CN105464066A CN201511002446.9A CN201511002446A CN105464066A CN 105464066 A CN105464066 A CN 105464066A CN 201511002446 A CN201511002446 A CN 201511002446A CN 105464066 A CN105464066 A CN 105464066A
Authority
CN
China
Prior art keywords
bailey bracket
single pin
wire rope
pin bailey
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201511002446.9A
Other languages
Chinese (zh)
Other versions
CN105464066B (en
Inventor
黄益彬
何井斌
田忠庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 8 Co Ltd
Original Assignee
Sinohydro Bureau 8 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 8 Co Ltd filed Critical Sinohydro Bureau 8 Co Ltd
Priority to CN201511002446.9A priority Critical patent/CN105464066B/en
Publication of CN105464066A publication Critical patent/CN105464066A/en
Application granted granted Critical
Publication of CN105464066B publication Critical patent/CN105464066B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02CSHIP-LIFTING DEVICES OR MECHANISMS
    • E02C5/00Mechanisms for lifting ships vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a construction method for detaching a large-span high-fall Belfast truss with a closed beam slab. The construction method includes the following steps that S1, construction preparation is carried out, embedded holes and hoisting holes corresponding to single Belfast truss frames in a one-to-one correspondence mode are arranged in the closed beam slab in advance, each embedded hole is located in the middle of the corresponding single Belfast truss frame, and each hoisting hole is located in the end of the corresponding single Belfast truss frame; S2, a winch is moved to the position near each embedded hole, a steel wire rope of the winch extends and is tied with the end of the corresponding single Belfast truss frame along the embedded hole, hoisting equipment is moved to the position near each hoisting hole, and a steel wire rope of the hoisting equipment extends into and is tied with the end of the corresponding single Belfast truss frame along the hoisting hole; S3, each single Belfast truss frame is hoisted; and S4, the steps from S2 to S3 are repeated, and all the single Belfast truss frames are detached sequentially. The construction method has the advantages of being not limited by the large span of the Belfast truss, avoiding overwater operation, being short in hoisting stroke, being high in efficiency and the like.

Description

The construction method that the Bailey bracket that a kind of large span height drop beam slab is closed is removed
Technical field
The present invention relates to technical field of building construction, particularly relate to the construction method of the Bailey bracket dismounting that a kind of large span height drop top board is closed.
Background technology
Current Bailey bracket truss principal is applied more in bridge engineering, and also less as the application of creation of vertical ship elevator top plate girder construction truss principal, and top beam slab Bailey bracket truss principal is removed at high-altitude operation at sea, and execution conditions are complicated.Such as, existing Goupitan reaches 18m across span of the beam and the plank in room, first order vertical ship lift ship railway carriage or compartment, the top board at top is all closed, high-altitude is waterborne carries out dismounting operation, Bailey bracket after dismounting is transported from waterborne by marine equipments such as cargo ships, completes dismounting work, and whole demolishing process is extremely loaded down with trivial details, dangerous high, very high requirement is proposed to constructor.
Summary of the invention
The technical problem to be solved in the present invention overcomes the deficiencies in the prior art, the construction method of the Bailey bracket dismounting that short, that efficiency the is high large span height drop top board of stroke is closed that provides a kind of and be not subject to the restriction of Bailey bracket large span, avoids operation at sea, lifts by crane.
For solving the problems of the technologies described above, the present invention by the following technical solutions:
The construction method that the Bailey bracket that large span height drop beam slab is closed is removed, comprises the steps:
S1: preparation of construction; Closed beam slab is preset and single Pin Bailey bracket embedded hole and hang thing hole one to one, described embedded hole is positioned at the middle part of every Pin Bailey bracket, described in hang the end that thing hole is positioned at every Pin Bailey bracket;
S2: hoist engine is moved to by embedded hole, steel wire rope of windlass stretches into along embedded hole and fastens the middle part in single Pin Bailey bracket; Moved to by lifting appliance and hang by thing hole, lifting appliance wire rope stretches into along hanging thing hole and fastens the single Pin Bailey bracket end in correspondence;
S3: single Pin Bailey bracket lifting; Specifically comprise:
S31: steel wire rope of windlass tightens up, cuts off the embedded fixing component at described single Pin Bailey bracket two ends, and the connector between adjacent two Pin Bailey brackets;
S32: steel wire rope of windlass stops after driving described single Pin Bailey bracket decline 2 ~ 3m, lifting appliance rope hoisting, and steel wire rope of windlass declines, and keeps single Pin Bailey bracket to rotate in same plane, until single Pin Bailey bracket is vertical;
S33: lifting appliance wire rope upwards promotes described single Pin Bailey bracket, until hang out from hanging in thing hole;
S4: repeat step S2 to step S3, remove each single Pin Bailey bracket successively, until complete.
Further improvement as technique scheme:
The two ends of described single Pin Bailey bracket are equipped with a horizontal bearing point, in described step S32, before steel wire rope of windlass drives described single Pin Bailey bracket decline 2 ~ 3m, first in single Pin Bailey bracket, fasten a rope, described cable traction list Pin Bailey bracket horizontally rotates, until single Pin Bailey bracket departs from horizontal bearing point.
When removing Pin Bailey bracket second from the bottom, by temporary fixed for last Pin Bailey bracket.
When removing last Pin Bailey bracket, first temporary fixed, then adopt hanging ladder as the safety operation frame carrying out cutting off operation in step S31.
The preparation of construction of described step S1 also comprises, and removes the scaffold tube bearing bent frame above Bailey bracket, and by each single Pin Bailey bracket number consecutively.
Described scaffold tube bearing bent frame is set up from hanging thing hole the cat ladder that dismounting personnel enter Bailey bracket, then set up bamboo springboard between single Pin Bailey bracket after removing, and to construct passage and job platform as dismounting personnel.
In described step S1, when roof beam board concrete is built, pre-buried pipeline is as embedded hole.
Described steel wire rope of windlass, lifting appliance wire rope are the bright wire rope that diameter is not less than φ 16mm.
Compared with prior art, the invention has the advantages that:
The construction method that the Bailey bracket that a kind of large span height drop beam slab of the present invention is closed is removed, an overall Bailey truss is divided into multiple single Pin Bailey bracket remove one by one, reduce difficulty of construction, presetting preburied hole and hang thing hole on closed beam slab, for lifting is prepared.During construction, steel wire rope of windlass fastens the middle part (center of gravity or close to center of gravity place) in single Pin Bailey bracket by embedded hole, lifting appliance wire rope fastens end in single Pin Bailey bracket by hanging thing hole, single Pin Bailey bracket lifting, rotate until vertically in same plane, hang out by hanging thing hole, single Pin Bailey bracket hangs out after vertically by horizontally rotating, not by the restriction of Bailey truss large span, operating personnel carry out constructing operation on Bailey truss and beam slab, avoid operation at sea, lifting stroke is short, and efficiency is high.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the construction method of the Bailey bracket dismounting that large span height drop beam slab of the present invention is closed.
Fig. 2 is embedded hole of the present invention and the layout schematic top plan view of hanging thing hole.
Fig. 3 is embedded hole of the present invention and the layout schematic cross-section hanging thing hole.
Fig. 4 is the schematic diagram one of single Pin Bailey bracket of the present invention in lifting process.
Fig. 5 is the schematic diagram two of single Pin Bailey bracket of the present invention in lifting process.
Fig. 6 is the schematic diagram three of single Pin Bailey bracket of the present invention in lifting process.
In figure, each label represents:
1, embedded hole; 2, thing hole is hung; 3, hoist engine; 4, steel wire rope of windlass; 5, lifting appliance; 6, lifting appliance wire rope.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the present invention is described in further detail.
Fig. 1 to Fig. 5 shows the embodiment of the construction method of the Bailey bracket dismounting that a kind of large span height drop beam slab of the present invention is closed, and it comprises the steps:
S1: preparation of construction; The Bailey bracket of entirety is divided into multiple single Pin Bailey bracket to remove successively, closed beam slab is preset and single Pin Bailey bracket embedded hole 1 and hang thing hole 2 one to one, embedded hole 1 is positioned at the middle part of every Pin Bailey bracket, hangs the end that thing hole 2 is positioned at every Pin Bailey bracket;
S2: hoist engine 3 is moved to embedded hole 1 other, steel wire rope of windlass 4 stretches into along embedded hole 1 and fastens the middle part in single Pin Bailey bracket; Moved to by lifting appliance 5 and hang side, thing hole 2, lifting appliance wire rope 6 stretches into along hanging thing hole 2 and fastens the single Pin Bailey bracket end in correspondence; Steel wire rope of windlass 4 stretches into along embedded hole 1 and fastens the middle part in single Pin Bailey bracket, to fasten center of gravity or better close to center of gravity place in the middle part of single Pin Bailey bracket, acutely rocks after avoiding lifting.
S3: single Pin Bailey bracket lifting; Specifically comprise:
S31: steel wire rope of windlass 4 tightens up, cuts off the embedded fixing component at single Pin Bailey bracket two ends, and the connector between adjacent two Pin Bailey brackets; Avoid other articles to produce lifting to interfere.
S32: steel wire rope of windlass 4 stops after driving single Pin Bailey bracket decline 2 ~ 3m, and lifting appliance wire rope 6 promotes, and steel wire rope of windlass 4 declines, and keeps single Pin Bailey bracket to rotate in same plane, until single Pin Bailey bracket is vertical; Rotate in same plane, avoid acutely rocking in lifting process, thus cause security incident.
S33: lifting appliance wire rope 6 upwards promotes single Pin Bailey bracket, until hang out from hanging in thing hole 2; In the present embodiment, lifting appliance wire rope 6 is provided with two Heave Heres in single Pin Bailey bracket, and two Heave Heres are located at same one end, and during lifting, two Heave Heres are lifted by crane simultaneously.
S4: repeat step S2 to step S3, remove each single Pin Bailey bracket successively, until complete.
The construction method that the Bailey bracket that a kind of large span height drop beam slab of the present invention is closed is removed, an overall Bailey truss is divided into multiple single Pin Bailey bracket remove one by one, reduce difficulty of construction, presetting preburied hole 1 and hang thing hole 2, for lifting is prepared on closed beam slab.During construction, steel wire rope of windlass fastens the middle part (center of gravity or close to center of gravity place) in single Pin Bailey bracket by embedded hole, lifting appliance wire rope fastens end in single Pin Bailey bracket by hanging thing hole, single Pin Bailey bracket lifting, rotate until vertically in same plane, hang out by hanging thing hole, single Pin Bailey bracket hangs out after vertically by horizontally rotating, not by the restriction of Bailey truss large span, operating personnel carry out constructing operation on Bailey truss and beam slab, avoid operation at sea, lifting stroke is short, and efficiency is high.
In the present embodiment, the two ends of single Pin Bailey bracket are equipped with a horizontal bearing point, in above-mentioned steps S32, before steel wire rope of windlass 4 drives described single Pin Bailey bracket decline 2 ~ 3m, first in single Pin Bailey bracket, fasten a rope, cable traction list Pin Bailey bracket horizontally rotates, until single Pin Bailey bracket departs from horizontal bearing point.
In the present embodiment, when removing Pin Bailey bracket second from the bottom, by temporary fixed for last Pin Bailey bracket.
In the present embodiment, when removing last Pin Bailey bracket, first temporary fixed, then adopt hanging ladder as the safety operation frame carrying out cutting off operation in step S31.
In the present embodiment, the preparation of construction of step S1 also comprises, and removes the scaffold tube bearing bent frame above Bailey bracket, and by each single Pin Bailey bracket number consecutively.Before construction, by multiple single Pin Bailey bracket from left to right or from right to left number consecutively, be convenient to lifting, the identification of numbering is strong, facilitates demolishing process to carry out in order.
In the present embodiment, scaffold tube bearing bent frame is set up from hanging thing hole 2 cat ladder that dismounting personnel enter Bailey bracket, then set up bamboo springboard between single Pin Bailey bracket after removing, and to construct passage and job platform as dismounting personnel.
In the present embodiment, in step S1, when roof beam board concrete is built, pre-buried pipeline is as embedded hole 1.In the present embodiment, embedded hole 1 and hang thing hole 2 all before concreting just first pre-buried go out, for later construction dismounting is prepared.
In the present embodiment, steel wire rope of windlass 4, lifting appliance wire rope 6 are not less than the bright wire rope of φ 16mm for diameter.
In the present embodiment, the lifting appliance 5 that site layout project is removed in construction is 25t mobile crane, and hoist engine 3 is 10t hoist engine.
Although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention.Any those of ordinary skill in the art, when not departing from technical solution of the present invention scope, can utilize the technology contents of above-mentioned announcement to make many possible variations and modification to technical solution of the present invention, or being revised as the Equivalent embodiments of equivalent variations.Therefore, every content not departing from technical solution of the present invention, according to the technology of the present invention essence to any simple modification made for any of the above embodiments, equivalent variations and modification, all should drop in the scope of technical solution of the present invention protection.

Claims (8)

1. the construction method that the Bailey bracket that large span height drop beam slab is closed is removed, is characterized in that: comprise the steps:
S1: preparation of construction; The Bailey bracket of entirety is divided into multiple single Pin Bailey bracket to remove successively, closed beam slab is preset and each single Pin Bailey bracket embedded hole (1) and hang thing hole (2) one to one, described embedded hole (1) is positioned at the middle part of every Pin Bailey bracket, described in hang the end that thing hole (2) is positioned at every Pin Bailey bracket;
S2: hoist engine (3) is moved to embedded hole (1) other, steel wire rope of windlass (4) stretches into along embedded hole (1) and fastens the middle part in single Pin Bailey bracket; Moved to by lifting appliance (5) and hang side, thing hole (2), lifting appliance wire rope (6) stretches into along hanging thing hole (2) and fastens the single Pin Bailey bracket end in correspondence;
S3: single Pin Bailey bracket lifting; Specifically comprise:
S31: steel wire rope of windlass (4) tightens up, cuts off the embedded fixing component at described single Pin Bailey bracket two ends, and the connector between adjacent two Pin Bailey brackets;
S32: steel wire rope of windlass (4) stops after driving described single Pin Bailey bracket decline 2 ~ 3m, and lifting appliance wire rope (6) promotes, and steel wire rope of windlass (4) declines, and keeps single Pin Bailey bracket to rotate in same plane, until single Pin Bailey bracket is vertical;
S33: lifting appliance wire rope (6) upwards promotes described single Pin Bailey bracket, until hang out from hanging in thing hole (2);
S4: repeat step S2 to step S3, remove each single Pin Bailey bracket successively, until complete.
2. the construction method that the Bailey bracket that large span height drop beam slab according to claim 1 is closed is removed, it is characterized in that: the two ends of described single Pin Bailey bracket are equipped with a horizontal bearing point, in described step S32, before steel wire rope of windlass (4) drives described single Pin Bailey bracket decline 2 ~ 3m, first in single Pin Bailey bracket, fasten a rope, described cable traction list Pin Bailey bracket horizontally rotates, until single Pin Bailey bracket departs from horizontal bearing point.
3. the construction method that the Bailey bracket that large span height drop beam slab according to claim 1 and 2 is closed is removed, is characterized in that: when removing Pin Bailey bracket second from the bottom, by temporary fixed for last Pin Bailey bracket.
4. the construction method that the Bailey bracket that large span height drop beam slab according to claim 3 is closed is removed, is characterized in that: when removing last Pin Bailey bracket, adopting hanging ladder as carrying out the safety operation frame cutting off operation in step S31.
5. the construction method that the Bailey bracket that large span height drop beam slab according to claim 1 is closed is removed, it is characterized in that: the preparation of construction of described step S1 also comprises, remove the scaffold tube bearing bent frame above Bailey bracket, and by each single Pin Bailey bracket number consecutively.
6. the construction method that the Bailey bracket that large span height drop beam slab according to claim 5 is closed is removed, it is characterized in that: after described scaffold tube bearing bent frame is removed, the cat ladder that dismounting personnel enter Bailey bracket is set up from hanging thing hole (2), between single Pin Bailey bracket, set up bamboo springboard again, to construct passage and job platform as dismounting personnel.
7. the construction method that the Bailey bracket that large span height drop beam slab according to claim 1 is closed is removed, it is characterized in that: in described step S1, when roof beam board concrete is built, pre-buried pipeline is as embedded hole (1).
8. the Bailey bracket closed of the large span height drop beam slab according to claim 1 construction method of removing, is characterized in that: described steel wire rope of windlass (4), lifting appliance wire rope (6) are not less than the bright wire rope of φ 16mm for diameter.
CN201511002446.9A 2015-12-29 2015-12-29 The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed Active CN105464066B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511002446.9A CN105464066B (en) 2015-12-29 2015-12-29 The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511002446.9A CN105464066B (en) 2015-12-29 2015-12-29 The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed

Publications (2)

Publication Number Publication Date
CN105464066A true CN105464066A (en) 2016-04-06
CN105464066B CN105464066B (en) 2017-03-29

Family

ID=55602186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511002446.9A Active CN105464066B (en) 2015-12-29 2015-12-29 The construction method that a kind of Bailey bracket of the high drop beam slab closing of large span is removed

Country Status (1)

Country Link
CN (1) CN105464066B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117911881A (en) * 2024-03-20 2024-04-19 四川公路桥梁建设集团有限公司 Long-span bridge construction positioning method and related device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0854237A1 (en) * 1997-01-18 1998-07-22 Krupp Fördertechnik GmbH Laying vehicle and process for placing dismountable bridges
MD4011B1 (en) * 2009-08-26 2010-01-29 Grigore CEAPA Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof
CN102134833A (en) * 2011-02-21 2011-07-27 中国一冶集团有限公司 Construction method for hoisting and disassembling bailey truss
CN102900027A (en) * 2012-10-22 2013-01-30 中铁十局集团有限公司 Dismounting method of bailey beam with upwardly strode existing lines and underneath penetrated existing bridge
CN103321213A (en) * 2013-05-31 2013-09-25 中交第二航务工程局有限公司 Integral installation device and method for water reinforcement cage
CN204456881U (en) * 2015-02-09 2015-07-08 中建二局第一建筑工程有限公司 Dismantling system of large-span building bailey frame

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0854237A1 (en) * 1997-01-18 1998-07-22 Krupp Fördertechnik GmbH Laying vehicle and process for placing dismountable bridges
MD4011B1 (en) * 2009-08-26 2010-01-29 Grigore CEAPA Process for the erection of the cast-in-situ reinforced pile and auxiliary mounter for realization thereof
CN102134833A (en) * 2011-02-21 2011-07-27 中国一冶集团有限公司 Construction method for hoisting and disassembling bailey truss
CN102900027A (en) * 2012-10-22 2013-01-30 中铁十局集团有限公司 Dismounting method of bailey beam with upwardly strode existing lines and underneath penetrated existing bridge
CN103321213A (en) * 2013-05-31 2013-09-25 中交第二航务工程局有限公司 Integral installation device and method for water reinforcement cage
CN204456881U (en) * 2015-02-09 2015-07-08 中建二局第一建筑工程有限公司 Dismantling system of large-span building bailey frame

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘勇、陈建峡: "三峡升船机贝雷架安装与拆除技术", 《中国工程科学》 *
陈雄、王俊: "贝雷梁技术在沙沱电站垂直升船机施工中的应用", 《人民长江》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117911881A (en) * 2024-03-20 2024-04-19 四川公路桥梁建设集团有限公司 Long-span bridge construction positioning method and related device
CN117911881B (en) * 2024-03-20 2024-06-11 四川公路桥梁建设集团有限公司 Long-span bridge construction positioning method and related device

Also Published As

Publication number Publication date
CN105464066B (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN101684639B (en) Process method for construction of steel-structured suspension bridge and light type cable carrying crane specially used in same
CN108163138B (en) Cabin-out method for overhaul of main engine of ship
CN106006425A (en) Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN103061265A (en) Construction method for lifting combined reinforcement cages
CN101264845A (en) Crown block high altitude integrated suspension transposition construction method
CN105464066A (en) Construction method for detaching large-span high-fall Belfast truss with closed beam slab
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN107487423B (en) Marine suspension scaffold and construction method thereof
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN204001751U (en) Super high steel structure construction overhanging unloading platform
CN102926329A (en) Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN202465213U (en) Hanging basket system for slope construction
CN201770429U (en) Portal type framework used for hoisting and slipping
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
CN212154622U (en) Outer wall plate mounting ladder stand for steel structure factory building
CN204057720U (en) The multiple little template gig of wall of vertical
CN211283412U (en) Hoisting device for precast concrete beam
CN201857225U (en) Hoisting device for bridge crane frame
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN106121254A (en) Heavy component transportation system after disassembly by reverse construction method and construction method
CN204549903U (en) A kind of fixed point traction and slide rail displacement hoisting device
CN104195953A (en) Method and device for transversely and integrally moving beam type supports out of bridge bottom plate
CN211081059U (en) Hoisting device for unit plate of curtain wall with curved outer vertical surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant