JP2002004225A - Method and device for stretching erecting pc bridge - Google Patents

Method and device for stretching erecting pc bridge

Info

Publication number
JP2002004225A
JP2002004225A JP2000188158A JP2000188158A JP2002004225A JP 2002004225 A JP2002004225 A JP 2002004225A JP 2000188158 A JP2000188158 A JP 2000188158A JP 2000188158 A JP2000188158 A JP 2000188158A JP 2002004225 A JP2002004225 A JP 2002004225A
Authority
JP
Japan
Prior art keywords
bridge
concrete
steel
tension
steel material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000188158A
Other languages
Japanese (ja)
Other versions
JP3466136B2 (en
Inventor
Tsukasa Takahashi
司 高橋
Takuya Mori
森  拓也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PS Corp
Original Assignee
PS Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PS Corp filed Critical PS Corp
Priority to JP2000188158A priority Critical patent/JP3466136B2/en
Publication of JP2002004225A publication Critical patent/JP2002004225A/en
Application granted granted Critical
Publication of JP3466136B2 publication Critical patent/JP3466136B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide technology having no need of using a sheath by solving the problem that the deterioration of the durability of a PC steel material is caused by water leaked into a gap part produced in the sheath in stretching erecting of a post tension system PC bridge. SOLUTION: The PC steel material is arranged in the form of a bridge body block, tightened by using a jack, concrete is placed, after the strength of concrete is expressed, the jack is loosed, and prestress is introduced into the concrete. It is repeated, and the PC bridge is right and left alternately extended and erected by a pretension system in the form of a cantilever.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、PC橋の張出架設
方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for overhanging a PC bridge.

【0002】[0002]

【従来の技術】橋脚上から橋体を橋軸方向に3〜5m毎
に分割して左右に張出して構築する橋梁の張出架設方法
は、長大スパンの橋梁の架設に適し、桁下空間条件に規
制されないなどの特徴があり、広範に採用されている。
この張出架設方法は橋脚の頭部に基点(張出開始点)と
なる柱頭部を最初に鉄筋コンクリートで構築し、その後
橋体ブロックを柱頭部から左右にバランスを取りながら
やじろ兵衛式に片持ち張出し架設し、橋体を延長して構
築していく。この場合橋体ブロックは、ポストテンショ
ン方式のプレストレストコンクリートで構築される。橋
体ブロックは現場打ち或いは予め製作ヤードで製作され
たプレキャストコンクリートブロックとして製作する
が、いずれにしても橋体ブロックのプレストレス導入は
ポストテンション方式で行っている。
2. Description of the Related Art A method of erection of a bridge constructed by dividing a bridge body from the top of a pier at intervals of 3 to 5 m in the direction of a bridge axis and projecting to the left and right is suitable for erection of a bridge having a long span and space conditions under a girder. It is widely used because it is not regulated.
In this method of overhanging the pier, the capital of the bridge pier, which is the base point (start point of overhang), is first constructed of reinforced concrete, and then the bridge block is cantilevered in a yajiro-bee-style while balancing the left and right from the capital. An overhang is erected, and the bridge is extended. In this case, the bridge block is constructed of post-tensioned prestressed concrete. The bridge block is cast in situ or as a precast concrete block previously manufactured in a manufacturing yard. In any case, the prestress of the bridge block is introduced by a post tension system.

【0003】このポストテンション方式のプレストレス
トコンクリートは、PC鋼材挿通ダクト(シース)をコ
ンクリート中に埋め込んで形成し、このシース中にPC
鋼材を押通してこれを緊張するものである。プレストレ
ス導入後、シース内にセメントミルクなどのグラウトを
注入し、PC鋼材をシースに付着させる。このグラウト
は完全にシース内を充填し後日の水分の侵入を防ぐ必要
がある。しかし従来、注入充填性の確認手法が確立され
ておらず、不測の空所が発生してPC鋼材の腐食等を生
じ、構造物の耐久性に問題を生ずる場合があることが指
摘されている。また、ポストテンション方式では、シー
ス配置、定着具の取付、グラウチング等の煩雑な作業が
伴う。
[0003] This post-tension type prestressed concrete is formed by embedding a PC steel insertion duct (sheath) in concrete, and forming a PC in this sheath.
It pushes the steel material and strains it. After the introduction of the prestress, grout such as cement milk is injected into the sheath, and the PC steel is attached to the sheath. It is necessary that this grout completely fills the inside of the sheath to prevent intrusion of moisture at a later date. However, it has been pointed out that, in the past, a method for confirming the injection filling property has not been established, and unexpected vacancies were generated, causing corrosion of the PC steel material and the like, which sometimes caused a problem in the durability of the structure. . In addition, the post-tension method involves complicated operations such as sheath arrangement, fixing device attachment, and grouting.

【0004】[0004]

【発明が解決しようとする課題】以上のように、従来の
PC橋の張出架設はポストテンション方式でPC鋼材を
緊張している。その技術ではPC鋼材を緊張した後、P
C鋼材挿通孔であるシース内をセメントミルクなどでグ
ラウチングする。このグラウチングによってシース内を
完全に充填することは難しく、空隙部が生じやすい。こ
の空隙部に侵入した水などにより、PC鋼材の耐久性の
劣化を引き起こす問題がある。PC鋼材の耐久性確保の
一つの方策として、腐食に強い新素材を使用することも
提案されているが、新素材PC材は価格が高く、定着部
の構造上の問題もあり、一般的には採用されていない。
As described above, in the conventional overhanging construction of the PC bridge, the PC steel is tensioned by the post tension system. In that technology, after tensioning PC steel, P
The inside of the sheath that is the C steel material insertion hole is grouted with cement milk or the like. It is difficult to completely fill the inside of the sheath by this grouting, and voids are likely to occur. There is a problem that the durability of the PC steel material is degraded by water or the like that has entered the voids. As one measure to secure the durability of PC steel, it has been proposed to use a new material that is resistant to corrosion. However, the cost of the new material PC is high, and there are problems with the structure of the fixing part. Has not been adopted.

【0005】本発明は上記問題点を解決したPC橋の張
出架設方法及び装置を開発し、これを提供することを目
的とするものである。本発明が解決しようとする課題
は、橋体を張出架設する際、プレストレスの導入に付随
して、シースを用いることなく、グラウチングすること
を必要としない技術を提供する点にある。
An object of the present invention is to develop and provide a method and apparatus for overhanging a PC bridge overcoming the above problems. The problem to be solved by the present invention is to provide a technique which does not require grouting without the use of a sheath in connection with the introduction of prestress when the bridge is overhanged.

【0006】[0006]

【課題を解決するための手段】本発明は、上記問題点を
解決するためになされたもので、次の技術手段を講じた
ことを特徴とするPC橋の張出架設方法及び装置であ
る。すなわち、本発明は、PC橋を片持ち張出架設する
に当たり、橋体の1ブロック分の型枠を既設橋体から前
方に張出設置し、該型枠内に既設橋体から橋軸方向に配
設したPC鋼材に緊張力を付与し、次いで、前記1ブロ
ックのコンクリートを打設し、コンクリート硬化後、P
C鋼材の緊張を開放してコンクリートにプレストレスを
導入する。以上の工程を繰り返しPC橋を片持ち張出架
設することを特徴とするPC橋の張出架設方法である。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and is a method and an apparatus for overhanging a PC bridge over which the following technical means are taken. That is, according to the present invention, when the PC bridge is cantilevered, the formwork for one block of the bridge body is installed to protrude forward from the existing bridge body, and is placed in the formwork from the existing bridge body in the bridge axis direction. Tension is applied to the PC steel material arranged in the above, and then the one block of concrete is poured, and after the concrete is hardened, P
Prestress is introduced into concrete by releasing the tension of steel C. An overhanging method for a PC bridge is characterized by repeating the above steps to overhang a PC bridge.

【0007】本発明は、従来のポストテンション方式で
はシース内のグラウチングに問題があるので、橋体ブロ
ックをシースを必要としないプレテンション方式でプレ
ストレスコンクリートを現場で構築する方法である。橋
体ブロックを片持ち張出構築する際、あらかじめ橋体ブ
ロックの型枠内にPC鋼材を配置し、ジャッキを用いて
PC鋼材を緊張後、型枠にコンクリートを打設し、時間
をおいてコンクリートの強度が発現した後、ジャッキを
緩め、コンクリートにプレストレスを導入する。これを
繰返して左右交互に片持梁状にPC橋を延長架設する。
本発明方法は、外ケーブル方式などと組み合わせて利用
することができ、その応用範囲は広く、極めて効果的な
技術である。
The present invention relates to a method of constructing prestressed concrete on site by a pretensioning method that does not require a sheath, since the conventional post-tensioning method has a problem in grouting in the sheath. When constructing the bridge block in a cantilevered manner, place the PC steel in the formwork of the bridge block in advance, tension the PC steel using the jack, then cast concrete into the formwork, and wait a while. After the concrete has developed its strength, the jack is loosened and prestress is introduced into the concrete. By repeating this, the PC bridge is extended and extended alternately in a cantilever shape.
The method of the present invention can be used in combination with an external cable method or the like, and its application range is wide and is a very effective technique.

【0008】また本発明では、型枠内に横締めPC鋼材
を配設し、この横締めPC鋼材に緊張力を付与した後、
コンクリートを打設することとすると好適である。すな
わち、PC鋼材の緊張は、橋軸方向のみならず、橋軸と
直角方向(横方向)にも、桁の上床版部にプレテンショ
ン方式でプレストレスを導入する。さらに、片持ち張出
架設の基点となる柱頭部の上床版もプレテンション方式
のプレストレストコンクリートで構築するとよい。
Further, in the present invention, a laterally tightened PC steel material is disposed in a mold, and after applying a tension to the laterally tightened PC steel material,
It is preferable to cast concrete. That is, the prestressing is introduced into the upper deck of the girder not only in the bridge axis direction but also in the direction perpendicular to the bridge axis (lateral direction) by the pretension method. Further, the upper floor slab, which is the base point of the cantilever overhanging construction, may be constructed of pretensioned prestressed concrete.

【0009】上記本発明方法を好適に実施することがで
きる本発明の装置は、橋軸方向に走行自在に既設橋体上
に載置され、片持ち張出架設する1ブロック分の型枠を
既設橋体から前方に張出保持する架設作業車と、既設橋
体に反力を取り、既設橋体から延出した橋軸方向PC鋼
材を緊張する緊張ユニットとを備えたことを特徴とする
PC橋の張出架設装置である。さらに、型枠の側面に装
着され、横締めPC鋼材を緊張する緊張装置を備えると
好適である。
The apparatus of the present invention which can suitably carry out the above-mentioned method of the present invention comprises a formwork for one block which is mounted on an existing bridge body so as to be able to run in the bridge axis direction and is cantilevered. It is characterized by comprising an erecting work vehicle that extends and holds forward from the existing bridge body, and a tensioning unit that takes a reaction force to the existing bridge body and tensions the PC steel in the bridge axis direction extending from the existing bridge body. This is an overhanging device for the PC bridge. Further, it is preferable to provide a tensioning device mounted on the side surface of the mold to tension the laterally tightened PC steel material.

【0010】[0010]

【発明の実施の形態】以下図面を参照して本発明の実施
の形態を説明する。図1〜図3は本発明の実施例の架設
作業車及びプレテンション方式でPC橋を張出し架設す
る架設作業の実施の形態を説明する図である。図1は側
面図、図2は図1のA−A矢視図、図3は進行方向正面
図で、図1のB−B矢視図である。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 3 are diagrams illustrating an embodiment of an erection work vehicle and an erection work for extending and erection of a PC bridge by a pretension method according to an embodiment of the present invention. 1 is a side view, FIG. 2 is a view along arrow AA in FIG. 1, FIG. 3 is a front view in the traveling direction, and is a view along arrow BB in FIG.

【0011】図1〜3は橋脚100上の柱頭部110か
ら張り出した張出部(既設橋体)120に隣接する橋体
ブロック130の施工を示している。この実施例は架設
作業車10を用いており、架設作業車10に支持された
型枠40内に鉄筋等を組立て、PC鋼材を配置(延長)
し、延長する橋体ブロック130のコンクリートを打設
して、橋体の片持ち張出し架設を行う。架設作業車10
は既設橋体上に配置されたメインビーム11から吊り材
12によって吊下されている。下端に配設した下部ビー
ム13上にサイドトラスフレーム14、15を設け、既
設橋体の前方に張り出して型枠40を支持している。前
後の下部ビーム13は下部連結ビーム16によって連結
されている。後方の下部ビーム13は後方下部ビーム補
剛材17によって補剛されている。サイドトラスフレー
ム14の尾端は後部支持装置20によって既設橋体の床
版下面に支持されている。後部支持装置20は、ローラ
ブラケット23に走行ローラ21を取り付けており、架
設作業車10の前進が容易である。またジャッキ22を
備えており、支持高さの調整が容易である。サイドトラ
スフレーム14からジャッキ41,43を介して型枠支
持ビーム42が吊下されており、その上に受け材45を
介して型枠40が組み立てられている。
1 to 3 show the construction of a bridge block 130 adjacent to an overhang portion (existing bridge body) 120 projecting from a column cap 110 on a pier 100. FIG. In this embodiment, an erection work vehicle 10 is used. Reinforcing bars and the like are assembled in a formwork 40 supported by the erection work vehicle 10, and PC steel materials are arranged (extended).
Then, concrete of the bridge block 130 to be extended is cast, and the cantilever of the bridge body is erected. Construction work vehicle 10
Is suspended by a suspending member 12 from a main beam 11 arranged on an existing bridge. Side truss frames 14 and 15 are provided on the lower beam 13 disposed at the lower end, and project to the front of the existing bridge to support the formwork 40. The front and rear lower beams 13 are connected by a lower connecting beam 16. The rear lower beam 13 is stiffened by a rear lower beam stiffener 17. The tail end of the side truss frame 14 is supported by the rear support device 20 on the lower surface of the floor slab of the existing bridge. The rear support device 20 has the traveling roller 21 attached to the roller bracket 23, so that the erection work vehicle 10 can easily move forward. In addition, since the jack 22 is provided, it is easy to adjust the supporting height. A form support beam 42 is suspended from the side truss frame 14 via jacks 41 and 43, and a form 40 is assembled thereon via a receiving member 45.

【0012】PC鋼材140を緊張する緊張ユニット5
0は、既設橋体120の上床版の上下に配設された後方
アンカービーム51,52を備えている。既設橋体を貫
通するテンションロッド57は既設橋体120の上床版
に設けた貫通孔を通って、上下のアンカービーム51,
52を連結固定しPC鋼材140による緊張力に対する
反力装置を形成する。上下のアンカービーム51、52
から前方に反力ビーム53が延びておりその先端にジャ
ッキ54が装着されている。前方フレーム55は、PC
鋼材140を定着フレーム56に仮止めしており、ジャ
ッキ54は、前方フレーム55に作用して定着フレーム
56を押圧し、PC鋼材140に緊張力を付与する。定
着フレーム56は、架設作業車10の横ビーム31から
ジャッキ32を介して支持されている。緊張ユニット5
0はそれ自体でPC鋼材の緊張力の反力を支持する構造
のものであり、プレテンション方式により橋体にプレス
トレスを導入する。
Tensioning unit 5 for tensioning PC steel 140
No. 0 includes rear anchor beams 51 and 52 disposed above and below the upper deck of the existing bridge 120. The tension rod 57 penetrating the existing bridge body passes through a through hole provided in the upper floor slab of the existing bridge body 120, and the upper and lower anchor beams 51,
52 are connected and fixed to form a reaction device against the tension caused by the PC steel 140. Upper and lower anchor beams 51, 52
, A reaction force beam 53 extends forward, and a jack 54 is attached to the tip thereof. The front frame 55 is a PC
The steel material 140 is temporarily fixed to the fixing frame 56, and the jack 54 acts on the front frame 55 to press the fixing frame 56, thereby applying tension to the PC steel material 140. The fixing frame 56 is supported via a jack 32 from the lateral beam 31 of the construction work vehicle 10. Tension unit 5
Numeral 0 is a structure that supports the reaction force of the tension of the PC steel material by itself, and introduces prestress into the bridge body by a pretension method.

【0013】緊張ユニット50の緊張ジャッキ54によ
り、PC鋼材を緊張した後型枠内にコンクリートを打設
する。コンクリートが所期の強度に達した後、緊張ジャ
ッキ54を緩めてコンクリートブロックにプレストレス
を導入する。その後、架設作業車10及び緊張ユニット
50を1ブロック長分前進させ、次のブロックの施工準
備に入る。以上のサイクルを繰り返して橋体の片持ち張
出し施工を行う。なお、PC鋼材140の緊張は、上記
の場合定着フレーム56を用いて同時緊張としている
が、PC鋼材を一本ずつ緊張することとしてもよい。な
お、架設作業車は緊張ユニット等の作業スペースが有効
に確保できる形式として下吊り型を用いているが、一般
的な橋面上に上置した上載型を用いることとしても、も
ちろん差し支えない。
After the PC steel is tensioned by the tensioning jack 54 of the tensioning unit 50, concrete is poured into the formwork. After the concrete reaches the desired strength, the tension jack 54 is loosened to introduce prestress into the concrete block. Thereafter, the erection work vehicle 10 and the tensioning unit 50 are advanced by one block length, and preparation for the construction of the next block is started. The above cycle is repeated to carry out cantilever extension of the bridge body. Note that, in the above case, the tension of the PC steel members 140 is simultaneously adjusted using the fixing frame 56, but the PC steel members may be tensioned one by one. In addition, although the suspension work vehicle uses a hanging type as a form in which a work space for a tension unit or the like can be effectively secured, it is needless to say that an overhead type mounted on a general bridge surface may be used.

【0014】次に、柱頭部の施工及び中間部の施工につ
いて、PC鋼材の支持手段も含めて以下説明する。図4
は橋脚100上の柱頭部110の施工説明図である。橋
脚100にブラケット70を取付け、柱頭部110の下
部部分111を鉄筋コンクリートで施工する。このとき
上床版112部分は施工しない。ブラケット70上の橋
軸方向2箇所にそれぞれ枠組み高台71を設け、その一
方にPC鋼材140を巻いたリール72を載せ、PC鋼
材140を繰り出して柱頭部110の上床版112の構
築位置を通って、他方のリール73に巻き付ける。図5
はこれを示す概念斜視図で、PC鋼材140の進行方向
を矢印74で示している。図6は図4の側面図である。
Next, the construction of the column capital and the construction of the intermediate portion will be described below, including the means for supporting PC steel. FIG.
FIG. 4 is a construction explanatory diagram of a column capital part 110 on a pier 100. The bracket 70 is attached to the pier 100, and the lower part 111 of the capital 110 is constructed of reinforced concrete. At this time, the upper floor slab 112 is not constructed. A frame hill 71 is provided at each of two places on the bracket 70 in the bridge axis direction, and a reel 72 around which a PC steel material 140 is wound is mounted on one of them, and the PC steel material 140 is fed out to pass through the construction position of the upper floor slab 112 of the column capital 110. Is wound around the other reel 73. FIG.
Is a conceptual perspective view showing this, and the traveling direction of the PC steel material 140 is indicated by an arrow 74. FIG. 6 is a side view of FIG.

【0015】図7〜9に柱頭部上床版112の施工方法
を示した。図7は側面図、図8、図9はそれぞれそのC
−C矢視図、D−D矢視図である。緊張ユニット80
は、柱頭部110上の上床版112を構築する位置の上
下を通って設けられており、橋軸方向両側まで張り出し
た上下圧縮主梁81、82を備え、これを中間横梁83
(図8)、端部横梁84、85(図9)で連結してい
る。主梁81、82の両端の端部横梁84、85には、
多数の縦補助部材86が掛け渡され、この縦補助部材8
6には、PC鋼材140の定着板87を取り付けてい
る。図10は定着板87の詳細図、図11、12はそれ
ぞれ図10のE−E矢視図、F−F矢視図である。定着
板86は、端部横梁84、85に係止し、緊張用ジャッ
キ92を介して定着部91を支持している。定着部91
はPC鋼材140を定着する定着グリップ93の座を備
えている。
FIGS. 7 to 9 show the method of constructing the upper column slab 112. FIG. 7 is a side view, and FIGS.
FIG. 4 is a view as viewed from an arrow C and a view as viewed from an arrow D-D. Tension unit 80
Are provided above and below the position where the upper floor slab 112 is to be constructed on the column capital 110, and are provided with upper and lower compression main beams 81 and 82 which protrude to both sides in the bridge axis direction.
(FIG. 8) and end cross beams 84 and 85 (FIG. 9). At the end cross beams 84, 85 at both ends of the main beams 81, 82,
A number of vertical auxiliary members 86 are stretched over the vertical auxiliary members 8.
6 is provided with a fixing plate 87 made of a PC steel material 140. FIG. 10 is a detailed view of the fixing plate 87, and FIGS. 11 and 12 are views taken along arrows EE and FF of FIG. 10, respectively. The fixing plate 86 is engaged with the end cross beams 84 and 85, and supports the fixing portion 91 via a tension jack 92. Fixing unit 91
Is provided with a seat for the fixing grip 93 for fixing the PC steel 140.

【0016】柱頭部の施工は次の通りである。図4に示
すように、橋脚100の上端側面にブラケット70を施
工する。柱頭部110の腹部及び下床版(下部部分11
1)を施工する。次いで図7に示すように上床版112
中を通るように、PC鋼材140を配設し、柱頭部用緊
張ユニットを上床版112の位置に取り付ける。上床版
112の型枠及び鋼材を組み立てる。PC鋼材140を
緊張して、定着板87に固定する。上床版112のコン
クリートを打設する。コンクリート硬化後、PC鋼材1
40の緊張を開放すれば、上床版112にプレストレス
が導入される。型枠を解体し、柱頭部緊張ユニットを解
体する。
The construction of the column capital is as follows. As shown in FIG. 4, a bracket 70 is installed on the upper end side surface of the pier 100. Abdomen and lower floor slab of column capital 110 (lower part 11
Perform 1). Next, as shown in FIG.
A PC steel member 140 is disposed so as to pass through the inside, and a tension unit for the capital is attached to the position of the upper floor slab 112. Assemble the formwork and steel of the upper floor slab 112. The PC steel 140 is tensioned and fixed to the fixing plate 87. The concrete of the upper floor slab 112 is cast. After hardening concrete, PC steel 1
When the tension of 40 is released, prestress is introduced into the upper floor slab 112. Dismantle the formwork and dismantle the capital cap tension unit.

【0017】次いで張出橋体の施工を行う。張出部の施
工は、架設作業車の設置、反力受けビームの取付け、緊
張ユニットの取付け、型枠、鉄筋の組立ての後、PC鋼
材の緊張、コンクリート打設を行い、コンクリート硬化
後PC鋼材の緊張を解除してコンクリートにプレストレ
スを導入し、次いで型枠解体、架設作業車及び緊張ユニ
ットの移動の工程に従う。、図13は本発明の張出橋体
の施工例の側面図、図14は図13のE−E矢視図、図
15は図13のF−F矢視図である。図13に示す架設
作業車10、緊張ユニット50は図1に示したものと同
様である。PC鋼材140は既設橋体120中のコンク
リートにプレストレスを付与しており、その延出部は緊
張ユニット50の定着フレーム56に定着されてコンク
リート打設前の橋体ブロック130の上床版内の部分が
緊張されている。PC鋼材140はさらに延長されてP
C鋼材支持ガイドレール170に取り付けられた案内板
171によって案内される。PC鋼材支持ガイドレール
170は架設作業車10の前方から鉛直下向に方向変換
し、さらに後方に向かって水平に曲がり、その水平部を
架設作業車10の横ビーム13で支持されている。
Next, the construction of the overhang bridge body is performed. Construction of the overhang is performed by installing the construction work vehicle, installing the reaction force receiving beam, installing the tension unit, assembling the formwork and reinforcing bars, then tensioning the PC steel, placing concrete, and then hardening the concrete. The pre-stress is introduced into the concrete by releasing the tension of the concrete, and then the process of dismantling the formwork, the construction work vehicle and the movement of the tensioning unit is followed. 13 is a side view of a construction example of the overhang bridge body of the present invention, FIG. 14 is a view as seen from the direction of arrows EE in FIG. 13, and FIG. 15 is a view as seen from the direction of arrows FF in FIG. The construction work vehicle 10 and the tensioning unit 50 shown in FIG. 13 are the same as those shown in FIG. The PC steel material 140 gives prestress to the concrete in the existing bridge body 120, and its extension is fixed to the fixing frame 56 of the tensioning unit 50, and the PC block 140 in the upper floor slab of the bridge body block 130 before the concrete is cast. The part is nervous. PC steel 140 is further extended to P
The guide is guided by a guide plate 171 attached to the C steel support guide rail 170. The PC steel support guide rail 170 changes its direction vertically downward from the front of the erection work vehicle 10, bends horizontally rearward, and is supported by the horizontal beam 13 of the erection work vehicle 10.

【0018】図16は、PC鋼材140の支持を示す側
面図、図17は図16の正面図である。図16,図17
では架設作業車10の図示を省略してある。既設橋体1
20上を走行するケーブル台車160からケーブルリー
ル164がフレーム163を介して既設橋体120の下
方に吊下されている。ケーブルリール164はPC鋼材
140を保持している。ケーブルリール164から巻き
戻されたPC鋼材140は、ガイドレール170に取り
付けられた多数の案内板171に案内されて、張出構築
すべき橋体ブロック130の先端をまわってその上床版
部に供給されており、さらにその先は構築済み橋体の上
床版内でコンクリートにプレストレスを与えている。図
17は図16の正面図で、既設橋体120上を車輪16
2によって走行するケーブル台車160を示しており、
ケーブル台車160のビーム161の両端から吊下され
た吊下フレーム163によってケーブルリール164が
支持されている状態を示している。このような専用のケ
ーブルリールを用いることによって、本発明を容易に合
理的に実施をすることができる。
FIG. 16 is a side view showing the support of the PC steel material 140, and FIG. 17 is a front view of FIG. 16 and 17
The illustration of the erection work vehicle 10 is omitted in FIG. Existing bridge 1
A cable reel 164 is suspended below the existing bridge body 120 via a frame 163 from a cable truck 160 traveling on the cable carrier 20. The cable reel 164 holds the PC steel material 140. The PC steel material 140 unwound from the cable reel 164 is guided by a large number of guide plates 171 attached to the guide rails 170, and is supplied to the upper floor slab around the tip of the bridge block 130 to be overhanged. After that, concrete is prestressed in the upper deck of the pre-constructed bridge. FIG. 17 is a front view of FIG.
2 shows a cable truck 160 traveling by 2
The state where the cable reel 164 is supported by the suspension frames 163 suspended from both ends of the beam 161 of the cable carriage 160 is shown. By using such a dedicated cable reel, the present invention can be easily and rationally implemented.

【0019】図18は緊張ユニット150の側面図、図
19は図18のH−H矢視図、図20は図18のJ−J
矢視図、図21は図18のK矢視図、図22は図18の
L矢視図である。緊張ユニット150は基本的に図1に
示す緊張ユニット50と同様のものである。
FIG. 18 is a side view of the tensioning unit 150, FIG. 19 is a view taken in the direction of arrows HH in FIG. 18, and FIG. 20 is JJ in FIG.
FIG. 21 is a view taken in the direction of the arrow K in FIG. 18, and FIG. 22 is a view taken in the direction of the arrow L in FIG. The tensioning unit 150 is basically the same as the tensioning unit 50 shown in FIG.

【0020】緊張ユニット150は、既設橋体120の
上床版を貫通するテンションロッド157に取り付けら
れた後方アンカービーム151,152を備えている。
上下のアンカービーム151、152から反力ビーム1
53が延出しておりその先端に端部横梁158、159
が設けられ、この端部横梁158、159に前方フレー
ム155、ジャッキ154、定着フレーム156を備え
ている。ジャッキ154は、前方フレーム155に作用
して定着フレーム156を押圧し、PC鋼材140に緊
張力を付与し、このとき反力ビーム153は緊張力の反
力を支持する。通常数十本のPC鋼材が配置されるた
め、PC鋼材の緊張、緊張開放を効率的に行うことがで
きるように、前方フレームはPC鋼材を一括して緊張、
緊張開放できるように構成する。また、PC鋼材の中間
部を順次緊張して行くので、緊張によるPC鋼材の損傷
を防止するために長尺チャックを使用する。なお、プレ
ストレス導入時の付着切れに伴うPC鋼材の戻りを考慮
する必要がある。本発明方法では基本的に定着具を有し
ないため、付着切れが起こる可能性がある。ストランド
材では問題にならないが、問題となる怖れがあるときは
圧着グリップなどを取り付ける。
The tensioning unit 150 includes rear anchor beams 151 and 152 attached to a tension rod 157 penetrating the upper deck of the existing bridge 120.
Reaction force beam 1 from upper and lower anchor beams 151 and 152
53 is extended and the end cross beams 158, 159
The front cross beams 158 and 159 are provided with a front frame 155, a jack 154, and a fixing frame 156. The jack 154 acts on the front frame 155 and presses the fixing frame 156 to apply tension to the PC steel 140, and at this time, the reaction force beam 153 supports the reaction force of the tension. Normally, dozens of PC steels are arranged, so that the front frame can collectively tighten the PC steels so that the PC steels can be efficiently tensioned and released.
Configure so that tension can be released. In addition, since the middle portion of the PC steel material is sequentially tightened, a long chuck is used to prevent damage to the PC steel material due to the tension. In addition, it is necessary to consider the return of the PC steel material due to the lack of adhesion at the time of introducing the prestress. Since the method of the present invention basically has no fixing device, there is a possibility that the adhesion may be cut off. This is not a problem with strand material, but if there is a fear of becoming a problem, attach a crimp grip or the like.

【0021】橋体ブロック130はプレテンション方式
によりプレストレスが導入される。また、橋体ブロック
130は図19に示すように横梁の両端部に取り付けら
れた部材141間に張設した横締めPC鋼材142に緊
張力を付与することによって、橋体ブロック130の上
床版に横締めプレストレスを付与することができる。
The bridge block 130 is prestressed by a pretension method. Further, as shown in FIG. 19, the bridge block 130 is applied to the upper floor slab of the bridge block 130 by applying tension to the laterally tightened PC steel 142 stretched between members 141 attached to both ends of the cross beam. A lateral tightening prestress can be applied.

【0022】図21,22は、後方アンカービーム15
1、152とテンションロッド157との関係を示すも
ので、テンションロッド157は既設上床版を貫通する
通しボルトとし、ジャッキ180で上下アンカービーム
151、152間に締め付けるようになっている。
FIGS. 21 and 22 show the rear anchor beam 15.
This shows the relationship between the tension rods 1 and 152 and the tension rod 157. The tension rod 157 is a through bolt penetrating the existing upper floor slab, and is tightened between the upper and lower anchor beams 151 and 152 by a jack 180.

【0023】以上の説明ではPC鋼材のドラムを橋体上
又は橋体から吊り下げて搬送操作して供給する手段につ
いて説明したが、PC鋼材の支持、取り扱いはこれに限
るものではなく、例えば、図23に示すように、メッセ
ンジャーワイヤ190を橋軸方向に張設し、吊具191
によってメッセンジャーワイヤからPC鋼材140を吊
下しておくこととしてもよく、また、橋梁の架設条件に
よっては、地上にドラムをおき、ガイドウェイを設けて
PC鋼材140を誘導することとしてもよい。さらに、
適宜の長さごとにカプラなどによってPC鋼材を連結す
ることとしてもよく、適宜長さごとに端部を定着し、別
のPC鋼材を重複させて力学的に連続させたり、ケーブ
ルをU字状に曲げてコンクリート中に埋設して定着端部
を形成するなど、実情に応じて設計することができる。
In the above description, the means for feeding the PC steel drum by suspending it on or from the bridge body and supplying the same is described. However, the support and handling of the PC steel material are not limited thereto. As shown in FIG. 23, the messenger wire 190 is stretched in the bridge axis direction,
The PC steel 140 may be hung from the messenger wire, or a drum may be provided on the ground and a guideway may be provided to guide the PC steel 140 depending on the bridge construction conditions. further,
The PC steel material may be connected by a coupler or the like at an appropriate length, and the ends may be fixed at the appropriate lengths and another PC steel material may be overlapped and mechanically continuous, or the cable may be U-shaped. It can be designed according to the actual situation, for example, by being bent into concrete and buried in concrete to form a fixing end.

【0024】[0024]

【発明の効果】本発明は、張出架設するPC橋のプレス
トレスの導入を従来のポストテンション方式に代えて、
プレテンション方式とする。プレストレスの導入は、張
出時の架設主方向、床版横方向、及び径間中央部で行
う。
According to the present invention, the prestressing of the PC bridge to be overhanged is replaced with the conventional post tension system.
The pretension method is used. The prestress is introduced in the main direction of the erection, the horizontal direction of the floor slab, and the center of the span during the overhang.

【0025】本発明によれば、従来のポストテンション
方式のプレストレス導入に伴うPC鋼材緊張後のグラウ
チングが不要になりPC鋼材が完全にコンクリート中に
埋設される。従って、グラウチング欠陥を生じないの
で、充填不完全に起因するPC鋼材の腐食等の問題が発
生せず、信頼性が極めて高い橋体を構築することができ
る。また、ポストテンション方式に伴うシース配置、定
着具の取付、グラウチング等の煩雑な作業が不要とな
る。
According to the present invention, the grouting after tensioning of the PC steel due to the introduction of the conventional post-tension type prestress is not required, and the PC steel is completely buried in the concrete. Therefore, since no grouting defect is generated, a problem such as corrosion of the PC steel due to incomplete filling does not occur, and a highly reliable bridge body can be constructed. In addition, complicated operations such as sheath arrangement, fixing tool attachment, grouting, and the like associated with the post-tension method are not required.

【0026】さらに、従来の張出施工では、橋体の張出
作業は左右同時に行うが、本発明では左右別々に行うこ
とができる。従って1サイクルの施工期間はほぼ同じで
あるがコンクリート養生中に起きる労務の無駄をなくす
ることができる。
Further, in the conventional overhanging work, the overhang work of the bridge body is performed at the same time on the left and right sides, but in the present invention, the overhang work can be performed separately on the left and right sides. Therefore, although the construction period of one cycle is almost the same, it is possible to eliminate the waste of labor that occurs during concrete curing.

【0027】さらに、本発明では、上床版中に配置され
る橋軸方向の鉄筋をPC鋼材に置換することができるの
で、鉄筋量を削減又は省略することができると言う効果
を奏する。
Further, according to the present invention, since the reinforcing steel in the bridge axis direction arranged in the upper floor slab can be replaced with a PC steel material, there is an effect that the amount of reinforcing steel can be reduced or omitted.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例の側面図である。FIG. 1 is a side view of an embodiment of the present invention.

【図2】図1のA−A矢視図である。FIG. 2 is a view taken along the line AA of FIG. 1;

【図3】図1のB−B矢視図である。FIG. 3 is a view taken in the direction of arrows BB in FIG. 1;

【図4】橋脚上の柱頭部の施工説明図である。FIG. 4 is an explanatory diagram of construction of a column capital on a pier.

【図5】柱頭部の施工を示す概念斜視図である。FIG. 5 is a conceptual perspective view showing construction of a column capital.

【図6】図4の側面図である。FIG. 6 is a side view of FIG. 4;

【図7】側面図である。FIG. 7 is a side view.

【図8】C−C矢視図である。FIG. 8 is a view as viewed in the direction of the arrows CC.

【図9】D−D矢視図である。FIG. 9 is a view as seen in the direction of arrows D-D.

【図10】定着板の詳細図である。FIG. 10 is a detailed view of a fixing plate.

【図11】定着板のE−E矢視図である。FIG. 11 is a view of the fixing plate as seen from an arrow EE.

【図12】定着板のF−F矢視図である。FIG. 12 is a view of the fixing plate viewed from an arrow FF.

【図13】本発明の施工例の側面図である。FIG. 13 is a side view of a construction example of the present invention.

【図14】図13のE−E矢視図である。FIG. 14 is a view as seen from the direction of arrows EE in FIG. 13;

【図15】図13のF−F矢視図である。FIG. 15 is a view as viewed in the direction of arrows FF in FIG. 13;

【図16】本発明の施工例のPC鋼材支持例の側面図で
ある。
FIG. 16 is a side view of an example of supporting a PC steel material in a working example of the present invention.

【図17】図16のG−G矢視図である。17 is a view as viewed in the direction of arrows GG in FIG. 16;

【図18】緊張ユニットの装着側面図である。FIG. 18 is a mounting side view of the tension unit.

【図19】図18のH−H矢視図である。FIG. 19 is a view as viewed in the direction of arrows HH in FIG. 18;

【図20】図18のJ−J矢視図である。20 is a view taken in the direction of arrows JJ in FIG. 18;

【図21】図18のK矢視図である。21 is a view as viewed in the direction of the arrow K in FIG. 18;

【図22】図18のL矢視図である。FIG. 22 is a view taken in the direction of the arrow L in FIG. 18;

【図23】PC鋼材をメッセンジャワイヤで吊下した説
明図である。。
FIG. 23 is an explanatory view in which a PC steel material is suspended by a messenger wire. .

【符号の説明】[Explanation of symbols]

10 架設作業車 11 メインビーム 12 吊り材 13 下部ビーム 14,15 サイドトラスフレーム 16 下部連結ビーム 17 後方下部ビーム補剛材 20 後部支持装置 21 走行ローラ 22 ジャッキ 23 ローラブラケット 31 横ビーム 32 ジャッキ 40 型枠 41,43 ジャッキ 42 型枠支持ビーム 45 受け材 50 緊張ユニット 51,52 アンカービーム 53 反力ビーム 54 ジャッキ 55 前方フレーム 56 定着フレーム 57 テンションロッド 70 ブラケット 71 枠組み高台 72 リール 73 リール 74 矢印 80 緊張ユニット 81、82 主梁 83 中間横梁 84、85 端部横梁 86 縦補助部材 87 定着板 91 定着部 92 緊張用ジャッキ 100 橋脚 110 柱頭部 111 下部部分 112 上床版 120 張出部(既設橋体) 130 橋体ブロック 140 PC鋼材 141 部材 142 横締めPC鋼材 150 緊張ユニット 151、152 アンカービーム 153 反力ビーム 154 ジャッキ 155 前方フレーム 156 定着フレーム 157 テンションロッド 158、159 端部横梁 160 リール台車 162 車輪 163 吊下フレーム 170 PC鋼材支持ガイドレール 171 案内板 DESCRIPTION OF SYMBOLS 10 Erecting work vehicle 11 Main beam 12 Suspension member 13 Lower beam 14, 15 Side truss frame 16 Lower connecting beam 17 Rear lower beam stiffener 20 Rear support device 21 Running roller 22 Jack 23 Roller bracket 31 Lateral beam 32 Jack 40 Formwork 41, 43 jack 42 formwork supporting beam 45 receiving member 50 tension unit 51, 52 anchor beam 53 reaction force beam 54 jack 55 front frame 56 fixing frame 57 tension rod 70 bracket 71 framework stand 72 reel 73 reel 74 arrow 80 tension unit 81 , 82 Main beam 83 Intermediate cross beam 84, 85 End cross beam 86 Vertical auxiliary member 87 Fixing plate 91 Fixing section 92 Tension jack 100 Bridge pier 110 Column cap 111 Lower part 112 Upper floor slab 120 Overhang (Existing bridge) 130 Bridge block 140 PC steel 141 Member 142 Lateral tightening PC steel 150 Tension unit 151, 152 Anchor beam 153 Reaction beam 154 Jack 155 Front frame 156 Fixing frame 157 Tension rod 158, 159 End cross beam 160 Reel Dolly 162 Wheel 163 Hanging frame 170 PC steel support guide rail 171 Guide plate

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成12年7月10日(2000.7.1
0)
[Submission date] July 10, 2000 (2007.1.
0)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0017[Correction target item name] 0017

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0017】次いで張出橋体の施工を行う。張出部の施
工は、架設作業車の設置、反力受けビームの取付け、緊
張ユニットの取付け、型枠、鉄筋の組立ての後、PC鋼
材の緊張、コンクリート打設を行い、コンクリート硬化
後PC鋼材の緊張を解除してコンクリートにプレストレ
スを導入し、次いで型枠解体、架設作業車及び緊張ユニ
ットの移動の工程に従う図13は本発明の張出橋体の
施工例の側面図、図14は図13のE−E矢視図、図1
5は図13のF−F矢視図である。図13に示す架設作
業車10、緊張ユニット50は図1に示したものと同様
である。PC鋼材140は既設橋体120中のコンクリ
ートにプレストレスを付与しており、その延出部は緊張
ユニット50の定着フレーム56に定着されてコンクリ
ート打設前の橋体ブロック130の上床版内の部分が緊
張されている。PC鋼材140はさらに延長されてPC
鋼材支持ガイドレール170に取り付けられた案内板1
71によって案内される。PC鋼材支持ガイドレール1
70は架設作業車10の前方から鉛直下向に方向変換
し、さらに後方に向かって水平に曲がり、その水平部を
架設作業車10の横ビーム13で支持されている。
Next, the construction of the overhang bridge body is performed. Construction of the overhang is performed by installing the construction work vehicle, installing the reaction force receiving beam, installing the tension unit, assembling the formwork and reinforcing bars, then tensioning the PC steel, placing concrete, and then hardening the concrete. The pre-stress is introduced into the concrete by releasing the tension of the concrete, and then the process of dismantling the formwork, the construction work vehicle and the movement of the tensioning unit is followed . FIG. 13 is a side view of a construction example of the overhang bridge body of the present invention, FIG. 14 is a view taken along the line EE of FIG.
5 is a view as viewed from the direction of arrows FF in FIG. The construction work vehicle 10 and the tensioning unit 50 shown in FIG. 13 are the same as those shown in FIG. The PC steel material 140 gives prestress to the concrete in the existing bridge body 120, and its extension is fixed to the fixing frame 56 of the tensioning unit 50, and the PC block 140 in the upper floor slab of the bridge body block 130 before the concrete is cast. The part is nervous. PC steel 140 is further extended to PC
Guide plate 1 mounted on steel support guide rail 170
Guided by 71. PC steel support guide rail 1
Numeral 70 changes the direction from the front of the erection work vehicle 10 vertically downward, bends horizontally rearward, and the horizontal portion is supported by the horizontal beam 13 of the erection work vehicle 10.

【手続補正2】[Procedure amendment 2]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図2[Correction target item name] Figure 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図2】 FIG. 2

【手続補正3】[Procedure amendment 3]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図3[Correction target item name] Figure 3

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図3】 FIG. 3

【手続補正4】[Procedure amendment 4]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図13[Correction target item name] FIG.

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図13】 FIG. 13

【手続補正5】[Procedure amendment 5]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図16[Correction target item name] FIG.

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図16】 FIG.

【手続補正6】[Procedure amendment 6]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図18[Correction target item name] FIG.

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図18】 FIG.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 PC橋を片持ち張出架設するに当たり、
橋体の1ブロック分の型枠を既設橋体から前方に張出設
置し、該型枠内に既設橋体から橋軸方向に配設したPC
鋼材に緊張力を付与し、次いで、前記1ブロックのコン
クリートを打設し、コンクリート硬化後、PC鋼材の緊
張を開放してコンクリートにプレストレスを導入し、以
上の工程を繰り返しPC橋を片持ち張出架設することを
特徴とするPC橋の張出架設方法。
1. When constructing a PC bridge over a cantilever,
A PC in which a formwork for one block of a bridge body is installed so as to protrude forward from the existing bridge body, and is arranged in the formwork from the existing bridge body in the bridge axis direction.
A tension is applied to the steel material, and then the one-block concrete is poured, and after the concrete is hardened, the tension of the PC steel material is released to introduce prestress into the concrete, and the above steps are repeated to cantilever the PC bridge. An overhanging method for a PC bridge, which comprises overhanging the bridge.
【請求項2】 前記型枠内に横締めPC鋼材を配設し、
該横締めPC鋼材に緊張力を付与した後、コンクリート
を打設することを特徴とする請求項1記載のPC橋の張
出架設方法。
2. A laterally tightened PC steel material is provided in the formwork,
2. The method of claim 1, wherein concrete is cast after applying tension to the laterally tightened PC steel.
【請求項3】 橋脚上の柱頭部をプレテンション方式で
構築することを特徴とする請求項1又は2記載のPC橋
の張出架設方法。
3. The method of claim 1, wherein the column cap on the pier is constructed by a pretension method.
【請求項4】 橋軸方向に走行自在に既設橋体上に載置
され、片持ち張出架設する1ブロック分の型枠を既設橋
体から前方に張出保持する架設作業車と、既設橋体に反
力を取り、既設橋体から延出した橋軸方向PC鋼材を緊
張する緊張ユニットとを備えたことを特徴とするPC橋
の張出架設装置。
4. An installation work vehicle that is mounted on an existing bridge body so as to be able to travel in the direction of the bridge axis, and that holds a formwork of one block to be cantilevered and extended forward from the existing bridge body. An overhanging apparatus for a PC bridge, comprising: a tensioning unit that takes a reaction force to the bridge body and tensions a PC steel member extending in a bridge axis direction from an existing bridge body.
【請求項5】 さらに型枠の側面に装着され、横締めP
C鋼材を緊張する緊張装置を備えたことを特徴とする請
求項4記載のPC橋の張出架設装置。
5. A laterally tightened P which is mounted on a side surface of a formwork.
The overhanging device for a PC bridge according to claim 4, further comprising a tensioning device for tensioning the C steel material.
JP2000188158A 2000-06-22 2000-06-22 Method and apparatus for overhanging PC bridge Expired - Fee Related JP3466136B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000188158A JP3466136B2 (en) 2000-06-22 2000-06-22 Method and apparatus for overhanging PC bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000188158A JP3466136B2 (en) 2000-06-22 2000-06-22 Method and apparatus for overhanging PC bridge

Publications (2)

Publication Number Publication Date
JP2002004225A true JP2002004225A (en) 2002-01-09
JP3466136B2 JP3466136B2 (en) 2003-11-10

Family

ID=18687998

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000188158A Expired - Fee Related JP3466136B2 (en) 2000-06-22 2000-06-22 Method and apparatus for overhanging PC bridge

Country Status (1)

Country Link
JP (1) JP3466136B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008308962A (en) * 2007-06-18 2008-12-25 Oriental Shiraishi Corp Post-curing method for concrete block in overhang construction
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
CN106223204A (en) * 2016-08-29 2016-12-14 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
JP2017002560A (en) * 2015-06-10 2017-01-05 株式会社富士ピー・エス Pretension floor slab construction method based on overhanging construction
CN111042006A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110666941A (en) * 2019-10-23 2020-01-10 甘肃路桥第四公路工程有限责任公司 Box girder prefabricated end template dismounting device and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008308962A (en) * 2007-06-18 2008-12-25 Oriental Shiraishi Corp Post-curing method for concrete block in overhang construction
JP2009057685A (en) * 2007-08-29 2009-03-19 Sumitomo Mitsui Construction Co Ltd Movable suspension support
JP2017002560A (en) * 2015-06-10 2017-01-05 株式会社富士ピー・エス Pretension floor slab construction method based on overhanging construction
CN106223204A (en) * 2016-08-29 2016-12-14 沈阳市政集团有限公司 A kind of prestressing force draws high narrow region aids construction stretching chassis and construction method
CN111042006A (en) * 2020-01-16 2020-04-21 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof
CN111042006B (en) * 2020-01-16 2022-04-15 中建七局安装工程有限公司 High pier edge span suspension casting beam Bailey truss structure and construction method thereof

Also Published As

Publication number Publication date
JP3466136B2 (en) 2003-11-10

Similar Documents

Publication Publication Date Title
CN107119574B (en) A kind of Cantilever Construction Method of arch rib bridge girder
KR101222620B1 (en) Prestressed concrete girder and it's manufacture and construction method which used pretensioning steel plate
JP4403051B2 (en) Corrugated steel web bridge construction method
JP3440422B2 (en) Bridge construction method and bridge construction device
JP2014001579A (en) Construction method of box-girder bridge
KR101665482B1 (en) Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
KR20160099410A (en) Pretension precast partition wall and construction method of the same
JP3635004B2 (en) Bridge cantilever construction method
JP2002004225A (en) Method and device for stretching erecting pc bridge
CN110469140B (en) Construction method for prestress reinforcement of frame beam
JP3737475B2 (en) Box girder bridge structure and construction method
JP3877995B2 (en) How to build a string string bridge
JP4056540B2 (en) Bridge girder construction method
KR20040091350A (en) Prestressed steel girder
JP2734985B2 (en) Cantilever shed and its construction method
CN114045750A (en) Construction method of high pier column tie beam
JPH07109711A (en) Continuous feeding method of concrete slab
JP2000320142A (en) Device and method for reinforcement assembly in construction work
JPH0393929A (en) Method of constructing composite beam using prestressed u-like precast concrete member
JP2667134B2 (en) Reinforcement method for columnar structures
JP2005155282A (en) Extruding construction method for prestressed concrete bridge
JP4375788B2 (en) Construction method of upper-floor type suspension floor slab bridge
JP2648937B2 (en) Reinforcing bar for long span beams
JP3878096B2 (en) Reinforced concrete members
JP3010355B1 (en) Construction method of joint of prestressed concrete floor

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030812

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090829

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120829

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees