CN202164579U - Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation - Google Patents
Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation Download PDFInfo
- Publication number
- CN202164579U CN202164579U CN 201120256051 CN201120256051U CN202164579U CN 202164579 U CN202164579 U CN 202164579U CN 201120256051 CN201120256051 CN 201120256051 CN 201120256051 U CN201120256051 U CN 201120256051U CN 202164579 U CN202164579 U CN 202164579U
- Authority
- CN
- China
- Prior art keywords
- abrupt slope
- rock
- seepage
- geomembrane
- connecting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120256051 CN202164579U (en) | 2011-07-19 | 2011-07-19 | Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201120256051 CN202164579U (en) | 2011-07-19 | 2011-07-19 | Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202164579U true CN202164579U (en) | 2012-03-14 |
Family
ID=45800418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201120256051 Expired - Lifetime CN202164579U (en) | 2011-07-19 | 2011-07-19 | Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202164579U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243681A (en) * | 2013-05-16 | 2013-08-14 | 黄河勘测规划设计有限公司 | Flexible connection method for geomembrane for earth and rockfill dam seepage proofing and concrete building |
CN109629516A (en) * | 2019-01-21 | 2019-04-16 | 岳胜利 | A kind of earth-rock dam deep-base seepage-control water-stopping structure for water conservancy and hydropower project |
-
2011
- 2011-07-19 CN CN 201120256051 patent/CN202164579U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103243681A (en) * | 2013-05-16 | 2013-08-14 | 黄河勘测规划设计有限公司 | Flexible connection method for geomembrane for earth and rockfill dam seepage proofing and concrete building |
CN109629516A (en) * | 2019-01-21 | 2019-04-16 | 岳胜利 | A kind of earth-rock dam deep-base seepage-control water-stopping structure for water conservancy and hydropower project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205012288U (en) | Embankment dam pitch core -wall base | |
CN101644041B (en) | Face rockfill dam toe board structure constructed on completely weathered bed rock and construction method thereof | |
CN205314116U (en) | Continuous type of combined type drilling cling compound structure | |
CN207469269U (en) | A kind of hydraulic engineering High strength geogrid structure class ecological revetment | |
CN103243721B (en) | Highrise Building With Raft Foundation and Core Walls Structure excavation construction method under Unfavorable geology condition | |
CN205035768U (en) | Enrockment concrete permeable dike | |
CN215669631U (en) | Deep overburden foundation structure | |
CN203320494U (en) | High dam spillway foundation drainage system | |
CN113818402A (en) | Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof | |
CN107761668B (en) | Coastal shore reservoir land-building type revetment structure and construction method thereof | |
CN202164579U (en) | Stepped concrete connecting structure for seepage-proof geomembrane of earth-rock dam or cofferdam and abrupt slope rock foundation | |
CN202450501U (en) | Bricking drainage structure for stilling pool | |
CN203307776U (en) | Concrete face rock fill dam toe board structure | |
CN202672119U (en) | Flexible drainage channel for coal gangue mountain | |
CN208455647U (en) | Soft Rock Slope ecological safeguard structure | |
CN204252074U (en) | A kind of bank slope protection structure | |
CN104929081A (en) | Enrockment concrete permeable dike and construction method thereof | |
CN203429645U (en) | Slope support structure assembly | |
CN215441846U (en) | Foundation anti-settling structure | |
CN201865118U (en) | Grouting spiral anchor base | |
CN204849791U (en) | Structure of earth rock cofferdam prevention of seepage system | |
CN208830256U (en) | A kind of concrete dam grout curtain arragement construction | |
CN210766791U (en) | Shear resistance foundation ditch is concrete structure of back cover under water | |
CN105780820A (en) | Anti-floating structure of bottom plate of underground building | |
CN105239535B (en) | Pitch core-wall pedestal and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN + Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION |
|
CP01 | Change in the name or title of a patent holder |
Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd. Address before: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp. |
|
CP03 | Change of name, title or address |
Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16 Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp. Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group |
|