CN1107536A - Splitting grouting and water-proof curtain construction method and equipment - Google Patents

Splitting grouting and water-proof curtain construction method and equipment Download PDF

Info

Publication number
CN1107536A
CN1107536A CN 94115435 CN94115435A CN1107536A CN 1107536 A CN1107536 A CN 1107536A CN 94115435 CN94115435 CN 94115435 CN 94115435 A CN94115435 A CN 94115435A CN 1107536 A CN1107536 A CN 1107536A
Authority
CN
China
Prior art keywords
immersed tube
splitter
water
curtain
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 94115435
Other languages
Chinese (zh)
Inventor
刘文涛
雷茂辉
李宝贵
张明义
张继良
马永平
宋世德
赵殿友
李静宜
于力
倪会新
兰立志
李�和
佟宝华
岳维国
杨来弟
王红月
侯亚萍
白学敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Nonferrous Metals Survey And Engineering Co Qinhuangdao Engineering Command
Qinhuangdao No2 Construction Engrg Co
Original Assignee
Liaoning Nonferrous Metals Survey And Engineering Co Qinhuangdao Engineering Command
Qinhuangdao No2 Construction Engrg Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Nonferrous Metals Survey And Engineering Co Qinhuangdao Engineering Command, Qinhuangdao No2 Construction Engrg Co filed Critical Liaoning Nonferrous Metals Survey And Engineering Co Qinhuangdao Engineering Command
Priority to CN 94115435 priority Critical patent/CN1107536A/en
Publication of CN1107536A publication Critical patent/CN1107536A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A splitter with arc plate is attached to pipe of vibration-type pipe sinking machine. Under action of pipe sinking machine, said splitter is sunk underground to split earth to form slot. The mortar is poured into arc slot via holes at head of pipe and grouting holes of splitter by mortar pump. Continuous construction can form an enclosed and continuous water-stop curtain.

Description

Splitting grouting and water-proof curtain construction method and equipment
The invention belongs to the job practices and the equipment thereof of building foundation deep-foundation pit engineering.Deep pit digging blocks water; keep off native dirty Foundation Design; it is in the formation all around of the intending deep pit excavation case type curtain that blocks water of chain one-tenth together; stop underground water in foundation ditch, to infiltrate; to guarantee the dried operation of foundation construction; can stablize the outer underground water level of curtain again, make it to protect the safety of Foundation Design existing building thing on every side.
At present known domestic and international deep pit digging retaining soil, block water, seepage control technique all adopts underground reinforced concrete diaphragm wall, steel bar concrete is stake, deep mixing method and high-pressure rotary spraying method and grouting etc. continuously.All there is the construction costs height to some extent in said method, needs to use material various, and is technical strong, and complex process equipment, situation long in time limit.For example, adopt steel bar concrete diaphragm wall method, it is intended to adopt on the ground a kind of trench machine, periphery along basic deep excavation project, rely on mud off, excavate out a long and narrow deep trouth, and in groove, hang into reinforcing cage, use the tremie method underwater concreting with tremie method with displacement mud then, build up a unit groove section.Carry out so piecemeal,, build up continuous steel concrete wall one underground with certain joint style, in order to intercept water, antiseepage, load-bearing, retaining soil.There are the following problems for this job practices: the one, need more special-purpose machines and tools and equipment; The 2nd, construction technology is comparatively complicated, and need have certain technical level; The 3rd, bad if construction technology is grasped, be easy to occur the hole of collapsing, the concrete sandwich leakage problems also need have the management method of the mud off that is fit to different geological conditionss, and handles the measures that will take when breaking down etc.
Purpose of the present invention is to provide a kind of foundation pit construction easy, duration weak point, dependable performance, also suitable building compact district, and soil property is that the deep pit digging of viscosity, grittiness ground blocks water, anti-splitting grouting and water-proof curtain construction method and the equipment that blends retaining soil.
Splitting grouting and water-proof curtain construction method of the present invention is: the immersed tube that adopts special vibrating immersed tube machine will have the arc splitter is learned into underground, soil body splitting is become the second-degree parabola deep-slotted chip breaker, utilize mortar pump by immersed tube sink into in the vibration carried, small opening and the splitter both sides injected hole of lean concrete grout by the immersed tube head injected in the deep-slotted chip breaker, form the arc board wall, after constructing continuously, the curtain that blocks water of chain one-tenth sealing.
A kind of equipment that is used for above-mentioned job practices: utilize the arc splitter is set on immersed tube, the cross section is the second-degree parabola shape, with soil body splitting grooving, has the injected hole with the mutual vertical conducting of immersed tube inner chamber on the diagonal of splitter.
The present invention draws than having following advantage with prior art:
1, process is simple.Adopt splitter with soil body splitting grooving.Splitter sink into on propose once grouting moulding simultaneously, avoided the job practices of manufacturability such as existing steel bar concrete diaphragm wall, technical complexity.
2, impervious effective.It is 4 * 10 that number is adopted in the splitting grouting and water-proof curtain infiltration -9Below the cm/s, and steel bar concrete diaphragm wall transmission coefficient 2 * 10 -4-2 * 10 -8Cm/s.
3, the construction period is short.The splitting grouting and water-proof curtain duration only accounts for 30% of the steel bar concrete construction of diaphragm wall phase.
4, cost is low.Splitting grouting and water-proof curtain reduces expense 58,76% than steel bar concrete diaphragm wall.
5, structural mechanical property is reasonable.Splitter adopts the second-degree parabola form, and second moment of area is big, and arch structure is stressed based on axial force, with the stake curtain integrated structure of soldier pile combining form.
Description of drawings:
Fig. 1 is splitter partial structurtes schematic diagrames.
Fig. 2 is the curtain wall schematic diagram.
Fig. 3 is the schematic diagram of stake curtain combination.
To do concrete description to the job practices and the equipment of splitting grouting and water-proof curtain of the present invention:
The soil body supporting curtain wall on slope is put in utilization, before the curtain construction, along the deep excavation project periphery, adopt shaping equipment DZ-40Y type exciting force 330KH vibration sinking tube machine, see Fig. 1, utilize on immersed tube, to be provided with the arc splitter is installed, its cross section is the second-degree parabola shape, underground in order to sink to, with soil body splitting grooving, and the injected hole that has on the diagonal of splitter with the mutual vertical connection of inner chamber of immersed tube is used for injecting slurries in groove.When foundation ditch allows to put the slope, the soil body supporting curtain wall on slope is put in the curtain utilization, the periphery of heavy deep excavation project, adopt the vibration sinking tube machine, the immersed tube that will have the arc splitter sinks to underground, because of the cross section of arc splitter is the second-degree parabola shape, soil body splitting is become thick 60mm, the second-degree parabola arcuate furrow of wide 900mm, by 100/15 molding sand stock pump (flow 100L/mm, pressure 15kg/cm) cement paste is injected in the immersed tube, immersed tube sink into in the vibration carried, lean concrete grout is injected lean concrete grout in the arcuate furrow by the small opening of immersed tube head and the injected hole of splitter both sides, it is thick to form 700mm after the slip casing by pressure, be second-degree parabola arc cement wall, (y=4fx(l-x)/l 2, chord length l=900mm, rise f=0.2, l=180mm, wall thickness s=70mm) and the curtain that blocks water of the chain one-tenth sealing in construction back is seen Fig. 2 continuously in certain sequence.
Fig. 3 is the embodiment of stake curtain associated methods.Utilize lagging pile supporting curtain (opposing lateral pressure), before the curtain construction, pile crown A side (A is that the outside, B are for inboard) is excavated to certain depth, slip casting splitter 2 two side ends are pressed close to after an a, the b point, slip casting splitter 2 avales, by mortar pump cement is injected in the immersed tube 1 equally, utilize immersed tube 1 sink into in the vibration carried, respectively the small opening of lean concrete grout by immersed tube 1 head and splitter 2 injected in the arcuate furrow.And block water, keep off soil and antiseepage by the sealing of the chain one-tenth of the order between stake.

Claims (3)

1, splitting grouting and water-proof curtain construction method, it is characterized in that: the immersed tube that adopts special vibrating immersed tube machine will have the arc splitter sinks to underground, soil body splitting is become the second-degree parabola arcuate furrow, utilize mortar pump by immersed tube sink into in the vibration carried, small opening and the splitter both sides injected hole of lean concrete grout by immersed tube countersunk head portion injected in the deep-slotted chip breaker, form the arc board wall, after constructing continuously, the curtain wall that blocks water of chain one-tenth sealing.
2, by the described splitting grouting and water-proof curtain construction method of claim 1, the supporting form of the curtain wall that it is characterized in that constructing continuously also can utilize the supporting curtain wall of chain one-tenth sealing between lagging pile.
3, the employed equipment of the above-mentioned job practices of a kind of usefulness, comprise special vibrating immersed tube machine, and immersed tube constitutes, it is characterized in that utilizing arc splitter (2) is set on immersed tube (1), the cross section is the second-degree parabola shape, has the injected hole (3) with the mutual vertical conducting of immersed tube (1) inner chamber on the diagonal of splitter (2).
CN 94115435 1994-08-29 1994-08-29 Splitting grouting and water-proof curtain construction method and equipment Pending CN1107536A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94115435 CN1107536A (en) 1994-08-29 1994-08-29 Splitting grouting and water-proof curtain construction method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94115435 CN1107536A (en) 1994-08-29 1994-08-29 Splitting grouting and water-proof curtain construction method and equipment

Publications (1)

Publication Number Publication Date
CN1107536A true CN1107536A (en) 1995-08-30

Family

ID=5037478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94115435 Pending CN1107536A (en) 1994-08-29 1994-08-29 Splitting grouting and water-proof curtain construction method and equipment

Country Status (1)

Country Link
CN (1) CN1107536A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425199A (en) * 2011-09-26 2012-04-25 郑州优特基础工程维修有限公司 Tri-cone-head pressing grooving plate and grouting slot construction method
CN102444128A (en) * 2011-09-26 2012-05-09 郑州优特基础工程维修有限公司 Grouting method for ultrathin high polymer cutoff wall
CN106703752A (en) * 2016-12-03 2017-05-24 吉林大学 System closing method used for oil shale underground in-situ exploitation
CN110499766A (en) * 2019-08-30 2019-11-26 郑州安源工程技术有限公司 A kind of slim grooving promotes synchronous grouting device and its application method
CN110499764A (en) * 2019-08-30 2019-11-26 郑州大学 A kind of cut-pff wall is at groove mould and high polymer cutoff wall grouting equipment
CN110616669A (en) * 2019-08-30 2019-12-27 郑州大学 Construction method of high polymer impervious wall
CN112502663A (en) * 2020-12-09 2021-03-16 中国矿业大学 Curtain grouting method based on directional hydraulic mechanical splitting technology
CN115859453A (en) * 2023-02-24 2023-03-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system
CN110499764B (en) * 2019-08-30 2024-06-28 郑州大学 Diaphragm wall grooving mold and high polymer diaphragm wall grouting equipment

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425199A (en) * 2011-09-26 2012-04-25 郑州优特基础工程维修有限公司 Tri-cone-head pressing grooving plate and grouting slot construction method
CN102444128A (en) * 2011-09-26 2012-05-09 郑州优特基础工程维修有限公司 Grouting method for ultrathin high polymer cutoff wall
CN102425199B (en) * 2011-09-26 2013-08-07 郑州优特基础工程维修有限公司 Tri-cone-head pressing grooving plate and grouting slot construction method
CN102444128B (en) * 2011-09-26 2013-11-13 郑州优特基础工程维修有限公司 Grouting method for ultrathin high polymer cutoff wall
CN106703752A (en) * 2016-12-03 2017-05-24 吉林大学 System closing method used for oil shale underground in-situ exploitation
CN106703752B (en) * 2016-12-03 2019-04-19 吉林大学 A kind of system enclosure method for oil shale underground in situ exploitation
CN110499766A (en) * 2019-08-30 2019-11-26 郑州安源工程技术有限公司 A kind of slim grooving promotes synchronous grouting device and its application method
CN110499764A (en) * 2019-08-30 2019-11-26 郑州大学 A kind of cut-pff wall is at groove mould and high polymer cutoff wall grouting equipment
CN110616669A (en) * 2019-08-30 2019-12-27 郑州大学 Construction method of high polymer impervious wall
CN110616669B (en) * 2019-08-30 2022-02-08 郑州大学 Construction method of high polymer impervious wall
CN110499764B (en) * 2019-08-30 2024-06-28 郑州大学 Diaphragm wall grooving mold and high polymer diaphragm wall grouting equipment
CN112502663A (en) * 2020-12-09 2021-03-16 中国矿业大学 Curtain grouting method based on directional hydraulic mechanical splitting technology
CN115859453A (en) * 2023-02-24 2023-03-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system
CN115859453B (en) * 2023-02-24 2023-04-28 陕西华邦建设工程有限公司 BIM-based foundation waterproof curtain design method and system

Similar Documents

Publication Publication Date Title
CN102124163B (en) Method for constructing a chair-type, self-supported earth retaining wall
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN108612111B (en) Steel pipe pile, foundation pit support structure and construction method of foundation pit support structure
CN108086328A (en) A kind of dynamic sealing, assembled building enclosure and its construction method from recharge
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN109056701A (en) Diaphram wall seam is anti-to stream construction method
CN108677925A (en) Half coercion underground continuous wall structure and its construction method
CN111733842A (en) Cofferdam construction method and cofferdam structure
CN201857603U (en) Heightened gravity dam
CN1107536A (en) Splitting grouting and water-proof curtain construction method and equipment
CN109339079A (en) A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum
CN104480945B (en) A kind of foundation ditch reversed construction method
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN112227382A (en) Double-row pile structure with water stopping function and construction method thereof
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN110258526A (en) The method of prefabricated diaphram wall and construct outer wall of basement and floor
CN1376836A (en) Method for controlling deformation of foundation pit's retaining wall by grouting in passive area of earth body
CN210636441U (en) Guide partition wall
CN106939596A (en) A kind of cast-in-place slub type slurry drilled pile
CN112627231A (en) Construction device for deep guide wall of soft soil
CN110792093A (en) Construction method of foundation pit waterproof curtain and waterproof curtain
CN110424331A (en) A kind of power station pin-connected panel water-drawing channel and construction method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication