JP4056540B2 - Bridge girder construction method - Google Patents

Bridge girder construction method Download PDF

Info

Publication number
JP4056540B2
JP4056540B2 JP2005230019A JP2005230019A JP4056540B2 JP 4056540 B2 JP4056540 B2 JP 4056540B2 JP 2005230019 A JP2005230019 A JP 2005230019A JP 2005230019 A JP2005230019 A JP 2005230019A JP 4056540 B2 JP4056540 B2 JP 4056540B2
Authority
JP
Japan
Prior art keywords
bridge girder
floor slab
precast
bridge
tendon
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2005230019A
Other languages
Japanese (ja)
Other versions
JP2007046277A (en
Inventor
昭夫 春日
昌晴 桑野
真一 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2005230019A priority Critical patent/JP4056540B2/en
Publication of JP2007046277A publication Critical patent/JP2007046277A/en
Application granted granted Critical
Publication of JP4056540B2 publication Critical patent/JP4056540B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本願発明は、道路橋、鉄道橋、歩道橋等として用いられる橋桁の架設方法に係り、特にコンクリートからなる橋桁又はコンクリートと鋼部材との複合構造である橋桁の構築方法に関するものである。   The present invention relates to a method for constructing a bridge girder used as a road bridge, a railway bridge, a pedestrian bridge, and the like, and more particularly to a method for constructing a bridge girder made of concrete or a composite structure of a concrete and a steel member.

コンクリリートで形成された橋桁、特にプレストレストコンクリートで形成された橋桁が広く普及しており、断面の形状も箱型断面,T型断面、U字型の断面等様々なものが、地形や支間長に応じて構築されている。また、断面の一部に鋼部材を用いる橋桁も多く用いられるようになっており、特に断面形状が箱型の橋桁でウェブに鋼板を用いた橋桁がある。このような橋桁では、上床版をコンクリートで形成することにより路面の広い範囲に作用する輪荷重を支持するとともに、ウェブに鋼材を用いることによって橋桁の自重を軽くすることができる。また、特許文献1には鋼ウェブを橋桁の軸線方向(以下、橋軸方向という)に分割した構造が、提案されている。   Bridge girder made of concrete, especially prestressed concrete, is widespread. Various cross-sectional shapes such as box-shaped cross section, T-shaped cross section, U-shaped cross section, etc. Is built according to. In addition, a bridge girder using a steel member for a part of a cross section is often used. In particular, there is a bridge girder having a box-shaped cross section and using a steel plate for a web. In such a bridge girder, the upper floor slab is made of concrete to support a wheel load acting on a wide area of the road surface, and the weight of the bridge girder can be reduced by using a steel material for the web. Patent Document 1 proposes a structure in which a steel web is divided in an axial direction of a bridge girder (hereinafter referred to as a bridge axis direction).

この橋桁は、コンクリート製の上床版と下床版とを連結する鋼ウェブが、橋軸方向の所定の長さに分割されており、それぞれの鋼ウェブは、高さ方向の中位より上床版と接合される上辺及び下床版と接合される下辺に近づくにしたがって橋軸方向の幅が徐々に拡大されたものとなっている。つまり分割された鋼ウェブのそれぞれは鼓形又は蝶形となっている。そして、これらの鋼ウェブのそれぞれ毎にプレキャストセグメントして箱型断面の部材が形成され、これらを現場において橋軸方向にに連結して橋桁を構築するものとなっている。   In this bridge girder, the steel web connecting the concrete upper floor slab and the lower floor slab is divided into a predetermined length in the bridge axis direction, and each steel web is separated from the middle in the height direction. The width in the direction of the bridge axis is gradually enlarged as approaching the upper side to be joined to and the lower side to be joined to the lower floor slab. That is, each of the divided steel webs has a drum shape or a butterfly shape. Each of these steel webs is precast segmented to form a box-shaped cross-section member, which is connected in the bridge axis direction on the site to construct a bridge girder.

上記のように橋桁をプレキャストセグメントとして製作し、現場において連結して橋桁を架設する方法も様々のものが提案されており、例えば桁架設位置に支保工を構築し、この上に上記プレキャストセグメントを配列して連結する方法がある。また、支保工を構築することが難しい場合、経済的でない場合には、橋脚上から両側に転倒モーメントのバランスを維持しながらプレキャストセグメントを順次張り出してゆく、いわゆる片持ち架設方法も採用される。
特開2002−220812号公報
Various methods have also been proposed in which a bridge girder is manufactured as a precast segment as described above, and connected in the field to construct a bridge girder. For example, a support is constructed at the girder installation position, and the precast segment is installed on this. There is a method of arranging and connecting. In addition, when it is difficult to construct a support work, or when it is not economical, a so-called cantilever construction method is adopted in which the precast segments are sequentially projected from the pier while maintaining the balance of the falling moment on both sides.
JP 2002-220812 A

しかしながら、上記のようなコンクリートを用いた橋桁で、いわゆる中規模の橋梁すなわち支間長が30mから70m程度の橋梁を架設するときに架設費用が嵩みやすく経済的な架設方法が望まれている。
支間の全域にわたって支保工を構築する工法では、橋脚が高くなると支保工の構築に多くの作業と費用が必要となるし、渓谷等の急峻な地形では支保工の構築が難しくなることも多い。橋脚上から両側に順次桁を張り出す片持ち工法では、分割して製作されたプレキャストセグメントを一つずつ順次に接合してゆくことになり、工期が長くなりやすい。また、単径間の橋桁では採用が難しい。
その他、架設用のガーダー又はトラスを仮設し、これにプレキャストセグメントを支持させて橋桁を連結する方法もあるが、ガーダー又はトラスの仮設に多くの費用を要し、連続した多径間の橋桁でないと経済的に有利とはならない。
However, there is a demand for an economical erection method in which a so-called medium-scale bridge, that is, a bridge having a span length of about 30 m to 70 m, is erected with a bridge girder using concrete as described above, and the construction cost is high.
In the construction method that constructs a support work over the entire span, if the pier is high, a lot of work and costs are required to construct the support work, and it is often difficult to construct a support work on steep terrain such as a valley. In the cantilever construction method in which the girders are sequentially projected from the pier to both sides, the precast segments produced by dividing are sequentially joined one by one, and the construction period tends to be long. In addition, it is difficult to adopt with a bridge girder between single diameters.
In addition, there is a method of temporarily installing a girder or truss for erection and connecting a bridge girder by supporting a precast segment to this, but it requires a lot of expenses for temporary girder or truss construction and is not a continuous multi-span bridge girder. And not economically advantageous.

本願発明は、上記のような事情に鑑みてなされたものであり、その目的は、コンクリートからなる橋桁又はコンクリートと鋼部材との複合構造からなる橋桁を、効率よく経済的に架設する方法を提供することである。   The present invention has been made in view of the circumstances as described above, and its purpose is to provide a method for efficiently and economically installing a bridge girder made of concrete or a bridge girder made of a composite structure of concrete and a steel member. It is to be.

上記課題を解決するために、請求項1に係る発明は、 コンクリートからなる上床版及び下床版と、これらを上下に連結する鋼部材とによって断面が箱状となった橋桁の架設方法であって、 2つの橋台間に緊張材を張架する工程と、 前記橋桁を構成する前記上床版と前記下床版と前記鋼部材とのうちの少なくとも前記下床版を含む部材を橋軸方向の所定長さに分割した複数のプレキャストセグメントを形成する工程と、 前記プレキャストセグメントを用いて断面が箱状となる領域の内側を前記緊張材が通過するように該プレキャストセグメントを該緊張材に支持させ、該緊張材に沿って複数のプレキャストセグメントを該橋桁を架設する高さとほぼ一致する位置に配列する工程と、 配列された複数のプレキャストセグメントを橋軸方向に連結する工程と、 前記プレキャストセグメントが連結された橋桁の両端部を支持するとともに、前記緊張材を前記橋桁の端部に定着し、該緊張材に導入された緊張力によって前記橋桁にプレストレスを導入する工程とを含むものとし、 前記プレキャストセグメントは、前記下床版から上方に立ち上げられた吊り支持部材により前記緊張材から懸垂支持し、 該吊り支持部材の寸法により、前記プレキャストセグメントを緊張材に沿って支持するときに、ほぼ橋桁を架設する高さに調整して配列するものであり、 前記鋼部材と前記上床版との全部又は一部は、前記プレキャストキャストセグメントが緊張材上の所定の位置に支持された後に、前記緊張材が張架されている範囲を囲むように形成する橋桁の架設方法を提供する。 In order to solve the above-mentioned problems, the invention according to claim 1 is a method for erection of a bridge girder having a box-shaped cross section by using an upper floor slab and a lower floor slab made of concrete, and a steel member that connects them vertically. A member including at least the lower floor slab of the upper floor slab, the lower floor slab, and the steel member constituting the bridge girder, and a step of stretching a tension material between two abutments Forming a plurality of precast segments divided into a predetermined length; and supporting the precast segment on the tendon so that the tendon passes inside a box-shaped region using the precast segment. A step of arranging a plurality of precast segments along the tendon at a position substantially coincident with a height of the bridge girder, and connecting the plurality of precast segments arranged in the bridge axis direction. And supporting both ends of the bridge girder to which the precast segment is connected, fixing the tension material to the end of the bridge girder, and introducing prestress into the bridge girder by the tension force introduced into the tension material The precast segment is suspended from the tension material by a suspension support member raised upward from the lower floor slab, and the precast segment is used as a tension material according to the dimensions of the suspension support member. When supporting along, it is arranged so that the height of the bridge girder is almost adjusted, and all or a part of the steel member and the upper floor slab is formed by a predetermined cast on the tension member. Provided is a bridge girder erection method which is formed so as to surround a range where the tendon is stretched after being supported in position .

この方法では、橋台又は橋脚間に緊張材すなわちケーブルを張架することにより、プレキャストセグメントをこのケーブルに支持させ、橋軸方向に配列することができる。また、プレキャストセグメントは橋台又は橋脚付近でケーブルに支持させ、ケーブルに沿って移動させて所定の位置に配置することができる。したがって、大きな架設機械又は設備、例えば支保工、ケーブルクレーン、大型クレーン等などを用いることなく施工が可能となる。 In this method, a tension member, that is, a cable is stretched between the abutment or the pier, so that the precast segment can be supported by the cable and arranged in the direction of the bridge axis. Further, the precast segment can be supported by the cable near the abutment or the pier and moved along the cable to be arranged at a predetermined position. Therefore, the construction can be performed without using a large erection machine or equipment such as a support, a cable crane, a large crane, or the like.

また、この方法では張架したケーブルが垂れ下がった状態となるが、このケーブル上にプレキャストセグメントの高さ方向の位置を調整して配列することにより、ケーブルに支持されたセグメントを連結して所定の縦断線形の橋桁を構築することができる。   In addition, in this method, the stretched cable is in a suspended state. By adjusting and arranging the position of the precast segment on the cable in the height direction, the segments supported by the cable are connected to each other in a predetermined manner. Longitudinal linear bridge girder can be constructed.

さらに、プレキャストセグメントが連結された後、橋桁の両端部を支持するとともにケーブルを橋桁の端部に定着し、該ケーブルに導入された緊張力によって橋桁にプレストレスを導入することができる。このようにプレキャストセグメントを所定の位置に搬送して配列し、連結するのに利用したケーブルをプレストレスを導入するための緊張材として利用することができ、仮設費用を低減することができる。また、ケーブルを橋桁自体に定着することによって、いわゆる自碇式の構造となり、ケーブルの張力が橋台又は橋脚に作用しなくなって安定した構造とすることができる。   Furthermore, after the precast segments are connected, both ends of the bridge girder can be supported, the cable can be fixed to the end of the bridge girder, and prestress can be introduced into the bridge girder by the tension force introduced into the cable. As described above, the cable used for transporting, arranging and connecting the precast segments to a predetermined position can be used as a tension material for introducing prestress, and temporary costs can be reduced. Further, by fixing the cable to the bridge girder itself, a so-called self-contained structure is obtained, and the cable tension does not act on the abutment or the pier, and a stable structure can be obtained.

断面の形状が箱型となった橋桁でウェブ部分に鋼部材を用いるものは、大きな剛性を維持するとともに重量が軽減される。これにより、鋼ウェブを有する箱型断面の橋桁は、張架した緊張材に吊り支持しても張力が過大にならず、本発明の方法によって効率よく架設することができる。   A bridge girder having a box-shaped cross section that uses a steel member for the web portion maintains high rigidity and reduces weight. Thereby, the bridge girder having a box-shaped cross section having a steel web does not become excessively tensioned even when suspended and supported by a tension member stretched, and can be efficiently installed by the method of the present invention.

また、吊り支持部材により下床版を前記ケーブルから懸垂支持させるので、所定の位置へケーブルに沿って搬送することができ、この吊り支持部材の調整によって該プレキャストセグメントを所定の高さに支持することが容易となる。
ケーブルは、プレキャストセグメントが所定の位置に支持された後に形成する鋼部材及び上床版に囲まれ、緊張によって橋桁に有効なプレストレスを導入することが可能となる。
Further, since the lower floor slab is suspended from the cable by the suspension support member , it can be conveyed along the cable to a predetermined position, and the precast segment is supported at a predetermined height by adjusting the suspension support member. It becomes easy.
The cable is surrounded by a steel member and an upper floor slab that are formed after the precast segment is supported at a predetermined position, and an effective prestress can be introduced into the bridge girder by tension.

請求項2に係る発明は、請求項1に記載の橋桁の架設方法において、 前記鋼部材は前記複数のプレキャストセグメント毎に分離しているものとする。 The invention according to claim 2 is the bridge girder construction method according to claim 1 , wherein the steel member is separated for each of the plurality of precast segments.

この方法では、鋼部材がプレキャストセグメント毎に分離していることにより、鋼部材例えば鋼ウェブを橋軸方向に接合する工程を省略できる。そして、このように鋼部材が橋軸方向に分割され独立していると取扱が容易であるとともに、プレストレス導入時の床版の変位を拘束することが少なく、床版に有効に圧縮応力が導入される。   In this method, since the steel member is separated for each precast segment, the step of joining the steel member, for example, a steel web in the bridge axis direction can be omitted. And if the steel member is divided and independent in the bridge axis direction in this way, the handling is easy and the displacement of the floor slab when pre-stress is introduced is less restricted, and the floor slab is effectively subjected to compressive stress. be introduced.

請求項3に係る発明は、 コンクリートからなる床版と、この床版の側縁部から下方に突き出した補剛桁部又はこの床版の側縁部から上方に立ち上げられた側板部とを有する橋桁の架設方法であって、 2つの橋台間に緊張材を張架する工程と、 前記橋桁を橋軸方向の所定長さに分割した複数のプレキャストセグメントを形成する工程と、 前記プレキャストセグメントを前記緊張材に支持させ、該緊張材に沿って複数のプレキャストセグメントを該橋桁を架設する高さとほぼ一致する位置に配列する工程と、 配列された複数のプレキャストセグメントを橋軸方向に連結する工程と、 前記プレキャストセグメントが連結された橋桁の両端部を支持するとともに、前記緊張材を前記橋桁の端部に定着し、該緊張材に導入された緊張力によって前記橋桁にプレストレスを導入する工程とを含むものとし、 前記プレキャストセグメントの両側部における前記補剛桁部又は前記側板部の外側面に支持部材を取り付けておき、 該支持部材を張架された2本の前記緊張材にそれぞれ係止して、該プレキャストセグメントを2本の緊張材間に吊り支持し、 前記支持部材の取り付け位置の調整によって、各プレキャストセグメントが緊張材上で配列されたときに、ほぼ橋桁を架設する高さに配列するものである橋桁の架設方法を提供するものである。 The invention according to claim 3 includes a floor slab made of concrete and a stiffening girder protruding downward from a side edge of the floor slab or a side plate raised up from the side edge of the floor slab. A method of laying a bridge girder having a step of stretching a tension member between two abutments, a step of forming a plurality of precast segments obtained by dividing the bridge girder into a predetermined length in a bridge axis direction, and the precast segment A step of supporting the tendon and arranging a plurality of precast segments along the tendon at a position substantially coincident with a height of the bridge girder, and connecting the arranged precast segments in the bridge axis direction And supporting both ends of the bridge girder to which the precast segment is connected, fixing the tendon to the end of the bridge girder, and by the tension force introduced into the tendon A step of introducing prestress into the girders, and a support member is attached to the outer surface of the stiffening girder portion or the side plate portion on both sides of the precast segment, and the two supporting members are stretched When the precast segments are arranged on the tendon by adjusting the mounting position of the support member, the precast segments are suspended and supported between the two tendons. It is intended to provide a bridge girder construction method that is arranged at almost the height of the bridge girder.

請求項4に係る発明は、請求項1、請求項2又は請求項3に記載の橋桁の架設方法において、 前記橋桁の下側に下弦材を張設するとともに、該下弦材と該橋桁とを上下方向に連結する柱状の外部支持部材を設け、 前記プレキャストセグメントを連結した後に、該下弦材の張力を調整することによって該橋桁の支間部分の高さを所定の高さに設定するものとする。 The invention according to claim 4 is the bridge girder construction method according to claim 1, claim 2 or claim 3 , wherein a lower chord member is stretched under the bridge girder, and the lower chord member and the bridge girder are A columnar external support member connected in the vertical direction is provided, and after connecting the precast segments, the tension of the lower chord material is adjusted to set the height of the span portion of the bridge girder to a predetermined height. .

この方法では、下弦材によって橋桁に作用する荷重が分担され、橋桁の耐荷力が増大するので、より長い支間の橋桁を構築することが可能となる。また、橋桁の支間部分の高さすなわち縦断方向の形状を正確に設定して橋桁を架設することができる。   In this method, the load acting on the bridge girder is shared by the lower chord material, and the load carrying capacity of the bridge girder increases, so that it is possible to construct a bridge girder with a longer span. In addition, the bridge girder can be installed by accurately setting the height of the span portion of the bridge girder, that is, the shape in the longitudinal direction.

請求項5に係る発明は、請求項4に記載の橋桁の架設方法において、 前記下弦材の両端は、張力を調整した状態で前記橋桁の両端部に定着するものとする。 The invention according to claim 5 is the bridge girder erection method according to claim 4 , wherein both ends of the lower chord member are fixed to both ends of the bridge girder in a state in which tension is adjusted.

上記のように下弦材を橋桁の両端部に定着することにより、橋桁には有効にプレストレスが導入される。また、橋台又は橋脚には大きな水平力が作用せず、橋台・橋脚は安定した構造となる。   Prestress is effectively introduced into the bridge girder by fixing the lower chord material to both ends of the bridge girder as described above. Moreover, a large horizontal force does not act on the abutment or the pier, and the abutment and the pier have a stable structure.

以上説明したように、本願発明の架設方法によれば、ケーブルにプレキャストセグメントを支持させてケーブル上の所定の位置に搬送し、配列することができる。そして、これらのプレキャストセグメントを連結して橋桁とすることができるので、支保工の構築や大型の重機を必要とすることなく橋桁を架設することができる。また、プレキャストセグメントを支持するためのケーブルは、プレキャストセグメントを連結した後に、橋桁にプレストレスを導入するための緊張材として用いることができ、ケーブルを有効に利用し、短い工期で経済的な架設が可能となる。   As described above, according to the erection method of the present invention, the precast segment can be supported by the cable, conveyed to a predetermined position on the cable, and arranged. And since these precast segments can be connected and used as a bridge girder, a bridge girder can be constructed without requiring support construction or large heavy machinery. In addition, the cable for supporting the precast segment can be used as a tensioning material for introducing prestress into the bridge girder after connecting the precast segment. Is possible.

以下、本願発明の実施の形態を図に基づいて説明する。
図1は、本願発明の一実施形態である架設方法と同様に張架されたケーブルを用いて構築することができる橋桁の概略側面図であり、図2は断面図である。
この橋桁1は、二つの橋台2,3間に支承4,5を介して単純支持されたものであり、
コンクリートからなる上床版11及び下床版12と、橋軸方向に沿って2列に配列され、
上床版11と下床版12とを上下に連結する鋼ウェブ13で構成され、箱型の断面となっている。また、これらで囲まれる箱型断面内には、緊張剤であるケーブル14が配置され、このケーブル14によって上床版11及び下床版12にプレストレスが導入されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 is a schematic side view of a bridge girder that can be constructed using cables stretched in the same manner as the construction method according to an embodiment of the present invention, and FIG. 2 is a cross-sectional view.
This bridge girder 1 is simply supported between two abutments 2 and 3 via supports 4 and 5,
The upper floor slab 11 and the lower floor slab 12 made of concrete are arranged in two rows along the bridge axis direction,
It consists of a steel web 13 that connects the upper floor slab 11 and the lower floor slab 12 up and down, and has a box-shaped cross section. Further, a cable 14 which is a tension agent is arranged in a box-shaped cross section surrounded by these, and prestress is introduced into the upper floor slab 11 and the lower floor slab 12 by this cable 14.

上床版11は所定幅で橋軸方向に連続しており、この上に路面が形成されるものであり、鉄筋コンクリートで形成され、必要に応じて橋軸と直角方向にプレストレスが導入される。
この上床版の鋼ウェブと接続される部分間つまり上床版の中央部分11aは、橋軸方向に均等な厚さの版状部材で形成されており、板状の鋼ウェブ13の上縁付近を埋め込むことによって鋼ウェブ13と接合されている。鋼ウエブ13との接合部より張り出した部分11bは、橋軸直角方向に張り出したコンクリートのリブ11cと、これと一体となったほぼ等厚の板部材11dとで形成されている。また、上記リブ11cの先端付近は、下床版12の側縁部に下端が接合された斜支持部材15によって支持される。
一方、下床版12は二列に配列された鋼ウェブ13の双方と接合されたコンクリートの版状部材であり、鋼ウェブ13の下縁付近をコンクリート内に埋め込むことによって接合されている。
The upper floor slab 11 has a predetermined width and is continuous in the bridge axis direction, on which a road surface is formed. The road deck 11 is formed of reinforced concrete, and prestress is introduced in a direction perpendicular to the bridge axis as necessary.
The portion connected to the steel web of the upper floor slab, that is, the central portion 11a of the upper floor slab is formed of a plate-like member having a uniform thickness in the direction of the bridge axis. The steel web 13 is joined by embedding. A portion 11b projecting from the joint with the steel web 13 is formed of a concrete rib 11c projecting in a direction perpendicular to the bridge axis, and a substantially equal thickness plate member 11d integrated therewith. The vicinity of the tip of the rib 11c is supported by an oblique support member 15 having a lower end joined to a side edge of the lower floor slab 12.
On the other hand, the lower floor slab 12 is a concrete plate-like member joined to both of the steel webs 13 arranged in two rows, and is joined by embedding the vicinity of the lower edge of the steel web 13 in the concrete.

鋼ウェブ13は上床版11と下床版12とを連結するものであり、橋軸方向に分割された複数の鋼板を配列したものである。各鋼板は、上辺と下辺との中間位置で幅が最も小さく、上辺又は下辺に近づくに従って幅が直線的に拡大されており、鼓型となっている。鋼製の鼓型形状とすることにより軽量化を図るとともに、橋桁にせん断力が作用したときの斜め方向の引張力及び圧縮力に対して有効に抵抗するものである。そして、側面に密着するようにコンクリートのリブ13bが形成され、斜め方向の圧縮力を負担するとともに座屈を防止するものとなっている。また、プレキャストセグメント毎に分離独立して配列されるため、ウェブの相互間を連結する必要がない。さらに、プレストレスを導入するときに上床版11及び下床版12の橋軸方向への変形を拘束することが少なく、有効にプレストレスが導入される。   The steel web 13 connects the upper floor slab 11 and the lower floor slab 12 and is an array of a plurality of steel plates divided in the bridge axis direction. Each steel plate has the smallest width at an intermediate position between the upper side and the lower side, and the width is linearly enlarged toward the upper side or the lower side, thus forming a drum shape. The steel drum shape reduces the weight and effectively resists the tensile and compressive forces in the oblique direction when a shearing force acts on the bridge girder. And the concrete rib 13b is formed so that it may closely_contact | adhere to a side surface, and it bears the compressive force of a diagonal direction, and prevents buckling. Moreover, since it arrange | positions separately for every precast segment, it is not necessary to connect between webs. Further, when prestress is introduced, deformation of the upper floor slab 11 and the lower floor slab 12 in the direction of the bridge axis is rarely restricted, and the prestress is effectively introduced.

上記上床版11と下床版12とは、上記鋼ウェブ13によって連結されるとともに橋桁1の両端部では、端部横桁16,17によって一体に接合されている。そして、この端部横桁16,17が支承4,5によって橋台2,3上に支持される。   The upper floor slab 11 and the lower floor slab 12 are connected by the steel web 13 and are joined together at the both ends of the bridge girder 1 by the end cross beams 16 and 17. The end cross beams 16 and 17 are supported on the abutments 2 and 3 by the supports 4 and 5.

上記ケーブル14は緊張力が導入された状態で、上記端部横桁16,17に定着されている。そして、上床版11と下床版12と鋼ウェブ13とで箱型に囲まれた内側で、下方に凸となる形状で張架され、所定の位置で支持部材18を介して上床版11に上方への力を付与するものとなっている。つまり、このケーブル14はいわゆる外ケーブルと称されるコンクリート部材外に配置されるものとなっており、高張力の鋼より線の外側に防錆被覆層が形成されたものが用いられている。   The cable 14 is fixed to the end cross beams 16 and 17 in a state where tension is introduced. The upper floor slab 11, the lower floor slab 12, and the steel web 13 are stretched in a convex shape on the inner side surrounded by the box shape, and are attached to the upper floor slab 11 via the support member 18 at a predetermined position. It gives the upward force. That is, the cable 14 is arranged outside a concrete member called a so-called outer cable, and a cable having a rust-proof coating layer formed on the outside of a high-strength steel wire is used.

次に、図1及び図2に示す橋桁を架設する方法の一例を参考例として説明する。
まず、橋桁を架設する位置の両側にそれぞれ橋台2,3を構築する。この橋台2,3は、大きな水平方向の力に抵抗できるように、アースアンカー6,7によって地盤又は岩盤に強固に固着する。そして、図3に示すように、これらの橋台2,3上に支承4,5を介して端部横桁となる端部ブロック16’,17’を形成し、橋台2,3に仮固定する。端部ブロック16’,17’は、現場でコンクリートを打設して形成するのが望ましいが、
プレキャストコンクリートによって形成するものであってもよい。端部ブロック16’,
17’の仮固定は、例えば図3に示すように、支承4,5の周辺部に仮固定ブロック19
,20を介挿し、鉛直方向の仮固定鋼材21で締め付ける。
Next, an example of a method for constructing the bridge girder shown in FIGS. 1 and 2 will be described as a reference example .
First, abutments 2 and 3 are constructed on both sides of the position where the bridge girder is constructed. The abutments 2 and 3 are firmly fixed to the ground or the rock by the earth anchors 6 and 7 so as to resist a large horizontal force. Then, as shown in FIG. 3, end blocks 16 ′ and 17 ′ serving as end cross beams are formed on these abutments 2 and 3 via supports 4 and 5, and temporarily fixed to the abutments 2 and 3. . The end blocks 16 'and 17' are preferably formed by placing concrete on site,
It may be formed of precast concrete. End block 16 ',
For example, as shown in FIG. 3, the temporary fixing block 17 '
, 20 are inserted and tightened with a temporarily fixed steel material 21 in the vertical direction.

その後、端部ブロック16’,17’間にケーブル14を張架する。ここで張架するケ
ーブル14は、端部ブロック16’,17’に埋め込まれたシース内に挿通し、両端部は
鋼より線に圧着された定着体にカプラーで延長ケーブル22を継ぎ足し、これを橋台2に定着する。これにより架設中にケーブル14から作用する反力を橋台2を介してアースアンカー6に負担させ、端部ブロック16’には大きな反力が作用しないようにしている。上記定着体にはナット23が螺合されており、完成系において端部ブロック16’,17’に反力を負担させてケーブル14を定着することができるものとする。
Thereafter, the cable 14 is stretched between the end blocks 16 'and 17'. The cable 14 to be stretched here is inserted into a sheath embedded in the end blocks 16 ′ and 17 ′, and the extension cable 22 is added with a coupler to a fixing body in which both ends are crimped to steel strands. Established on Abutment 2. As a result, the reaction force acting from the cable 14 during installation is borne on the earth anchor 6 via the abutment 2 so that no large reaction force acts on the end block 16 '. A nut 23 is screwed onto the fixing body, and the cable 14 can be fixed by applying a reaction force to the end blocks 16 'and 17' in the completed system.

一方、工場又は桁製作ヤードでは、橋軸方向と垂直な断面で分割した複数のプレキャストセグメントを製作する。図4は、上記橋桁を構成するプレキャストセグメント1aの正面図、図5は斜下方からの斜視図である。
上記橋桁1を製作するために用いるプレキャストセグメント1aは、上床版の中央部1
1aすなわち二つのウエブ間の上床版と、鋼ウェブ13と、上床版11の張出し部11bを支持するためのリブ11cと、このリブ11cの先端付近を下床版の側縁部から支持する斜支持部材15とで主要部が構成される。
On the other hand, in a factory or a girder production yard, a plurality of precast segments divided by a cross section perpendicular to the bridge axis direction are produced. 4 is a front view of the precast segment 1a constituting the bridge girder, and FIG. 5 is a perspective view obliquely from below.
The precast segment 1a used for manufacturing the bridge girder 1 is a central portion 1 of the upper floor slab.
1a, ie, an upper floor slab between two webs, a steel web 13, a rib 11c for supporting an overhanging portion 11b of the upper floor slab 11, and a slant that supports the vicinity of the tip of the rib 11c from the side edge of the lower floor slab. A main part is constituted by the support member 15.

鋼ウェブ13の上縁付近には複数のスタッドジベル13aが植設されており、上床版のコンクリートはこれを埋め込むように打設して鋼ウェブ13と強固に一体化する。また、鋼ウェブ13の下端には下床版12の両端部12aとなるコンクリート部材を形成する。この下床版の両端部12aも上床版11と同様に、鋼ウェブ13に植設されたスタッドジベル13aを埋め込むようにコンクリートを打設して形成する。そして、下床版12の中央部側には、鉄筋12bを突き出すように配置しておき、現場で打設するコンクリートとの一体化を図るものとしている。   In the vicinity of the upper edge of the steel web 13, a plurality of stud gibbles 13 a are planted, and the concrete of the upper floor slab is cast so as to be embedded and firmly integrated with the steel web 13. Further, a concrete member that forms both end portions 12 a of the lower floor slab 12 is formed at the lower end of the steel web 13. Similar to the upper floor slab 11, both end portions 12 a of the lower floor slab are formed by casting concrete so as to embed the stud gibber 13 a planted in the steel web 13. And it arrange | positions so that the reinforcing bar 12b may be protruded in the center part side of the lower floor slab 12, and it shall aim at integration with the concrete laid in the field.

上記リブ11cは一端が上床版11aの鋼ウェブ13との接合部付近から橋軸と直角方向に側方へ張出すものであり、一つのプレキャストセグメントに対して一カ所に設ける。このリブ11cの先端付近の下面には斜支持部材15の一端が接合され、この斜支持部材15の他端は鋼ウェブ13と一体となるように打設された下床版の端部12aに接合され、橋桁の架設後において上床版の張り出し部11bに作用する荷重をリブ11cを介して下方から支持するものとする。   One end of the rib 11c extends laterally in the direction perpendicular to the bridge axis from the vicinity of the joint between the upper floor slab 11a and the steel web 13, and is provided at one location with respect to one precast segment. One end of the oblique support member 15 is joined to the lower surface near the tip of the rib 11c, and the other end of the oblique support member 15 is attached to the end portion 12a of the lower floor slab that is integrally formed with the steel web 13. It is assumed that the load acting on the overhanging portion 11b of the upper floor slab after the bridge girder is installed is supported from below through the rib 11c.

支持部材18は、プレキャストセグメント1aをケーブル14上に支持させるために設
けるものであり、上床版11aの下面から下方に突き出したU字型の部材である。そして、下端部に設けられた二つの係止部18aをそれぞれ2本のケーブル14に係止し、プレキャストセグメント1aをケーブル14上に支持するものである。この支持部材18は型鋼等によって形成されており、一つのプレキャストセグメントに1基又は2基が設けられる。
この支持部材18は、橋桁1の支間中央部に用いられるプレキャストセグメントには、
高さの大きいものが取り付けられ、橋桁1の端部近くに用いられるプレキャストセグメントには高さが小さいものが取り付けられる。すなわち、これらの支持部材18で各プレキャストセグメント1aをケーブル14上に支持したときに、各プレキャストセグメントの上面が完成時の縦断線形に沿って平坦に配列されるものとしている。
なお、この支持部材18は、橋桁の完成後もケーブルと橋桁とを連結し、力を伝達する機能を維持するものであるが、この他に架設中におけるプレキャストセグメントの安定を図るために、補助用の支持部材を架設中にのみ使用してもよい。
The support member 18 is provided to support the precast segment 1a on the cable 14, and is a U-shaped member protruding downward from the lower surface of the upper floor slab 11a. And the two latching | locking parts 18a provided in the lower end part are each latched to the two cables 14, and the precast segment 1a is supported on the cable 14. FIG. The support member 18 is formed of mold steel or the like, and one or two are provided in one precast segment.
This support member 18 is a precast segment used in the central part of the span of the bridge girder 1.
A thing with a large height is attached, and a thing with a small height is attached to the precast segment used near the end of the bridge girder 1. That is, when each precast segment 1a is supported on the cable 14 by these support members 18, the upper surface of each precast segment shall be arranged flatly along the vertical alignment at the time of completion.
This support member 18 maintains the function of connecting the cable and the bridge girder and transmitting the force even after the bridge girder is completed, but in addition to this, in order to stabilize the precast segment during erection, The support member may be used only during installation.

上記にようにして形成されたプレキャストセグメント1aは、図6に示すように例えば
クレーン24等によって吊り上げ、橋台付近において支持部材18を介してケーブル14上に支持させる。そして、ケーブル14上を走行させて所定の位置に搬送し、ケーブル14上の所定の位置に仮固定する。順次このような作業を繰り返し、架設する橋桁のほぼ全域に複数のプレキャストセグメント1aを配列する。このとき、配列された各プレキャストセグメントの上床版の上面が、ほぼ所定の高さとなって平坦となるように支持部材18の寸法が設定されている。また、ケーブル14の張力の調整によってプレキャストセグメントの高さ方向の位置を調整することもできる。
As shown in FIG. 6, the precast segment 1 a formed as described above is lifted by, for example, a crane 24 and is supported on the cable 14 via the support member 18 in the vicinity of the abutment. Then, it travels on the cable 14 and is transported to a predetermined position, and temporarily fixed at a predetermined position on the cable 14. Such operations are sequentially repeated, and a plurality of precast segments 1a are arranged in almost the entire area of the bridge girder to be installed. At this time, the dimension of the support member 18 is set so that the upper surface of the upper floor slab of each precast segment arranged is flat at a predetermined height. Further, the position of the precast segment in the height direction can be adjusted by adjusting the tension of the cable 14.

全てのプレキャストセグメント1aをケーブル14上の所定の位置に配置した後、隣接するプレキャストセグメント1aの上床版11a間、上床版11aと端部ブロック16’,17’との間、隣接するプレキャストセグメントの下床版の端部12a間及び下床版端部12aと端部ブロック16’,17’との間に間詰めコンクリートを打設して相互間を連結する。
なお、プレキャストセグメント間の接合は、各プレキャストセグメントの接合面が正確に合致するように形成されている場合には、接着剤で接合することもできる。
After all the precast segments 1a are arranged at predetermined positions on the cable 14, between the upper floor slabs 11a of adjacent precast segments 1a, between the upper floor slab 11a and the end blocks 16 'and 17', Filled concrete is placed between the end portions 12a of the lower floor slab and between the end portion 12a of the lower floor slab and the end blocks 16 'and 17' to connect each other.
In addition, the joining between precast segments can also be joined with an adhesive, when the joining surface of each precast segment is formed so that it may correspond exactly.

次に下床版12の中央部のコンクリートすなわち鋼ウェブ13の下端部にそれぞれ接合されているコンクリート部材12a間にコンクリートを打設する。このとき、型枠は既に形成されている下床版両端部のコンクリート部材12aに支持させ、このコンクリート部材12aから突き出している鉄筋12bを埋め込むようにコンクリートを打設する。このように下床版12が形成されることにより、上床版11aと下床版12と二つの鋼ウェブ13とで閉じた箱型断面となり、大きな剛性を有するものとなる。   Next, the concrete is placed between the concrete members 12 a respectively joined to the concrete at the center of the lower floor slab 12, that is, the lower end of the steel web 13. At this time, the formwork is supported by the concrete members 12a at both ends of the lower floor slab already formed, and concrete is placed so as to embed the reinforcing bars 12b protruding from the concrete members 12a. By forming the lower floor slab 12 in this way, a box-shaped cross section closed by the upper floor slab 11a, the lower floor slab 12, and the two steel webs 13 is obtained, and has a large rigidity.

その後、ケーブル14の緊張力によって橋桁1に軸線方向のプレストレスを導入する。
ケーブル14は、所定の緊張力を導入した状態で端部ブロックすなわち端部横桁16,17に定着し、ケーブル14の反力を橋桁に作用させる。そして、ケーブル14に接続された延長ケーブル22を撤去するとともに、端部ブロック16’,17’を仮固定していた仮固定ブロック19,20および仮固定鋼材21を撤去する。これにより、ケーブル14の反力は橋台2,3から端部横桁16,17に移行し、端部横桁16,17から橋桁1に軸力として伝達される。これにより、両端部が単純支持された箱桁となる。つまり、ケーブル14に作用する引張力と橋桁1に作用する圧縮力とが相殺され、橋台2,3には水平力が作用しない、いわゆる自碇化された構造系に変換される。
Thereafter, axial prestress is introduced into the bridge girder 1 by the tension of the cable 14.
The cable 14 is fixed to the end block, that is, the end cross beams 16 and 17 in a state where a predetermined tension force is introduced, and the reaction force of the cable 14 is applied to the bridge beam. Then, the extension cable 22 connected to the cable 14 is removed, and the temporarily fixed blocks 19 and 20 and the temporarily fixed steel material 21 that have temporarily fixed the end blocks 16 ′ and 17 ′ are removed. As a result, the reaction force of the cable 14 shifts from the abutments 2 and 3 to the end cross beams 16 and 17 and is transmitted from the end cross beams 16 and 17 to the bridge beam 1 as an axial force. As a result, the box girder is simply supported at both ends. That is, the tensile force acting on the cable 14 and the compressive force acting on the bridge girder 1 are offset, and the structure is converted into a so-called self-contained structure system in which no horizontal force acts on the abutments 2 and 3.

さらに、上床版の張出し部11bは、図7に示すように、プレテンショニング方式でプレストレスが導入されたコンクリートパネル25をリブ11c上に敷き並べ、この上で鉄筋を組み立てる。そして、このコンクリートパネル25を型枠とし、一体となるようにコンクリートを打設する。つまり、プレストレスが導入されたコンクリートパネルが型枠として機能するとともに上床版11の一部となる。これによりコンクリートを打設するための型枠の設置及び撤去する工程を省略することができ、工期の短縮が可能となる。   Furthermore, as shown in FIG. 7, the overhanging portion 11b of the upper floor slab lays the concrete panels 25 into which the prestress is introduced by the pretensioning method on the ribs 11c, and assembles the reinforcing bars thereon. And this concrete panel 25 is used as a formwork, and concrete is poured so that it may become one. That is, the concrete panel into which the prestress is introduced functions as a mold and becomes a part of the upper floor slab 11. Thereby, the process of installing and removing the formwork for placing concrete can be omitted, and the construction period can be shortened.

なお、上記橋桁では、架設中にプレキャストセグメントを支持するために張架したケーブル14だけで橋桁1にプレストレスを導入するものとなっているが、プレキャストセグメントの連結後に、断面が箱型となった部分の内側に追加のケーブルを張架し、緊張力を導入して充分なプレストレスを導入することもできる。
また、追加のケーブルは、図8に示すように断面が箱型となった橋桁の下側に配置してもよい。このケーブル26は、両端が端部横桁16,17に定着されるとともに、橋桁の下面に取り付けられた外部支持部材27によって形状が拘束され、この外部支持部材27を介して橋桁1に上方への力を伝達するものとなっている。
In the bridge girder, prestress is introduced into the bridge girder 1 only by the cable 14 stretched to support the precast segment during erection, but the cross section becomes a box shape after the precast segment is connected. An additional cable can be stretched on the inside of the raised part to introduce tension and introduce sufficient prestress.
Further, the additional cable may be arranged below the bridge girder having a box-shaped cross section as shown in FIG. Both ends of the cable 26 are fixed to the end cross beams 16 and 17 and the shape of the cable 26 is constrained by an external support member 27 attached to the lower surface of the bridge girder. It is intended to transmit the power of.

このような追加のケーブルに緊張力を導入することによって、橋桁の支間中央部分は上方に押し上げられる。したがって、緊張力の調整によって橋桁の支間部分が所定の高さに正確に設定される。   By introducing tension in such an additional cable, the central part of the span of the bridge girder is pushed upward. Accordingly, the span portion of the bridge girder is accurately set to a predetermined height by adjusting the tension.

なお、上記ケーブル26は、プレキャストセグメント1aを支持するケーブル14とともに最初に配置しておいてもよいし、プレキャストセグメント1aが連結されてから所定の位置に配置してもよい。そして、プレキャストセグメントが連結された後に緊張力を導入する。
また、このケーブル26は、断面形状が箱型となった部分の内側に配置されるケーブルと同様に鋼より線に被覆を施したものを用いることができる。また、ケーブルを内包した薄いコンクリート板とすることもできる。
Note that the cable 26 may be disposed first together with the cable 14 supporting the precast segment 1a, or may be disposed at a predetermined position after the precast segment 1a is connected. And tension is introduced after the precast segments are connected.
The cable 26 may be a cable in which a steel wire is coated similarly to a cable arranged inside a box-shaped section. Moreover, it can also be set as the thin concrete board which included the cable.

次に、本願に係る発明の実施形態である橋桁の架設方法について説明する。
図9は、この方法によって架設することができる橋桁の一例を示す概略側面図であり、
図10は断面図である。
この橋桁31は、図1に示す橋桁1と同様に、二つの橋台2,3間に単純支持されたものであり、現場で打設されたコンクリートからなる上床版41と、主にプレキャストコンクリートで形成された下床版42と、これらを上下に連結する鋼ウェブ43と、これらによって囲まれる範囲内に配置され、上床版41と下床版42とにプレストレスを導入するケーブル44とで主要部が形成されている。
Next, a construction method of a bridge girder which is an embodiment of the invention according to the present application will be described.
FIG. 9 is a schematic side view showing an example of a bridge girder that can be installed by this method.
FIG. 10 is a cross-sectional view.
This bridge girder 31 is simply supported between the two abutments 2 and 3 in the same manner as the bridge girder 1 shown in FIG. 1, and is composed of an upper floor slab 41 made of concrete placed on site and mainly precast concrete. The lower floor slab 42 formed, the steel web 43 that connects them up and down, and the cable 44 that is disposed within the range surrounded by these and introduces prestress into the upper floor slab 41 and the lower floor slab 42 are mainly used. The part is formed.

この橋桁では、鋼ウェブ43が矩形の鋼板から形成されており、橋軸方向に分割され、
所定の間隔で二列に配列されている。これらの鋼板は、上縁付近及び下縁付近を上床版41及び下床版42のコンクリート中に埋め込んで接合するものであってもよいし、上縁及び下縁に沿って水平なフランジを設け、このフランジに取り付けたスタッドジベル等のずれ止め部材を埋め込むようにコンクリートを打設するものであってもよい。
In this bridge girder, the steel web 43 is formed from a rectangular steel plate and is divided in the bridge axis direction,
They are arranged in two rows at a predetermined interval. These steel plates may be bonded by embedding the vicinity of the upper edge and the vicinity of the lower edge in the concrete of the upper floor slab 41 and the lower floor slab 42, or providing horizontal flanges along the upper edge and the lower edge. In addition, concrete may be placed so as to embed a stopper member such as a stud gibber attached to the flange.

上記橋桁31の架設は次のように行うことができる。
図1に示す橋桁1と同様に、橋台2,3を構築し、これらの橋台2,3上に支承4,5を介して端部ブロック46,47を仮固定する。そして、端部ブロック46,47間にケーブル44を張架する。
The bridge girder 31 can be erected as follows.
Similarly to the bridge girder 1 shown in FIG. 1, the abutments 2 and 3 are constructed, and the end blocks 46 and 47 are temporarily fixed on the abutments 2 and 3 via the supports 4 and 5. Then, the cable 44 is stretched between the end blocks 46 and 47.

一方、工場又は桁製作ヤードで製作するプレキャストセグメント31aは、図 11に示すように、コンクリートの下床版42と、これに立ち上げられた鋼ウェブ43と、ケーブル44にこのプレキャストセグメントを吊り支持させるための吊り支持部材45とで主要部が形成されたものとする。また、鋼ウェブ43となる鋼板を取り付けず、下床版42に吊り支持部材45を取り付けたものとし、鋼ウェブ43はこのプレキャストセグメントを現場で連結した後に取り付けるものとすることもできる。   On the other hand, the precast segment 31a manufactured in the factory or the girder yard is suspended and supported by a concrete lower floor slab 42, a steel web 43 raised on this, and a cable 44, as shown in FIG. It is assumed that the main part is formed with the suspension support member 45 for causing the above. Further, it is possible to attach the suspension support member 45 to the lower floor slab 42 without attaching the steel plate to be the steel web 43, and the steel web 43 may be attached after the precast segments are connected in the field.

このプレキャストセグメント31aを現場に搬入し、図12に示すようにクレーン48等によって吊り上げ、吊り支持部材45を介してケーブル44に吊り支持させる。そして、ケーブル44に沿って搬送し、順次に複数のプレキャストセグメント31aを所定の位置に配列する。このとき吊り支持部材45の寸法等によって、各プレキャストセグメント31a下縁が、橋桁の下面の高さとほぼ一致するように支持される。その後、隣り合うプレキャストセグメント31aの下床版42間及び下床版42と端部ブロック46,47との間に間詰めコンクリートを打設して連結する。そして、必要に応じて下床版12にプレストレスを導入する。このプレストレスは、予めプレキャストセグメントの下床版42に形成しておいたダクトに緊張材を挿通し、この緊張材によって導入するものであってもよいし、下床版に沿って外ケーブルを配置してもよい。   The precast segment 31a is carried into the site, and is lifted by a crane 48 or the like as shown in FIG. And it conveys along the cable 44 and arranges the several precast segment 31a in a predetermined position sequentially. At this time, the lower edge of each precast segment 31a is supported so as to substantially coincide with the height of the lower surface of the bridge girder, depending on the dimensions of the suspension support member 45 and the like. Thereafter, the interstitial concrete is placed between the lower floor slabs 42 adjacent to each other and between the lower floor slab 42 and the end blocks 46 and 47 to be connected. And prestress is introduce | transduced into the lower floor slab 12 as needed. This pre-stress may be one in which a tension material is inserted into a duct previously formed in the lower floor slab 42 of the precast segment and introduced by this tension material, or an outer cable is connected along the lower floor slab. You may arrange.

次に、連結された下床版42上で上床版41を形成するための型枠を組み立て、コンクリートを打設して上床版を形成する。
上床版41と下床版42とが二つの端部ブロック46,47間で連続するように形成されると、橋台に定着されているケーブル44を端部ブロック46,47すなわち形成された橋桁の横桁部分で定着し、ケーブル44の反力を橋桁31に作用させる。これにより、橋桁31にはプレストレスがさらに導入され、橋桁上に作用する活荷重に抵抗できるものとなる。
Next, a form for forming the upper floor slab 41 is assembled on the connected lower floor slab 42, and concrete is placed to form an upper floor slab.
When the upper floor slab 41 and the lower floor slab 42 are formed so as to be continuous between the two end blocks 46 and 47, the cable 44 fixed to the abutment is connected to the end blocks 46 and 47, that is, the bridge girder formed. Fixing is performed at the cross beam portion, and the reaction force of the cable 44 is applied to the bridge beam 31. As a result, prestress is further introduced into the bridge girder 31 and can resist the live load acting on the bridge girder.

なお、上記架設方法では、プレキャストセグメントの下床版部分を橋軸方向に連結した後に上床版41のコンクリートを打設するものとしているが、下床版を連結する前の状態で型枠を設置し、上床版のコンクリートを打設するとともに、各プレキャストセグメントの下床版を連結するものであってもよい。
また、橋桁の断面が箱状となった内側又は図8に示す橋桁と同様に橋桁の下側に追加のケーブルを配置し、下床版及び上床版が連結された後に緊張力を導入して橋桁の両端部に定着することもできる。
In the above construction method, the concrete of the upper floor slab 41 is placed after the lower floor slab portion of the precast segment is connected in the direction of the bridge axis, but the formwork is installed in a state before the lower floor slab is connected. Then, the concrete of the upper floor slab may be cast and the lower floor slab of each precast segment may be connected.
In addition, arrange an additional cable inside the bridge girder in a box shape or under the girder like the bridge girder shown in Fig. 8, and introduce tension after the lower floor slab and upper floor slab are connected. It can be fixed at both ends of the bridge girder.

図13は、本願発明に係る架設方法によって構築することができる橋桁の他の例を示す概略側面図であり、図14は断面図である。
この橋桁51は、全断面がコンクリートで形成されており、路面を形成する床版61と、この床版61の側縁部から下方に突き出した補剛桁部62と、床版の側縁部から上方に立ち上げられた側板部63とを有するものである。そして、図1に示す橋桁と同様に二つの橋台2,3間に単純支持されたものであり、この橋桁の両端部に定着されて側板部63の外側に張架されたケーブル64によってプレストレスが導入されている。また、橋桁51の下側には両端部から下方に垂れ下がるように張設された下弦材68を備えており、橋桁51の下面から下方に突き出した外部支持部材69の下端を支持するものとなっている。
FIG. 13 is a schematic side view showing another example of a bridge girder that can be constructed by the erection method according to the present invention, and FIG. 14 is a sectional view.
This bridge girder 51 is made of concrete in its entire cross section, and includes a floor slab 61 that forms a road surface, a stiffening girder portion 62 that protrudes downward from a side edge of the floor slab 61, and a side edge of the floor slab. And a side plate portion 63 raised upward. 1 is simply supported between the two abutments 2 and 3 in the same manner as the bridge girder shown in FIG. 1, and is prestressed by cables 64 fixed to both ends of the bridge girder and stretched outside the side plate portion 63. Has been introduced. A lower chord member 68 is provided below the bridge girder 51 so as to hang downward from both ends, and supports the lower end of the external support member 69 protruding downward from the lower surface of the bridge girder 51. ing.

上記橋桁51の軸線方向に所定間隔をおいた位置には、上記側板部63と補剛桁部62との外側に、鉛直リブ70が設けられ、外側の側面がほぼ鉛直となっている。そして、この鉛直面の所定の高さに支持部材65が取り付けられ、この支持部材65がケーブル64に係止され、橋桁51からケーブル64に鉛直方向の荷重が伝達されるものとなっている。   Vertical ribs 70 are provided outside the side plate portion 63 and the stiffening girder portion 62 at positions spaced apart in the axial direction of the bridge girder 51, and the outer side surfaces are substantially vertical. A support member 65 is attached to a predetermined height of the vertical surface, the support member 65 is locked to the cable 64, and a load in the vertical direction is transmitted from the bridge girder 51 to the cable 64.

上記側板部63は、床版61及び補剛桁部62と一体となったコンクリートで形成されており、橋桁51の一部として機能するともに、高欄として用いられるものである。そして、橋桁51の軸線方向に所定間隔で円形の貫通孔63aが設けられ、重量を軽減している。   The side plate part 63 is formed of concrete integrated with the floor slab 61 and the stiffening girder part 62 and functions as a part of the bridge girder 51 and is used as a rail. And the circular through-hole 63a is provided in the axial direction of the bridge girder 51 at predetermined intervals, and the weight is reduced.

上記外部支持部材69は、鋼管からなり下端は下弦材68を構成するコンクリート板68aに接続されている。下弦材68は橋桁51の両端部間で連続する薄いコンクリート板68aと、このコンクリート板の下面に設けられた溝に嵌め入れられたケーブル68bとによって主要部が構成され、コンクリート板68aにはプレストレスが導入されている。   The external support member 69 is made of a steel pipe, and the lower end thereof is connected to a concrete plate 68 a constituting the lower chord material 68. The lower chord material 68 is mainly composed of a thin concrete plate 68a continuous between both ends of the bridge girder 51 and a cable 68b fitted in a groove provided on the lower surface of the concrete plate. Stress has been introduced.

上記橋桁51の架設は次のように行うことができる。
図1に示す橋桁と同様に、橋台2,3上に端部ブロック66,67を形成し、これらの間にケーブル64を張架する。一方、橋桁51を構成するプレキャストセグメント51aは、床版61と補剛桁部62と側板部63とを含む橋桁を軸線方向の所定長さに分割した形状に製作する。このプレキャストセグメント51aの両側部に支持部材65を取り付け、張架された2本のケーブル64にそれぞれ係止し、2本のケーブル間に吊り支持する。そして、図15に示すようにケーブル64上を滑動させて所定の位置に搬送する。このように複数のプレキャストセグメントを吊り支持し、搬送して所定の位置に配列する。このとき、支持部材65が取り付けられている位置がプレキャストセグメント毎に調整されており、ケーブル64上で配列されたときに、各プレキャストセグメントがほぼ橋桁を架設する高さに位置するものとなっている。
The bridge girder 51 can be erected as follows.
As with the bridge girder shown in FIG. 1, end blocks 66 and 67 are formed on the abutments 2 and 3, and a cable 64 is stretched between them. On the other hand, the precast segment 51a constituting the bridge girder 51 is manufactured in a shape in which a bridge girder including a floor slab 61, a stiffening girder part 62, and a side plate part 63 is divided into a predetermined length in the axial direction. Support members 65 are attached to both sides of the precast segment 51a, locked to the two cables 64 stretched, and supported by being suspended between the two cables. And as shown in FIG. 15, it slides on the cable 64 and conveys to a predetermined position. In this manner, the plurality of precast segments are suspended and supported, conveyed, and arranged at predetermined positions. At this time, the position where the support member 65 is attached is adjusted for each precast segment, and when arranged on the cable 64, each precast segment is positioned at a height at which the bridge beam is constructed. Yes.

なお、ケーブル64上を搬送するプレキャストセグメント51aは、一基ずつ搬送してもよいが、図15に示すようにケーブル64上で二基ずつを仮接合し、これらを一体として搬送することができる。これによりプレキャストセグメント51aを安定した状態で搬送することができる。また、外部支持部材69が接続されるプレキャストセグメントは、搬送するまでに所定位置の下面に外部支持部材69となる鋼管を取り付けておくのが望ましい。   In addition, although the precast segment 51a conveyed on the cable 64 may be conveyed one by one, as shown in FIG. 15, two can be temporarily joined on the cable 64 and these can be conveyed as a unit. . Thereby, the precast segment 51a can be conveyed in a stable state. Moreover, it is desirable to attach the steel pipe used as the external support member 69 to the lower surface of a predetermined position by the precast segment to which the external support member 69 is connected before conveyance.

ケーブル64上に配列されたプレキャストセグメント51aは、隣接するプレキャストセグメント間及びプレキャストセグメント51aと端部ブロック66,67間に間詰めコンクリートを充填することによって連結する。そして、橋台2,3に定着されているケーブル64を端部ブロック66,67で定着し、ケーブル64の反力を橋桁51に作用させて橋桁51にプレストレスを導入する。   The precast segments 51a arranged on the cable 64 are connected by filling between the adjacent precast segments and between the precast segments 51a and the end blocks 66, 67 by filling concrete. The cable 64 fixed to the abutments 2 and 3 is fixed by the end blocks 66 and 67, and the reaction force of the cable 64 is applied to the bridge girder 51 to introduce prestress into the bridge girder 51.

さらに、橋桁51の下方に下弦材68を構成するケーブル68bを張架し、プレキャストコンクリート板68aをこのケーブル上に配列するともに、これらを連結して下弦材68を形成する。ただし、プレキャストコンクリート板68aは、図15に示すように両端部で橋桁の端部と連結せず、下弦材の軸線方向の大きな変形を許容するものとしておく。そして、ケーブル68bの張力の調整により下弦材68の高さを調整し、外部支持部材69の下端と接合するとともに、下弦材68が橋桁51の自重及び載荷される荷重の一部を負担するように外部支持部材69に圧縮力を導入する。これにより橋桁を上方に押し上げ、橋桁の高さを正確な位置に調整することができる。下弦材の両端部は、下弦材の張力の調整が終了した後に連結する。   Further, a cable 68b constituting the lower chord material 68 is stretched below the bridge girder 51, and precast concrete plates 68a are arranged on the cable, and these are connected to form the lower chord material 68. However, as shown in FIG. 15, the precast concrete board 68a is not connected to the ends of the bridge girders at both ends, and allows a large deformation in the axial direction of the lower chord material. Then, the height of the lower chord material 68 is adjusted by adjusting the tension of the cable 68b and joined to the lower end of the external support member 69, and the lower chord material 68 bears the weight of the bridge girder 51 and a part of the loaded load. A compressive force is introduced into the external support member 69. As a result, the bridge girder can be pushed upward, and the height of the bridge girder can be adjusted to an accurate position. Both ends of the lower chord material are connected after the adjustment of the tension of the lower chord material is completed.

なお、上記橋桁51は下弦材68を有するものとなっているが、コンクリートの床版61と補剛桁部62と側板部63とで形成される橋桁51のみで荷重を支持するものとし、下弦材68を用いない構造を採用することもできる。   The bridge girder 51 has a lower chord member 68. However, only the bridge girder 51 formed by the concrete floor slab 61, the stiffening girder portion 62, and the side plate portion 63 supports the load. A structure that does not use the material 68 can also be employed.

本願発明の一実施形態である架設方法と同様にケーブルを用いて構築することができる橋桁の概略側面図である。It is a schematic side view of the bridge girder which can be constructed | assembled using a cable similarly to the construction method which is one Embodiment of this invention. 図1に示す橋桁の断面図である。It is sectional drawing of the bridge girder shown in FIG. 図1に示す橋桁の架設中における橋桁端部の構造を示す概略側面図である。It is a schematic side view which shows the structure of the bridge girder edge part in construction of the bridge girder shown in FIG. 図1に示す橋桁を構成するプレキャストセグメントの正面図である。It is a front view of the precast segment which comprises the bridge girder shown in FIG. 図1に示す橋桁を構成するプレキャストセグメントの斜下方からの斜視図である。It is a perspective view from diagonally downward of the precast segment which comprises the bridge girder shown in FIG. 図1に示す橋桁の架設方法を示す概略図である。It is the schematic which shows the construction method of the bridge girder shown in FIG. 図1に示す橋桁の上床版を形成する方法を示す概略斜視図である。It is a schematic perspective view which shows the method of forming the upper floor slab of the bridge girder shown in FIG. 図1に示す橋桁と同じ架設方法を利用して架設することができる他の橋桁の例を示す概略側面図である。It is a schematic side view which shows the example of the other bridge girder which can be constructed using the same construction method as the bridge girder shown in FIG. 本願発明の実施形態である架設方法によって構築することができる橋桁の概略側面図である。It is a schematic side view of the bridge girder which can be constructed | assembled by the construction method which is embodiment of this invention. 図9に示す橋桁の断面図である。It is sectional drawing of the bridge girder shown in FIG. 図9に示す橋桁を構成するプレキャストセグメントの斜視図である。It is a perspective view of the precast segment which comprises the bridge girder shown in FIG. 図9に示す橋桁の架設方法を示す概略図である。It is the schematic which shows the construction method of the bridge girder shown in FIG. 本願発明の他の実施形態である架設方法によって構築することができる橋桁の概略側面図である。It is a schematic side view of the bridge girder which can be constructed | assembled by the construction method which is other embodiment of this invention. 図13に示す橋桁の断面図である。It is sectional drawing of the bridge girder shown in FIG. 図13に示す橋桁の架設方法を示す概略図である。It is the schematic which shows the construction method of the bridge girder shown in FIG.

符号の説明Explanation of symbols

1:橋桁、 1aプレキャストセグメント、 2,3:橋台、 4,5:支承、
6,7:アースアンカー、
11:上床版、 11a:上床版の中央部、 11b:上床版の張り出し部、 11c:リブ、 11d:現場で打設されるコンクリート、 12:下床版、 12a:下床版端部のコンクリート部材、 12b:鉄筋、 13:鋼ウェブ、 13a:スタッドジベル、 13b:コンクリートのリブ、 14:ケーブル(緊張材)、 15:斜支持部材、 16,17:端部横桁、 16’,17’:端部ブロック、 18:支持部材、 18a:係止部、 19,20:仮固定ブロック、
21:仮固定鋼材、 22:延長ケーブル、 23:ナット、 24:クレーン、
25:コンクリートパネル、 26:下弦材、 27:外部支持部材、
31:橋桁、 31a:プレキャストセグメント、
41:上床版、 42:下床版、 43:鋼ウェブ、 44:ケーブル(緊張材)、 45:吊り支持部材、 46,47:端部ブロック、 48:クレーン、
51:橋桁、 51a:プレキャストセグメント、
61:床版、 62:補剛桁部、 63:側板部、 63a:貫通孔、 64:ケーブル(緊張材)、 65:支持部材、 66,67:端部ブロック、 68:下弦材、 68a:コンクリート板、 68b:ケーブル、 69:外部支持部材、 70:鉛直リブ
1: bridge girder, 1a precast segment, 2, 3: abutment, 4, 5: support,
6, 7: Earth anchor,
11: Upper floor slab, 11a: Center part of upper floor slab, 11b: Overhanging part of upper floor slab, 11c: Rib, 11d: Concrete placed on site, 12: Lower floor slab, 12a: Concrete at the end of lower floor slab Member, 12b: Reinforcing bar, 13: Steel web, 13a: Stud gibber, 13b: Concrete rib, 14: Cable (tension material), 15: Diagonal support member, 16, 17: End cross beam, 16 ', 17' : End block, 18: support member, 18a: locking portion, 19, 20: temporary fixing block,
21: Temporarily fixed steel material, 22: Extension cable, 23: Nut, 24: Crane,
25: Concrete panel, 26: Lower chord material, 27: External support member,
31: Bridge girder, 31a: Precast segment,
41: Upper floor slab, 42: Lower floor slab, 43: Steel web, 44: Cable (tension material), 45: Suspension support member, 46, 47: End block, 48: Crane,
51: Bridge girder, 51a: Precast segment,
61: Floor slab, 62: Stiffening girder part, 63: Side plate part, 63a: Through hole, 64: Cable (tension material), 65: Support member, 66, 67: End block, 68: Lower chord material, 68a: Concrete plate, 68b: Cable, 69: External support member, 70: Vertical rib

Claims (5)

コンクリートからなる上床版及び下床版と、これらを上下に連結する鋼部材とによって断面が箱状となった橋桁の架設方法であって、
2つの橋台間に緊張材を張架する工程と、
前記橋桁を構成する前記上床版と前記下床版と前記鋼部材とのうちの少なくとも前記下床版を含む部材を橋軸方向の所定長さに分割した複数のプレキャストセグメントを形成する工程と、
前記プレキャストセグメントを用いて断面が箱状となる領域の内側を前記緊張材が通過するように該プレキャストセグメントを該緊張材に支持させ、該緊張材に沿って複数のプレキャストセグメントを該橋桁を架設する高さとほぼ一致する位置に配列する工程と、
配列された複数のプレキャストセグメントを橋軸方向に連結する工程と、
前記プレキャストセグメントが連結された橋桁の両端部を支持するとともに、前記緊張材を前記橋桁の端部に定着し、該緊張材に導入された緊張力によって前記橋桁にプレストレスを導入する工程とを含むものとし、
前記プレキャストセグメントは、前記下床版から上方に立ち上げられた吊り支持部材により前記緊張材から懸垂支持し、
該吊り支持部材の寸法により、前記プレキャストセグメントを緊張材に沿って支持するときに、ほぼ橋桁を架設する高さに調整して配列するものであり、
前記鋼部材と前記上床版との全部又は一部は、前記プレキャストキャストセグメントが緊張材上の所定の位置に支持された後に、前記緊張材が張架されている範囲を囲むように形成することを特徴とする橋桁の架設方法。
A method for erection of a bridge girder having a box-shaped cross section by means of an upper floor slab and a lower floor slab made of concrete and a steel member that connects them up and down,
Stretching the tension material between the two abutments,
Forming a plurality of precast segments obtained by dividing a member including at least the lower floor slab of the upper floor slab, the lower floor slab, and the steel member constituting the bridge girder into a predetermined length in a bridge axis direction;
The precast segment is supported by the tendon so that the tendon passes through the inside of the box-shaped region using the precast segment, and a plurality of precast segments are installed along the tendon. Arranging at a position substantially coincident with the height to be
Connecting a plurality of precast segments arranged in the direction of the bridge axis;
Supporting both ends of the bridge girder to which the precast segment is connected, fixing the tendon to the end of the bridge girder, and introducing prestress to the bridge girder by the tension force introduced into the tendon. Including
The precast segment is suspended from the tendon by a suspension support member raised upward from the lower floor slab,
According to the dimensions of the suspension support member, when supporting the precast segment along the tension material, it is arranged so as to be adjusted to the height at which the bridge girder is constructed.
All or part of the steel member and the upper floor slab are formed so as to surround a range in which the tension material is stretched after the precast cast segment is supported at a predetermined position on the tension material. A construction method of bridge girder characterized by
前記鋼部材は前記複数のプレキャストセグメント毎に分離していることを特徴とする請求項1に記載の橋桁の架設方法。 2. The bridge girder construction method according to claim 1, wherein the steel member is separated for each of the plurality of precast segments. コンクリートからなる床版と、この床版の側縁部から下方に突き出した補剛桁部又はこの床版の側縁部から上方に立ち上げられた側板部とを有する橋桁の架設方法であって、A bridge girder erection method comprising a concrete floor slab and a stiffening girder protruding downward from a side edge of the floor slab or a side plate raised upward from the side edge of the floor slab. ,
2つの橋台間に緊張材を張架する工程と、  Stretching the tension material between the two abutments,
前記橋桁を橋軸方向の所定長さに分割した複数のプレキャストセグメントを形成する工程と、  Forming a plurality of precast segments obtained by dividing the bridge girder into a predetermined length in the bridge axis direction;
前記プレキャストセグメントを前記緊張材に支持させ、該緊張材に沿って複数のプレキャストセグメントを該橋桁を架設する高さとほぼ一致する位置に配列する工程と、  Supporting the precast segment on the tendon, and arranging a plurality of precast segments along the tendon at a position substantially coincident with the height of the bridge girder;
配列された複数のプレキャストセグメントを橋軸方向に連結する工程と、  Connecting a plurality of precast segments arranged in the direction of the bridge axis;
前記プレキャストセグメントが連結された橋桁の両端部を支持するとともに、前記緊張材を前記橋桁の端部に定着し、該緊張材に導入された緊張力によって前記橋桁にプレストレスを導入する工程とを含むものとし、  Supporting both ends of the bridge girder to which the precast segment is connected, fixing the tendon to the end of the bridge girder, and introducing prestress to the bridge girder by the tension force introduced into the tendon. Including
前記プレキャストセグメントの両側部における前記補剛桁部又は前記側板部の外側面に支持部材を取り付けておき、  A support member is attached to the outer surface of the stiffening girder part or the side plate part on both sides of the precast segment,
該支持部材を張架された2本の前記緊張材にそれぞれ係止して、該プレキャストセグメントを2本の緊張材間に吊り支持し、  The supporting member is respectively engaged with the two tension members stretched, and the precast segment is suspended and supported between the two tension members,
前記支持部材の取り付け位置の調整によって、各プレキャストセグメントが緊張材上で配列されたときに、ほぼ橋桁を架設する高さに配列するものであることを特徴とする橋桁の架設方法。  A bridge girder laying method characterized in that, when the precast segments are arranged on the tendon by adjusting the mounting position of the support member, the bridge girder is arranged at a height at which the bridge girder is erected.
前記橋桁の下側に下弦材を張設するとともに、該下弦材と該橋桁とを上下方向に連結する柱状の外部支持部材を設け、
前記プレキャストセグメントを連結した後に、該下弦材の張力を調整することによって該橋桁の支間部分の高さを所定の高さに設定することを特徴とする請求項1、請求項2又は請求項3に記載の橋桁の架設方法。
A lower chord member is stretched under the bridge girder, and a columnar external support member that connects the lower chord member and the bridge girder in the vertical direction is provided.
After connecting the precast segments, claim 1, characterized in that to set the height of the span portion of該橋digit at a predetermined height by adjusting the tension of the lower chord, claim 2 or claim 3 erection method of bridge girder described.
前記下弦材の両端は、張力を調整した状態で前記橋桁の両端部に定着することを特徴とする請求項4に記載の橋桁の架設方法。 The bridge girder construction method according to claim 4 , wherein both ends of the lower chord member are fixed to both ends of the bridge girder in a state in which tension is adjusted.
JP2005230019A 2005-08-08 2005-08-08 Bridge girder construction method Active JP4056540B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005230019A JP4056540B2 (en) 2005-08-08 2005-08-08 Bridge girder construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005230019A JP4056540B2 (en) 2005-08-08 2005-08-08 Bridge girder construction method

Publications (2)

Publication Number Publication Date
JP2007046277A JP2007046277A (en) 2007-02-22
JP4056540B2 true JP4056540B2 (en) 2008-03-05

Family

ID=37849328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005230019A Active JP4056540B2 (en) 2005-08-08 2005-08-08 Bridge girder construction method

Country Status (1)

Country Link
JP (1) JP4056540B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929130A (en) * 2010-09-19 2010-12-29 中铁十二局集团有限公司 Hanging basket device for closure construction of continuous box girders

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4914994B2 (en) * 2007-03-29 2012-04-11 オリエンタル白石株式会社 Construction method of direct-type suspension floor slab bridge
JP2014114591A (en) * 2012-12-10 2014-06-26 Ps Mitsubishi Construction Co Ltd Concrete bridge girder and construction method for the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929130A (en) * 2010-09-19 2010-12-29 中铁十二局集团有限公司 Hanging basket device for closure construction of continuous box girders

Also Published As

Publication number Publication date
JP2007046277A (en) 2007-02-22

Similar Documents

Publication Publication Date Title
KR100423757B1 (en) Prestressed composite truss girder and construction method of the same
KR101693256B1 (en) Construction method of prefabricated psc bridge
JP2003268719A (en) Steel-concrete composite beam and its installation method
JP2006316580A (en) Corrugated steel plate web pc composite beam and construction method of bridge using corrugated steel plate web pc composite beam
KR20170121815A (en) Corrugated Steel Plate Web-PSC beam And Bridge Construction Method Thereof
JP3701250B2 (en) Cable stayed bridge and its construction method
JP4056540B2 (en) Bridge girder construction method
JP5399133B2 (en) Main girder, bridge and bridge construction method
JP3844743B2 (en) Box girder bridge structure and its construction method
JP4336659B2 (en) Construction method of upper-floor type suspension floor slab bridge
JP5937898B2 (en) Construction method of box girder bridge
JP3737475B2 (en) Box girder bridge structure and construction method
KR20040054639A (en) External Prestressing Method of PS Concrete Composite Girder Bridge by Anchoring and Holding Tendon on Precast Cross-Beam
JP2750556B2 (en) Manufacturing method of prestressed concrete girder
KR20130090709A (en) Construction method for corrugated steel plate web-psc composite beam
KR20050018589A (en) Method of construction for girder bridge
JP4375788B2 (en) Construction method of upper-floor type suspension floor slab bridge
JP4493245B2 (en) Suspended floor slab bridge and method for reinforcing suspended floor slab
JP2963879B2 (en) Bridge girder
JP3877995B2 (en) How to build a string string bridge
KR101209674B1 (en) The site built-up hybrid girder which is prestressed by gap difference of connection face of blocks
CN111005301A (en) Assembled combined beam bridge and construction method thereof
KR101004221B1 (en) One Way Waffle Slab System Continued by Post-tensioning and Post-tensioning method of the same
JP2009221714A (en) Composite girder bridge of prestressing steel concrete, and its erection method
JP2000104219A (en) Erection of combined truss bridge

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070801

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070814

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071005

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071211

R150 Certificate of patent or registration of utility model

Ref document number: 4056540

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131221

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250