CN204234718U - 一种钢包包底工作层内衬 - Google Patents
一种钢包包底工作层内衬 Download PDFInfo
- Publication number
- CN204234718U CN204234718U CN201420538417.9U CN201420538417U CN204234718U CN 204234718 U CN204234718 U CN 204234718U CN 201420538417 U CN201420538417 U CN 201420538417U CN 204234718 U CN204234718 U CN 204234718U
- Authority
- CN
- China
- Prior art keywords
- prefabricated component
- type prefabricated
- liner
- working lining
- blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
本实用新型公开了一种钢包包底工作层内衬,它包括内衬本体、两块透气砖、水口座砖和“L”型预制件,内衬本体为圆形,所述的透气砖、水口座砖和“L”型预制件固定设置于内衬本体内部,“L”型预制件重心与圆形内衬本体圆心相重合,所述的“L”型预制件短边位于两块透气砖之间,长边位于水口座砖和其中一块透气砖之间,所述的“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间固定设置有间隙,该间隙通过刚玉质浇注料填充。本实用新型提高了钢包接钢时钢水冲击区域内衬强度,保证了钢包包底工作层的安全使用,同时该钢包包底工作层内衬生产制造方便、成本低廉,具有极大的推广应用价值。
Description
技术领域
本实用新型涉及一种钢包包底工作层内衬。
背景技术
钢包包底工作层内衬的使用性能直接关系到钢包的安全运行,转炉出钢过程中,红热钢水直接冲击在钢包包底工作层,随着盛钢次数的递增,工作层冲击部位因冲击侵蚀而形成凹坑,钢水浇铸末期,因包底有凹坑,钢水不能完全流尽,只能作为大包铸余倾翻,造成浪费,更严重者,使得钢包工作层完全侵蚀掉,造成钢包包底漏钢事故,危及设备、人员安全。
实用新型内容
本实用新型所要解决的技术问题是提供一种钢包包底工作层内衬,提高内衬耐冲击强度,避免钢包在使用过程中,因转炉钢水冲击而造成钢包工作层撞击点产生凹坑,实现在降低耐材使用成本的同时,提高钢水浇铸成材率,预防或杜绝重大设备、人员安全事故。
为实现上述技术目的,本实用新型所提出的一种钢包包底工作层内衬,它包括内衬本体、两块透气砖、水口座砖和“L”型预制件,内衬本体为圆形,所述的透气砖、水口座砖和“L”型预制件固定设置于内衬本体内部,“L”型预制件采用高耐压强度浇注料烘烤成型,“L”型预制件重心与圆形内衬本体圆心相重合,所述的“L”型预制件短边位于两块透气砖之间,长边位于水口座砖和其中一块透气砖之间,所述的“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间固定设置有间隙,该间隙通过刚玉质浇注料填充。
生产制造时,将“L”型预制件及两块透气砖、水口座砖放置于内衬本体上部指定位置后,对“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间的间隙采用刚玉质浇注料填充后,整体浇注,使得“L”型预制件、两块透气砖、水口座砖和内衬本体成为一个整体。
为增强钢包包底工作层耐材的整体性,“L”型预制件的机构及边缘为不等半径的圆弧形台阶,更利于预制件与浇注料凝为一体。
本实用新型所提出的一种钢包包底工作层内衬,提高了钢包接钢时钢水冲击区域内衬强度,保证了钢包包底工作层的安全使用,同时该钢包包底工作层内衬生产制造方便、成本低廉,具有极大的推广应用价值。
附图说明
图1是本实用新型所提出的一种钢包包底工作层内衬的结构示意图。
图2是图1的俯视图。
图3是图1的左视图。
具体实施方式
参见附图,一种钢包包底工作层内衬,它包括内衬本体1、两块透气砖2、水口座砖3和“L”型预制件4,内衬本体为圆形,所述的透气砖、水口座砖和“L”型预制件固定设置于内衬本体内部,“L”型预制件采用高耐压强度浇注料烘烤成型,“L”型预制件重心与圆形内衬本体圆心相重合,所述的“L”型预制件短边位于两块透气砖之间,长边位于水口座砖和其中一块透气砖之间,所述的“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间固定设置有间隙,该间隙通过刚玉质浇注料填充。
生产制造时,将“L”型预制件及两块透气砖、水口座砖放置于内衬本体底端的上部指定位置后,对“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间的间隙采用刚玉质浇注料填充后,整体浇注,使得“L”型预制件、两块透气砖、水口座砖和内衬本体成为一个整体。
为增强钢包包底工作层耐材的整体性,“L”型预制件的机构及边缘为不等半径的圆弧形台阶,更利于预制件与浇注料凝为一体。
本实用新型所提出的一种钢包包底工作层内衬,提高了钢包接钢时钢水冲击区域内衬强度,保证了钢包包底工作层的安全使用,同时该钢包包底工作层内衬生产制造方便、成本低廉,具有极大的推广应用价值。
Claims (2)
1.一种钢包包底工作层内衬,其特征在于它包括内衬本体、两块透气砖、水口座砖和“L”型预制件,内衬本体为圆形,所述的透气砖、水口座砖和“L”型预制件固定设置于内衬本体内部,“L”型预制件采用浇注料烘烤成型,“L”型预制件重心与圆形内衬本体圆心相重合,所述的“L”型预制件短边位于两块透气砖之间,长边位于水口座砖和其中一块透气砖之间,所述的“L”型预制件与两块透气砖之间、“L”型预制件与水口座砖之间固定设置有间隙,该间隙通过刚玉质浇注料填充。
2.根据权利要求1所述的一种钢包包底工作层内衬,其特征在于“L”型预制件的机构及边缘为不等半径的圆弧形台阶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420538417.9U CN204234718U (zh) | 2014-09-19 | 2014-09-19 | 一种钢包包底工作层内衬 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420538417.9U CN204234718U (zh) | 2014-09-19 | 2014-09-19 | 一种钢包包底工作层内衬 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204234718U true CN204234718U (zh) | 2015-04-01 |
Family
ID=52764270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420538417.9U Expired - Fee Related CN204234718U (zh) | 2014-09-19 | 2014-09-19 | 一种钢包包底工作层内衬 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204234718U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110523966A (zh) * | 2019-09-25 | 2019-12-03 | 张家港广大特材股份有限公司 | 一种钢包双透气芯 |
-
2014
- 2014-09-19 CN CN201420538417.9U patent/CN204234718U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110523966A (zh) * | 2019-09-25 | 2019-12-03 | 张家港广大特材股份有限公司 | 一种钢包双透气芯 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203725753U (zh) | 炼钢钢包结构 | |
CN105112610A (zh) | 一种快速均匀钢液的底吹氩方法 | |
CN204234718U (zh) | 一种钢包包底工作层内衬 | |
CN205888059U (zh) | 高炉砌筑铁水罐 | |
CN206425545U (zh) | 一种钢包包壁工作衬 | |
CN2818014Y (zh) | 钢包壁内衬结构 | |
CN102632229A (zh) | 一种改进的中间包包盖 | |
CN209272454U (zh) | 一种新式钢包 | |
CN205183761U (zh) | 一种钢包包底浇注结构 | |
CN202571220U (zh) | 一种改进的中间包包盖 | |
CN204359118U (zh) | 塔式熔铝炉熔化室炉床结构 | |
CN208917231U (zh) | 一种高炉出残铁装置 | |
CN208374194U (zh) | 一种组合式钢包冲击区预制块砖 | |
CN103506579B (zh) | 一种浇口盆 | |
CN203426434U (zh) | 一种下水口砖 | |
CN207188777U (zh) | 一种模具铸造用钢水包 | |
CN206373354U (zh) | 一种连铸大包座砖固定结构 | |
CN202885542U (zh) | Rh精炼炉用浸渍管 | |
CN204321179U (zh) | 冲击缸 | |
CN204094132U (zh) | 一种组合式钢包冲击区预制块砖 | |
CN204194792U (zh) | 改进的连铸中间包挡渣堰 | |
CN102886514B (zh) | 钢包底浇注方法及其冲击区加强浇注料施工模具 | |
CN203440391U (zh) | 脱硫枪 | |
CN215746389U (zh) | 一种可拆卸的铁水罐防冲击结构 | |
CN104418598A (zh) | 一种钢包用耐火浇注料 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150401 Termination date: 20210919 |
|
CF01 | Termination of patent right due to non-payment of annual fee |