CN107013044A - The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof - Google Patents

The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof Download PDF

Info

Publication number
CN107013044A
CN107013044A CN201610055332.9A CN201610055332A CN107013044A CN 107013044 A CN107013044 A CN 107013044A CN 201610055332 A CN201610055332 A CN 201610055332A CN 107013044 A CN107013044 A CN 107013044A
Authority
CN
China
Prior art keywords
lighting roof
newel
module
lowering
hoisting gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610055332.9A
Other languages
Chinese (zh)
Inventor
叶宇峰
阎红伟
石路也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanda Commercial Planning & Research Institute Co ltd
Original Assignee
Wanda Commercial Planning & Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanda Commercial Planning & Research Institute Co ltd filed Critical Wanda Commercial Planning & Research Institute Co ltd
Priority to CN201610055332.9A priority Critical patent/CN107013044A/en
Publication of CN107013044A publication Critical patent/CN107013044A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/163Jacks specially adapted for working-up building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Abstract

A kind of modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof, wherein method is:1) lighting roof is subjected to modularization segmentation, forms annulus module and peripheral modules;2) each module is independently processed, and transported to the installation of lighting roof;3) lowering or hoisting gear is set up in the installation site of annulus module, and annulus module is fixed on lowering or hoisting gear, the installation site of annulus module is promoted to by the liter ceiling hold newel of lowering or hoisting gear step by step;4) border is installed in lighting roof and strut and bottom ring component is fixedly mounted;5) peripheral modules are fixedly mounted in annulus module and bottom ring component;6) the lighting roof structural bearings at the top of the operating platform of artificial excision center column top, is formed with enough spaces between annulus module and newel top operating platform;7) declined step by step by the liter ceiling hold newel of lowering or hoisting gear, complete the installation of lighting roof.

Description

The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
Technical field
Filled the present invention relates to a kind of modularization installation method of lighting roof and for the lifting for installing lighting roof Put.
Background technology
Up to now, the arrangement and method for construction of ellipse (or circular) lighting roof on various mansions, square etc. is big Still use conventional methods more, i.e. factory process steel structure member, loose mail is transported to scene, in construction All round victory scaffold is set up at scene, and loose mail then is hoisted into high-altitude in place, then carries out live splicing, this High-altitude is planted to dissipate the long construction period for spelling construction method, working measure complexity, be not easy to control quality and apply The shortcomings of work security risk is of a relatively high.Although for the installation of this steel construction with large span space Also have with construction using installation methods such as high altitude bulk, the lifting of slitting piecemeal and integral installation constructions.Wherein Assembly in pieces at height refers to structure smallest assembled rigid unit or loose mail directly carries out assembled method, construction in design attitude When have full hall scaffold and encorbelment two kinds of method, the former is widely used in the construction of rack and reticulated shell, is particularly suitable for The construction of grid structure with bolt-sphere joints;The latter's overseas construction is used, and is once used for the construction of concrete shell. Assembly in pieces at height belongs to full hall scaffold assembling method in situ, and piece weight is light, and vertical transport is without large-scale Crane gear, process is simple;But erecting scaffold is needed, cycle length, costly, amount of high-altitude operation Greatly, precision is difficult to control to, and auxiliary material is more, costly.Slitting piecemeal lift-on/lift-off system refer to by structure according to Itself form is divided into block elements, lifts, Ran Houzai in place to high-altitude design attitude by hoisting machinery respectively Assembled integral installation method.The characteristics of the method be it is most of welding, assembly be operated in ground or work Factory is carried out, and is conducive to control construction quality and can save a large amount of assembly making support, but it is structural segmented after need Consider temperature pier measure, spelling rod member, unit joint, which still need, afterwards sets up assembled moulding bed.Slide in high-altitude Shifting method, which refers to total being divided into the construction unit of several strips to be slid onto on the track set in advance, to be set Count position and splice integral installation method, this bar element can be lifted after installation on ground to assembly On moulding bed, it can also be segmented, smallest assembled rigid unit even loose mail is combined into sliding element on installation at high altitude moulding bed. The basic step of integral installation construction method is:First the good steel worm-gearing of installation on ground truss at different levels and its Internal necessary support system, then using the lifting bracket at the top of each steel column as bearing, at it Upper laying centre-hole jack is simultaneously integrally lifted steel worm-gearing by steel strand wires, finally treats that steel worm-gearing is integrally carried Superlift certain altitude again when being raised to design attitude, then pointwise dropping place and is connected with the steel corbel of pillar. The selection for focusing on installation at high altitude platform of empty sliding construction method, the setting of sliding rail, tractive force The problems such as precision of calculating and Synchronization Control, cost is very big.Existing lighting roof installation in a word, Scale popularization can not be all carried out, its drawback is:Site Welding workload is big, it is impossible to effectively improve construction Quality, the construction period is long, and lighting roof Steel Structure Installation is costly.
The content of the invention
Modularization operation can be realized it is an object of the invention to provide one kind, and greatly improves lighting roof The lighting roof modularization installation method of installation effectiveness, while providing a kind of lifting dress installed for lighting roof Put.Lighting roof installation method in the present invention be particularly suitable for use in existing mansion commonly use ellipse (or circle Shape) lighting roof.
The modularization installation method of lighting roof, comprises the following steps in the present invention:
1) drawn, and will be entirely adopted in computer software according to the design size of lighting roof, shape Spire makees ring disconnection, radially segmented mode and is divided into multiple independent modules, the multiple independent Module includes positioned at the annulus module in lighting roof centre position and is distributed with the annulus module in dispersion shape Peripheral modules, each peripheral modules are numbered respectively;
2) it is separately machined according to the shape of each module and size progress, transported after machining to lighting roof Installation at;
3) lowering or hoisting gear is set up on the corresponding ground of lighting roof middle circle module mounting location, and will be described Annulus module is fixed on the newel top operating platform of lowering or hoisting gear, will the annulus module fix On the lighting roof structural bearings at the top of the newel top operating platform, by the liter of lowering or hoisting gear Ceiling hold newel is promoted to the installation site of annulus module step by step;
4) while the annulus module rises, install fixed on the concrete floor of border in lighting roof Strut and bottom ring component are installed;
5) peripheral modules are fixedly mounted in the annulus module and bottom ring component according to numbering;
6) the lighting roof structural bearings at the top of the operating platform of artificial excision center column top, in the annulus mould Enough confessions center capital is formed between the vertical truss of single Pin of block and newel top operating platform The space that portion's operating platform is moved up;
7) declined step by step by the liter ceiling hold newel of the lowering or hoisting gear, complete the installation of lighting roof.
The step 5) in, the peripheral modules are fixed on the annulus one by one in a symmetrical manner In module and bottom ring component.
The global shape of the lighting roof is rounded or oval spherical dome.
The step 3) in, the support for including lowering or hoisting gear sets up step, is specifically:
1) install and detect a liter ceiling hold basis;
2) the first standard knot in liter ceiling hold newel is hung on the basis of liter ceiling hold using tower crane, and Mounting seat bolt;
3) tower crane is utilized, second standard knot risen in ceiling hold newel is installed, and it is fixed;
4) tower crane is utilized, the section that climbs risen in ceiling hold newel is installed, and it is fixed;
5) newel top operating platform is lifted into section top of climbing, installed and fixed;
6) by the annulus module hoisting of lighting roof to newel top operating platform top, and with buckle with Stem top operating platform is fixed;
7) using the electric block and slide rail climbed on section, next standard knot is installed, installed successively, directly Installed to all standard knots, by annulus module raises to installation site.
The annulus module is welded by two symmetrical intermediate modules on the newel top operating platform top It is connected into shape.
In the present invention for lighting roof modularization installation method lowering or hoisting gear include a liter ceiling hold basis, Ceiling hold newel, newel top operating platform are risen, described liter of ceiling hold basis is using rolling wide width wing edge H profile steel, fixation is respectively welded in groined type.
Described liter of ceiling hold newel is made up of standard knot and the section that climbs, and is set on the top of the section that climbs There are electric block, counterweight, connected while being provided with the section that climbs with newel top operating platform The cat ladder with guardrail.
The newel top operating platform include lighting roof structural bearings, 8 vertical truss of list Pin, Platform center framework and multiple connecting rods, use spiral shell between the single vertical truss of Pin and Platform center framework Tether and connect, form a detachable, reusable structure, the newel top operating platform is consolidated Dingan County is mounted in the top for the section that climbs.
The lighting roof structural bearings is 8 pieces of steel plate washers being fixed on 8 vertical truss of list Pin, in institute The outboard end for stating steel plate washer is fixed with for carrying out spacing limited block to the annulus module.
The Platform center framework includes four columns being fixedly connected with the section top side detachable that climbs, Gu Surely the square set platform of at the top of four root posts and lower portion is connected to, is put down in two square sets up and down The mode that the side of platform is bolted is fixedly connected with 8 vertical truss of list Pin, and 8 lists Pin is stood Formula truss is distributed in dispersion shape mode.And connected between two neighboring single vertical truss of Pin by connecting rod It is fixed, then flat board is laid between the connecting rod of bottom surface level, in bottom periphery formation construction passage.
Lighting roof modularization installation method can effectively solve to adapt to current and later architectural image in the present invention The requirement of each side such as rich and changeful, complicated, corollary system is more, technological requirement height, can be work Journey provides efficient, simple, convenient, safe, economic solution, promotes industrial development and society to enter Step.
Brief description of the drawings
Fig. 1 is the schematic side view of lighting roof in the present invention.
Fig. 2 is the schematic top plan view of lighting roof in the present invention.
Fig. 3 is lowering or hoisting gear and structural representation of the annulus module in raised configuration in the present invention.
Fig. 4 is the structural representation of the newel top operating platform of lowering or hoisting gear in the present invention.
Fig. 5 is the structural representation on liter ceiling hold basis in the present invention.
Fig. 6 is the mounting structure schematic diagram of the limited block in the present invention.
Fig. 7 is the flow chart of lighting roof installation method in the present invention.
Embodiment
In order to further illustrate the principle and structure of the present invention, the present invention is preferable to carry out in conjunction with accompanying drawing Example is illustrated, but the embodiment is only to provide explanation to be used with explanation, it is impossible to for limiting this The scope of patent protection of invention.
As shown in Figure 3 and Figure 4, liter is included for the lowering or hoisting gear in lighting roof installation method of the present invention Ceiling hold basis 1, liter ceiling hold newel 2, newel top operating platform 3.Wherein:Rise ceiling hold Basis 1 is in groined type, and being welded to each other fixation by rolling wide width wing edge H profile steel 10 forms, and groined type rises top Eight ends 12 of bracket basis 1 are connected by built-in fitting with reinforced concrete girder in building or post, Guarantee to carry superstructure load, construction loads and consider certain failure load, may be used also if necessary With to being reinforced for connecting the structural elements under the fulcrum 11 for rising ceiling hold newel 2, such as Fig. 5 institutes Show.
Rise ceiling hold newel 2 and include standard knot components 20 and climb a section 21, wherein standard knot Component 20 includes some vertical fixations and can enumerate first in fixed standard knot, standard knot components 20 Standard knot is vertically fixed on groined type and risen on the fulcrum 11 on ceiling hold basis 1, and the section 3 that climbs is enclosed on standard knot On component 20, wherein standard knot components 20 and the section 21 that climbs are using the standard knot used in current tower crane With the section 21 that climbs, therefore for standard knot and climb section 21 rise and decline work principle it is no longer detailed Description.But in the present invention climbing section 21 be used in existing tower crane climb section on the basis of at it Bottom is provided with some the first electronic fixed claw (not shown)s for being used to grab standardization section component 20, Counterweight support 23 is fixed with the side on 21 tops of section of climbing, is located on 21 tops of section of climbing and is provided with counterweight The corresponding opposite side of support 23 is fixed with boatswain chair platform 24, and the lower surface of boatswain chair platform 24 passes through electric sliding rail 26 Electric block 27 is slidably connected, electric block 27 is hung by lifting rope 28 and is connected to electric crane pawl 25, with side Just the installation of lighting roof is realized, while in order to ensure the safety of workmen, in 21 tops of section welding of climbing It is fixed with band guardrail cat ladder (not shown).
Newel top operating platform 3, is fixedly mounted on the top for the section 21 that climbs, such as Fig. 3 and Fig. 4 institutes Show.Newel top operating platform 3 include lighting roof structural bearings 30,8 vertical truss 31 of list Pin, Platform center framework 32 and multiple connecting rods 33.
Platform center framework 32 includes four columns 34 being fixedly connected with 21 top side detachables of section that climb, The square set platform 35 of (such as welding manner) at the top of four root post 34 and lower portion is fixedly connected with, Stood while two or four can be further added by between square set platform 35 and be used to strengthen the second of intensity Post 36, it is ensured that the intensity and rigidity of whole newel top operating platform 3.In two square sets up and down The mode that the side of platform 35 is bolted is fixedly connected with 31,8 list Pin of the vertical truss of 8 list Pin Vertical truss 31 is distributed in dispersion shape mode.And by even between two neighboring single vertical truss 31 of Pin Extension bar 33 is connected, then lays flat board between the connecting rod 33 of bottom surface level, can be in bottom surface week Side forms construction passage 38, while setting up guardrail between vertical connecting 33, it is ensured that workmen's Safety, guardrail extends to the top for the section 21 that climbs always.
Lighting roof structural bearings 30 is bolted for 8 pieces and is fixed on the vertical ends of truss 31 of single Pin The steel plate washer 37 on surface, the annulus module 4 of lighting roof, which is mounted directly, to be placed on steel plate washer 37, steel plate washer 37 be I-steel, and width, can be in center capital when steel plate washer 37 is removed in more than 300mm Enough spaces are reserved between the top of portion's operating platform 3 and annulus module 4, to be grasped at the top of newel Make platform 3 and the section 21 that climbs has enough rise spaces, realize the dismounting of standard knot.In steel plate washer 37 lateral border, which is bolted, is fixed with limited block 39, can be by adjusting limited block 39 in steel pad Installation site on piece 37, to adapt to a variety of various sizes of lighting roof annulus modules 4, as shown in Figure 6. Separately lighting roof top module absolute altitude error and ring error can be adjusted by adjusting the height of steel plate washer 37.
As depicted in figs. 1 and 2, need lighting roof to be mounted substantially in oval (or circle) ball in the present invention Shape, the present invention for it is this substantially installed in oval (or circle) spherical lighting roof when enter according to the following steps OK, as shown in Figure 7:
Using major diameter as 31.600m, minor axis diameter is 22.106m, and rise is 4.987m, bottom branch Exemplified by the pillar height of short column 6 is supportted for 1.238m oval spherical lighting roof, described in detail.Wherein support short Post 6 has 40, and 1.278m every long, weight 70kg are taken root on the concrete floor of lighting roof border. It is welded with bottom ring component 7 between adjacent supports short column 6, ring component 7 totally 40, most long 2.3m, Weight 90kg.These structural elements of lighting roof are quarter bend, between loose mail and module, module and module Connection uses butt welding.These welding techniques are prior art, are no longer described in detail.
The first step:The specific size and shape of oval spherical lighting roof is drawn in a computer, and Using computer oval spherical lighting roof is made ring disconnect, it is radially segmented, be divided into 11 kinds of different shapes Module, module number is 22 pieces, includes in 22 pieces of modules middle two pieces, and two pieces in the middle of this exist The annulus module 4 positioned at lighting roof centre position can be formed after splicing, remaining is past from annulus module 4 To in dispersion shape arranged distribution, and it is symmetrical 20 pieces of peripheral modules 5 two-by-two.
Second step:Produced by lighting roof manufacturing firm according to the size of disparate modules, and transport need The job site of lighting roof steel construction is installed.
3rd step:One lowering or hoisting gear is set at the construction field (site), annulus module 4 is fixedly mounted on lifting dress The top put, lighting roof installation position is lifted by lowering or hoisting gear by middle circle module 4.
4th step:While annulus module rises, install solid on the concrete floor of border in lighting roof Dingan County fills strut 6 and bottom ring component 7.
5th step:Peripheral modules 5 are fixedly mounted in annulus module 4 and bottom ring structure according to numbering On part 7, the installation of peripheral modules 5 needs to be symmetrically installed according to numbering during segmentation.
6th step:Artificial excision is fixed on the lighting roof knot between annulus module 4 and the vertical truss 31 of list Pin Piece steel plate washer of structure bearing 30, i.e., 8 37, so that the shape between annulus module 4 and the vertical truss 31 of list Pin Into the space having for newel top operating platform 3 and the rising of section 21 of climbing, provided for the dismounting of standard knot Space.
7th step:Have and dismantle standard knot step by step, complete the installation of lighting roof.
In superincumbent third step, the support for including lowering or hoisting gear sets up step, is specifically:
1) install and detect a liter ceiling hold basis 1;
2) the first standard knot is hung on liter ceiling hold basis 1 using tower crane, and mounting seat bolt;
3) tower crane is utilized, second standard knot is installed, and it is fixed;
4) tower crane is utilized, the section 21 that climbs is installed, and it is fixed;
5) newel top operating platform 3 is lifted into 21 tops of section of climbing, installed and fixed;
6) two intermediate modules of lighting roof are lifted into the top of newel top operating platform 3, and with card Button is fixed with newel top operating platform 3, is symmetrically welded inside-out as an entirety, i.e. annulus Module 4;In this step, can be by module between center after ground welding if lifting condition license Integral hoisting;
7) using the electric block 27 and slide rail 26 climbed on section 21, next standard knot is installed, according to It is secondary to install, until all standard knots are installed, by annulus module raises to installation site.

Claims (10)

1. a kind of modularization installation method of lighting roof, comprises the following steps:
1) drawn, and will be entirely adopted in computer software according to the design size of lighting roof, shape Spire makees ring disconnection, radially segmented mode and is divided into multiple independent modules, the multiple independent Module includes positioned at the annulus module in lighting roof centre position and is distributed with the annulus module in dispersion shape Peripheral modules, each peripheral modules are numbered respectively;
2) it is separately machined according to the shape of each module and size progress, transported after machining to lighting roof Installation at;
3) lowering or hoisting gear is set up on the corresponding ground of lighting roof middle circle module mounting location, and will be described Annulus module is fixed on the newel top operating platform of lowering or hoisting gear, will the annulus module fix On the lighting roof structural bearings at the top of the newel top operating platform, by the liter of lowering or hoisting gear Ceiling hold newel is promoted to the installation site of annulus module step by step;
4) while the annulus module rises, install fixed on the concrete floor of border in lighting roof Strut and bottom ring component are installed;
5) peripheral modules are fixedly mounted in the annulus module and bottom ring component according to numbering;
6) the lighting roof structural bearings at the top of the operating platform of artificial excision center column top, in the annulus mould Enough confessions center capital is formed between the vertical truss of single Pin of block and newel top operating platform The space that portion's operating platform is moved up;
7) declined step by step by the liter ceiling hold newel of the lowering or hoisting gear, complete the installation of lighting roof.
2. the modularization installation method of lighting roof according to claim 1, it is characterised in that described Step 5) in, the peripheral modules are fixed on the annulus module and bottom one by one in a symmetrical manner On portion's ring component.
3. the modularization installation method of lighting roof according to claim 1, it is characterised in that described The global shape of lighting roof is rounded or oval spherical dome.
4. the modularization installation method of lighting roof according to claim 1, it is characterised in that described Step 3) in, the support for including lowering or hoisting gear sets up step, is specifically:
1) install and detect a liter ceiling hold basis;
2) the first standard knot in liter ceiling hold newel is hung on the basis of liter ceiling hold using tower crane, and Mounting seat bolt;
3) tower crane is utilized, second standard knot risen in ceiling hold newel is installed, and it is fixed;
4) tower crane is utilized, the section that climbs risen in ceiling hold newel is installed, and it is fixed;
5) newel top operating platform is lifted into section top of climbing, installed and fixed;
6) by the annulus module hoisting of lighting roof to newel top operating platform top, and with buckle with Stem top operating platform is fixed;
7) using the electric block and slide rail climbed on section, next standard knot is installed, installed successively, directly Installed to all standard knots, by annulus module raises to installation site.
5. the modularization installation method of lighting roof according to claim 4, it is characterised in that described Annulus module is shaped by two symmetrical intermediate modules in the newel top operating platform upper weld.
6. a kind of lifting dress for being used for lighting roof modularization installation method in above-mentioned any one claim Put, it is characterised in that include a liter ceiling hold basis, rise ceiling hold newel, newel top operational Fixation is respectively welded in groined type using rolling wide width wing edge H profile steel in platform, described liter of ceiling hold basis.
7. lowering or hoisting gear according to claim 6, it is characterised in that described liter of ceiling hold newel It is made up of standard knot and the section that climbs, the top of the section that climbs is provided with electric block, counterweight, simultaneously The cat ladder with guardrail connected with newel top operating platform is installed in the section that climbs.
8. lowering or hoisting gear according to claim 6, it is characterised in that the newel top operational Platform includes lighting roof structural bearings, 8 vertical truss of list Pin, Platform center framework and multiple connections Bar, is connected by screw bolts between the single vertical truss of Pin and Platform center framework, formed one it is detachable, Reusable structure, the newel top operating platform is fixedly mounted on the top for the section that climbs.
9. lowering or hoisting gear according to claim 8, it is characterised in that the lighting roof structural bearings For 8 pieces of steel plate washers being fixed on 8 vertical truss of list Pin, it is fixed with the outboard end of the steel plate washer For carrying out spacing limited block to the annulus module.
10. lowering or hoisting gear according to claim 8, it is characterised in that Platform center framework includes There are four columns being fixedly connected with the section top side detachable that climbs, be fixedly connected at the top of four root posts with The square set platform at half position, the side being bolted in the side of two square set platforms up and down Formula is fixedly connected with 8 vertical truss of list Pin, and the vertical truss of 8 list Pin is distributed in dispersion shape mode. And be connected between two neighboring single vertical truss of Pin by connecting rod, then in the connection of bottom surface level Flat board is laid between bar, in bottom periphery formation construction passage.
CN201610055332.9A 2016-01-27 2016-01-27 The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof Pending CN107013044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610055332.9A CN107013044A (en) 2016-01-27 2016-01-27 The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610055332.9A CN107013044A (en) 2016-01-27 2016-01-27 The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof

Publications (1)

Publication Number Publication Date
CN107013044A true CN107013044A (en) 2017-08-04

Family

ID=59439201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610055332.9A Pending CN107013044A (en) 2016-01-27 2016-01-27 The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof

Country Status (1)

Country Link
CN (1) CN107013044A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109695317A (en) * 2018-12-29 2019-04-30 中建一局集团第一建筑有限公司 A kind of lighting roof Steel Structure Installation method
CN114233022A (en) * 2022-01-05 2022-03-25 北钢建设集团股份有限公司 Circular steel structure dome auxiliary installation equipment and construction method
CN114482381A (en) * 2022-02-17 2022-05-13 中建八局新型建造工程有限公司 Method for mounting parts of dome steel structure
CN114482281A (en) * 2022-02-17 2022-05-13 中国建筑第二工程局有限公司 Elliptical daylighting roof and installation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0949333A (en) * 1995-08-09 1997-02-18 Kajima Corp Field assembly device for tank roof reinforcement
JPH0960114A (en) * 1995-08-22 1997-03-04 Tokyu Constr Co Ltd Construction method of dome-like roof
JP2001173098A (en) * 1999-12-15 2001-06-26 Takenaka Komuten Co Ltd Mobile frame trestle for constructing dome-like roof and construction method
CN2841803Y (en) * 2005-07-12 2006-11-29 王英春 Unit-combination type daylighting top
CN101328746A (en) * 2007-06-18 2008-12-24 浙江展诚建设集团股份有限公司 Steel structure high altitude mounting method
CN101387129A (en) * 2008-09-19 2009-03-18 常州第一建筑工程有限公司 Steel frame mounting method for glass roof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0949333A (en) * 1995-08-09 1997-02-18 Kajima Corp Field assembly device for tank roof reinforcement
JPH0960114A (en) * 1995-08-22 1997-03-04 Tokyu Constr Co Ltd Construction method of dome-like roof
JP2001173098A (en) * 1999-12-15 2001-06-26 Takenaka Komuten Co Ltd Mobile frame trestle for constructing dome-like roof and construction method
CN2841803Y (en) * 2005-07-12 2006-11-29 王英春 Unit-combination type daylighting top
CN101328746A (en) * 2007-06-18 2008-12-24 浙江展诚建设集团股份有限公司 Steel structure high altitude mounting method
CN101387129A (en) * 2008-09-19 2009-03-18 常州第一建筑工程有限公司 Steel frame mounting method for glass roof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
阎红伟: "椭圆形采光顶钢结构模块化施工技术", 《钢结构》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109695317A (en) * 2018-12-29 2019-04-30 中建一局集团第一建筑有限公司 A kind of lighting roof Steel Structure Installation method
CN114233022A (en) * 2022-01-05 2022-03-25 北钢建设集团股份有限公司 Circular steel structure dome auxiliary installation equipment and construction method
CN114482381A (en) * 2022-02-17 2022-05-13 中建八局新型建造工程有限公司 Method for mounting parts of dome steel structure
CN114482281A (en) * 2022-02-17 2022-05-13 中国建筑第二工程局有限公司 Elliptical daylighting roof and installation method thereof
CN114482381B (en) * 2022-02-17 2024-04-16 中建八局新型建造工程有限公司 Method for installing parts for dome steel structure

Similar Documents

Publication Publication Date Title
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
CN101858163B (en) Method for installing flare tower frame in bulk
CN109610834B (en) High-altitude construction method for multi-layer large-span heavy-load concrete structure
CN109208915B (en) Construction method for integrally lifting cooling tower system and steel gallery
CN103938875A (en) Ground single body tensioning lifting construction method of single layer suspendome
CN104895335B (en) Method for mounting hanging pillar
CN111218987A (en) Bearing type net rack construction method
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN114182647B (en) Construction method for lifting and turning weak arch
CN107939141A (en) A kind of steel structure tower and its construction method
CN113348289A (en) Multi-column wind turbine tower and erection method
CN205369948U (en) Lifting device for daylighting top is used for installing
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN205314521U (en) Quick installation and maintenance platform in boiler stove
CN102259794B (en) Method for installing overall combined type crane beam
CN103743581A (en) Internal-climbing tower crane test platform apparatus and test method
CN112411760B (en) Construction method for integrally hoisting and combining cantilever installation of head unit
CN111877789B (en) Construction method for integrally lifting, replacing and constructing new and old steel roof
CN203806999U (en) Self-jacking cable rope tower crane column
CN105298097B (en) A kind of shaftless ferris wheel wheel disc assembly and Construction of Supporting method
CN114482561A (en) Steel structure roof installation method
CN113494127A (en) Construction method for layered lifting of large-span open-web corridor steel platform
CN112049477A (en) Platform support construction method and platform support structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication