CN204370373U - Seepage proof curtain structure closed by a kind of reservoir - Google Patents

Seepage proof curtain structure closed by a kind of reservoir Download PDF

Info

Publication number
CN204370373U
CN204370373U CN201420676321.9U CN201420676321U CN204370373U CN 204370373 U CN204370373 U CN 204370373U CN 201420676321 U CN201420676321 U CN 201420676321U CN 204370373 U CN204370373 U CN 204370373U
Authority
CN
China
Prior art keywords
gunite
sheet
pile
mud jacking
splitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420676321.9U
Other languages
Chinese (zh)
Inventor
钱国伟
曹净
丁文云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201420676321.9U priority Critical patent/CN204370373U/en
Application granted granted Critical
Publication of CN204370373U publication Critical patent/CN204370373U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of reservoir and closes seepage proof curtain structure, belongs to preventive works technical field.This structure comprises dykes and dams and the dam foundation, dam foundation part is divided into pervious layer from top to bottom, aquitard and impervious layer, also comprise splitting mud jacking mud wall, gunite sheet-pile, gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams all full symmetrics axis is the longest is dam body axis A, dam body axis A bilateral symmetry arranges splitting mud jacking hole, dam body axis A is also provided with gunite sheet-pile hole, gunite sheet-pile is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile penetrates dam foundation highly permeable layer in dykes and dams inside, embed aquitard or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall is the height of dykes and dams.This structure construction is easy and simple to handle, applicability strong, cost is lower.

Description

Seepage proof curtain structure closed by a kind of reservoir
Technical field
The utility model relates to a kind of reservoir and closes seepage proof curtain structure, belongs to preventive works technical field.
Background technology
50 ~ seventies of 20th century, China has built large quantities of reservoir engineering, the earth and rockfill dam wherein greatly for utilizing local filling material to fill.In view of the restriction of human-subject test and construction ability at that time, special seepage control method or seepage control method deficiency are not had to the dam foundation or dam body, cause the more serious dam foundation or dam body leakage problems, there is very large potential safety hazard, become sick dam, greatly constrain safety and the profit point of reservoir.Sick dam antiseepage weak part is positioned at the dam foundation mostly, and for extensive use in earth and rockfill dam dam foundation impervious consolidation method is grouting and concrete cut method.But conventional grout method applies little pressure will cause dam body to ftracture, to the grouting of dam foundation stratum, general concrete castability is poor under a certain pressure, and once can fill with, slurries spread again comparatively far away, are difficult to control.If adopt concrete cut to reinforce, the pore-creating of impervious wall fluting can cause foundation stress " release " and rigid concrete wall and the loose contact of consolidation mud skin, and it is poor to be out of shape adaptive capacity, and grooving is also more difficult, and cost is higher.
Summary of the invention
For above-mentioned prior art Problems existing and deficiency, the utility model provides a kind of reservoir to close seepage proof curtain structure.In this structure, splitting mud jacking mud wall and gunite sheet-pile can connect into closed seepage proof curtain, dam can not only be made to solve seepage stability problem within a short period of time, guarantee the safety of dam, and constructing operation is easy, applicability strong, cost is lower, the utility model is achieved through the following technical solutions.
Seepage proof curtain structure closed by a kind of reservoir, comprise dykes and dams 1 and the dam foundation, dam foundation part is divided into pervious layer 4 from top to bottom, aquitard 5 and impervious layer, also comprise splitting mud jacking mud wall 2, gunite sheet-pile 3, gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams 1 all full symmetrics axis is the longest is dam body axis A, dam body axis A both sides 0.5 ~ 2.0m is symmetrical arranged splitting mud jacking hole, dam body axis A is also provided with gunite sheet-pile hole, gunite sheet-pile 3 is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile 3 penetrates dam foundation highly permeable layer 4 in dykes and dams 1 inside, embed aquitard 5 or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall 2 by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall 2 is the height of dykes and dams 1.
Described gunite sheet-pile 3 should exceed the dam foundation and dykes and dams 1 boundary line 1 ~ 2m, and passes through highly permeable layer 4, embeds aquitard 5 or impervious layer 2 ~ 3m; Gunite sheet-pile pitch of holes is 1 ~ 2m.
Described gunite sheet-pile 3 is made up of the stake of continuous print churning semicircle, and adjacent semicircle stake lap length is not less than 150mm, and can take segmentation point sequence construction or sequential production, injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1.
Described gunite sheet-pile 3 is positioned on the upside of dam body axis A or downside.The position that gunite sheet-pile 3 is positioned at dam body axis A is determined by actual leakage prevention structure.
Described splitting mud jacking pitch of holes is 3 ~ 5m, carries out longitudinal mud jacking from dykes and dams 1 dam crest to the dam foundation; For being conducive to the adjustment of dam body internal stress, strengthen splitting mud jacking pressure, increase mud jacking number of times, every hole is no less than 5 times as far as possible; Injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; According to the principle of " pile bottom grouting, few filling is how multiple ", segmentation point sequence construction or sequential production can be taked; Splitting mud jacking no meter parameter should meet " earth and rockfill dam dam body grouting technique specification " SD266-88 related request.
This structure is equally applicable to the Anti-seeping technology of river course, power station dykes and dams.
This structure can effectively fill dam body water leakage inside passage and hole by splitting mud jacking mud wall 2, eliminates dam body infiltration path, increases dam embankment densify degree; Form gunite sheet-pile 3 by high pressure jet grouting technique, can effectively solve leakage of dam foundation problem; Splitting mud jacking mud wall 2 and gunite sheet-pile 3 can connect into closed seepage proof curtain, make dam solve seepage stability problem within a short period of time, guarantee safety and the profit point of dam
The beneficial effects of the utility model are: (1) utilizes splitting mud jacking technology in dam body altitude range, form twice splitting mud jacking mud wall, mud fully can fill leak paths and the hole of dam body inside, eliminate infiltration hidden danger, effectively can not only solve the leakage problems of dam body, dam embankment densify degree can also be improved, increase the stability of reservoir dam.In addition, splitting mud jacking technology has the advantages such as investment is little, instant effect, equipment and technology are simple, easy to operate in earth dam reinforcement.
(2) utilize high pressure jet grouting technique to form high pressure board wall in dam foundation position, effectively can solve the leakage problems of the dam foundation, constructing operation is easy.
(3) board wall that formed of the mud wall that formed of splitting mud jacking and high pressure jet grouting, can connect into closed curtain, have ignored the defect adding concrete floor under impervious body and dam, the seepage stability of dam is guaranteed when making up reservoir dam design.
Accompanying drawing explanation
Fig. 1 is the utility model structural profile schematic diagram;
Fig. 2 is the utility model floor map A;
Fig. 3 is the utility model floor map B.
In figure: 1-dykes and dams, 2-splitting mud jacking mud wall, 3-gunite sheet-pile, 4-highly permeable layer, 5-aquitard, A-dam body axis.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Embodiment 1
As illustrated in fig. 1 and 2, seepage proof curtain structure closed by this reservoir, comprise dykes and dams 1 and the dam foundation, dam foundation part is divided into pervious layer 4 from top to bottom, aquitard 5 and impervious layer, also comprise splitting mud jacking mud wall 2, gunite sheet-pile 3, gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams 1 all full symmetrics axis is the longest is dam body axis A, dam body axis A both sides 0.5m is symmetrical arranged splitting mud jacking hole, dam body axis A is also provided with gunite sheet-pile hole, gunite sheet-pile 3 is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile 3 penetrates dam foundation highly permeable layer 4 in dykes and dams 1 inside, embed aquitard 5 or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall 2 by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall 2 is the height of dykes and dams 1.
Wherein gunite sheet-pile 3 should exceed the dam foundation and dykes and dams 1 boundary line 1m, and passes through highly permeable layer 4, embeds aquitard 5 or impervious layer 2m; Gunite sheet-pile pitch of holes is 1m; Gunite sheet-pile 3 is made up of the stake of continuous print churning semicircle, and adjacent semicircle stake lap length is not less than 150mm, and can take segmentation point sequence construction or sequential production, injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; Gunite sheet-pile 3 is positioned on the upside of dam body axis A.The position that gunite sheet-pile 3 is positioned at dam body axis A is determined by actual leakage prevention structure; Splitting mud jacking pitch of holes is 3m, carries out longitudinal mud jacking from dykes and dams 1 dam crest to the dam foundation; For being conducive to the adjustment of dam body internal stress, strengthen splitting mud jacking pressure, increase mud jacking number of times, every hole is no less than 5 times as far as possible; Injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; According to the principle of " pile bottom grouting, few filling is how multiple ", segmentation point sequence construction or sequential production can be taked; Splitting mud jacking no meter parameter should meet " earth and rockfill dam dam body grouting technique specification " SD266-88 related request.
Embodiment 2
As shown in figs. 1 and 3, seepage proof curtain structure closed by this reservoir, comprise dykes and dams 1 and the dam foundation, dam foundation part is divided into pervious layer 4 from top to bottom, aquitard 5 and impervious layer, also comprise splitting mud jacking mud wall 2, gunite sheet-pile 3, gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams 1 all full symmetrics axis is the longest is dam body axis A, dam body axis A both sides 2.0m is symmetrical arranged splitting mud jacking hole, dam body axis A place is also provided with gunite sheet-pile hole, gunite sheet-pile 3 is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile 3 penetrates dam foundation highly permeable layer 4 in dykes and dams 1 inside, embed aquitard 5 or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall 2 by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall 2 is the height of dykes and dams 1.
Wherein gunite sheet-pile 3 should exceed the dam foundation and dykes and dams 1 boundary line 2m, and passes through highly permeable layer 4, embeds aquitard 5 or impervious layer 3m; Gunite sheet-pile pitch of holes is 2m; Gunite sheet-pile 3 is made up of the stake of continuous print churning semicircle, and adjacent semicircle stake lap length is not less than 150mm, and can take segmentation point sequence construction or sequential production, injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; Gunite sheet-pile 3 is positioned on the downside of dam body axis A, and the position that gunite sheet-pile 3 is positioned at dam body axis A is determined by actual leakage prevention structure; Described splitting mud jacking pitch of holes is 5m, carries out longitudinal mud jacking from dykes and dams 1 dam crest to the dam foundation; For being conducive to the adjustment of dam body internal stress, strengthen splitting mud jacking pressure, increase mud jacking number of times, every hole is no less than 5 times as far as possible; Injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; According to the principle of " pile bottom grouting, few filling is how multiple ", segmentation point sequence construction or sequential production can be taked; Splitting mud jacking no meter parameter should meet " earth and rockfill dam dam body grouting technique specification " SD266-88 related request.
Embodiment 3
As shown in Figure 1, seepage proof curtain structure closed by this reservoir, comprise dykes and dams 1 and the dam foundation, dam foundation part is divided into pervious layer 4 from top to bottom, aquitard 5 and impervious layer, also comprise splitting mud jacking mud wall 2, gunite sheet-pile 3, gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams 1 all full symmetrics axis is the longest is dam body axis A, dam body axis A both sides 1.5m is symmetrical arranged splitting mud jacking hole, dam body axis A place is also provided with gunite sheet-pile hole, gunite sheet-pile 3 is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile 3 penetrates dam foundation highly permeable layer 4 in dykes and dams 1 inside, embed aquitard 5 or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall 2 by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall 2 is the height of dykes and dams 1.
Described gunite sheet-pile 3 should exceed the dam foundation and dykes and dams 1 boundary line 1.5m, and passes through highly permeable layer 4, embeds aquitard 5 or impervious layer 2.5m; Gunite sheet-pile pitch of holes is 1.5m; Gunite sheet-pile 3 is made up of the stake of continuous print churning semicircle, and adjacent semicircle stake lap length is not less than 150mm, and can take segmentation point sequence construction or sequential production, injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; Gunite sheet-pile 3 is positioned on the upside of dam body axis A or downside, and the position that gunite sheet-pile 3 is positioned at dam body axis A is determined by actual leakage prevention structure; Splitting mud jacking pitch of holes is 4m, carries out longitudinal mud jacking from dykes and dams 1 dam crest to the dam foundation; For being conducive to the adjustment of dam body internal stress, strengthen splitting mud jacking pressure, increase mud jacking number of times, every hole is no less than 5 times as far as possible; Injecting paste material selects cement paste, and water/binder ratio is 1:1 ~ 1.5:1; According to the principle of " pile bottom grouting, few filling is how multiple ", segmentation point sequence construction or sequential production can be taked; Splitting mud jacking no meter parameter should meet " earth and rockfill dam dam body grouting technique specification " SD266-88 related request.
By reference to the accompanying drawings detailed description of the invention of the present utility model is explained in detail above, but the utility model is not limited to above-mentioned embodiment, in the ken that those of ordinary skill in the art possess, various change can also be made under the prerequisite not departing from the utility model aim.

Claims (5)

1. seepage proof curtain structure closed by a reservoir, comprise dykes and dams (1) and the dam foundation, dam foundation part is divided into pervious layer (4) from top to bottom, aquitard (5) and impervious layer, it is characterized in that: also comprise splitting mud jacking mud wall (2), gunite sheet-pile (3), gunite sheet-pile hole and splitting mud jacking hole, that dykes and dams (1) all full symmetrics axis is the longest is dam body axis A, dam body axis A both sides 0.5 ~ 2.0m is symmetrical arranged splitting mud jacking hole, dam body axis A is also provided with gunite sheet-pile hole, gunite sheet-pile (3) is formed by adopting high pressure jet grouting technique to form the stake of continuous print churning semicircle in gunite sheet-pile hole, gunite sheet-pile (3) penetrates dam foundation highly permeable layer (4) in dykes and dams (1) inside, embed aquitard (5) or impervious layer, splitting mud jacking hole forms splitting mud jacking mud wall (2) by adopting splitting mud jacking technology, the height of splitting mud jacking mud wall (2) is the height of dykes and dams (1).
2. seepage proof curtain structure closed by reservoir according to claim 1, it is characterized in that: described gunite sheet-pile (3) should exceed the dam foundation and dykes and dams (1) boundary line 1 ~ 2m, and passes through highly permeable layer (4), embeds aquitard (5) or impervious layer 2 ~ 3m; Gunite sheet-pile pitch of holes is 1 ~ 2m.
3. seepage proof curtain structure closed by reservoir according to claim 2, it is characterized in that: described gunite sheet-pile (3) is made up of the stake of continuous print churning semicircle, and adjacent semicircle stake lap length is not less than 150mm.
4. seepage proof curtain structure closed by reservoir according to claim 3, it is characterized in that: described gunite sheet-pile (3) is positioned on the upside of dam body axis A or downside.
5. seepage proof curtain structure closed by reservoir according to claim 4, it is characterized in that: described splitting mud jacking pitch of holes is 3 ~ 5m.
CN201420676321.9U 2014-11-13 2014-11-13 Seepage proof curtain structure closed by a kind of reservoir Expired - Fee Related CN204370373U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420676321.9U CN204370373U (en) 2014-11-13 2014-11-13 Seepage proof curtain structure closed by a kind of reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420676321.9U CN204370373U (en) 2014-11-13 2014-11-13 Seepage proof curtain structure closed by a kind of reservoir

Publications (1)

Publication Number Publication Date
CN204370373U true CN204370373U (en) 2015-06-03

Family

ID=53326605

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420676321.9U Expired - Fee Related CN204370373U (en) 2014-11-13 2014-11-13 Seepage proof curtain structure closed by a kind of reservoir

Country Status (1)

Country Link
CN (1) CN204370373U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971667A (en) * 2016-07-20 2016-09-28 中铁二院昆明勘察设计研究院有限责任公司 Preventing and treating structure for water-rich railway tunnel ballast bed mud pumping
CN106703752A (en) * 2016-12-03 2017-05-24 吉林大学 System closing method used for oil shale underground in-situ exploitation
CN110904915A (en) * 2019-07-19 2020-03-24 王增平 Reservoir engineering rock-soil body water permeation and seepage prevention design method
CN111622180A (en) * 2020-05-28 2020-09-04 中国电建集团中南勘测设计研究院有限公司 Salt pan dam foundation seepage-proof hydraulic balance structure system and control method thereof
CN111809562A (en) * 2020-06-18 2020-10-23 上海河道建设有限公司 Prevention of seepage hydraulic engineering dykes and dams
CN112962516A (en) * 2021-02-23 2021-06-15 河海大学 Design and construction method of danger-removing reinforcement measure for inhibiting dike foundation piping
CN113216091A (en) * 2021-04-27 2021-08-06 湖南欣盛建设有限公司 Multi-combined full-section seepage-proofing reinforcing construction method for main dam of reservoir

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971667A (en) * 2016-07-20 2016-09-28 中铁二院昆明勘察设计研究院有限责任公司 Preventing and treating structure for water-rich railway tunnel ballast bed mud pumping
CN105971667B (en) * 2016-07-20 2018-02-02 中铁二院昆明勘察设计研究院有限责任公司 A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method
CN106703752A (en) * 2016-12-03 2017-05-24 吉林大学 System closing method used for oil shale underground in-situ exploitation
CN106703752B (en) * 2016-12-03 2019-04-19 吉林大学 A kind of system enclosure method for oil shale underground in situ exploitation
CN110904915A (en) * 2019-07-19 2020-03-24 王增平 Reservoir engineering rock-soil body water permeation and seepage prevention design method
CN111622180A (en) * 2020-05-28 2020-09-04 中国电建集团中南勘测设计研究院有限公司 Salt pan dam foundation seepage-proof hydraulic balance structure system and control method thereof
CN111809562A (en) * 2020-06-18 2020-10-23 上海河道建设有限公司 Prevention of seepage hydraulic engineering dykes and dams
CN112962516A (en) * 2021-02-23 2021-06-15 河海大学 Design and construction method of danger-removing reinforcement measure for inhibiting dike foundation piping
CN113216091A (en) * 2021-04-27 2021-08-06 湖南欣盛建设有限公司 Multi-combined full-section seepage-proofing reinforcing construction method for main dam of reservoir

Similar Documents

Publication Publication Date Title
CN204370373U (en) Seepage proof curtain structure closed by a kind of reservoir
CN103422511B (en) A kind of reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN204023501U (en) A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam
CN104141314B (en) The method of complete seepage proof curtain is formed in rock, native two media
CN202626978U (en) Cemented soil secant pile group, diaphragm wall constituted by same and building foundation pit support system constituted by cemented soil secant pile group
CN105648988B (en) A kind of stage construction method of Face Rockfill Dam vertical seepage control structure
CN205012284U (en) Build dam dam foundation seepage prevention structure on overburden
CN104878723A (en) Earth-rock mixed dam integral vertical anti-seepage structure and construction method
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN203007961U (en) Gabion cofferdam structure
CN105155472A (en) Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure
CN206157670U (en) Asphalt concrete seepage prevention structure
CN202450505U (en) Base processing system in lava areas
CN204212168U (en) A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam
CN203429645U (en) Slope support structure assembly
CN204690692U (en) Soil stone mixed dam upper and lower disjunctor vertical cartel leakage preventing structure
CN204551378U (en) A kind of leakage preventing structure of loose rock dam upstream face top layer
CN208830256U (en) A kind of concrete dam grout curtain arragement construction
CN203096696U (en) High and low composite backwater weir
CN207143843U (en) A kind of explosion-proof earth embankment of precast splice type
CN105821892A (en) Horizontal screen pipe dewatering system and treatment method
CN202164579U (en) Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation
CN106149640A (en) Improve method and the double-drainage body rock of rock infiltration security
CN206346200U (en) Special-shaped foundation ditch corner constructing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20161113

CF01 Termination of patent right due to non-payment of annual fee