CN106703752B - A kind of system enclosure method for oil shale underground in situ exploitation - Google Patents

A kind of system enclosure method for oil shale underground in situ exploitation Download PDF

Info

Publication number
CN106703752B
CN106703752B CN201611097759.1A CN201611097759A CN106703752B CN 106703752 B CN106703752 B CN 106703752B CN 201611097759 A CN201611097759 A CN 201611097759A CN 106703752 B CN106703752 B CN 106703752B
Authority
CN
China
Prior art keywords
oil shale
grouting
hole
top plate
confining bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611097759.1A
Other languages
Chinese (zh)
Other versions
CN106703752A (en
Inventor
孙友宏
李强
周科
张弛
郭威
韩婧
刘世畅
吕世东
孙中瑾
李家晟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin University
Original Assignee
Jilin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin University filed Critical Jilin University
Priority to CN201611097759.1A priority Critical patent/CN106703752B/en
Publication of CN106703752A publication Critical patent/CN106703752A/en
Application granted granted Critical
Publication of CN106703752B publication Critical patent/CN106703752B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/003Insulating arrangements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/241Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection combined with solution mining of non-hydrocarbon minerals, e.g. solvent pyrolysis of oil shale
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/295Gasification of minerals, e.g. for producing mixtures of combustible gases

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Railway Tracks (AREA)

Abstract

The invention discloses a kind of system enclosure method for oil shale underground in situ exploitation, closed system according to the present invention is made of the heat-insulated confining bed of top plate, floor spacer confining bed and horizon mining region closing curtain;The present invention covers oil shale in-situ production zone the following steps are included: one, the setting floor spacer confining bed at oil shale layer bottom plate, is connected to become entirety with horizon mining region closing curtain;Two, the heat-insulated confining bed of top plate is set at oil shale top plate, covers oil shale in-situ production zone, the method that the setting heat-insulated confining bed of top plate uses fracture grouting makes in each injected hole slurries mutually go here and there diameter.Three, closing curtain in horizon mining region is continuous and closed, using the method for osmotic grouting, passes through exploitation oil shale layer bottom plate, reaches the basal bed of bad hydraulic permeability;The present invention provides a closed heating region for oil shale underground in situ exploitation, for blocking the entrance of production zone longitudinal direction underground water, heat loss and the entrance of horizontal direction underground water and oil gas and byproduct outflow.

Description

A kind of system enclosure method for oil shale underground in situ exploitation
Technical field
The present invention relates to a kind of ground in-situ system enclosure methods, in particular to a kind of to exploit for oil shale underground in situ System enclosure method.
Background technique
Oil shale in-situ production technique is a kind of novel oil shale mining method after oil shale retorting, it passes through brill The modes such as hole and hydraulic fracturing, form heating channel in subterranean oil shale rock stratum, and heat source enters behind heating channel to oil shale Heating destructive distillation is carried out, the air-fuel mixture product of generation, which is exported through recovery well to earth's surface, carries out separating treatment.The oil shale that compares is dry Technology is evaporated, oil shale in-situ production technique is few with ground installation, and occupied area is small, pollutes in production process small equal significant excellent Point.
It mainly includes oil shale heating channel and oil shale layer crack that oil shale in-situ exploitation, which needs to form one in underground, Closed exploitation space.Such a closed exploitation space is conducive to the range for controlling oil shale in-situ exploitation, avoids original The adverse effects such as oil gas leakage are generated to external stratum in the recovery process of position.In the exploitation space of such a high temperature, especially It is noted that the influence that underground water and the exploitation of temperature diffusion couple generate.On the one hand, if there is water in exploitation space or without exploitation The characteristics of heat insulation work in space, specific heat big due to water, a big chunk heat will be only absorbed by the water, and be exploited and will be unable to reach in space Ideal temperature influences oil shale recovery efficiency.On the other hand, if having water in exploitation space, even if producing oil gas, oil gas A large amount of vapor can be carried and return to earth's surface, while oil supply gas-water separation work belt carrys out difficulty, be greatly reduced returning for oil gas It produces effects rate.If exploitation space is connected with underground aquaporin, the pollutant generated in recovery process can enter underground reservoir, Polluted underground water.Therefore, providing enclosure space for the production zone of oil shale is particularly important.
The ground in-situ production practice (ICP) of Shell Co. Ltd proposes a kind of underground freezing wall technology, with heated well and Producing well certain distance bores more mouthfuls of spacing centainly and is interconnected to form the freezing well of closed system, and certain temperature is injected into well Freezing liquid recycled in system, so that underground water around well and surrounding rocks is formed freezing wall.But underground freezes answering for wall The disadvantages of in the process, there are long construction periods, and energy consumption is high, generate pollution to underground water.
Patent CN102278116B provides a kind of cold districts production underground freezing wall device and production freezing wall Method.This method will be sent using low-temperature glycol aqueous solution as circulatory mediator from winter outdoor temperature cold source obtained Enter in the hole beaten in advance, freeze geologic body, and then forms freezing wall.This method construction can only in winter and winter temperature is cold Area carries out, and limitation is larger, without the condition being widely popularized.
Summary of the invention
Exist the purpose of the present invention is to solve the method that the existing production zone for oil shale provides enclosure space and applies The work period is long, energy consumption is high, the problem of polluting environment, being subject to seasonal restrictions, and the one kind provided is suitable for different buried depth difference thickness Oil shale underground in situ exploitation system enclosure method.
Closed system according to the present invention is by the heat-insulated confining bed of top plate, floor spacer confining bed and horizon mining region Close curtain composition.
The present invention the following steps are included:
One, floor spacer confining bed is set at oil shale layer bottom plate, covers oil shale in-situ production zone, is opened with level Exploiting field domain closing curtain is connected to become entirety;
It is to bore a series of fracture grouting of quincuncial arrangements on ground for the fracture grouting method of floor spacer confining bed Hole, the grouting serous fluid in adjacent fracture grouting hole mutually go here and there diameter, and hole depth reaches oil shale layer bottom plate.
Injected hole passes through oil shale layer bottom plate, using the grouting mode of protrusive, carries out slip casting, slurries in oil shale bottom plate It is greater than oil shale in-situ perpendicular under the action of pulling stress in stratification direction in pressure, oil shale layer of riving, the splitting route of slurries In criss-cross veiny network, slurries mutually go here and there diameter in each injected hole, form floor spacer confining bed.
Two, the heat-insulated confining bed of top plate is set at oil shale top plate, covers oil shale in-situ production zone, top plate is set The method that heat-insulated confining bed uses fracture grouting makes in each injected hole slurries mutually go here and there diameter.
It is to bore a series of fracture grouting of quincuncial arrangements on ground for the fracture grouting method of the heat-insulated confining bed of top plate Hole, the grouting serous fluid in adjacent fracture grouting hole mutually go here and there diameter, and hole depth reaches oil shale layer top plate.
Injected hole passes through oil shale layer top plate, using the grouting mode of protrusive, carries out slip casting, slurries in oil shale top plate It is greater than oil shale in-situ perpendicular under the action of pulling stress in stratification direction in pressure, oil shale layer of riving, the splitting route of slurries In criss-cross veiny network, slurries mutually go here and there diameter in each injected hole, form the heat-insulated confining bed of top plate;
It is poured into fracture grouting hole and closes mud i.e. fracture grouting slurries, insertion one-way valve tube to oil shale layer top plate, Grouting serous fluid to be cleaved is set in one-way valve tube, is inserted into slip casting core pipe into one-way valve tube, carries out slip casting;Work as slurry pressure When greater than oil shale in-situ vertical stratification direction tensile stress, slurries are rived in oil shale layer and entrance crack, and it is heat-insulated to form top plate Confining bed.
Three, closing curtain in horizon mining region is continuous and closed, using the method for osmotic grouting, passes through and exploits oily page Rock stratum bottom plate reaches the basal bed of bad hydraulic permeability.
It is to bore a series of single slip castings on ground for the osmotic grouting method of horizon mining region closing curtain construction Hole, slip casting hole depth reach at oil shale layer bottom plate, and slip casting pitch of holes should meet the grout mixing overlapping of adjacent holes, finally Continuous and closed horizon mining region closing curtain can be formed.When carrying out slip casting to single hole, Ying Caiyong is segmented from bottom to top The mode of slip casting, using only tholepin plug, carries out segmenting slip casting since oil shale bottom plate.
The course of work and principle of the invention are as follows:
The present invention is to provide a closed heating zone around oil shale in-situ production zone i.e. heat injection well and recovery well Domain.
Arrange fracture grouting hole and curtain-grouting hole, fracture grouting hole is in quincunx distribution, and meets the slip casting of adjacent holes Slurries mutually go here and there diameter, and hole depth reaches oil shale layer bottom plate.The rounded single distribution in curtain-grouting hole, adjacent single hole spacing 3m, hole The deep 5m below oil shale layer bottom plate.
It is poured into fracture grouting hole and closes mud i.e. fracture grouting slurries, insertion one-way valve tube to oil shale layer bottom plate, Grouting serous fluid to be cleaved is set in one-way valve tube, is inserted into slip casting core pipe into one-way valve tube, carries out slip casting.Work as slurry pressure When greater than oil shale in-situ vertical stratification direction tensile stress, slurries are rived in oil shale layer and entrance crack, form floor spacer Confining bed.Same method can form the heat-insulated confining bed of top plate.
After completing the heat-insulated confining bed of top plate and bottom plate, the construction of horizon mining region closing curtain is carried out, single hole is applied Working hour, the tripping in grouting pipe in curtain-grouting hole, using only tholepin plug segmenting slip casting from bottom to top, by curtain-grouting slurries from Grouting pipe injects 5-1 sections, after the completion of 5-1 sections of injections, starts 5-2 sections of slip casting, until 5-n sections.After the completion of single hole construction, Carrying out other curtain-grouting holes again, (construction ultimately forms horizon mining region closing curtain.
After the completion of above step, that is, the heat-insulated closed area of oil shale in-situ exploitation is established, which can carry out oily page The follow-up work of rock in-situ retorting.
Beneficial effects of the present invention: the present invention provides a closed heating region for oil shale underground in situ exploitation, For blocking the entrance of production zone longitudinal direction underground water, heat loss and the entrance of horizontal direction underground water and oil gas and by-product stream Out.
Detailed description of the invention
Fig. 1 is the system enclosure method schematic diagram of the embodiment of the present invention.
Fig. 2 is the plane well location layout drawing of the embodiment of the present invention.
Fig. 3 is the heat-insulated confining bed construction technology figure of top plate and bottom plate of the embodiment of the present invention.
Fig. 4 is that curtain construction process figure is closed in the horizon mining region of the embodiment of the present invention.
Specific embodiment
It please refers to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, is the first embodiment of the present invention, the obturator that the present embodiment is related to System is made of the heat-insulated confining bed of top plate, floor spacer confining bed and horizon mining region closing curtain.
Need to block underground water entrance and heat loss on longitudinal direction;Need to block underground water entrance and oil gas in horizontal direction And byproduct reserves.
It is shown according to geologic information, oil shale layer buried depth is 64~72m, and stratum belongs to weak water penetration stratum more.Draw a circle to approve oily page Rock production zone is 30m × 30m square area.
According to the weak water penetration property on stratum, the construction of the heat-insulated confining bed of top plate and floor spacer confining bed is first carried out.It adopts It is constructed with fracture grouting method, slip casting bore dia 80mm, hole depth 75m pass through oil shale layer.Quincunx progress is pressed in production zone Cloth hole, distance between borehole 2.5m.Using protrusive grouting method.Grouting with plunger are as follows: drilling-slip casting-cleaning bottom of hole-drilling-slip casting. At drilling to 61m, tripping in stop grouting plug carries out perforation slip casting, 2.5~3MPa of grouting pressure, and material is modified rubber cement, can also Think nano modification superhigh tenacity cement-base composite material.After the completion of top plate slip casting, cleaning bottom of hole drilling is carried out, is crept into 75m, under Enter stop grouting plug, perforation slip casting is carried out to bottom plate.
After the completion of the heat-insulated confining bed of top plate and floor spacer confining bed fracture grouting, level is formed using permeation grouting method and is opened Close curtain, slip casting bore dia 80mm, hole depth 80m, until oil shale layer bottom plate in exploiting field domain.Injected hole is carried out along production zone periphery Cloth hole, distance between borehole 1m.When single hole mortar depositing construction, using retrusive segmenting slip casting method from bottom to top, segmentation distance is 8m, 1~1.5MPa of grouting pressure, injecting paste material are to coagulate type polymer cement waterproof slurry fastly.
After the completion of closed system construction, water yield is from 19m in production zone3/ d drops to 1m3Within/d, oil shale in-situ Production practice successfully carries out and output shale oil, it was demonstrated that this method can provide heat-insulated closed anti-for oil shale in-situ production practice Region is answered, reduces thermal loss, underground water enters and the outflow of oil gas and byproduct.
It please refers to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, is the second embodiment of the present invention, the obturator that the present embodiment is related to System is made of the heat-insulated confining bed of top plate, floor spacer confining bed and horizon mining region closing curtain.
Compared with the Coal Gasification of ground, underground gasification is not needed coal mining to ground, but coal seam is carried out in underground Gasification, would not also lead to the problem of on the ground gangue or coal ash with accounting for firming, dust and fine particulates pollution atmosphere, phase Ying Di, hazardous trace elements will increase the risk of underground water pollution in underground in coal ash.For reduce coal ash and with it is harmful in coal ash Pollution of the element to groundwater environment, therefore need to a resistant-walled production zone be provided for underground coal gasification(UCG) in advance.
It is shown according to geologic information, somewhere coal seam buried depth is 41.2~47.0m, and stratum underground water is on the high side, draws a circle to approve mining area Domain is 50m × 50m.
According to the weak water penetration property on stratum, the construction of the heat-insulated confining bed of top plate and floor spacer confining bed is first carried out.It adopts It is constructed with fracture grouting method, slip casting bore dia 80mm, hole depth 50m pass through coal seam.Quincunx carry out cloth is pressed in production zone Hole, distance between borehole 2.5m.Using protrusive grouting method.Grouting with plunger are as follows: drilling-slip casting-cleaning bottom of hole-drilling-slip casting.It bores It proceeds at 39m, tripping in stop grouting plug, carries out perforation slip casting, 2.5~3MPa of grouting pressure, material is modified rubber cement, can also be with For nano modification superhigh tenacity cement-base composite material.After the completion of top plate slip casting, cleaning bottom of hole drilling is carried out, is crept into 50m, tripping in Stop grouting plug carries out perforation slip casting to bottom plate.
After the completion of the heat-insulated confining bed of top plate and floor spacer confining bed fracture grouting, level is formed using permeation grouting method and is opened Close curtain, slip casting bore dia 80mm, hole depth 54m, until seat earth in exploiting field domain.Injected hole carries out cloth along production zone periphery Hole, distance between borehole 1m.When single hole mortar depositing construction, using retrusive segmenting slip casting method from bottom to top, segmentation distance is 8m, note 1~1.5MPa of pressure is starched, injecting paste material is to coagulate type polymer cement waterproof slurry fastly.
After the completion of closed system construction, water yield is from 30m in production zone3/ d drops to 1m3Within/d, coal underground gas Chemical industry skill successfully carries out and output coal bed gas, it was demonstrated that this method can provide heat-insulated closed reaction zone for coal underground gasifying technology Domain reduces the pollution of coal ash and harmful element to groundwater environment.

Claims (1)

1. a kind of system enclosure method for oil shale underground in situ exploitation, closed system is by the heat-insulated confining bed of top plate, bottom The heat-insulated confining bed of plate and horizon mining region closing curtain composition;It is characterized by comprising following steps:
One, floor spacer confining bed is set at oil shale layer (1) bottom plate, covers oil shale in-situ production zone, is opened with level Exploiting field domain closing curtain is connected to become entirety;
It is to bore a series of the first fracture grouting of quincuncial arrangements on ground for the fracture grouting method of floor spacer confining bed Hole (61), the grouting serous fluid in adjacent first fracture grouting hole (61) mutually go here and there diameter, and hole depth reaches oil shale layer (1) bottom plate;
First fracture grouting hole (61) passes through oil shale layer (1) bottom plate, using the grouting mode of protrusive, in oil shale layer (1) Bottom plate carries out slip casting, and slurries are greater than oil shale in-situ perpendicular under the action of pulling stress in stratification direction in pressure, oil shale of riving Layer (1), the splitting routes of slurries are in criss-cross veiny network, and slurries mutually go here and there diameter in each injected hole, formation floor spacer Confining bed;
Two, the heat-insulated confining bed of top plate is set at oil shale layer (1) top plate, covers oil shale in-situ production zone, setting top The method that the heat-insulated confining bed of plate uses fracture grouting makes in each injected hole slurries mutually go here and there diameter;
It is to bore a series of the second fracture grouting of quincuncial arrangements on ground for the fracture grouting method of the heat-insulated confining bed of top plate Hole (62), the grouting serous fluid in adjacent second fracture grouting hole (62) mutually go here and there diameter, and hole depth reaches oil shale layer (1) top plate;
Second fracture grouting hole (62) passes through oil shale layer (1) top plate, using the grouting mode of protrusive, in oil shale layer (1) Top plate carries out slip casting, and slurries are greater than oil shale in-situ perpendicular under the action of pulling stress in stratification direction in pressure, oil shale of riving Layer (1), the splitting routes of slurries are in criss-cross veiny network, and slurries mutually go here and there diameter in each injected hole, and formation top plate is heat-insulated Confining bed;
Closing mud i.e. fracture grouting slurries (13), insertion one-way valve tube (11) to oil are poured into the second fracture grouting hole (62) Rammell (1) top plate, grouting serous fluid (13) to be cleaved are set in one-way valve tube (11), are inserted into slip casting core pipe (12) to unidirectionally In valve pipe, slip casting is carried out;When slurry pressure is greater than oil shale in-situ vertical stratification direction tensile stress, slurries are rived oil shale layer (1) and enter in crack, formed the heat-insulated confining bed of top plate (7);
Three, closing curtain in horizon mining region is continuous and closed, using the method for osmotic grouting, passes through exploitation oil shale layer (1) bottom plate reaches the basal bed of bad hydraulic permeability;
It is to bore a series of single third splitting notes on ground for the osmotic grouting method of horizon mining region closing curtain construction It starches hole (63), third fracture grouting hole (63) depth reaches at oil shale layer (1) bottom plate, and third fracture grouting hole (63) spacing is answered The grout mixing overlapping for meeting adjacent holes may finally form continuous and closed horizon mining region closing curtain;It is right When single hole carries out slip casting, the mode of Ying Caiyong segmenting slip casting from bottom to top utilizes only tholepin since oil shale layer (1) bottom plate It fills in (16), carries out segmenting slip casting.
CN201611097759.1A 2016-12-03 2016-12-03 A kind of system enclosure method for oil shale underground in situ exploitation Active CN106703752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611097759.1A CN106703752B (en) 2016-12-03 2016-12-03 A kind of system enclosure method for oil shale underground in situ exploitation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611097759.1A CN106703752B (en) 2016-12-03 2016-12-03 A kind of system enclosure method for oil shale underground in situ exploitation

Publications (2)

Publication Number Publication Date
CN106703752A CN106703752A (en) 2017-05-24
CN106703752B true CN106703752B (en) 2019-04-19

Family

ID=58934509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611097759.1A Active CN106703752B (en) 2016-12-03 2016-12-03 A kind of system enclosure method for oil shale underground in situ exploitation

Country Status (1)

Country Link
CN (1) CN106703752B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060717B (en) * 2017-06-14 2023-02-07 长春工程学院 Oil shale underground in-situ cleavage cracking construction device and construction process
CN107060716B (en) * 2017-06-14 2023-02-07 长春工程学院 Oil shale underground in-situ jet splitting construction device and construction process
CN107178355B (en) * 2017-07-14 2023-03-14 新疆国利衡清洁能源科技有限公司 Construction method of underground coal gasification system
CN107558950A (en) * 2017-09-13 2018-01-09 吉林大学 Orientation blocking method for the closing of oil shale underground in situ production zone
CN107605422B (en) * 2017-10-20 2023-04-25 吉林大学 Combined packer and packing method for high-temperature high-pressure working condition
CN110159233B (en) * 2019-06-10 2021-07-23 中国石油大学(华东) Method for improving natural gas hydrate reservoir recovery ratio through artificial dense cover layer
CN110749477A (en) * 2019-10-11 2020-02-04 河海大学 Portable farmland shallow-buried underground water sampling and buried depth measuring device
CN112112601A (en) * 2020-09-18 2020-12-22 西安交通大学 Closed system for underground in-situ pyrolysis of coal and construction method thereof
CN112412430B (en) * 2020-09-18 2022-02-01 西安交通大学 System and method for underground in-situ pyrolysis of coal
CN112160738B (en) * 2020-09-18 2021-12-28 西安交通大学 Well arrangement structure for underground in-situ pyrolysis of coal and construction method thereof
CN112127868B (en) * 2020-09-27 2021-08-24 中国地质大学(北京) Test device for simulating underground coal gasification and oil shale co-production and test method thereof
CN113006795B (en) * 2021-04-09 2023-10-20 中国煤炭地质总局勘查研究总院 Treatment method of dwarf coal field roof sandstone water
CN115306367B (en) * 2022-08-19 2023-11-21 陕西省煤田地质集团有限公司 Underground in-situ conversion and economical evaluation method for oil-rich coal

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1107536A (en) * 1994-08-29 1995-08-30 秦皇岛市第二建筑工程公司 Splitting grouting and water-proof curtain construction method and equipment
CN102051868A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Dam anti-seepage high polymer directional split grouting method
CN102182470A (en) * 2011-03-21 2011-09-14 同济大学 Full-section sealing extrusion grouting method
CN202323973U (en) * 2011-11-15 2012-07-11 山西四建集团有限公司 Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN103291325A (en) * 2013-06-25 2013-09-11 山东科技大学 Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN204370373U (en) * 2014-11-13 2015-06-03 昆明理工大学 Seepage proof curtain structure closed by a kind of reservoir
CN105041344A (en) * 2015-06-30 2015-11-11 中国矿业大学 High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN105421498A (en) * 2015-11-16 2016-03-23 同济大学 Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7784545B2 (en) * 2004-05-14 2010-08-31 Maguire James Q In-situ method of fracturing gas shale and geothermal areas
US20070284107A1 (en) * 2006-06-02 2007-12-13 Crichlow Henry B Heavy Oil Recovery and Apparatus

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1107536A (en) * 1994-08-29 1995-08-30 秦皇岛市第二建筑工程公司 Splitting grouting and water-proof curtain construction method and equipment
CN102051868A (en) * 2009-11-02 2011-05-11 郑州优特基础工程维修有限公司 Dam anti-seepage high polymer directional split grouting method
CN102182470A (en) * 2011-03-21 2011-09-14 同济大学 Full-section sealing extrusion grouting method
CN202323973U (en) * 2011-11-15 2012-07-11 山西四建集团有限公司 Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN103291325A (en) * 2013-06-25 2013-09-11 山东科技大学 Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN204370373U (en) * 2014-11-13 2015-06-03 昆明理工大学 Seepage proof curtain structure closed by a kind of reservoir
CN105041344A (en) * 2015-06-30 2015-11-11 中国矿业大学 High-pressure gas seam-expanding, grouting and water-plugging method for precutting trough of microfissure surrounding rock
CN105421498A (en) * 2015-11-16 2016-03-23 同济大学 Foundation pit anti-seepage and settlement control method based on stereoscopic curtain-well group system
CN105862722A (en) * 2016-04-07 2016-08-17 中建交通建设集团有限公司 Three-dimensional treatment method of subway deep foundation pit in karst intense development region

Also Published As

Publication number Publication date
CN106703752A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106703752B (en) A kind of system enclosure method for oil shale underground in situ exploitation
CN107387052B (en) A kind of oil shale in-situ recovery method
CN103061730B (en) A kind of multielement hot fluid foam flooding is for coal bed methane exploring method
CN103122759B (en) A kind of coal bed gas well multielement hot fluid enhanced recovery method
CN101503957B (en) Aboveground and underground combined heat injection coal bed gas extraction method
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
CN107100605B (en) Method for developing dry hot rock by using double horizontal wells and circulating supercritical carbon dioxide
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN110644963B (en) Method for exploiting hydrate based on multilateral well
CN108868736B (en) double-L well structure and method for exploiting marine hydrate reservoir by fracturing
CA2839518C (en) Recycling co2 in heavy oil or bitumen production
CA2847759C (en) A method of enhancing resource recovery from subterranean reservoirs
CN104653148A (en) Well group reforming comprehensive utilization method for waste oil wells
US20150204171A1 (en) Carbon dioxide energy storage and enhanced oil recovery
CN112610191B (en) Method for exploiting natural gas hydrate reservoir permeable by cover layer by utilizing branch horizontal well
CN109025940B (en) CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method
CN106089291A (en) A kind of collaborative extraction is caving the old dead zone of formula and the method for lower coal seam coal bed gas
US8833454B2 (en) Hydrocarbon recovery method
CA2815737A1 (en) Steam assisted gravity drainage with added oxygen geometry for impaired bitumen reservoirs
CN104370508A (en) Coal mine floor rock mass grouting reinforcement method and grouting slurry
CN107120098A (en) One kind utilizes CO2The well construction design and method hidden with geothermal energy exploitation of gas hydrate
CN102971491A (en) Thermal mobilization of heavy hydrocarbon deposits
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
CN114876438A (en) Coal mining method for in-situ hydrogen production of filling coal
CN105971563B (en) A kind of lower part tool post method exploits the pumping method for the compound old dead zone coal bed gas to be formed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant