CN204152205U - Decoration exposed concrete construction method split bolt punch die used - Google Patents

Decoration exposed concrete construction method split bolt punch die used Download PDF

Info

Publication number
CN204152205U
CN204152205U CN201420557429.6U CN201420557429U CN204152205U CN 204152205 U CN204152205 U CN 204152205U CN 201420557429 U CN201420557429 U CN 201420557429U CN 204152205 U CN204152205 U CN 204152205U
Authority
CN
China
Prior art keywords
cylinder
template
split bolt
punch die
external screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420557429.6U
Other languages
Chinese (zh)
Inventor
黄宪宇
高瑞
张少康
郭爱霞
吕全苗
陈万里
陈丽芬
赵延涛
王树伟
许茹
娄勇
杜伟
王德春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201420557429.6U priority Critical patent/CN204152205U/en
Application granted granted Critical
Publication of CN204152205U publication Critical patent/CN204152205U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Decoration exposed concrete construction method of the present utility model split bolt punch die used, it is characterized in that: comprise a cylinder, the round platform of protrusion is had outside cylinder upper end, cylinder lower end outside has external screw thread, round platform axis cross section is trapezoidal, and round platform upper end diameter is little, and lower end diameter is large, on the external screw thread of cylinder lower end, cover has nut, barrel bore 1.5cm; This split bolt punch die lower end is inserted in the hole template from template front, and the external screw thread that nut is enclosed within cylinder from template back surface is tightened fixing; After building, form the tubaeform split bolt hole that mouth diameters is large, base diameter is little.The beneficial effects of the utility model are, can improve concrete pouring quality, can improve wall body decoration effect, obtain economic and social benefit preferably.Steel mould is installed in template upper bolt hole position, and concreting completes, and after bolt hole steel mould is removed, hole percentage of head rice is high, smoother attractive in appearance, saves maintenance cost.

Description

Decoration exposed concrete construction method split bolt punch die used
Technical field
The invention belongs to the realm of building construction, relate to a kind of decoration exposed concrete construction method split bolt punch die used.
Background technology
At present, existing decoration clear-water concrete structure exist that reinforcing bar binding is of poor quality, concrete pouring quality is poor, the problem of wall body decoration weak effect, cannot meet customer requirement, therefore need to improve.
Summary of the invention
The present invention, in order to make up the deficiencies in the prior art, provides the decoration exposed concrete construction method split bolt punch die used that a kind of reinforcing bar binding quality is high, concrete pouring quality good, wall body decoration is effective.
The present invention is achieved through the following technical solutions:
Decoration exposed concrete construction method of the present invention split bolt punch die used, it is characterized in that: comprise a cylinder, the round platform of protrusion is had outside cylinder upper end, cylinder lower end outside has external screw thread, round platform axis cross section is trapezoidal, and round platform upper end diameter is little, and lower end diameter is large, on the external screw thread of cylinder lower end, cover has nut, barrel bore 1.5cm; This split bolt punch die lower end is inserted in the hole template from template front, and the external screw thread that nut is enclosed within cylinder from template back surface is tightened fixing; After building, form the tubaeform split bolt hole that mouth diameters is large, base diameter is little.This mould adopts steel mould.
The invention has the beneficial effects as follows, reinforcing bar binding quality can be ensured, can concrete pouring quality be improved, wall body decoration effect can be improved, obtain economic and social benefit preferably.Decoration dry concrete construction principle adopts steel frame pipe to install in the assembling reinforcement stage; When one step is built, template adopts punching block version; Steel mould is installed in template upper bolt hole position.Installing by steel frame pipe, effectively ensure that straight cis degree and the verticality of reinforcing bar, improve reinforcing bar binding quality, protective layer thickness can meet the demands.The use of one step body of wall steel form, ensure that the directly suitable of constuction joint, stops secondary and builds bad root phenomenon generation, solve the problem that voids and pits is more.Concreting completes, and after bolt hole steel mould is removed, hole percentage of head rice is high, smoother attractive in appearance.Built-in fitting is fixed on wall form, builds rear guarantee built-in fitting and body of wall in same plane.Save maintenance cost, obtain good economic benefit and social benefit.The method is applicable to big-and-middle-sized decoration clear-water concrete structure.
Accompanying drawing explanation
Fig. 1 is schematic flow sheet of the present invention.Fig. 2 is split bolt punch die schematic diagram.
In figure, 1 cylinder, 2 round platforms, 3 external screw threads, 4 nuts, 5 templates, 6 endoporus.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention.
Decoration exposed concrete construction method of the present invention, comprises the following steps: base plate steel bar binding → brushing release agent, base plate model sheetinstallat and reinforcing → underplate concrete are built, → wall steel bar colligation → split bolt punch die installation of fully vibrating in time, installation of embedded parts, top board and wall form are installed and reinforcing → top board and walls concrete is built, fully vibrate in time → stripping → maintenance → beautify bolt hole.
Decoration dry concrete construction principle adopts steel frame pipe to install in the assembling reinforcement stage; When one step is built, template adopts punching block version; Steel mould is installed in template upper bolt hole position.
Before base plate steel bar binding step, also comprise preparation of construction step, namely carry out surveying setting-out to scene, channel excavation completes, and carries out bed course and builds, and in casting process, hanging wire controls its planeness, prevents from impacting lower step operation.
In wall steel bar step of ligation, be Control protection layer thickness uniformity, after wall steel bar, set up scaffold, wall steel bar is erected muscle colligation on scaffold, controls the straight cis degree of reinforcing bar and verticality, in reinforcing bar binding process, control spacing well, want colligation firm, position colligation is accurate; The assembling reinforcement stage adopts steel frame pipe to install.
After wall steel bar colligation completes, start to install a step wall form, in order to reach cicada seam effect, its edge joint position pastes one sponge adhesive tape in template; Install formwork reinforcement screw in process will screw, ensure that the straight genial piece of template is tight; Template adopts steel form.
When underplate concrete is built, the Angle Position of smearing in template drills through an air-vent every 50cm, for discharging the bubble produced in casting process, to reach impression quality.
Before two step wall forms are installed, template is installed split bolt punch die, and eyelet cross direction profiles spacing is 60cm, fore-and-aft distance 50cm, ensures that cicada seam is on the center line between bolt.
During installation of embedded parts, body of wall light current built-in fitting is elongated, when in processing, just have a little distortion.For improving impression quality, the Interal fixation of body of wall light current built-in fitting in template, flat with sponge adhesive tape lining between steel plate and template, build rear guarantee built-in fitting and body of wall in same plane.
When underplate concrete is built and is built with top board and walls concrete, to treatment of construction joints, for ensureing that constuction joint place is without bad root phenomenon, to help the formation of outseam, one time body of wall is poured into suitable for reading with steel form concordant, and carry out the floating process of press polish, be that two step formwork erections are prepared, and paste sponge adhesive tape in constuction joint bottom.
When underplate concrete is built and built with top board and walls concrete, vibrate closely knit, vibrate a little every 30cm mono-, anti-leak-stopping shakes.
The split bolt punch die that decoration exposed concrete construction method of the present invention is used, comprise a cylinder 1, the round platform 2 of protrusion is had outside cylinder upper end, cylinder lower end outside has external screw thread 3, round platform axis cross section is trapezoidal, and round platform upper end diameter is little, and lower end diameter is large, on the external screw thread of cylinder lower end, cover has nut 4, cylinder endoporus 6 internal diameter 1.5cm; This split bolt punch die lower end is inserted in the hole template from template 5 front, and the external screw thread that nut is enclosed within cylinder from template back surface is tightened fixing; After building, form the tubaeform split bolt hole that mouth diameters is large, base diameter is little.This mould adopts steel mould.Split bolt punch die replaces the position of Plastic cap, avoids each side reason produced because of plug.
Performance analysis:
Decoration exposed concrete construction method is widely used with in engineering.Compare through case history, adopt opposite-pulling bolt mold construction cost higher, but the later stage repairs decoration relatively, provides cost savings, serves good economic benefit and social benefit.
Application example:
Engineering name: Jinan City two ring West Road ground level road and environmental construction engineering
Starting date: on August 3rd, 2012
Completion date: on November 28th, 2012
Project site: ring West Road, Huaiyin District, Jinan City two
Because this engineering is Jinan City's key project, comprise the pipe gallery section of viewing and emulating, long 96m.
In work progress, carried out the control in details respectively to critical process, the side of reinforcing bar is pricked, and the use of steel form, and the input of bolt hole mould, the change of each details, makes concrete structures overall appearance, has good impression quality.

Claims (1)

1. a decoration exposed concrete construction method split bolt punch die used, it is characterized in that: comprise a cylinder, the round platform of protrusion is had outside cylinder upper end, cylinder lower end outside has external screw thread, round platform axis cross section is trapezoidal, and round platform upper end diameter is little, and lower end diameter is large, on the external screw thread of cylinder lower end, cover has nut, barrel bore 1.5cm; This split bolt punch die lower end is inserted in the hole template from template front, and the external screw thread that nut is enclosed within cylinder from template back surface is tightened fixing; After building, form the tubaeform split bolt hole that mouth diameters is large, base diameter is little.
CN201420557429.6U 2014-09-26 2014-09-26 Decoration exposed concrete construction method split bolt punch die used Expired - Lifetime CN204152205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420557429.6U CN204152205U (en) 2014-09-26 2014-09-26 Decoration exposed concrete construction method split bolt punch die used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420557429.6U CN204152205U (en) 2014-09-26 2014-09-26 Decoration exposed concrete construction method split bolt punch die used

Publications (1)

Publication Number Publication Date
CN204152205U true CN204152205U (en) 2015-02-11

Family

ID=52510331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420557429.6U Expired - Lifetime CN204152205U (en) 2014-09-26 2014-09-26 Decoration exposed concrete construction method split bolt punch die used

Country Status (1)

Country Link
CN (1) CN204152205U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278840A (en) * 2014-09-26 2015-01-14 济南城建集团有限公司 Decorating bare concrete construction method and split bolt hole die for same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278840A (en) * 2014-09-26 2015-01-14 济南城建集团有限公司 Decorating bare concrete construction method and split bolt hole die for same

Similar Documents

Publication Publication Date Title
CN104278840A (en) Decorating bare concrete construction method and split bolt hole die for same
CN108914965A (en) The continuous construction method of aluminum alloy mould plate for pipe gallery
CN206784951U (en) Concrete placement floor thickness control device
CN103061504A (en) Concrete board pipeline installation reserved hole construction mould and construction method
CN206616862U (en) Formwork root bracing means
CN103233479B (en) Method for pouring concrete cup foundation
CN203270627U (en) Construction joint structure of shear wall
CN104911999B (en) Buried anchor construction method
CN205088950U (en) Instrument formula creeping formwork anchorage device
CN204152205U (en) Decoration exposed concrete construction method split bolt punch die used
CN204662949U (en) For concrete wall and masonry wall intersection aluminum alloy mould plate groove pressing device
CN106381999A (en) Fair-faced concrete wall intaglio character die plate construction method
CN204354275U (en) A kind of cable duct list ditch mould
CN212176569U (en) Floor preformed hole plugging device
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN205476491U (en) Outer wall post template bottom consolidates uses pre -cast screw
CN207794610U (en) The support device corniced for installing exterior wall
CN1904226A (en) Construction method of recoverable brad wall base pit enclosure
CN206319404U (en) A kind of building precast exterior sheathing
CN202299427U (en) Device for connecting and positioning steel molding plate of building
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN211250563U (en) Pouring die for bearing wall board
CN104775831A (en) Tunnel secondary lining inverted arch and arch wall combined part short-free side wall arcing construction method
CN204510688U (en) A kind of temporary fixing structure of precast wall panel
CN209874074U (en) Porous inclined plane slip casting embedded pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant