CN201686458U - Movable operating platform used for quickly processing welding seam at end opening of steel box girder - Google Patents

Movable operating platform used for quickly processing welding seam at end opening of steel box girder Download PDF

Info

Publication number
CN201686458U
CN201686458U CN2010201845996U CN201020184599U CN201686458U CN 201686458 U CN201686458 U CN 201686458U CN 2010201845996 U CN2010201845996 U CN 2010201845996U CN 201020184599 U CN201020184599 U CN 201020184599U CN 201686458 U CN201686458 U CN 201686458U
Authority
CN
China
Prior art keywords
box
operating platform
end opening
hoist cable
case beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201845996U
Other languages
Chinese (zh)
Inventor
李四建
张凌
王伟民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yiye Machinery & Electronic Engineering Co Ltd
Original Assignee
Wuhan Yiye Machinery & Electronic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yiye Machinery & Electronic Engineering Co Ltd filed Critical Wuhan Yiye Machinery & Electronic Engineering Co Ltd
Priority to CN2010201845996U priority Critical patent/CN201686458U/en
Application granted granted Critical
Publication of CN201686458U publication Critical patent/CN201686458U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses the technical field of engineering construction and particularly relates to a movable operating platform used for quickly processing the welding seam at an end opening of a steel box girder. The movable operating platform is composed of a box-shaped operating platform and a hoisting device, wherein the hoisting device is used for hoisting the box-shaped operating platform from the ground to the height of the lower edge of the steel box girder, and the box-shaped operating platform moves along a sling to process the welding seam at the end opening of the steel box girder; the hoisting device comprises adjusting pipe columns, fixed pulleys, the sling and a windlass, the adjusting pipe columns are connected at the lower edges of the steel box girder and at two ends of the welding seam, the fixed pulleys are arranged on the adjusting pipe columns, the head end of the sling is fixed while the tail end thereof is connected with the windlass after passing through the fixed pulleys, a hook pulley is arranged on the box-shaped operating platform, and the hook pulley is arranged on the sling. In the utility model, the connection of the adjusting pipe columns can be achieved depending on an original upright; the operating difficulty is lowered; the windlass can be used for hoisting three operating platforms at one step, so as to accelerate the construction progress; the box-shaped operating platform is assembled in field, and the manufacture is convenient; the integral device has simple and practical structure and is convenient for popularization.

Description

The activity operations platform that is used for fast processing steel case beam end opening weld seam
Technical field
The utility model relates to technical field of engineering machinery, relates in particular to a kind of activity operations platform that is used for fast processing steel case beam end opening weld seam.
Background technology
The lower edge of steel box girder bridge beam is overhead general high more than 9 meters, because it is highly higher, the work that the processing of its main weld and ceramic gasket are pasted is difficult to launch, and the normal at present method of using is to set up scaffold, and this mode exists that difficulty is excessive, expense is too high, long construction period, the loaded down with trivial details shortcoming of operation.
Summary of the invention
The purpose of this utility model is to provide a kind of simple in structure, activity operations platform that is used for fast processing steel case beam end opening weld seam of making things convenient for Fast Installation.
To achieve these goals, the technical solution of the utility model is: a kind of activity operations platform that is used for fast processing steel case beam end opening weld seam, it includes box-shaped service platform and lifting appliance, lifting appliance winches to steel case beam lower edge height with the box-shaped service platform from ground, the box-shaped service platform moves to handle steel case beam end opening weld seam along hoist cable; Lifting appliance comprises regulates tubing string, dead sheave, hoist cable, winch, the steel case beam lower edge at weld seam two is connected with the adjusting tubing string, regulate tubing string and be provided with dead sheave, the hoist cable head end is fixed, be connected with winch behind the terminal pile warp dead sheave, the box-shaped service platform is provided with lifting hook pulley, and lifting hook pulley hangs and is located on the hoist cable.
The box-shaped service platform is made up of framework, base plate and safety rope, and to forming, seal with base plate by the framework bottom surface by steel pipe for framework, frame facet attachment security rope.
Described winch is 3 tons of winchs, 3 box-shaped service platforms of winch coiling hoist cable lifting.
The connection of adjusting tubing string of the present utility model can rely on original column operation, has reduced operation easier, and three service platforms of the disposable lifting of winch, accelerating construction progress; The box-shaped service platform can be right, easy to make by on-the-spot group; Whole apparatus structure is simple and practical, is convenient to promote.
Description of drawings
The birds-eye view that Fig. 1 uses for the utility model embodiment;
Fig. 2 is that the A-A of Fig. 1 is to figure;
Fig. 3 is the schematic three dimensional views of box-shaped service platform among the utility model embodiment;
Description of symbols among the figure: 1-dead sheave; The 2-winch; 3-box-shaped service platform; The 4-hoist cable; 5-regulates tubing string; The 6-weld seam; 7-steel case beam; The 8-lifting hook pulley; The 9-column truss type; The 10-safety rope; The 11-base plate; The 12-framework.
The specific embodiment
In order to understand the utility model better, below in conjunction with embodiment and accompanying drawing the technical solution of the utility model is described further, referring to Fig. 1 to 3:
A kind of activity operations platform that is used for fast processing steel case beam end opening weld seam by the utility model enforcement, it includes box-shaped service platform 3 and lifting appliance, box-shaped service platform 3 is by framework 12, base plate 11 and safety rope 10 are formed, framework 12 usefulness Φ 35 * 4 steel pipe field welding groups are to forming, framework 12 long 1500mm, wide 1000mm, high 1000mm, framework 12 bottom laying depths are that the steel plate of 4mm is as base plate 11,12 4 sides of framework are that the seizing wire of 9mm connects and to surround safety rope 10 with diameter, be used for support personnel's safety, steel rope one end is fixed, blue bolt and tension are spent in one end utilization.The staff is equipped with operation tool, in box-shaped service platform 3 to constructions such as main weld 6 processing.
Box-shaped service platform 3 then relies on lifting appliance to realize from ground to the lifting of steel case beam 7 lower edges, the top of box-shaped service platform 3 is connected with lifting hook pulley 8, lifting appliance comprises regulates tubing string 5, dead sheave 1, hoist cable 4 and winch 2, regulates steel case beam 7 lower edges that tubing string 5 is arranged on main weld 6 two.Because steel case beam 7 bridges are supported by column truss type 9, when tubing string 5 is regulated in welding, only need operating personal just can arrive the target location by column truss type 9, easy construction need not additionally to set up construction equipments such as scaffold.Regulate tubing string 5 and use as the bracing frame of dead sheave 1, its intensity must meet the demands, so what regulate that tubing string 55 selects for use is the steel pipe of Φ 219 * 8.Regulate the dead sheave 1 of 3 tons of captive joints on the tubing string 5.In order to make box-shaped service platform 3 lifting more steady, hoist cable 4 is all passed in box-shaped service platform 3 both sides, and every side is provided with two lifting hook pulleys 8, and this also just makes adjusting tubing string 5 numbers of 6 liang of head ends of main weld be respectively two.Hoist cable 4 should satisfy requirement of strength, must possess elasticity again, so what hoist cable 4 adopted in the present embodiment is the fiber steel rope, hoist cable 4 head ends are fixed, terminal pile warp dead sheave 1 back be arranged on ground-surface winch 2 and be connected, winch 2 starts the hoist cable 4 of just can reeling, thereby with 3 liftings of box-shaped service platform.In order to improve operating efficiency, a winch 2 lifts by crane three box-shaped service platforms 3 simultaneously, is that 3 tons of winchs 2 are to guarantee enough output torques so winch 2 selects for use.When box-shaped service platform 3 reaches with lifting hook pulley 8 steel case beams 7 lower edges, hoist cable 4 basic maintenance levels, and the length direction that is parallel to steel case beam 7 end opening weld seams 6, by the operation of staff to lifting hook pulley 8, box-shaped service platform 3 can slide along hoist cable 4 front and back, to carry out the processing to whole piece main weld 6, what lifting hook pulley 8 was selected for use is 0.5 ton of pulley of remaining silent.
The utility model use is: the workmen is with equipment to enter box-shaped service platform 3, the terrestrial operation employee starts winch 2, the end of coiling hoist cable 4, hoist cable 4 shrinks box-shaped service platform 3 is risen to construction height, the workmen handles main weld 6 in box-shaped service platform 3, and utilizes lifting hook pulley 8 to slide on hoist cable 4 with processing whole piece weld seam 6, after weld seam 6 disposes, the terrestrial operation employee starts winch 2 hoist cable 4 that comes up, and returns ground.The utility model operation is just clean, easy to use, needs material few, and is safe and reliable, can satisfy main tank beam bottom weld seam 6 fast processing operatings needs.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalence of being done according to the utility model claim changes, and still belongs to protection domain of the present utility model.

Claims (3)

1. activity operations platform that is used for fast processing steel case beam end opening weld seam, it is characterized in that: it includes box-shaped service platform (3) and lifting appliance, lifting appliance winches to steel case beam (7) lower edge height with box-shaped service platform (3) from ground, box-shaped service platform (3) moves to handle steel case beam (7) end opening weld seam (6) along the hoist cable (4) of lifting appliance; Lifting appliance comprises regulates tubing string (5), dead sheave (1), hoist cable (4), winch (2), steel case beam (7) lower edge at weld seam (6) two is connected with regulates tubing string (5), regulate tubing string (5) and be provided with dead sheave (1), hoist cable (4) head end is fixed, terminal pile warp dead sheave (1) back is connected with winch (2), box-shaped service platform (3) is provided with lifting hook pulley (8), and lifting hook pulley (8) hangs and is located on the hoist cable (4).
2. the activity operations platform that is used for fast processing steel case beam end opening weld seam according to claim 1, it is characterized in that: box-shaped service platform (3) is made up of framework (12), base plate (11) and safety rope (10), framework (12) by steel pipe to forming, framework (12) bottom surface is sealed with base plate (11), framework (12) side attachment security rope (10).
3. the activity operations platform that is used for fast processing steel case beam end opening weld seam according to claim 1, it is characterized in that: described winch (2) is 3 tons of winchs (2), winch (2) coiling hoist cable (4) lifting three box-shaped service platforms (3).
CN2010201845996U 2010-04-30 2010-04-30 Movable operating platform used for quickly processing welding seam at end opening of steel box girder Expired - Fee Related CN201686458U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201845996U CN201686458U (en) 2010-04-30 2010-04-30 Movable operating platform used for quickly processing welding seam at end opening of steel box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201845996U CN201686458U (en) 2010-04-30 2010-04-30 Movable operating platform used for quickly processing welding seam at end opening of steel box girder

Publications (1)

Publication Number Publication Date
CN201686458U true CN201686458U (en) 2010-12-29

Family

ID=43374744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201845996U Expired - Fee Related CN201686458U (en) 2010-04-30 2010-04-30 Movable operating platform used for quickly processing welding seam at end opening of steel box girder

Country Status (1)

Country Link
CN (1) CN201686458U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI411490B (en) * 2011-10-07 2013-10-11 Li Way Mechanical Engineering Co Ltd Box column assembly equipment and method
CN109881590A (en) * 2019-04-18 2019-06-14 中冶建工集团有限公司 Bridge steel box girder high altitude operation operating platform and building method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI411490B (en) * 2011-10-07 2013-10-11 Li Way Mechanical Engineering Co Ltd Box column assembly equipment and method
CN109881590A (en) * 2019-04-18 2019-06-14 中冶建工集团有限公司 Bridge steel box girder high altitude operation operating platform and building method

Similar Documents

Publication Publication Date Title
CN101734560B (en) High-altitude dismantling method of inside-climbing tower crane for towering structure construction
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN205387439U (en) Mast hoisting accessory
CN209988942U (en) Assembled building superimposed sheet lifting device
CN201334306Y (en) Hoisting machine for upright post member
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN210313196U (en) Climbing cable hoisting system
JP2014047479A (en) Method for lifting demolishing heavy machine to building to be demolished
CN202670961U (en) External construction platform device for large-sized vertical column
CN202744226U (en) Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane
CN201144134Y (en) Double herringbone hoisting derrick mast
CN202529744U (en) Structure of auxiliary hoist of fixed mast and crawler crane equipped with structure
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN209685129U (en) A kind of stator of steam turbine generator hanging apparatus
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN204040442U (en) A kind of integral lifting elevator hoistways operating platform
CN210193239U (en) Supplementary portal frame device of dismantling construction tower crane counterweight
CN210594893U (en) Double-hook clamp for hoisting H-shaped steel beam
CN201980890U (en) Herringbone hoisting mast for hoisting under special situation of high altitude
CN201857225U (en) Hoisting device for bridge crane frame
CN202658521U (en) Overhauling system of stayed cable of single plane cable stayed bridge
CN205973582U (en) Simple and easy hoisting accessory of cable cover plate
CN216235766U (en) High-rise building steel vestibule hoisting device
CN215160476U (en) Simple crane of offshore oilfield steel wire operation blowout prevention system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101229

Termination date: 20170430