CN202299427U - Device for connecting and positioning steel molding plate of building - Google Patents
Device for connecting and positioning steel molding plate of building Download PDFInfo
- Publication number
- CN202299427U CN202299427U CN201120335457XU CN201120335457U CN202299427U CN 202299427 U CN202299427 U CN 202299427U CN 201120335457X U CN201120335457X U CN 201120335457XU CN 201120335457 U CN201120335457 U CN 201120335457U CN 202299427 U CN202299427 U CN 202299427U
- Authority
- CN
- China
- Prior art keywords
- positioning sleeve
- conical
- conical positioning
- building
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a device for connecting and positioning a building steel molding plate, relating to the field of buildings. The device comprises a first conical positioning sleeve, a second conical positioning sleeve, a conical positioning pin, a building template border, bolts and nuts, wherein the first conical positioning sleeve and the second conical positioning sleeve are welded on the building template border through a positioning fixture, and the conical positioning pin is fixed at the inner sides of the first conical positioning sleeve and the second conical positioning sleeve through the bolts and the nuts. According to the utility model, by means of a principle that the conical positioning pin is automatically aligned by using a conical shape, the flatness of the adjacent template borders is obtained through automatic alignment while the template borders are connected and fastened, and thus, the precision in splicing the templates is greatly increased.
Description
Technical field:
The utility model relates to building field, is specifically related to a kind of building iron template and connects positioner.
Background technology:
In traditional building pouring construction, it is that two templates that adopt a plurality of whole long bolts to be oppositely arranged connect with nut mostly that used template connects positioner, after building completion at present; The screw rod that is exposed is fallen with artificial cutter; Cut a hole a pothole again and fill up cement, the shortcoming that this template connects positioner is: the construction trouble, particularly both taken manual work, time-consuming; Cutter screw rod two end portions has down also become scrap iron; Waste energy, also can usually cause screw rod in the pouring layer loosening and leak, seep water with the cast joint portion, price is hanged down construction quality.
The utility model content:
The purpose of the utility model provides the building iron template and connects positioner, and it is firm to connect template when it uses, can be through taper positioning principle automatic capturing, and accurate positioning improves the template assembly precision greatly.
In order to solve the existing problem of background technology, the utility model is to adopt following technical scheme: it comprises the first taper positioning sleeve 1, the second taper positioning sleeve 2, conical dowel pin 3, construction formwork frame 4, bolt 5, nut 6; The first taper positioning sleeve 1 and the second taper positioning sleeve 2 are welded on the construction formwork frame 4 through positioning tool, and conical dowel pin 3 is fixed in the inboard of the first taper positioning sleeve 1 and the second taper positioning sleeve 2 through bolt 5 and nut 6.
The utility model utilizes the principle of taper automatic capturing through conical dowel pin 3, and when connecting the formboard fastening frame, the planeness of automatic capturing adjacent forms frame improves the template assembly precision greatly.
The utlity model has following beneficial effect: it is firm to connect template during use, can be through taper positioning principle automatic capturing, and accurate positioning improves the template assembly precision greatly.
Description of drawings:
Fig. 1 is the structural representation of the utility model.
The specific embodiment:
Referring to Fig. 1, this specific embodiment adopts following technical scheme: it comprises the first taper positioning sleeve 1, the second taper positioning sleeve 2, conical dowel pin 3, construction formwork frame 4, bolt 5, nut 6; The first taper positioning sleeve 1 and the second taper positioning sleeve 2 are welded on the construction formwork frame 4 through positioning tool, and conical dowel pin 3 is fixed in the inboard of the first taper positioning sleeve 1 and the second taper positioning sleeve 2 through bolt 5 and nut 6.
This specific embodiment is utilized the principle of taper automatic capturing through conical dowel pin 3, and when connecting the formboard fastening frame, the planeness of automatic capturing adjacent forms frame improves the template assembly precision greatly.
It is firm to connect template when this specific embodiment is used, can be through taper positioning principle automatic capturing, and accurate positioning improves the template assembly precision greatly.
Claims (1)
1. the building iron template connects positioner, it is characterized in that it comprises the first taper positioning sleeve (1), the second taper positioning sleeve (2), conical dowel pin (3), construction formwork frame (4), bolt (5), nut (6); The first taper positioning sleeve (1) and the second taper positioning sleeve (2) are welded on the construction formwork frame (4) through positioning tool, and conical dowel pin (3) is fixed in the inboard of the first taper positioning sleeve (1) and the second taper positioning sleeve (2) through bolt (5) and nut (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120335457XU CN202299427U (en) | 2011-09-08 | 2011-09-08 | Device for connecting and positioning steel molding plate of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120335457XU CN202299427U (en) | 2011-09-08 | 2011-09-08 | Device for connecting and positioning steel molding plate of building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202299427U true CN202299427U (en) | 2012-07-04 |
Family
ID=46368353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120335457XU Expired - Fee Related CN202299427U (en) | 2011-09-08 | 2011-09-08 | Device for connecting and positioning steel molding plate of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202299427U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105386597A (en) * | 2015-12-03 | 2016-03-09 | 浙江海滨建设集团有限公司 | Auxiliary casting device and auxiliary casting method of roof |
CN109484494A (en) * | 2017-09-12 | 2019-03-19 | 郑州宇通客车股份有限公司 | A kind of modular vehicle |
CN115929029A (en) * | 2021-09-22 | 2023-04-07 | 王建和 | Locking part |
-
2011
- 2011-09-08 CN CN201120335457XU patent/CN202299427U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105386597A (en) * | 2015-12-03 | 2016-03-09 | 浙江海滨建设集团有限公司 | Auxiliary casting device and auxiliary casting method of roof |
CN109484494A (en) * | 2017-09-12 | 2019-03-19 | 郑州宇通客车股份有限公司 | A kind of modular vehicle |
CN109484494B (en) * | 2017-09-12 | 2021-05-04 | 郑州宇通客车股份有限公司 | Modular vehicle |
CN115929029A (en) * | 2021-09-22 | 2023-04-07 | 王建和 | Locking part |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201050190Y (en) | Formwork clamp for building construction | |
CN202299427U (en) | Device for connecting and positioning steel molding plate of building | |
CN203238958U (en) | Tool-type building template connecting piece | |
CN105220877B (en) | Vertical formwork bottom mortar leakage prevention, level-off integrated apparatus | |
CN207953016U (en) | A kind of encased steel plate mixing shearing wall member processing tool | |
CN102912977A (en) | Mold used for pouring shaped stair | |
CN202416869U (en) | Novel building engineering basement exterior wall split bolt | |
CN202209046U (en) | Wall connecting rod for external scaffold | |
CN202500323U (en) | Novel splicing structure | |
CN202073313U (en) | Beam fixture | |
CN204212417U (en) | A kind of bracing means of shear wall aluminum alloy mould plate | |
CN209227594U (en) | A kind of aluminum wood gang form applied to pipe gallery construction | |
CN204455779U (en) | Combined type channel-section steel formwork leverage | |
CN108894490B (en) | Edge sealing device and method for concrete construction of assembly type structure laminated layer | |
CN201169923Y (en) | Grouting and joint pointing dual-purpose tools | |
CN203307931U (en) | Embedded part positioning screw connecting structure | |
CN203097290U (en) | Assembled type split bolt | |
CN203160251U (en) | Connecting device for joints of steel and wood templates | |
CN205077871U (en) | Vertical template bottom anti -leakage , level -off integrated device | |
CN201924595U (en) | Beam side template section steel fixture | |
CN202556001U (en) | Button-locating mechanism of pole button plate welding device of scaffold | |
CN206279550U (en) | A kind of chamfer tool for being applied to project of transmitting and converting electricity basic stand column | |
CN221761377U (en) | Reusable building beam side template supporting device | |
CN211421845U (en) | Clamping device for waterproof reverse ridge pouring template in toilet | |
CN204780973U (en) | Concrete chamfer construction tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120704 Termination date: 20180908 |