CN208830256U - A kind of concrete dam grout curtain arragement construction - Google Patents

A kind of concrete dam grout curtain arragement construction Download PDF

Info

Publication number
CN208830256U
CN208830256U CN201821531398.1U CN201821531398U CN208830256U CN 208830256 U CN208830256 U CN 208830256U CN 201821531398 U CN201821531398 U CN 201821531398U CN 208830256 U CN208830256 U CN 208830256U
Authority
CN
China
Prior art keywords
concrete dam
dam body
curtain
weight plate
grout curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821531398.1U
Other languages
Chinese (zh)
Inventor
王立成
陆强
王超
李岳东
蒋小军
张安
刘艳红
王文己
张丽艳
马站
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201821531398.1U priority Critical patent/CN208830256U/en
Application granted granted Critical
Publication of CN208830256U publication Critical patent/CN208830256U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of concrete dam grout curtain arragement constructions, including basement rock, concrete dam body, grout curtain, collector drain, coagulation earth mulch weight plate is arranged in concrete dam body upstream side, coagulation earth mulch weight plate is placed on basement rock, copper water stop is set between coagulation earth mulch weight plate and concrete dam body, bituminous flax cord is filled among the copper lug of copper water stop, pitch high pressure closed pore plate is set between coagulation earth mulch weight plate and concrete dam body, coagulation earth mulch weight plate lower disposed grout curtain, drainage hole after the lower part setting curtain of collector drain in concrete dam body.It is placed in inside dam body compared with irrigation gallery with traditional grout curtain, drainage hole moves forward after grout curtain and curtain, so that grout curtain and dam construction interfere with each other reduction, the connection of copper water stop flexible structure, avoid influence of the tensile stress to grout curtain structure, downstream uplift pressure reduces, and corresponding reduction of seeping water substantially increases the structure safety of dam body.Structural shape is simple, easy to operate, and cost is lower, and easy to implement, and construction, maintenance are simple and convenient.

Description

A kind of concrete dam grout curtain arragement construction
Technical field
The utility model relates to a kind of leakage preventing structure, especially a kind of concrete dam grout curtain arragement construction.
Background technique
Heavy Curtain Grouting Technology is the important antiseepage means in construction of hydro project, and traditional grout curtain is inside dam body Irrigation gallery is set, is then drilled using geological drilling rig to stratum in gallery, makes the drilling of suitable curtain, then to hole Interior be perfused has the cement slurries of elevated pressures, and cement slurry can gradually penetrate into subterranean layer after being injected, be slowly solidified to together, by The entirety of a solidification is gradually formed with drilling, bottom depth is gone directly inside formation, and water protecting curtain is ultimately formed.But due to arch dam Narrower width, dam body is mainly by two sides spandrel stress, and majority can call in person on dam and generate Tension Stress Zone, and is compression in toe Area, and Tension Stress Zone often causes dam lower concrete and basement rock to crack, and then leads to grout curtain body drawing crack, thus largely Water and total head pressure import the dam foundation, dam body leak;In compressive region, then it can make the dam foundation is compressed to become more waterproof, from And drainage efficiency is reduced, cause grout curtain under dam crack occur, downstream uplift pressure is increased sharply, and water percolating capacity increasing causes serious Accident, French Malpasset arch dam because downstream uplift pressure too greatly caused by dam body have an accident.In addition grout curtain is generally in dam body It is carried out in the irrigation gallery of setting, irrigation gallery construction is poured with dam body to intersect, and influences each other;Worker is in the milk in gallery Operation, working environment are severe.
Utility model content
Technical problem to be solved by the utility model is to provide a kind of concrete dam grout curtain arragement constructions, utilize Grout curtain Forward solves dam body because the drawbacks of grout curtain is cracked caused by tensile stress.The structure does not influence dam body itself Structure safety, it is thus also avoided that grout curtain crack caused by accident.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is: a kind of concrete dam grout curtain Coagulation earth mulch weight is arranged in arragement construction, including basement rock, concrete dam body, grout curtain, collector drain, concrete dam body upstream side Pressing plate, coagulation earth mulch weight plate are placed on basement rock, copper water stop are arranged between coagulation earth mulch weight plate and concrete dam body, copper stops Bituminous flax cord is filled among the copper lug of water piece, and pitch high pressure closed pore is set between coagulation earth mulch weight plate and concrete dam body Plate, coagulation earth mulch weight plate lower disposed grout curtain, drainage hole after the lower part setting curtain of collector drain in concrete dam body.
The coagulation earth mulch weight plate thickness is not less than 3m.
The grout curtain is away from upstream dam facing 2.5-3m.
The collector drain is close to dam body downstream side.
The coagulation earth mulch weight plate is reinforced on basement rock by dowel.
A kind of concrete dam grout curtain method, comprising the following steps:
(1) the casting concrete dam body on the basement rock excavated, and form collector drain;
(2) when concrete dam body is poured away from basement rock 2.5m~3.0m, copper is set in concrete dam body upstream dam facing Sealing piece fills bituminous flax cord in the copper lug of copper water stop;
(3) the casting concrete lid weight plate on the basement rock of concrete dam body upstream side, coagulation earth mulch weight plate and concrete Dam body is connected by copper water stop, and pitch high pressure closed pore plate is arranged between coagulation earth mulch weight plate and concrete dam body;
(4) it when coagulation earth mulch weight plate intensity is greater than 80% design strength, is carried out in coagulation earth mulch weight plate lower part The construction of grout curtain;
(5) after Curtain Grouting Construction finishes simultaneously passed examination, the drilling for carrying out drainage hole after curtain in collector drain is applied Work.
The beneficial effects of the utility model are: prevent grout curtain crack leak, structure is easily operated, do not increase construction at This, constructs more convenient.
Detailed description of the invention
Fig. 1 is the utility model concrete dam grout curtain arragement construction schematic diagram.
Fig. 2 is the utility model Copper water stop detail drawing.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
As shown in Figure 1, 2, the concrete dam grout curtain arragement construction of the utility model, including basement rock 3, concrete dam body 1, coagulation earth mulch weight plate 2 is arranged in grout curtain 9, collector drain 11,1 upstream side of concrete dam body, and coagulation earth mulch weight plate 2 is set In on basement rock 3, copper water stop 5 is set, in the copper lug 6 of copper water stop 5 between coagulation earth mulch weight plate 2 and concrete dam body 1 Between fill bituminous flax cord 7, between coagulation earth mulch weight plate 2 and concrete dam body 1 be arranged pitch high pressure closed pore plate 8, coagulation earth mulch The 2 lower disposed grout curtain 9 of weight plate, drainage hole 10 after the lower part setting curtain of collector drain 11 in concrete dam body 1.
2 thickness of coagulation earth mulch weight plate is not less than 3m.The grout curtain 9 is away from upstream dam facing 2.5-3m.The row Water gallery 11 is close to dam body downstream side.The coagulation earth mulch weight plate 2 is reinforced on basement rock 3 by dowel 4.
Above-mentioned concrete dam Curtain Grouting Construction method, comprising the following steps:
(1) the casting concrete dam body on the basement rock excavated, and form collector drain;
(2) when concrete dam body is poured away from basement rock 2.5m~3.0m, copper is set in concrete dam body upstream dam facing Sealing piece fills bituminous flax cord in the copper lug of copper water stop;
(3) the casting concrete lid weight plate on the basement rock of concrete dam body upstream side, coagulation earth mulch weight plate and concrete Dam body is connected by copper water stop, and pitch high pressure closed pore plate is arranged between coagulation earth mulch weight plate and concrete dam body;
(4) it when coagulation earth mulch weight plate intensity is greater than 80% design strength, is carried out in coagulation earth mulch weight plate lower part The construction of grout curtain;
(5) after Curtain Grouting Construction finishes simultaneously passed examination, the drilling for carrying out drainage hole after curtain in collector drain is applied Work.
Specifically, coagulation earth mulch weight plate 2 is arranged in 1 upstream side of concrete dam body, coagulation earth mulch weight plate 2 is placed in base It on rock 3, is reinforced by dowel 4, twice copper water stop 5, twice Copper water stop is arranged in coagulation earth mulch weight plate 2 and concrete dam body 1 Bituminous flax cord 7 is filled among the copper lug 6 of piece 5, and pitch height is set between coagulation earth mulch weight plate 2 and concrete dam body 1 and is pressed off Orifice plate 8, drainage hole 10 after the 2 lower disposed grout curtain 9 of coagulation earth mulch weight plate and curtain, the setting of drainage hole 10 is mixed after curtain The lower part of collector drain 11 in solidifying earth dam body 1.Grout curtain inside dam body compared with irrigation gallery is placed in traditional grout curtain And drainage hole moves forward after curtain, so that grout curtain and dam construction interfere with each other reduction, the connection of copper water stop flexible structure is kept away Influence of the tensile stress to grout curtain structure is exempted from, downstream uplift pressure reduces, and corresponding reduction of seeping water substantially increases the knot of dam body Structure safety.
Twice copper water stop 5 is arranged in coagulation earth mulch weight plate 2 and concrete dam body 1, has that resistance to corrosion is strong, tension is strong Horizontal leakage preventing body of the twice copper water stop 5 for the advantages that spending height, good toughness, acceptable moderate finite deformation as total.Coagulation Pitch high pressure closed pore plate 8 is set between earth mulch weight plate 2 and concrete dam body 1, so that coagulation earth mulch weight plate 2 and concrete dam The structure for being suitable for dam deformation is formed between body 1.The 2 lower disposed grout curtain 9 of coagulation earth mulch weight plate and 9 heel row of grout curtain Water hole 10, grout curtain 9 prevent the leakage of water, and collector drain 11 in concrete dam body 1 is arranged in drainage hole 10 after curtain Lower part reduces dam body uplift pressure.In addition, grout curtain is constructed by being moved to outside dam on coagulation earth mulch weight plate in irrigation gallery, Working environment is greatly improved, and embodies humanistic care.Structural shape is simple, easy to operate, and cost is lower, and easy to implement, applies Work, maintenance are simple and convenient.
Meanwhile concrete dam body 1 by coagulation earth mulch weight plate 2, grout curtain 9 and the construction of drainage hole 10 in the case where not interfered It pours simultaneously.
Embodiment described above is merely to illustrate the technical idea and feature of the utility model, and its object is to make ability Technical staff in domain, cannot be only practical new to limit this with this example it will be appreciated that the content of the utility model and implement accordingly The scope of the patents of type, i.e., same changes or modifications made by the revealed spirit of all the utility model, still falls in the utility model The scope of the patents in.

Claims (5)

1. a kind of concrete dam grout curtain arragement construction, including basement rock (3), concrete dam body (1), grout curtain (9), draining Gallery (11), which is characterized in that coagulation earth mulch weight plate (2) are arranged in concrete dam body (1) upstream side, coagulation earth mulch weight plate (2) it is placed on basement rock (3), copper water stop (5) is set between coagulation earth mulch weight plate (2) and concrete dam body (1), copper water stop (5) bituminous flax cord (7) are filled among copper lug (6), drip is set between coagulation earth mulch weight plate (2) and concrete dam body (1) Green high pressure closed pore plate (8), coagulation earth mulch weight plate (2) lower disposed grout curtain (9), collector drain in concrete dam body (1) (11) drainage hole (10) after lower part setting curtain.
2. concrete dam grout curtain arragement construction according to claim 1, which is characterized in that the coagulation earth mulch weight plate (2) thickness is not less than 3m.
3. concrete dam grout curtain arragement construction according to claim 1, which is characterized in that the grout curtain (9) away from Upstream dam facing 2.5-3m.
4. concrete dam grout curtain arragement construction according to claim 1, which is characterized in that the collector drain (11) is tight Adjacent dam body downstream side.
5. concrete dam grout curtain arragement construction according to claim 1, which is characterized in that the coagulation earth mulch weight plate (2) it is reinforced on basement rock (3) by dowel (4).
CN201821531398.1U 2018-09-18 2018-09-18 A kind of concrete dam grout curtain arragement construction Active CN208830256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821531398.1U CN208830256U (en) 2018-09-18 2018-09-18 A kind of concrete dam grout curtain arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821531398.1U CN208830256U (en) 2018-09-18 2018-09-18 A kind of concrete dam grout curtain arragement construction

Publications (1)

Publication Number Publication Date
CN208830256U true CN208830256U (en) 2019-05-07

Family

ID=66313882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821531398.1U Active CN208830256U (en) 2018-09-18 2018-09-18 A kind of concrete dam grout curtain arragement construction

Country Status (1)

Country Link
CN (1) CN208830256U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930252A (en) * 2018-09-18 2018-12-04 中水北方勘测设计研究有限责任公司 A kind of concrete dam grout curtain arragement construction and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930252A (en) * 2018-09-18 2018-12-04 中水北方勘测设计研究有限责任公司 A kind of concrete dam grout curtain arragement construction and its construction method

Similar Documents

Publication Publication Date Title
CN101096852B (en) Method for anti-floating of underground building
CN101644041B (en) Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof
CN101200885B (en) Earth-rock dam deep-base seepage-control water-stopping structure for water conservancy and hydropower project
CN204370373U (en) Seepage proof curtain structure closed by a kind of reservoir
CN205012288U (en) Embankment dam pitch core -wall base
CN205012284U (en) Build dam dam foundation seepage prevention structure on overburden
CN105484204A (en) Stone masonry dam or concrete dam sealing anti-seepage reinforcement structure and construction method thereof
CN207452895U (en) A kind of high slope anchored pile supporting
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN215669631U (en) Deep overburden foundation structure
CN208830256U (en) A kind of concrete dam grout curtain arragement construction
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN209353301U (en) Asphaltic concrete core wall and dam foundation impervious wall connection structure
CN105155472A (en) Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure
CN108930252A (en) A kind of concrete dam grout curtain arragement construction and its construction method
CN208455647U (en) Soft Rock Slope ecological safeguard structure
CN203320576U (en) Waterproof and drainage system for basement external wall of super high-rise buildings
CN109356102A (en) Asphaltic concrete core wall and dam foundation impervious wall connection structure
CN108193649A (en) Core-wall homogeneous dam
CN204849791U (en) Structure of earth-rock cofferdam seepage-proofing system
CN204690692U (en) Soil stone mixed dam upper and lower disjunctor vertical cartel leakage preventing structure
CN209429054U (en) Seepage prevention of dam founda structure in ultra-deep thick-covering
CN208219557U (en) Connection structure of perpendicular prevention of seepage geomembrane and bed rock face
CN202164579U (en) Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation
CN207228131U (en) Argillaceous siltstone side slope structure