CN202658521U - Overhauling system of stayed cable of single plane cable stayed bridge - Google Patents
Overhauling system of stayed cable of single plane cable stayed bridge Download PDFInfo
- Publication number
- CN202658521U CN202658521U CN 201220242535 CN201220242535U CN202658521U CN 202658521 U CN202658521 U CN 202658521U CN 201220242535 CN201220242535 CN 201220242535 CN 201220242535 U CN201220242535 U CN 201220242535U CN 202658521 U CN202658521 U CN 202658521U
- Authority
- CN
- China
- Prior art keywords
- cable
- single plane
- bridge
- stayed bridge
- stayed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides an overhauling system of a stayed cable of a single plane cable stayed bridge. The overhauling system comprises a climbing device, a first power device, a safety rope, a working platform and an anti-falling device. Rollers of a clamping groove are arranged below the climbing device, the climbing device is contacted with the stayed cable of the single plane cable stayed bridge through the rollers of the clamping groove. The power device is arranged on the climbing device, the climbing device and the working platform are connected through a rope, and the anti-falling device is arranged at the top end of a bridge tower of the single plane cable stayed bridge and connected with the working platform through the safety rope. The single plane stayed cable is usually arranged in a central isolation belt of the bridge, the overhauling system does not need to be assisted by large-sale devices such as cranes, and normal traffic can not be affected. The clamping groove of the rollers and the stayed cable are made of the materials with the same strength and rigidity, and damage can not be caused on the stayed cable. The overhauling system is high in operation efficiency, and an overhauling device is low in construction cost and small in nursing cost.
Description
Technical field
The utility model belongs to the field of bridge maintenance, is specially a kind of examination and repair system and application thereof of single plane cable stayed bridge suspension cable.
Background technology
Single plane cable stayed bridge generally is in girder cross section centre position suspension cable to be set, and along bridge many group suspension cables is set vertically, connects girder and king-tower.As the suspension cable of main load-carrying member, weight and the various load action of girder passed to king-tower, be one of main member of cable stayed bridge.Single plane cable stayed bridge has obtained increasing application owing to handsome in appearance in bridge engineering, so the suspension cable maintenance also is the constant demand that exists.The lot of domestic and international cable stayed bridge has been implemented cable replacement engineering, the suspension cable of the cable stayed bridge that also has is because of anchor head corrosion fracture, cause disaster to occur, also explicitly call for the maintenance maintenance requirement during considering to run in the CONSTRUCTION OF CABLE-STAYED BRIDGE design among " road oblique roller bridge design details " (JTG/T D65-01-2007), as seen to the importance of the maintenance repair of suspension cable.A lot of cable stayed bridges are considered for view in addition, are provided with landscape lighting luminaire at suspension cable, need to consider the examination and repair system design equally when designing to the maintenance of these lightings.
In the Design of Cable-Stayed Bridge in past, once inconsiderate to the maintenance inspection requirements, lack checkout facility, the bridge that has even have to adopt fire balloon inspection.Now inspection method commonly used is to adopt the crane inspection platform inspection of slinging, and the suspension cable that has is higher, and is high to the requirement of crane, almost takies whole track scope, very large to the normal influence on system operation of road.The lifting operation platform is easily run into suspension cable, damage the outer PE sheath of suspension cable, and operating efficiency is low, and inspection is once wasted time and energy expensive.
Summary of the invention
For the deficiency that existing cable stayed bridge maintenance field exists, the utility model purpose provides a kind of examination and repair system of single plane cable stayed bridge suspension cable.
For realizing the purpose of this utility model, concrete technical scheme is:
A kind of examination and repair system of single plane cable stayed bridge suspension cable, this examination and repair system comprises climbing device, the first power set, safety rope, the job platform that can settle the maintainer and falling proof device, be provided with the roller of draw-in groove below the climbing device, climbing device contacts with the suspension cable of single plane cable stayed bridge by the roller that draw-in groove is arranged, described the first power set are installed in the climbing device, described climbing device is connected by rope with described job platform, described falling proof device is positioned at the bridge tower top of single plane cable stayed bridge, is connected with maintainer in the job platform by safety rope.
Wherein, described the number of the roller of draw-in groove is arranged is even number, contacts with the uppermost a pair of suspension cable of single plane cable stayed bridge, and the spacing between the roller is adjustable.
Wherein, described have the roller of draw-in groove to contact with the uppermost a pair of suspension cable of single plane cable stayed bridge, its mode is the draw-in groove that suspension cable is positioned at roller, and this has the roller of draw-in groove to use with the same material of the sheath of the suspension cable of single plane cable stayed bridge to make, for example the PE material.
Wherein, lifting rope is installed in described the first power set, the lifting rope of pulling out is positioned at the top of the uppermost a pair of suspension cable of single plane cable stayed bridge, and the bridge tower top of lifting rope one end and single plane cable stayed bridge is fixed, and the beam of the other end and single plane cable stayed bridge is fixed.
Wherein, vertical the second mobile power set of driving job platform are installed on the described job platform.
A kind of method of using described examination and repair system maintenance single plane cable stayed bridge, comprising: the maintainer is arranged in described job platform, by the first power set of controlling examination and repair system examination and repair system is moved along the suspension cable direction; By the second power set that the control job platform is installed, make job platform vertically mobile up and down, carry out the maintenance to the single plane cable stayed bridge all sites.
Wherein, described examination and repair system moves along the suspension cable direction, is by the driving of the first power set of examination and repair system, moves around in the suspension cable direction along lifting rope.
Wherein, described job platform is vertically mobile up and down, is along the rope that connects crawl device, and the driving of the second power set by job platform is vertically mobile up and down.
Wherein, described falling proof device is connected with the maintainer who is arranged in described job platform by safety rope.
The beneficial effects of the utility model are:
The climbing device of examination and repair system of the present utility model can be creeped along suspension cable, the job platform of hanging on the climbing device can be vertically mobile up and down, the two combination, thereby realized that job platform can arrive each position of whole suspension cables, thereby realized the maintenance function to whole suspension cables and upper attached light fixture.The automatic adjustable interval of the roller of the climbing device of this system is applicable to the suspension cable of unequal-interval.Cat head arranges anti-falling mechanism, guarantees the safety of maintainer when work.
Single rope face suspension cable generally is arranged in the central partition of bridge, and examination and repair system of the present utility model does not need by main equipments such as cranes, therefore, can not affect normal traffic.Roller draw-in groove and suspension cable adopt the material of same intensity and rigidity outward, can be to the suspension cable injury.
Examination and repair system operating efficiency of the present utility model is high.The repair apparatus cost is low, and maintenance cost is little.
Description of drawings
Fig. 1 is the layout sketch of the examination and repair system of the utility model single plane cable stayed bridge suspension cable.Among the figure, 1 is climbing device, and 2 is lifting rope, and 3 is falling proof device, and 4 is job platform, and 5 is the uppermost a pair of suspension cable of single plane cable stayed bridge.
Fig. 2 is Fig. 1 circle position partial enlarged drawing.Among the figure, 6 is the power set of installing in the climbing device, and 7 is the power set of installing on the job platform.
The specific embodiment
Following examples are used for explanation the utility model, but are not used for limiting scope of the present utility model.
Embodiment 1: the examination and repair system of single plane cable stayed bridge suspension cable
See Fig. 1.A kind of examination and repair system of single plane cable stayed bridge suspension cable, comprise power set 6 (the first power set), job platform 4 and the falling proof device 3 installed in climbing device 1, the climbing device, be provided with the roller of draw-in groove below the climbing device, climbing device contacts with the uppermost a pair of suspension cable 5 of single plane cable stayed bridge by the roller that draw-in groove is arranged, and suspension cable is positioned at the draw-in groove of roller.Power set are installed in the climbing device, and climbing device is connected by rope with job platform, are equipped with on the job platform to drive the vertical mobile power set 7 (the second power set) of job platform.Falling proof device is positioned at the bridge tower top of single plane cable stayed bridge, is connected with maintainer on the job platform by safety rope.
Wherein, the number that the roller of draw-in groove is arranged is two to (4), contacts with the uppermost a pair of suspension cable of single plane cable stayed bridge, and the spacing between two rollers of every pair is adjustable, is applicable to the suspension cable of unequal-interval.The same PE material of the sheath of the suspension cable of roller use and single plane cable stayed bridge is made.
Embodiment 2: the maintenance of single plane cable stayed bridge suspension cable
Climbing device utilizes the uppermost a pair of suspension cable of cable stayed bridge as climbing track, the draw-in groove roller is stuck on a pair of suspension cable in the top, power set are installed in the crawl device, and power set can creep up and down along a pair of suspension cable in the top climbing device by hauling lifting rope.The maintainer is arranged in described job platform, by the power set of controlling examination and repair system examination and repair system is moved along the suspension cable direction; By the power set that the control job platform is installed, make job platform vertically mobile up and down, carry out the maintenance to the whole suspension cables of single plane cable stayed bridge and attached light fixture.
Falling proof device is connected with the maintainer who is arranged in described job platform by safety rope, guarantees maintainer's safety.
Claims (5)
1. the examination and repair system of a single plane cable stayed bridge suspension cable, it is characterized in that, this examination and repair system comprises climbing device, the first power set, safety rope, can settle maintainer's job platform and falling proof device, be provided with the roller of draw-in groove below the climbing device, climbing device contacts with the suspension cable of single plane cable stayed bridge by the roller that draw-in groove is arranged, described the first power set are installed in the climbing device, described climbing device is connected by rope with described job platform, described falling proof device is positioned at the bridge tower top of single plane cable stayed bridge, is connected with maintainer in the job platform by safety rope.
2. examination and repair system as claimed in claim 1 is characterized in that, described the number of the roller of draw-in groove is arranged is even number, contacts with the uppermost a pair of suspension cable of single plane cable stayed bridge, and the spacing between the roller is adjustable.
3. examination and repair system as claimed in claim 2 is characterized in that, described have the roller of draw-in groove to contact with the uppermost a pair of suspension cable of single plane cable stayed bridge, and the mode of contact is the draw-in groove that suspension cable is positioned at roller.
4. examination and repair system as claimed in claim 1 is characterized in that, lifting rope is installed in described the first power set, and the bridge tower top of lifting rope one end and single plane cable stayed bridge is fixed, and the beam of the other end and single plane cable stayed bridge is fixed.
5. examination and repair system as claimed in claim 1 is characterized in that, is equipped with on the described job platform to drive vertical the second mobile power set of job platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220242535 CN202658521U (en) | 2012-05-25 | 2012-05-25 | Overhauling system of stayed cable of single plane cable stayed bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220242535 CN202658521U (en) | 2012-05-25 | 2012-05-25 | Overhauling system of stayed cable of single plane cable stayed bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202658521U true CN202658521U (en) | 2013-01-09 |
Family
ID=47453438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220242535 Expired - Lifetime CN202658521U (en) | 2012-05-25 | 2012-05-25 | Overhauling system of stayed cable of single plane cable stayed bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202658521U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422432A (en) * | 2012-05-25 | 2013-12-04 | 中铁工程设计咨询集团有限公司 | Overhaul system of stayed cable of sing-cable-plane cable-stayed bridge and application thereof |
CN106087766A (en) * | 2016-08-12 | 2016-11-09 | 扬州北晟桥梁科技有限公司 | New type suspension bridge main push-towing rope and hoist cable integrated construction frock |
-
2012
- 2012-05-25 CN CN 201220242535 patent/CN202658521U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103422432A (en) * | 2012-05-25 | 2013-12-04 | 中铁工程设计咨询集团有限公司 | Overhaul system of stayed cable of sing-cable-plane cable-stayed bridge and application thereof |
CN103422432B (en) * | 2012-05-25 | 2015-11-25 | 中铁工程设计咨询集团有限公司 | A kind of examination and repair system of single plane cable stayed bridge suspension cable and application thereof |
CN106087766A (en) * | 2016-08-12 | 2016-11-09 | 扬州北晟桥梁科技有限公司 | New type suspension bridge main push-towing rope and hoist cable integrated construction frock |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
CN105442458B (en) | Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar | |
CN205387439U (en) | Mast hoisting accessory | |
CN204057851U (en) | Performance stage booth lifting mechanism | |
CN201376848Y (en) | Large-scale double-tower automatic-elevation hoisting equipment | |
CN103422432B (en) | A kind of examination and repair system of single plane cable stayed bridge suspension cable and application thereof | |
WO2017008717A1 (en) | Bridge crane suspension device and method for valve tower | |
CN103967263B (en) | Hydraulic automatic jumping discharging platform | |
CN202658521U (en) | Overhauling system of stayed cable of single plane cable stayed bridge | |
CN104362544A (en) | Pulley type tower head clamp | |
CN203947758U (en) | Novel hydraulic automatic climbing discharging platform | |
CN201250058Y (en) | Improved lifting trolley | |
CN205170212U (en) | Semi -portal crane | |
CN201176567Y (en) | Mobile angular adjustment frame hanging at end of staying cable beam | |
CN202729645U (en) | Tower crane with elevator | |
CN202744961U (en) | Lifting mechanism for anti-falling beam check block | |
CN202744226U (en) | Hoisting tri-magnification rope winding olecranon-shaped arm head of moving arm tower crane | |
CN201598570U (en) | Cable-stayed bridge cableway erecting equipment | |
CN202808252U (en) | Small-sized light hoisting equipment | |
CN103470057A (en) | Method of hoisting high altitude components | |
CN103452043B (en) | Maintenance system of cable-stayed bridge solid pylon and application of maintenance system | |
CN201686458U (en) | Movable operating platform used for quickly processing welding seam at end opening of steel box girder | |
CN103058083B (en) | Bolt sphere truss gig | |
CN104058349B (en) | A kind of steel strand hoisting clamping device and method for improving | |
CN202201650U (en) | Four-supporting-column combined hoisting device for ultra-high voltage serial compensation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20130109 |