel's working spaces, operation horizontal according to construction part The bearing capacity of platform meets construction loads requirement, and surfacing, it is simple to chassis moves, and protects in the setting of job platform periphery Hurdle;
On job platform, chassis assembles in place, is placed on construction operation platform by lower steel plate, lower steel plate universal wheel and operation Contact with platform face must assure that smooth-going, facilitates subsequent movement adjusting position;
Upper steel plate steel thimble is directly installed on lower steel plate screw, after installation, adjustable screw leading screw, it is ensured that on Steel plate level, uses horizon rule to check;
Tensioning equipment is installed, and is manually lifted by tensioning equipment and installs at upper steel plate crescent moon steel plate, makes tensioning equipment and crescent moon steel plate Radian closely connected, it is ensured that tensioning equipment is installed firm;
Jacking chassis, tensioning equipment is in place, loosens leading screw and fixes nut, uses Manual hydraulic jack top upper steel plate, according to The position of stretch-draw work anchorage and steel strand wires steel bundle determines hoisting depth, fastens leading screw and fixes nut, then profit after highly determining Moving integrally chassis with universal wheel, make the tensioning equipment on chassis concentric with steel strand wires, universal wheel is fixed after determining in position, it is ensured that The stability of stretching process;
Tensioning construction, carries out stretch-draw operation after tensioning equipment is in place, stretch-draw operation is wanted in strict accordance with design and specification Ask and construct, observe the position of tensioning equipment and chassis simultaneously, occur that skew adjusts in time;
Declining chassis, removed by tensioning equipment, stretch-draw operation uses Manual hydraulic jack by upper steel plate jack-up after completing, and puts Nut fixed by loose wire thick stick, leading screw is fixed nut and screws off and be placed on above lower steel plate, declines Manual hydraulic jack and makes upper steel plate Decline, drop to initial position.
The invention have the advantages that
1, large-sized prestress tensioning equipment is installed to high and narrow construction area by self-control jacking chassis by this engineering method, carries out whole Body stretch-draw operation, makes whole bundle steel strand wires synchronous tension, it is ensured that consistent with bundle steel strand wires stretch value, it is ensured that pre-stress construction matter Amount.
2, stretch-draw main equipment is installed to specify region integral tension by this engineering method, uses small-sized thousand compared to traditional method Jin top single tendon stretch improves efficiency of construction, saves duration and artificial, machine cost.
3, large-scale tensioning equipment can be fixedly secured, stablize lifting, safety height by this engineering method self-control chassis, it is ensured that set Standby and personal security.
4, this engineering method uses steel plate, sleeve, helical screw, Manual hydraulic jack etc. to be assembled into jacking chassis, and structure is skilful Wonderful, easy accessibility, can manually be transported to chassis accessory on stretch-draw platform assemble, it is simple to be not suitable for the narrow area of crane lifting Stretching construction.
Accompanying drawing explanation
Fig. 1 is the trolley structure schematic diagram of the present invention.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is the Construction Principle figure of the present invention.
Detailed description of the invention
A kind of prestressing force draws high narrow region aids construction stretching chassis, including upper steel plate 5, lower steel plate 1, crescent moon steel plate 6, Screw 2, leading screw fix nut 3, steel thimble 4 and universal wheel 7(see Fig. 1,2).Described screw 2 is four, all revolves Being screwed with leading screw and fix nut 3, described four screws 2 are welded on lower steel plate 1 by setting position.Above described upper steel plate 5 Both sides are respectively welded crescent moon steel plate 6, and four screw opposite positions at upper steel plate 5 with lower steel plate are welded with four steel Sleeve pipe 4.Four steel thimbles 4 of upper steel plate are sleeved on four screws 2 of lower steel plate, when upper steel plate 5 ascending, descending, screw Leading screw is fixed nut 3 and is fixed on steel thimble 4 bottom, makes upper steel plate 5 ascending, descending to specifying position.Described universal wheel 7 is four, four Individual universal wheel 7 is fixed on below lower steel plate 1 by setting position, constitutes prestressing force and draws high narrow region aids construction stretching chassis.
Prestressing force draws high the construction method of narrow region aids construction stretching chassis, shown in Fig. 3, including following method:
Nut 3 fixed by leading screw on fastening screw 2, is placed on lower steel plate 1 by Manual hydraulic jack 8, decontrols leading screw Clamp nut 3, after pressing Manual hydraulic jack 8 jacking upper steel plate 5, then falls Manual hydraulic jack, is repeated several times by, then exists Discharge tensioning equipment 9 on crescent moon steel plate 6, again press Manual hydraulic jack, rise, fall, check whether and disclosure satisfy that top Rise requirement, qualified after the upper steel plate of jacking is dismantled standby;
Job platform is set up, and utilizes original box beam support bowl button support used to carry out job platform and sets up, set up operation horizontal Platform height to match with chassis hoisting depth, and leaves enough personnel's working spaces, operation horizontal according to construction part The bearing capacity of platform meets construction loads requirement, and surfacing, it is simple to chassis moves, and protects in the setting of job platform periphery Hurdle;
On job platform, chassis assembles in place, is placed on construction operation platform by lower steel plate 1, lower steel plate universal wheel 7 and work Industry contact with platform face must assure that smooth-going, facilitates subsequent movement adjusting position;
Upper steel plate steel thimble 4 is directly installed on lower steel plate screw 2, after installation, suitable adjustable screw leading screw, To ensure upper steel plate 5 level, horizon rule can be used if desired to check;
Tensioning equipment is installed, and is manually lifted by tensioning equipment 9 and installs at upper steel plate crescent moon steel plate 6, makes tensioning equipment and crescent moon steel The radian of plate is closely connected, it is ensured that tensioning equipment is installed firm;
Jacking chassis, tensioning equipment 9 is in place, loosens leading screw and fixes nut, uses Manual hydraulic jack 8 to push up upper steel plate 5, root Determine hoisting depth according to the position of stretch-draw work anchorage and steel strand wires steel bundle, fasten leading screw after highly determining and fix nut 3, then Utilizing universal wheel 7 to move integrally chassis, make the tensioning equipment 9 on chassis concentric with steel strand wires, universal wheel is fixed after determining in position, Guarantee the stability of stretching process;
Tensioning construction, carries out stretch-draw operation after tensioning equipment is in place, stretch-draw operation is wanted in strict accordance with design and specification Ask and construct, observe the position of tensioning equipment and chassis simultaneously, occur that skew adjusts in time;
Decline chassis, tensioning equipment 9 is removed, stretch-draw operation complete after use Manual hydraulic jack by upper steel plate jack-up, Loosen leading screw and fix nut, leading screw is fixed nut and screws off and be placed on above lower steel plate, decline Manual hydraulic jack and make steel Plate declines, and drops to initial position.

Claims (2)

1. prestressing force draws high a narrow region aids construction stretching chassis, including upper steel plate (5), lower steel plate (1), crescent moon steel plate (6), screw (2), leading screw fix nut (3), steel thimble (4) and universal wheel (7), it is characterised in that described screw (2) being four, all screwed leading screw and fixed nut (3), described four screws (2) are welded on lower steel plate by setting position (1) on, upper steel plate (5) both sides above are respectively welded crescent moon steel plate (6), at four spirals of upper steel plate (5) Yu lower steel plate (1) Leading screw (2) opposite position is welded with four steel thimbles (4), and four steel thimbles (4) of upper steel plate are sleeved on four of lower steel plate On screw (2), when upper steel plate (5) ascending, descending, screw leading screw and fix nut (3) and be fixed on steel thimble (4) bottom, make Steel plate (5) ascending, descending is to specifying position, and described universal wheel (7) is four, and four universal wheels (7) are fixed on lower steel by setting position Plate (1) below, constitutes prestressing force and draws high narrow region aids construction stretching chassis.
2. prestressing force draws high the construction method of narrow region aids construction stretching chassis, it is characterised in that include following method:
Nut (3) fixed by leading screw in fastening screw (2), is placed on lower steel plate (1) by Manual hydraulic jack (8), puts Drive leading screw clamp nut (3), after pressing Manual hydraulic jack (8) jacking upper steel plate (5), then fall Manual hydraulic jack (8), it is repeated several times by, then on crescent moon steel plate (6), discharges tensioning equipment (9), again press Manual hydraulic jack (8), rise, Fall, check whether and disclosure satisfy that jacking requirement, qualified after the upper steel plate (5) of jacking is dismantled standby;
Job platform is set up, and utilizes original box beam support bowl button support used to carry out job platform and sets up, set up job platform Height to match with chassis hoisting depth, and leaves enough personnel's working spaces, job platform according to construction part Bearing capacity meet construction loads requirement, and surfacing, it is simple to chassis moves, and arranges guardrail at job platform periphery;
On job platform chassis assemble in place, lower steel plate (1) is placed on construction operation platform, lower steel plate universal wheel (7) with Job platform contact surface must assure that smooth-going, facilitates subsequent movement adjusting position;
Upper steel plate steel thimble (4) is directly installed on lower steel plate screw (2), after installation, adjustable screw leading screw, Ensure upper steel plate (5) level, use horizon rule to check;
Tensioning equipment is installed, and is manually lifted by tensioning equipment (9) and installs to upper steel plate crescent moon steel plate (6) place, makes tensioning equipment and crescent moon The radian of steel plate is closely connected, it is ensured that tensioning equipment is installed firm;
Jacking chassis, tensioning equipment (9) is in place, loosens leading screw and fixes nut, uses Manual hydraulic jack (8) top upper steel plate (5), determine hoisting depth according to the position of stretch-draw work anchorage and steel strand wires steel bundle, fasten leading screw after highly determining and fix nut (3), then utilizing universal wheel (7) to move integrally chassis, make the tensioning equipment on chassis concentric with steel strand wires, position is solid after determining Determine universal wheel, it is ensured that the stability of stretching process;
Tensioning construction, carries out stretch-draw operation after tensioning equipment (9) is in place, stretch-draw operation is in strict accordance with design and specification Requirement is constructed, and observes the position of tensioning equipment and chassis simultaneously, occurs that skew adjusts in time;
Decline chassis, by tensioning equipment (9) remove, stretch-draw operation complete after use Manual hydraulic jack by upper steel plate jack-up, Loosen leading screw and fix nut, leading screw is fixed nut and screws off and be placed on above lower steel plate, decline Manual hydraulic jack and make steel Plate declines, and drops to initial position.
CN201610741352.1A 2016-08-29 2016-08-29 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method Pending CN106223204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610741352.1A CN106223204A (en) 2016-08-29 2016-08-29 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610741352.1A CN106223204A (en) 2016-08-29 2016-08-29 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method

Publications (1)

Publication Number Publication Date
CN106223204A true CN106223204A (en) 2016-12-14

Family

ID=57554951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610741352.1A Pending CN106223204A (en) 2016-08-29 2016-08-29 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method

Country Status (1)

Country Link
CN (1) CN106223204A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254847A (en) * 2017-06-15 2017-10-17 上海颖川路桥科技有限公司 A kind of city rotary interchange synchronization of jacking up steel support structure
CN107401123A (en) * 2017-08-11 2017-11-28 中铁六局集团有限公司 Portable prestressed stretch-draw servicing unit
CN111675133A (en) * 2020-07-07 2020-09-18 中国能源建设集团山西电力建设有限公司 Pipeline lifting and pulling moving device and method in narrow space
CN112267687A (en) * 2020-10-16 2021-01-26 五冶集团上海有限公司 Manufacturing method of movable prestress tensioning and shoring combined device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004225A (en) * 2000-06-22 2002-01-09 Ps Corp Method and device for stretching erecting pc bridge
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN202047576U (en) * 2011-03-21 2011-11-23 江西理工大学 Novel scaffold
CN204728218U (en) * 2015-06-17 2015-10-28 中铁二十一局集团第一工程有限公司 Bridge beam body base plate exposes steel strand tension jack supporting device
CN204876508U (en) * 2015-07-15 2015-12-16 徐伟明 Portable height -adjustable scaffold
CN206015533U (en) * 2016-08-29 2017-03-15 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004225A (en) * 2000-06-22 2002-01-09 Ps Corp Method and device for stretching erecting pc bridge
CN101748681A (en) * 2009-12-22 2010-06-23 浙江省大成建设集团有限公司 Pretensioning method construction technology of 50m broken line reinforced concrete T-shaped beam
CN202047576U (en) * 2011-03-21 2011-11-23 江西理工大学 Novel scaffold
CN204728218U (en) * 2015-06-17 2015-10-28 中铁二十一局集团第一工程有限公司 Bridge beam body base plate exposes steel strand tension jack supporting device
CN204876508U (en) * 2015-07-15 2015-12-16 徐伟明 Portable height -adjustable scaffold
CN206015533U (en) * 2016-08-29 2017-03-15 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254847A (en) * 2017-06-15 2017-10-17 上海颖川路桥科技有限公司 A kind of city rotary interchange synchronization of jacking up steel support structure
CN107401123A (en) * 2017-08-11 2017-11-28 中铁六局集团有限公司 Portable prestressed stretch-draw servicing unit
CN111675133A (en) * 2020-07-07 2020-09-18 中国能源建设集团山西电力建设有限公司 Pipeline lifting and pulling moving device and method in narrow space
CN112267687A (en) * 2020-10-16 2021-01-26 五冶集团上海有限公司 Manufacturing method of movable prestress tensioning and shoring combined device

Similar Documents

Publication Publication Date Title
CN106223204A (en) A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
CN206229944U (en) A kind of power equipment maintaining cable shear
CN205677222U (en) A kind of civil engineering work construction bracket
CN205531388U (en) A unloading device for steel structural support
CN205347999U (en) Bridge construction bracket constructional device
CN106812069A (en) The bottom of mountain area buttress Hanging Basket high stops puts device and method
CN103352437A (en) Quick beam lowering method based on bridge synchronous jacking and overall replacement
CN206015533U (en) A kind of prestressing force draws high narrow region aids construction stretching chassis
CN207077223U (en) A kind of balance weight milling flat fixed platform device
CN104695717A (en) Upwarp degree precontrol adjusting equipment of revolving platform
CN202323780U (en) Bottom die suspending device of midspan closure section
CN102174836A (en) Framework column bending hysteresis test specimen with reusable stiffening bar sections
CN106735524B (en) A kind of electric pole is listed quickly to remove specific purpose tool
CN105088967A (en) Program-controlled automatic lifting mechanism for bottom basket of hanging basket
CN202017503U (en) Automatic pin puller for hydraulic support
CN105712248A (en) Hand lifting mechanism
CN208103726U (en) Build lifting handgrip
CN107237515A (en) The support meanss and its application method of circular steel truss structure
CN203145492U (en) Support head for removing template early
CN207087765U (en) The main stuffing-box of high-pressure plunger pump and secondary stuffing-box extracting tool
CN201848680U (en) Device for disassembling cross girder body and middle frame body of rough crusher
CN202704411U (en) Vertical vibrating hoist of waste cigarette
CN204867531U (en) Folding flexible drilling equipment of assembled
CN201713281U (en) Pressure container inlet dismounting device
CN206457725U (en) It is a kind of to be used for the overall device transferred and remove dragging suspension basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214

RJ01 Rejection of invention patent application after publication