CN202323780U CN 201120474033 CN201120474033U CN202323780U CN 202323780 U CN202323780 U CN 202323780U CN 201120474033 CN201120474033 CN 201120474033 CN 201120474033 U CN201120474033 U CN 201120474033U CN 202323780 U CN202323780 U CN 202323780U
Authority
CN
China
Prior art keywords
suspender belt
jack
crossbeam
closure section
installing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120474033
Other languages
Chinese (zh)
Inventor
孙亚峰
郑邦友
温秉银
魏力
谢格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 23rd Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
China Railway 23rd Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 23rd Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical China Railway 23rd Bureau Group Co Ltd
Priority to CN 201120474033 priority Critical patent/CN202323780U/en
Application granted granted Critical
Publication of CN202323780U publication Critical patent/CN202323780U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a bottom die suspending device of a midspan closure section. The bottom die suspending device comprises a hanging belt and a lifting device for lifting the hanging belt, wherein the lifting device is arranged on a supporting beam and comprises a first jack and a second jack, and a cross beam is arranged between the first jack and the second jack and is detachably connected with the hanging belt. According to the utility model, by the manner of erecting the cross beam between the first jack and the second jack to form a carrying beam, the hanging belt penetrates through the cross beam to realize detachable connection, the jacks are both used in the construction process before a bottom die in the closure section is suspended, as a top beam, a stiff framework and the like all comprise jacks, so that the jacks can be obtained on a construction site without being purchased additionally, and thus, the cost is saved; and meanwhile, compared with a winch, the jacks adopted as the lifting device have the beneficial effects of simple structure and light self-weight.

Description

Stride the bed die suspension arrangement of closure section in a kind of
Technical field
The utility model relates to the construction equipment of striding the closure section in a kind of, strides the bed die suspension arrangement of closure section in particularly a kind of.
Background technology
The wide-span case beam cantilever pouring mainly is divided into following three parts: 0# section construction, cantilever pouring are partly constructed and closure section construction, wherein 0# section construction, cantilever pouring is partly constructed and closure section construction in the end bay closure part, all adopt cast-in-place cantilever method usually; The used main equipment of cast-in-place cantilever method is Hanging Basket, through the reach of Hanging Basket, symmetrically to both sides span centre paragraph by paragraph pouring concrete; And apply prestressing force, so cycle operation, but in stride the construction of closure section; Because closure section two beam sections are separated, and can't suspend Hanging Basket in midair, therefore; In stride closure section and need change into usually and adopt the suspension bracket method to stride the construction of closure section in carrying out: the Hanging Basket that promptly earlier former construction is adopted is removed; After removing Hanging Basket, between two beam sections of need closure, suspension bracket is installed again, through suspender belt the bed die of suspension bracket with the closure section is connected again; Install the back through suspender belt with bed die lifting and adjustment bed die absolute altitude, accomplish again and follow-uply stride the construction of closure section part in other.
The main device of suspension bracket method construction is prefabricated brace summer, and brace summer is provided with hoist engine, and hoist engine links to each other with suspender belt, after hoist engine can be promoted to specified altitude assignment with suspender belt, through pin-and-hole preset on the suspender belt, suspender belt and brace summer is fixed.Its mounting method is following: at first need be according to the prefabricated brace summer of closure section span; Then brace summer is lifted between the two closure sections, forms, again through suspension bracket all the other templates of mating formation in order to support the suspension bracket of whole closure section construction; Form bottom die platform; Be the basis again with the bottom die platform, side form and internal mold are installed, until accomplishing whole closure section.
But it has following weak point:
1, the equipment component that adopted of suspension bracket construction such as hoist engine etc., owing in the preorder work progress, do not use, and all be difficult at the construction field (site) seek, need during construction to prepare separately, increased construction cost.
2, with hoist engine as lifting appliance, complex structure, from great has increased the additional load of closed beam section, and hoist engine and suspender belt dismounting are inconvenient.
The utility model content
The technical problem that the utility model will solve is to overcome the above-mentioned deficiency of prior art, and a kind of bed die suspension arrangement of striding the closure section in simple in structure, with low cost is provided.
For solving the problems of the technologies described above, the utility model provides following technical scheme:
Stride the bed die suspension arrangement of closure section in a kind of; Comprise suspender belt and be used to promote the lifting appliance of suspender belt; Said lifting appliance is arranged on the brace summer; Said lifting appliance comprises first jack and second jack, is provided with crossbeam between said first jack and second jack, and said crossbeam is connected with suspender belt is dismantled and assembled.
Through the mode of setting up crossbeam in the middle of first jack and second jack; Form shoulder pole girder, suspender belt passes from crossbeam can realize dismantled and assembled connection, in the work progress of jack before the suspension of closure section bed die use is arranged all; As all including jack at back timber, stiff skeleton etc.; Can obtain jack at the construction field (site), need not to purchase separately, provide cost savings; Simultaneously, adopt jack, compare, have beneficial effect simple in structure, that deadweight is lighter than hoist engine as lifting appliance.
Be provided with pin-and-hole on said suspender belt and the crossbeam, be provided with removable bearing pin between said suspender belt and crossbeam.Cooperate with pin-and-hole through bearing pin, realize that suspender belt is connected with the dismantled and assembled of crossbeam, when bearing pin passes crossbeam and be fixed on the pin-and-hole, suspender belt is connected to the upper surface of crossbeam, can realize fixing through bearing pin; When needs dismounting or replacing bearing pin, only need got bearing pin and get final product.
Said crossbeam is provided with the first suspender belt installing hole, and the said first suspender belt installing hole runs through the end face and the bottom surface of crossbeam, and the shape of the said first suspender belt installing hole and the profile of suspender belt are suitable.Adopt such structure, suspender belt passes from the middle part of crossbeam through the first suspender belt installing hole, has avoided the interference between suspender belt and the crossbeam.
Said brace summer is provided with the second suspender belt installing hole, and the said second suspender belt installing hole runs through the end face and the bottom surface of brace summer, and the profile of said second suspender belt installing hole and suspender belt is suitable.Adopt such structure, suspender belt passes from the middle part of brace summer through the second suspender belt installing hole, has avoided the interference between suspender belt and the brace summer.
The said second suspender belt mounting hole site is under the first suspender belt installing hole.Adopt such structure, suspender belt runs through crossbeam and brace summer vertically through the first suspender belt installing hole and the second suspender belt installing hole, has avoided the mutual interference between suspender belt and crossbeam and the brace summer.
The below of said brace summer also is provided with bearing beam, and the axioversion of said bearing beam is axial in brace summer.Through bearing beam is set, can play the effect of adjustable support beam both ends difference in height, simultaneously since the axioversion of bearing beam in brace summer axially, can change and regulate the distributed areas of load on closed beam section, make layout more reasonable.
Said bearing beam is an i iron.Adopt such structure,, can the i iron recycling of passing into disuse be reached the beneficial effect of practicing thrift cost owing to have a large amount of discarded i iron at the construction field (site).
Be provided with junction plate between said bearing beam and the brace summer, weld with bearing beam and brace summer respectively at the two ends of said junction plate.Adopt such structure, can avoid the relative slip between bearing beam and the brace summer, make connection more firm.
Said crossbeam is an i iron.Owing to have a large amount of discarded i iron at the construction field (site), can the i iron recycling of passing into disuse be reached the beneficial effect of practicing thrift cost.
Said crossbeam is an i iron, and said i iron is provided with the first suspender belt installing hole, said i iron top flange, bottom flange and therebetween web, and the said first suspender belt installing hole runs through top flange, bottom flange and therebetween web.Owing to have a large amount of discarded i iron at the construction field (site), can the i iron recycling of passing into disuse be reached the beneficial effect of practicing thrift cost; Simultaneously, the first suspender belt installing hole is run through the web setting, when having avoided on the edge of a wing perforate, cause the i iron strength deficiency and conquassation, make that its structure is stable more, intensity is bigger.
Compared with prior art, the beneficial effect of the utility model is: through the mode of setting up crossbeam in the middle of first jack and second jack, form shoulder pole girder; Suspender belt passes from crossbeam can realize dismantled and assembled connection; In the work progress of jack before the suspension of closure section bed die use is arranged all,, can obtain jack at the construction field (site) as all including jack at back timber, stiff skeleton etc.; Need not to purchase separately, provide cost savings; Simultaneously, adopt jack, compare, have beneficial effect simple in structure, that deadweight is lighter than hoist engine as lifting appliance;
Further, the crossbeam that between first jack and second jack, is set up also can utilize the member of being dismantled in the preorder work progress; As when Hanging Basket is dismantled; Behind the interior sliding beam and outer sliding beam dismounting with Hanging Basket, as crossbeam, its length, intensity and rigidity all can meet the demands; Member after the dismounting is utilized again, significantly saved construction cost.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Fig. 2 is the structural representation of a kind of embodiment of the utility model.
Mark among the figure: suspender belt-1; Brace summer-2; First jack-3a; Second jack-3b; Crossbeam-4; Pin-and-hole-5; Bearing pin-6; Bearing beam-7; Junction plate-8.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is further described.
The embodiment of the utility model is not limited to following examples, all belongs within the protection domain of the utility model in the various variations of making under the prerequisite that does not break away from the utility model aim.
Embodiment 1
As depicted in figs. 1 and 2, the bed die suspension arrangement of striding closure section in the present embodiment comprises suspender belt 1 and is used to promote the lifting appliance of suspender belt 1 that an end of suspender belt 1 links to each other with lifting appliance; The other end of suspender belt 1 is connected with bed die; And through lifting appliance up-down bed die, lifting appliance is arranged on the brace summer 2, and lifting appliance comprises the first jack 3a and the second jack 3b; The first jack 3a and the second jack 3b all are arranged on the top of brace summer 2; The movable end that is provided with crossbeam 4, the first jack 3a and the second jack 3b between the first jack 3a and the second jack 3b is fixedly connected with the bottom, two ends of crossbeam 4 respectively, under the driving of the first jack 3a and the second jack 3b; Crossbeam 4 can move up and down with respect to brace summer 2; Crossbeam 4 and 1 dismantled and assembled connection of suspender belt, thus make crossbeam 4 in the drive process of lifting appliance, the height of suspender belt 1 is adjusted.
Embodiment 2
As depicted in figs. 1 and 2, the bed die suspension arrangement of striding closure section in the present embodiment comprises suspender belt 1 and is used to promote the lifting appliance of suspender belt 1 that an end of suspender belt 1 links to each other with lifting appliance; The other end of suspender belt 1 is connected with bed die, and through lifting appliance up-down bed die, lifting appliance is arranged on the brace summer 2; Lifting appliance comprises the first jack 3a and the second jack 3b; The first jack 3a and the second jack 3b all are arranged on the top of brace summer 2, and the movable end that is provided with crossbeam 4, the first jack 3a and the second jack 3b between the first jack 3a and the second jack 3b is fixedly connected with the bottom, two ends of crossbeam 4 respectively; Be provided with pin-and-hole 5 on suspender belt 1 and the crossbeam 4; 4 on suspender belt 1 and crossbeam are provided with removable bearing pin 6, through cooperating of bearing pin 6 and pin-and-hole 5, realize that suspender belt 1 is connected with the dismantled and assembled of crossbeam 4.Crossbeam 4 is provided with the first suspender belt installing hole, and brace summer 2 is provided with the second suspender belt installing hole, and the second suspender belt mounting hole site is under the first suspender belt installing hole.The first suspender belt installing hole runs through the end face and the bottom surface of crossbeam 4; The second suspender belt installing hole runs through the end face and the bottom surface of brace summer 2, and the shape of the first suspender belt installing hole and the second suspender belt installing hole is all suitable with the profile of suspender belt 1, and suspender belt 1 runs through brace summer 2 and crossbeam 4 internally; When suspender belt 1 is fixed on 4 last times of crossbeam through bearing pin 6; After bearing pin 6 was squeezed into pin-and-hole 5, the two ends of bearing pin 6 were pressed in the end face of crossbeam 4, thereby realized clamping.
Embodiment 3
As depicted in figs. 1 and 2, between brace summer 2 and closed beam section, be provided with bearing beam 7, in order to the out-of-flatness of height between the adjustment closed beam section; The axioversion of bearing beam 7 is axial in brace summer 2; To realize being uniformly distributed with of load, reasonable distribution load, be provided with junction plate 8 between bearing beam 7 and the brace summer 2, weld with bearing beam 7 and brace summer 2 respectively at the two ends of said junction plate 8; To realize the location between bearing beam 7 and the brace summer 2, avoid relative slip.Crossbeam 4 is i iron with bearing beam 7, and i iron is a kind of " worker " font cross section shaped steel shown in name; Last bottom flange is flush, has advantages of high bearing capacity, simultaneously; Length is longer, is suitable as the overarm of large span, gives it up after the dismounting; Then waste be can cause, and whole budget of construction and cost increased.The first suspender belt installing hole of crossbeam 4, i iron top flange, bottom flange and therebetween web, the first suspender belt installing hole runs through top flange, bottom flange and therebetween web.Adopt such structure, the first suspender belt mounting hole site is in i iron cross section middle part, and through hole is arranged on i iron web place can be reduced and offer the loss of through hole to i iron intensity.
All the other structures are please with reference to embodiment 2.

Claims (10)

1. stride the bed die suspension arrangement of closure section in one kind; Comprise suspender belt (1) and be used to promote the lifting appliance of suspender belt (1); Said lifting appliance is arranged on the brace summer (2); It is characterized in that: said lifting appliance comprises first jack (3a) and second jack (3b), is provided with crossbeam (4) between said first jack (3a) and second jack (3b), said crossbeam (4) and dismantled and assembled connection of suspender belt (1).
2. stride the bed die suspension arrangement of closure section in according to claim 1, it is characterized in that: be provided with pin-and-hole (5) on said suspender belt (1) and the crossbeam (4), be provided with removable bearing pin (6) between said suspender belt (1) and crossbeam (4).
3. stride the bed die suspension arrangement of closure section in according to claim 2; It is characterized in that: said crossbeam (4) is provided with the first suspender belt installing hole; The said first suspender belt installing hole runs through the end face and the bottom surface of crossbeam (4), and the profile of the shape of the said first suspender belt installing hole and suspender belt (1) is suitable.
4. stride the bed die suspension arrangement of closure section in according to claim 3; It is characterized in that: said brace summer (2) is provided with the second suspender belt installing hole; The said second suspender belt installing hole runs through the end face and the bottom surface of brace summer (2), and the profile of said second suspender belt installing hole and suspender belt (1) is suitable.
5. stride the bed die suspension arrangement of closure section in according to claim 4, it is characterized in that: the said second suspender belt mounting hole site is under the first suspender belt installing hole.
6. stride the bed die suspension arrangement of closure section in according to claim 1, it is characterized in that: the below of said brace summer (2) also is provided with bearing beam (7), and the axioversion of said bearing beam (7) is axial in brace summer (2).
7. stride the bed die suspension arrangement of closure section in according to claim 6, it is characterized in that: said bearing beam (7) is an i iron.
8. stride the bed die suspension arrangement of closure section in according to claim 6; It is characterized in that: be provided with junction plate (8) between said bearing beam (7) and the brace summer (2), weld with bearing beam (7) and brace summer (2) respectively at the two ends of said junction plate (8).
9. stride the bed die suspension arrangement of closure section in described according to arbitrary claim in the claim 1 to 8, it is characterized in that: said crossbeam (4) is an i iron.
10. stride the bed die suspension arrangement of closure section in described according to arbitrary claim in the claim 3 to 5; It is characterized in that: said crossbeam (4) is an i iron; Said i iron is provided with the first suspender belt installing hole; Said i iron top flange, bottom flange and therebetween web, the said first suspender belt installing hole runs through top flange, bottom flange and therebetween web.
CN 201120474033 2011-11-24 2011-11-24 Bottom die suspending device of midspan closure section Expired - Lifetime CN202323780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120474033 CN202323780U (en) 2011-11-24 2011-11-24 Bottom die suspending device of midspan closure section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120474033 CN202323780U (en) 2011-11-24 2011-11-24 Bottom die suspending device of midspan closure section

Publications (1)

Publication Number Publication Date
CN202323780U true CN202323780U (en) 2012-07-11

Family

ID=46435764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120474033 Expired - Lifetime CN202323780U (en) 2011-11-24 2011-11-24 Bottom die suspending device of midspan closure section

Country Status (1)

Country Link
CN (1) CN202323780U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN112681154A (en) * 2021-01-23 2021-04-20 中交(福州)建设有限公司 Hanging basket elevation adjusting device and method
CN114892543A (en) * 2022-06-01 2022-08-12 中国十九冶集团有限公司 Construction method of bridge closure device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130517A (en) * 2017-04-23 2017-09-05 中建三局基础设施工程有限公司 It is a kind of fine-tuning from lifting closure mould bases base apparatus and its operating method
CN112681154A (en) * 2021-01-23 2021-04-20 中交(福州)建设有限公司 Hanging basket elevation adjusting device and method
CN114892543A (en) * 2022-06-01 2022-08-12 中国十九冶集团有限公司 Construction method of bridge closure device

Similar Documents

Publication Publication Date Title
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN202766975U (en) Novel deck erection crane
CN106759845B (en) A kind of construction method of Steel corridor
CN102345381A (en) Hydraulic creeping formwork system and creeping formwork construction method
CN103669215B (en) Vertical-horizontal overall-sliding type side mold of fulcrum-few support
CN202323780U (en) Bottom die suspending device of midspan closure section
CN104763446A (en) Multi-functional trolley for subway station construction
CN104746883A (en) Construction method for three-crane lifting installation used for bow-shaped space truss
CN202248860U (en) Hydraulic climbing formwork system
CN103288002B (en) Simple combination door frame high-altitude weight hanging apparatus
CN202064281U (en) Slip form frame
CN205669313U (en) A kind of Universal adjustable hangs template system
CN203795311U (en) Multi-leg high pier and slip form construction device
CN202946193U (en) Tunnel center gutterway formwork
CN209873592U (en) Lifting type movable auxiliary tool for installing variable-section cantilever on steel box girder
CN204059199U (en) A kind of rear fulcrum cast-in-place cantilever hanging basket system for stayed-cable bridge
CN203613464U (en) Slip form construction cargo transportation device
CN103743581B (en) Internal-climbing tower crane test platform device and test method
CN203361642U (en) Assembled-structure cast-in-place stair steel molding plate
CN203393619U (en) Multifunctional construction platform for constructing cross beams between twin-deck bridges through cast-in-place
CN203144909U (en) Bridge high pier roller die construction device
CN205295972U (en) Dismantle simple and easy device of beiLei beam support
CN205223861U (en) Capable system is walked to cast -in -place simple box girder centre form of high -efficient support
CN204532374U (en) The multi-functional chassis of metro station construction
CN103669219B (en) Many limbs height pier is with sliding construction equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120711