CN204078883U - A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly - Google Patents

A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly Download PDF

Info

Publication number
CN204078883U
CN204078883U CN201420534197.2U CN201420534197U CN204078883U CN 204078883 U CN204078883 U CN 204078883U CN 201420534197 U CN201420534197 U CN 201420534197U CN 204078883 U CN204078883 U CN 204078883U
Authority
CN
China
Prior art keywords
assembly
cylinder
pipe assembly
linear slide
slide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420534197.2U
Other languages
Chinese (zh)
Inventor
唐秋贵
阳盛权
吴朝懿
邓沈安
张庶民
桂立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHA ZHONGYI PHARMACEUTICAL MACHINERY Co Ltd
Original Assignee
CHANGSHA ZHONGYI PHARMACEUTICAL MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHA ZHONGYI PHARMACEUTICAL MACHINERY Co Ltd filed Critical CHANGSHA ZHONGYI PHARMACEUTICAL MACHINERY Co Ltd
Priority to CN201420534197.2U priority Critical patent/CN204078883U/en
Application granted granted Critical
Publication of CN204078883U publication Critical patent/CN204078883U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

What the utility model discloses a kind of equipment of straight line Batch assemblage medical drugs packaging material send pipe assembly, comprises inlet pipe assembly, the upper pipe assembly connecting inlet pipe assembly and the adapter assembly being connected pipe assembly.Described inlet pipe assembly comprises adjustable under-chassis two, dish frame of shaking, chemical feed pipe shake dish, horizontal feed device, horizontal feed rail, pole, cylinder one, briquetting, adapter assembly, cylinder two, locating plate one, servomotor two, ball wire bar pair one, linear slide rail one, regulating plate one; Upper pipe assembly comprises support one, servomotor three, ball wire bar pair two, vacuum cups one, cylinder three, linear slide rail pair one; Adapter assembly comprises cylinder four, linear slide rail pair two, adapter fixture.The utility model can by the chemical feed pipe of random scattering according to certain rule neatly arrange and sequentially-fed on adapter fixture, by upper pipe assembly, chemical feed pipe is positioned on the locating dowel pin of main conveyer chain clamp body.

Description

A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly
Technical field
The utility model relates to Medical Packing Materials production technical field.
Background technology
At present, domestic soft bag and plastic bottle transfusion industry are developed rapidly, and after the regulation that particularly SDA specification transfusion enterprise must be proved by GMP, transfusion manufacturing enterprise have been pushed to the road that specification develops in a healthy way.Transfusion package industrialization, namely transfusion package manufacturing line production domesticization, infusion film material domesticizes, the production domesticization of transfusion packaging material combination cover manufacturing line, only in this way could provide the transfusion package of safety economy for industry of infusing.Comprehensive domestic transfusion industry situation, transfusion package manufacturing line and infusion film achieve production domesticization substantially, but transfusion packaging material is then in pure artificial or semi-artificial partly mechanical level substantially, the development of serious restriction transfusion industry.
The packaging technology of traditional Medical Packing Materials combination cover is as follows: in (being combined as example with chemical feed pipe) artificial collector → comb → manual top cement plug → transhipment → craft, compressing tablet → pneumatic hot weld compressing tablet → transhipment (synchronously carry out, artificial simple die rushes easily tore film) → film is put in craft and bag is examined → be packaged into pneumatic hot weld film → transhipment → side weldering → Manual light.
Medical Packing Materials production efficiency of the prior art is relatively low, and hand labor intensity is comparatively large, and quality needs to be improved further, and middle all swivel links are more, there is the risk of potential secondary pollution.
Medical drugs packaging material (chemical feed pipe) brief introduction that need assemble: as shown in Figure 1, the arrow left side is the component part of medical drugs packaging material (chemical feed pipe), comprising chemical feed pipe, compressing tablet, plug and easily tore film, is the chemical feed pipe integral structure after chemical feed pipe, compressing tablet, plug and easily tore film being assembled on the right of arrow.This kind of Medical Packing Materials combines by four, and require compressing tablet to weld with pipe and must not have rosin joint phenomenon, easily tore film welds with body, firm.
Utility model content
Technical problem to be solved in the utility model is, what provide a kind of equipment of straight line Batch assemblage medical drugs packaging material send pipe assembly, and the medical drugs packaging material of random scattering can neatly be arranged according to certain rule by it, carry out in order carrying and be positioned on main conveyer chain assembly.
The technical solution of the utility model is: a kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly, it is characterized in that, comprise inlet pipe assembly, the upper pipe assembly connecting inlet pipe assembly and the adapter assembly being connected pipe assembly.
Described inlet pipe assembly comprises adjustable under-chassis two, dish frame of shaking, chemical feed pipe shake dish, horizontal feed device, horizontal feed rail, pole, cylinder one, briquetting, adapter assembly, cylinder two, locating plate one, servomotor two, ball wire bar pair one, linear slide rail one, regulating plate one; Described chemical feed pipe shake dish be fixedly mounted on shake dish frame on, shake dish frame below adjustable under-chassis two is installed; Chemical feed pipe shakes to coil and docks with horizontal feed rail, and horizontal feed rail is fixedly mounted on straight feeding device, and straight feeding device connects pole; Described servomotor two connects ball wire bar pair one, ball wire bar pair one connecting tubes assembly, and adapter assembly to be arranged on linear slide rail one and can to move on linear slide rail one; Cylinder one and briquetting are all positioned at above horizontal feed rail, and cylinder one connects briquetting; Be arranged on cylinder two connected positioning plate one on pole, regulating plate one is arranged on below pole.
Upper pipe assembly comprises support one, servomotor three, ball wire bar pair two, vacuum cups one, cylinder three, linear slide rail pair one; Described servomotor three, ball wire bar pair two, vacuum cups one, cylinder three, linear slide rail pair one are installed on support one, linear slide rail pair one is positioned at support one both sides above, ball wire bar pair two is positioned at Middle face on support one, servomotor three is positioned at ball wire bar pair two end, cylinder three and vacuum cups one are installed in below ball wire bar pair two, and vacuum cups one connects cylinder three and ball wire bar pair two.
Adapter assembly comprises cylinder four, linear slide rail pair two, adapter fixture; Cylinder four connecting tubes fixture, adapter fixture connecting linear slide rail pair two.
The equipment of described straight line assembling medical Medical Packing Materials comprises loading stand, described in send pipe assembly to be fixed in loading stand by regulating plate one and support one; Described pole is fixed in loading stand.
An equipment for straight line Batch assemblage medical drugs packaging material, comprises Rack Body assembly, and main conveyer chain assembly, send pipe assembly, dress plug assembly, dress wafer assembly, follow the tracks of wafer assembly, supersonic welding assembly, rushes membrane module, film feeding assembly, face-bonding membrane module, side weldering membrane module, discharge component, electrically-controlled component; Describedly send pipe assembly, dress plug assembly, dress wafer assembly, follow the tracks of wafer assembly, supersonic welding assembly, rush membrane module, film feeding assembly, face-bonding membrane module, side weldering membrane module, discharge component, electrically-controlled component be arranged on Rack Body assembly from front to back successively; Described main conveyer chain assembly be arranged on Rack Body assembly and front and back connect successively send pipe assembly, dress plug assembly, dress wafer assembly, follow the tracks of wafer assembly, supersonic welding assembly, rush membrane module, film feeding assembly, face-bonding membrane module, side weldering membrane module and discharge component.
Described Rack Body assembly comprises the frame body be welded by section bar, the adjustable under-chassis one providing the loading stand of reference for installation and installation site and adjustment height and level for each station; Be threaded connection mode between frame body, adjustable under-chassis, loading stand to connect as one.Loading stand has various screw and unthreaded hole.
Described main conveyer chain assembly comprises servomotor one, planetary reducer, fixed bracket body, messenger chain, sprocket wheel, transmission main shaft, clamp body, fixed pedestal, track, plate rail, bearing, tommy, driven sprocket, tensioning member one, tensioning member two, special chain; Being installed by fixed bracket body and fixed pedestal is connected in Rack Body loading stand; Track and plate rail and fixed bracket body form a round and round rail.
Described dress plug assembly comprises adjustable under-chassis three, the dish permanent seat one that shakes, plug shake dish, pillar one, straight feeding device, rubber stopper orbital, top cement plug assembly, connect plug assembly, plug positioning component, support two, linear slide rail two, servomotor four, ball wire bar pair three, cylinder five, vacuum stopper suction head, regulating plate two, cylinder six, connect plug rail, linear slide rail three, end regulating plate one, cylinder seven, locating clip; By the support two on top cement plug assembly, connect the regulating plate two on plug assembly and the end regulating plate one on plug positioning component is fixed in the loading stand on Rack Body assembly; Plug fixing the shaking with the dish that shakes of dish of shaking is coiled on permanent seat and is positioned over mill floor by adjustable under-chassis three, regulates adjustable under-chassis three to dock with rubber stopper orbital and keeps highly consistent; Rubber stopper orbital fixing with straight feeding device on and be fixed in loading stand by pillar one.
Dress wafer assembly comprises adjustable under-chassis four, the dish permanent seat two that shakes, compressing tablet shake dish, pillar two, straight feeding device, compressing tablet track, upper wafer assembly, connect wafer assembly, support three, linear slide rail four, servomotor five, ball wire bar pair four, cylinder eight, vacuum cups two, regulating plate three, cylinder nine, connect compressing tablet rail, linear slide rail five; Be fixed in the loading stand on Rack Body assembly by the support three on upper wafer assembly and the regulating plate three connect on wafer assembly; The compressing tablet dish that shakes is fixed on the dish that shakes and shakes on dish permanent seat and to be positioned over mill floor by adjustable under-chassis four, regulates adjustable under-chassis four and compressing tablet orbital docking also to keep highly consistent; Compressing tablet track 86 fixing with straight feeding on and be fixed in loading stand by pillar two.
Described tracking wafer assembly comprises servomotor six, motor mounting rack, Timing Belt one, regulating plate four, ball wire bar pair five, linear slide rail six, cylinder ten, locating plate two; Be fixed on by regulating plate four and motor mounting plate in the loading stand of Rack Body assembly.
Described supersonic welding assembly comprises end adapter plate one, locking fixture block, cylinder 11, wave welding head of ultrasonic wave, large guide upright post, upper mounting plate, end slide plate; Be fixed in the loading stand of Rack Body assembly by end adapter plate one; Cylinder 11 is fixed on upper mounting plate, unclamps the screw on locking fixture block, the height of wave welding head of ultrasonic wave can be regulated to mate chemical feed pipe welding and assembling height along large guidepost axis direction;
Described film feeding assembly comprises installs bent plate one, capsule stack, pressuring diaphragm, roller, pulling assembly, installation bent plate two, winder wheel, servomotor nine, nip rolls, pressing film roller, Timing Belt three, adapter plate, adapter plate, film; Adapter plate one and adapter plate two are datum clamp face; Be individually fixed in by installation bent plate one and installation bent plate two on the left wallboard and right wallboard rushing and put membrane module; Pulling assembly for being free to slide structure, pressuring diaphragm by mould on roller to ensure when film runs not sideslip; When film strips pressure to be pressed on nip rolls to ensure that servomotor nine drives it to run by pressing film roller, film does not produce slippage thus makes each film feeding distance consistent; Winder wheel is for collecting the discarded film after having rushed.
Described punching is put membrane module and is comprised right wallboard, follow the tracks of carrier film assembly, rush membrane module, guide component, left wallboard, support four, inhale film head, cylinder 12, servomotor seven, ball wire bar pair six, linear slide rail pair three, end adapter plate two, stamping-out cylinder, motor mounting plate, Timing Belt two, linear slide rail seven, regulating plate five, ball wire bar pair seven, cylinder 13, locating plate three, servomotor eight, caster, pipe position block, outer guiding post is secondary, elasticity stripper, clamping plate, counterdie seat board, end adapter plate three, inner guiding post is secondary, stamping knife, stage clip, end regulating plate two, cylinder 14, correcting plate, be fixed in the loading stand on Rack Body assembly by the regulating plate five on end adapter plate two, support four, tracking film feeding assembly and the end regulating plate two in guide component, die assembly is fixed on end adapter plate two by end adapter plate three, stamping-out cylinder is fixed on end adapter plate two, and the piston rod on it is connected with the counterdie seat board on die assembly,
Caster upside-down mounting, the edge of a knife faces down, and is fixed together with end adapter plate three by outer guiding post is secondary; Four groups of pipe position blocks caster are equipped with; Caster has interior guide hole; Stamping knife and inner guiding post are fixed on clamping plate, run through elasticity stripper; Between elasticity stripper and clamping plate, stage clip be housed and have 5 ~ 8MM gap with clamping plate, during matched moulds, two plates are combined; Boards wall is on counterdie seat board and connected together by screw and pin; Counterdie seat board has outer guiding post hole to install the guide pin bushing of outer guiding post pair, and the piston rod of stamping-out cylinder does plate by rod end screw thread and late summer and connects together; During stamping-out cylinder action, it does oscilaltion campaign in outer guiding post secondary axis direction.
A method for straight line Batch assemblage medical drugs packaging material, comprises the steps:
(1) shake dish automatically manage Guan Shangguan, straight line feeder straight line send pipe, servo evenly divides open pipe;
(2) vacuum cups suction pipe and put to main conveyor belt, main conveyor belt run pipe is delivered to next station;
(3) shaking, reason plug top cement plug, straight line feeder straight line send the dislocation of plug, plug, vacuum cups suction plug, are automatically pressed in pipe by plug dish automatically;
(4) synchronously carry out shaking dish automatically reason compressing tablet and send compressing tablet, straight line feeder send compressing tablet, compressing tablet dislocation, vacuum are inhaled compressing tablet in compressing tablet, track and localization and deliver to next station;
(5) positioning ultrasonic weldering compressing tablet, main conveyor belt deliver to next station;
(6) servo film feeding, automatically rush film, vacuum film adsorption, tracking servo location put film, follow the tracks of and inhale film with main conveyor belt to next station;
(7) track and localization face-bonding film, main conveyor belt are to lower station;
(8) oriented side weldering film, main conveyor belt are to lower station;
(9) detection, main conveyor belt are to lower station;
(10) Medical Packing Materials finished product is gone out.
The utility model send pipe assembly to be an independently station, its effect and function be by the chemical feed pipe of random scattering according to certain rule neatly arrange and sequentially-fed on adapter fixture, by upper pipe assembly, chemical feed pipe is positioned on the locating dowel pin of main conveyer chain clamp body.
The packaging technology of traditional Medical Packing Materials combination cover is as follows: in (being combined as example with chemical feed pipe) artificial collector → comb → manual top cement plug → transhipment → craft, compressing tablet → pneumatic hot weld compressing tablet → transhipment (synchronously carry out, artificial simple die rushes easily tore film) → film is put in craft and bag is examined → be packaged into pneumatic hot weld film → transhipment → side weldering → Manual light.
Straight-line batch assembly method of assembly process is as follows: (dosing tube combination, for example) vibration plate automatic cut pipe on the pipe - line feeder straight pipe to separate servo even tube, vacuum suction straw and put to the conveyor belt and pipe main conveyor belt running to the next station - > (simultaneous) vibration plate automatically unscramble rubber plug rubber plug to line feeder line send stopper, rubber plug dislocation, vacuum suction head rubber plug - will automatically be pressed into the tube stopper - (simultaneous) vibration disc automatically manage pressure and pressure pills to linear feeder to send tablet, tablet dislocation tracking to vacuum tablet, the tablet is sent to the next station to locate ultrasonic welding of tablet, the main conveyor belt, to the next station to (simultaneous) servo film feeding, automatic film, vacuum film - tracking servo positioning put film - tracking vacuum membrane and along with the main conveyor belt to the next location - tracking are welding film - the main conveyor belt to the next station to locate side welding, the main conveyor belt to the next station to detect, under the main delivery to location - the nonconforming, the qualified products.
Comprehensive above two kinds of technology modes compare, and straight line Batch assemblage method advantage is obvious:
1, production efficiency is high, and with 20 calculating of the every station of this equipment, assembling production capacity is 12000/hour.Be equivalent to class's production capacity of 45 people.
2. quality assurance increases substantially.
3. greatly reduce hand labor intensity.
4. decrease middle all swivel links, effectively evade potential secondary pollution risk.
Accompanying drawing explanation
Fig. 1 is component part and the integral structure schematic diagram of medical drugs packaging material (chemical feed pipe) of the prior art.
Fig. 2 is the outside drawing of the equipment of straight line Batch assemblage medical drugs packaging material in the utility model.
Fig. 3 is the main TV structure schematic diagram of the equipment of straight line Batch assemblage medical drugs packaging material in the utility model.
Fig. 4 is the plan structure schematic diagram of the equipment of straight line Batch assemblage medical drugs packaging material in the utility model.
Fig. 5 is the Rack Body unit construction schematic diagram in the utility model.
Fig. 6 is the main conveyer chain unit construction schematic diagram in the utility model.
Fig. 7 send pipe unit construction schematic diagram in the utility model.
Fig. 8 is the inlet pipe unit construction schematic diagram in the utility model.
Fig. 9 is the upper pipe unit construction schematic diagram in the utility model.
Figure 10 is the adapter unit construction schematic diagram in the utility model.
Figure 11 is the dress plug unit construction schematic diagram in the utility model.
Figure 12 is the top cement plug unit construction schematic diagram in the utility model.
Figure 13 connects plug unit construction schematic diagram in the utility model.
Figure 14 is the plug positioning component structural representation in the utility model.
Figure 15 is the dress wafer assembly structural representation in the utility model.
Figure 16 is the upper wafer assembly structural representation in the utility model.
Figure 17 connects wafer assembly structural representation in the utility model.
Figure 18 is the tracking wafer assembly structural representation in the utility model.
Figure 19 is the supersonic welding unit construction schematic diagram in the utility model.
Figure 20 is that rushing in the utility model puts membrane module structure schematic diagram.
Figure 21 is the tracking carrier film unit construction schematic diagram in the utility model.
Figure 22 rushes membrane module structure schematic diagram in the utility model.
Figure 23 is the guide component structural representation in the utility model.
Figure 24 is the film feeding unit construction schematic diagram in the utility model.
Figure 25 is the face-bonding membrane module structure schematic diagram in the utility model.
Figure 26 is the face-bonding head group part structural representation in the utility model.
Figure 27 is the side weldering membrane module structure schematic diagram in the utility model.
Figure 28 is the side weldering unit construction schematic diagram in the utility model.
Figure 29 is the side soldering tip unit construction schematic diagram in the utility model.
Figure 30 is the correcting folded film unit construction schematic diagram in the utility model.
Figure 31 is the discharge component structural representation in the utility model.
Description of reference numerals: 1 Rack Body assembly, 2 main conveyer chain assemblies, 3 send pipe assembly, 4 dress plug assemblies, 5 dress wafer assemblies, 6 follow the tracks of wafer assembly, 7 supersonic welding assemblies, membrane module is put in 8 punchings, 9 film feeding assemblies, 10 face-bonding membrane modules, 11 side weldering membrane modules, 12 discharge components, 13 electrically-controlled components, 14 frame bodies, 15 adjustable under-chassis one, 16 loading stand, 17 servomotors one, 18 planetary reducers, 19 fixed bracket body, 20 messenger chains, 21 sprocket wheels, 22 transmission main shafts, 23 clamp bodies, 24 fixed pedestals, 25 tracks, 26 plate rails, 27 bearings, 28 tommys, 29 driven sprockets, 30 tensioning member one, 31 tensioning member two, 32 special chain, 33 inlet pipe assemblies, pipe assembly on 34, 35 adjustable under-chassis two, 36 shake dish frame, 37 chemical feed pipes shake dish, 38 horizontal feed devices, 39 horizontal feed rails, 40 poles, 41 cylinders one, 42 briquettings, 43 adapter assemblies, 44 cylinders two, 45 locatings plate one, 46 servomotors two, 47 ball wire bar pairs one, 48 linear slide rails one, 49 regulating plates one, 50 supports one, 51 servomotors three, 52 ball wire bar pairs two, 53 vacuum cupss one, 54 cylinders three, 55 linear slide rail pairs one, 56 cylinders four, 57 linear slide rail pairs two, 58 adapter fixtures, 59 adjustable under-chassis three, 60 shake coils permanent seat one, 61 plugs shake dish, 62 pillars one, 63 straight feeding devices, 64 rubber stopper orbitals, 65 top cement plug assemblies, 66 connect plug assembly, 67 plug positioning components, 68 supports two, 69 linear slide rails two, 70 servomotors four, 71 ball wire bar pairs three, 72 cylinders five, 73 vacuum stopper suction heads, 74 regulating plates two, 75 cylinders six, 76 connect plug rail, 77 linear slide rails three, 78 end regulating plates one, 79 cylinders seven, 80 locating clips, 81 adjustable under-chassis four, 82 shake coils permanent seat two, 83 compressing tablets shake dish, 84 pillars two, 85 straight feeding devices, 86 compressing tablet tracks, wafer assembly on 87, 88 connect wafer assembly, 89 supports three, 90 linear slide rails four, 91 servomotors five, 92 ball wire bar pairs four, 93 cylinders eight, 94 vacuum cupss two, 95 regulating plates three, 96 cylinders nine, 97 connect compressing tablet rail, 98 linear slide rails five, 99 servomotors six, 100 motor mounting racks, 101 Timing Belts one, 102 regulating plates four, 103 ball wire bar pairs five, 104 linear slide rails six, 105 cylinders ten, 106 locatings plate two, 107 end adapter plates one, 108 locking fixture blocks, 109 cylinders 11, 110 wave welding head of ultrasonic wave, 111 large guide upright posts, 112 upper mounting plates, 113 end slide plates, 114 right wallboards, 115 follow the tracks of carrier film assembly, 116 rush membrane module, 117 guide component, 118 left wallboards, 119 supports four, 120 inhale film head, 121 cylinders 12, 122 servomotors seven, 123 ball wire bar pairs six, 124 linear slide rail pairs three, 125 end adapter plates two, 126 stamping-out cylinders, 127 motor mounting plates, 128 Timing Belts two, 129 linear slide rails seven, 130 regulating plates five, 131 ball wire bar pairs seven, 132 cylinders 13, 133 locatings plate three, 134 servomotors eight, 135 casters, 136 pipe position blocks, 137 outer guiding posts are secondary, 138 elasticity strippers, 139 clamping plate, 140 counterdie seat boards, 141 end adapter plates three, 142 inner guiding posts are secondary, 143 stamping knives, 144 stage clips, 145 end regulating plates two, 146 cylinders 14, 147 correcting plates, 148 install bent plate one, 149 capsule stacks, 150 pressuring diaphragms, 151 rollers, 152 pulling assemblies, 153 install bent plate two, 154 winder wheels, 155 servomotors nine, 156 nip rolls, 157 pressing film rollers, 158 Timing Belts three, 159 adapter plates one, 160 adapter plates two, 161 films, 162 supports five, 163 face-bonding head group parts, 164 adapter plates, 165 cylinders 15, 166 linear slide rails eight, 167 positive soldering tips, 168 heating pipes, 169 springs, 170 guiding sheaths, 171 thermocouples, 172 side weldering assemblies, 173 correcting folded film assemblies, 174 side soldering tip assemblies, 175 films, 176 end regulating plates three, 177 side soldering tip adapter plates, 178 cylinders 16, 179 linear slide rail pairs four, 180 side soldering tips, 181 heating pipes, 182 springs, 183 guiding sheaths, 184 thermocouples, 185 end regulating plates four, 186 correcting folded film heads, 187 correcting adapter plates, 188 linear slide rail pairs five, 189 cylinders 17, 190 supports six, 191 cylinders 18, 192 clamp fixing plate, 193 jaws, 194 ship and resell on another market, 195 servomotors ten, 196 ball wire bar pairs eight, 197 cylinders 19, 198 linear slide rail pairs six, 199 risers, 200 linear slide rail pairs seven.
Detailed description of the invention
As shown in Fig. 1 to Figure 31, a kind of equipment of straight line Batch assemblage medical drugs packaging material, comprises Rack Body assembly 1, main conveyer chain assembly 2, send pipe assembly 3, dress plug assembly 4, dress wafer assembly 5, follows the tracks of wafer assembly 6, supersonic welding assembly 7, rush membrane module 8, film feeding assembly 9, face-bonding membrane module 10, side weldering membrane module 11, discharge component 12, electrically-controlled component 13.Describedly send pipe assembly 3, dress plug assembly 4, dress wafer assembly 5, follow the tracks of wafer assembly 6, supersonic welding assembly 7, rush membrane module 8, film feeding assembly 9, face-bonding membrane module 10, side weldering membrane module 11, discharge component 12, electrically-controlled component 13 be arranged on Rack Body assembly 1 from front to back successively; Described main conveyer chain assembly 2 be arranged on Rack Body assembly 1 and front and back connect successively send pipe assembly 3, dress plug assembly 4, dress wafer assembly 5, follow the tracks of wafer assembly 6, supersonic welding assembly 7, rush membrane module 8, film feeding assembly 9, face-bonding membrane module 10, side weldering membrane module 11 and discharge component 12.
The equipment of this straight line Batch assemblage medical drugs packaging material is straight line two ends symmetric offset spread, by module and the design of station formula, described in send pipe assembly 3, dress plug assembly 4, dress wafer assembly 5, follow the tracks of wafer assembly 6, supersonic welding assembly 7, rush membrane module 8, film feeding assembly 9, face-bonding membrane module 10, side weldering membrane module 11, discharge component 12 respectively correspond to a station corresponding to function performed by this assembly.Each station controls separately, independent operating.Connect the relaying with feedback by inductive switch as signal between adjacent station, PLC system Comprehensive Control, integrate and respectively independently control station, form an organic whole.
The station of each assembly and correspondence thereof is described in detail as follows:
One, Rack Body assembly (see Fig. 5):
Rack Body assembly 1 is the basic component of this equipment, and its effect is for each station provides the workplatform of a smooth running.Rack Body assembly 1 comprises the frame body 14 be welded by section bar, the loading stand 16 providing reference for installation and installation site for each station and regulates the adjustable under-chassis 1 of height and level.Be threaded connection mode between frame body, adjustable under-chassis, loading stand to connect as one.Loading stand 16 has various screw and unthreaded hole, for installing each station component thereon.Be the space that framework is formed below it, for installing electric control cabinet, wire casing, pneumatic controller, vacuum pump etc.
Two, main conveyer chain assembly (see Fig. 6)
Described main conveyer chain assembly 2 comprises servomotor 1, planetary reducer 18, fixed bracket body 19, messenger chain 20, sprocket wheel 21, transmission main shaft 22, clamp body 23, fixed pedestal 24, track 25, plate rail 26, bearing 27, tommy 28, driven sprocket 29, tensioning member 1, tensioning member 2 31, special chain 32.
Main conveyer chain assembly 2 is this equipment key part, and it act as the transhipment of material, each station of connecting.Installed by fixed bracket body 19 and fixed pedestal 24 and be connected in Rack Body loading stand 16.Servomotor 1, planetary reducer 18 drives transmission main shaft 22 by messenger chain 20, sprocket wheel 21, driven sprocket 29 also drives special chain 32 and the clamp body 23 connected thereon to do gap circulatory motion, accurately the material be positioned on tommy 28 is delivered to next station.
Track 25 and plate rail 26 and fixed bracket body 19 form a round and round rail, and running for special chain 32 provides accurate benchmark.Bearing 27 on clamp body 23 runs in circular rails.Tensioning member 2 31 and tensioning member 1 are that special chain 32 tensioning is used, compensate the elongation error that special chain 32 long-time running brings, special chain 32 active section that is in operation is made to maintain tension all the time, to ensure the material pitch be positioned on clamp body 23, the location for each station provides a good platform.
Three, pipe assembly (see Fig. 7,8,9,10) is sent
Pipe assembly is sent to comprise adjustable under-chassis 2 35, shake and coil frame 36, chemical feed pipe shakes dish 37, horizontal feed device 38, horizontal feed rail 39, pole 40, cylinder 1, briquetting 42, cylinder 2 44, locating plate 1, servomotor 2 46, ball wire bar pair 1, linear slide rail 1, regulating plate 1, support 1, servomotor 3 51, ball wire bar pair 2 52, vacuum cups 1, cylinder 3 54, linear slide rail secondary 1, cylinder 4 56, linear slide rail secondary 2 57, adapter fixture 58.
Pipe assembly 3 is sent to be an independently station, its effect and function be by the chemical feed pipe of random scattering according to certain rule neatly arrange and sequentially-fed on adapter fixture 58, by upper pipe assembly 34, chemical feed pipe is positioned on the locating dowel pin 28 of main conveyer chain 2 clamp body 23.
Send pipe assembly 3 to form primarily of inlet pipe assembly 33 and upper pipe assembly 34, adapter assembly 43, be fixed in the loading stand 16 on Rack Body assembly 1 with the support 1 on upper pipe assembly 34 by the regulating plate 1 on inlet pipe assembly 33.Chemical feed pipe shakes, and dish 37 is fixing to be coiled in frame 36 and is positioned over mill floor by adjustable under-chassis 2 35 with shaking, and regulates adjustable under-chassis 2 35 dock with horizontal feed rail 39 and keep highly consistent.Horizontal feed rail 39 fixing with straight feeding device 38 on and be fixed in loading stand 16 by pole 40.
Treat that reason medical medicine adding pipe is poured chemical feed pipe into and to be shaken dish 37, under the dish that shakes carries the driving of electromagnet, chemical feed pipe shakes the arrangement of dish 37 inner orbit automatic sequence from outlet out along chemical feed pipe, enter horizontal feed rail 39, chemical feed pipe is delivered to first notch of adapter fixture 58 forward by horizontal feed rail 39 under straight feeding device 38 drives, servomotor 2 46 drives adapter assembly 43 on linear slide rail 1, do accurate step motion by ball wire bar pair 1 and (namely often walks a notch, pause 0.5 ~ 1.5 second) after whole notch has material, the cylinder 1 be placed in above horizontal feed rail drives briquetting 42 to be pushed down by the material at horizontal feed rail 39 place, simultaneously, cylinder 2 44 on inlet pipe assembly 33 drives locating plate 1 chemical feed pipe correcting to be located.
Cylinder 3 54 on upper pipe assembly 34 drives that vacuum cups 1 is descending holds chemical feed pipe, and the 1S that pauses, cylinder 4 56 on adapter assembly 43 drives adapter fixture 58 rollback on linear slide rail secondary 2 57, and the cylinder 2 44 on inlet pipe assembly 33 drives locating plate 1 also rollback.
Cylinder 3 54 on upper pipe assembly 34 drives vacuum cups 1 up, servomotor 3 51 drives vacuum cups 1 on linear slide rail secondary 1 on linear running to main conveyer chain assembly 2 clamp body 23 directly over locating dowel pin 28 by ball wire bar pair 2 52, cylinder 3 54 drives vacuum cups 1 descending, chemical feed pipe is placed on locating dowel pin 28, cylinder 3 54 drives horizontal reset on vacuum cups 1, and servomotor 3 51 drives vacuum cups 1 on linear slide rail secondary 1 directly over linear running to adapter fixture 58 by ball wire bar pair 2 52.
Synchronous with upper action, servomotor 2 46 drives adapter assembly 43 quick notch aligning horizontal feed rail 39 moved to continuously on adapter fixture 58 on linear slide rail 1 to stop by ball wire bar pair 1, and the cylinder 4 56 on adapter assembly 43 drives adapter fixture 58 to advance on linear slide rail secondary 2 57 and docks horizontal feed rail 39.Complete whole action of feeding station and repeat next circulation.
Synchronous with a upper action, the servomotor 1 on main conveyer chain assembly 2 drives special chain 32 heating pipe on clamp body 23 to be delivered to next station dress plug.
Four, plug assembly (see Figure 11,12,13,14) is filled
Dress plug assembly primarily of top cement plug assembly 65, connect plug assembly 66, plug positioning component 67 forms.Comprise adjustable under-chassis 3 59, the dish permanent seat 1 that shakes, plug shake dish 61, pillar 1, straight feeding device 63, rubber stopper orbital 64, support 2 68, linear slide rail 2 69, servomotor 4 70, ball wire bar pair 3 71, cylinder 5 72, vacuum stopper suction head 73, regulating plate 2 74, cylinder 6 75, connect plug rail 76, linear slide rail 3 77, end regulating plate 1, cylinder 7 79, locating clip 80.
Dress plug assembly 4 is an independently station, its effect and function be the plug of random scattering is neatly arranged according to certain rule and sequentially-fed to connecing on plug rail 76, then by top cement plug assembly 65, plug to be loaded with chemical feed pipe on the locating dowel pin 28 of main conveyer chain 2 clamp body 23.
Dress plug assembly 4 is primarily of adjustable under-chassis 3 59, and shake dish permanent seat 1, and plug shakes dish 61 pillar 1 straight feeding device 63, and rubber stopper orbital 64, top cement plug assembly 65, connects plug assembly 66, formation such as plug positioning component 67 grade.
By the support 2 68 on top cement plug assembly 65, connect the regulating plate 2 74 on plug assembly 66 and the end regulating plate 1 on plug positioning component 67 is fixed in the loading stand 16 on Rack Body assembly 1.Plug fixing the shaking with the dish that shakes of dish 61 of shaking is coiled on permanent seat 60 and is positioned over mill floor by adjustable under-chassis 3 59, regulates adjustable under-chassis 3 59 dock with rubber stopper orbital 64 and keep highly consistent.Rubber stopper orbital 64 fixing with straight feeding device 63 on and be fixed in loading stand 16 by pillar 1.
Treat that reason medical rubber stopper is poured plug into and to be shaken dish 61, under the dish that shakes carries the driving of electromagnet, plug shakes the arrangement of dish 61 inner orbit automatic sequence from 5 outlets out along plug, enter the corresponding interface of rubber stopper orbital 63, plug to be delivered to forward to connect and plug assembly 66 being connect plug rail 76 notch by rubber stopper orbital 63 under straight feeding device 63 drives, cylinder 6 75 driving connects plug rail 76 and moves ahead on linear slide rail 3 77, misplaces with rubber stopper orbital 63 interface.Cylinder 5 72 on top cement plug assembly 65 drives vacuum stopper suction head 73 descending, holds plug.
Cylinder 5 72 on top cement plug assembly 65 drives the up return of vacuum stopper suction head 73.Meanwhile, cylinder 6 75 driving connect on plug assembly 66 connects plug rail 76 and retreats on linear slide rail 3 77, resets.Servomotor 4 70 drives directly over vacuum stopper suction head 73 chemical feed pipe that on linear running to main conveyer chain assembly 2 clamp body 23, locating dowel pin 28 is located on linear slide rail 2 69 by ball wire bar pair 3 71, cylinder 5 72 drives vacuum stopper suction head 73 descending, plug is loaded in chemical feed pipe, cylinder 5 72 drives horizontal reset on vacuum stopper suction head 73, and servomotor 4 70 drives vacuum stopper suction head 73 linear running on linear slide rail secondary 3 77 to fill in directly over rail 76 to connecing by ball wire bar pair 3 71.
Synchronous with above-mentioned action, when the special chain 32 in main conveyer chain assembly 2 moves to dress plug station, the cylinder 7 79 on plug positioning component 67 drives locating clip 80 to be clamped by chemical feed pipe, location.When plug loads in chemical feed pipe, cylinder 5 72 drives on vacuum stopper suction head 73 after horizontal reset, and cylinder 7 79 drives locating clip 80 return.
Servomotor 1 on main conveyer chain assembly 2 drives special chain 32 chemical feed pipe installing plug on clamp body 23 to be delivered to next station dress compressing tablet.
Five, wafer assembly (see Figure 15,16,17) is filled
Dress wafer assembly comprises wafer assembly 87, connects wafer assembly 88.Specifically comprise adjustable under-chassis 4 81, the dish permanent seat 2 82 that shakes, compressing tablet shake dish 83, pillar 2 84, straight feeding device 85, compressing tablet track 86, support 3 89, linear slide rail 4 90, servomotor 5 91, ball wire bar pair 4 92, cylinder 8 93, vacuum cups 2 94, regulating plate 3 95, cylinder 9 96, connect compressing tablet rail 97, linear slide rail 5 98.
Dress wafer assembly 4 is an independently station, its effect and function be the compressing tablet of random scattering is neatly arranged according to certain rule and sequentially-fed to connecing on compressing tablet rail 97, then by upper wafer assembly 87 compressing tablet loaded and tops bar in hole with chemical feed pipe on the locating dowel pin 28 of main conveyer chain 2 clamp body 23.
Dress wafer assembly 5 is primarily of adjustable under-chassis 4 81, and shake dish permanent seat 2 82, and compressing tablet shakes dish 83, and pillar 2 84, straight feeding device 85, compressing tablet track 86, upper wafer assembly 87, connects formation such as wafer assembly 88 grade.
Be fixed in the loading stand 16 on Rack Body assembly 1 by the support 3 89 on upper wafer assembly 87 and the regulating plate 3 95 connect on wafer assembly 88.Compressing tablet shake dish 83 be fixed on the dish that shakes shake dish permanent seat 82 on and be positioned over mill floor by adjustable under-chassis 4 81, regulate adjustable under-chassis 4 81 dock with compressing tablet track 86 and keep highly consistent.Compressing tablet track 86 fixing with straight feeding 85 on and be fixed in loading stand 16 by pillar 2 84.
Wait to manage medical compressing tablet to pour compressing tablet into and shake in dish 83, under the dish that shakes carries the driving of electromagnet, compressing tablet shakes the arrangement of dish 83 inner orbit automatic sequence from 5 outlets out along compressing tablet, enter the corresponding interface of compressing tablet track 86, compressing tablet to be delivered to forward to connect and wafer assembly 88 is connect compressing tablet rail 97 notch by compressing tablet track 86 under straight feeding device 85 drives, cylinder 9 96 driving connects compressing tablet rail 97 and moves ahead on linear slide rail 5 98, misplaces with compressing tablet track 86 interface.Cylinder 8 93 on upper wafer assembly 87 drives vacuum cups 2 94 descending, holds compressing tablet.
Cylinder 8 93 on upper wafer assembly 87 drives the up return of vacuum cups 2 94.Meanwhile, cylinder 9 96 driving connect on wafer assembly 88 connects compressing tablet rail 97 and retreats on linear slide rail 5 98, resets.Servomotor 5 91 drives directly over vacuum cups 2 94 chemical feed pipe that on linear running to main conveyer chain assembly 2 clamp body 23, locating dowel pin 28 is located on linear slide rail 4 90 by ball wire bar pair 4 92, cylinder 93 drives vacuum cups 2 94 descending, compressing tablet is loaded in chemical feed pipe, cylinder 8 93 drives horizontal reset on vacuum cups 2 94, servomotor 5 91 by ball wire bar pair 4 92 drive vacuum cups 2 94 on linear slide rail secondary 4 90 linear running to connecing directly over compressing tablet rail 97.
Servomotor 1 on main conveyer chain assembly 2 drives special chain 32 chemical feed pipe installing plug compressing tablet on clamp body 23 to be delivered to next station dress supersonic welding compressing tablet station.
Six, wafer assembly (see Figure 18) is followed the tracks of
Follow the tracks of wafer assembly and comprise servomotor 6 99, motor mounting rack 100, Timing Belt 1, regulating plate 4 102, ball wire bar pair 5 103, linear slide rail 6 104, cylinder 10, locating plate 2 106.
Following the tracks of wafer assembly 6 is auxiliary positioning station.Its Function and operation is in dress compressing tablet station location and guiding, load in chemical feed pipe step groove smoothly to allow compressing tablet, be in operation for preventing compressing tablet and fall from chemical feed pipe, when main conveyer chain assembly 2 runs, locating plate 2 106 also synchronized tracking moves to next station and ultrasonic welding station.
Positioning states is kept to provide guiding until be back to upper station location and guiding after having welded again for ultrasonic welding.
Be fixed in the loading stand 16 of Rack Body assembly 1 by regulating plate 4 102 and motor mounting plate 100.
Following the tracks of wafer assembly 6 initial position is that locating plate 2 106 is in dress compressing tablet station, and cylinder 10 is in the state of stretching out.
When the chemical feed pipe installing plug is sent into dress compressing tablet station by main conveyer chain assembly 2, the chemical feed pipe correcting that cylinder 10 descending (returning) drives locating plate 2 106 to be placed on special chain 32 clamp body 23.When the cylinder 8 93 on dress wafer assembly 5 drives vacuum cups 2 94 that compressing tablet loaded chemical feed pipe and after return, servomotor 6 99 is by Timing Belt 1, and ball wire bar pair 5 103 drives locating plate 2 106 to weld station to move to the identical speed tracing of main conveying assembly 2 on linear slide rail 6 104.After welding completes, cylinder 10 stretches out, and servomotor 6 99 drives locating plate 2 106 returning quickly to initial bit.
Seven, supersonic welding assembly (see Figure 19)
Supersonic welding assembly comprises end adapter plate 1, locking fixture block 108, cylinder 11, wave welding head of ultrasonic wave 110, large guide upright post 111, upper mounting plate 112, end slide plate 113.
Supersonic welding assembly 7 is an independent station, its function and effect be installed plug and compressing tablet chemical feed pipe in the up-down vibration of this station by wave welding head of ultrasonic wave 110, the flexible welding of generating heat of compressing tablet and chemical feed pipe is integrated, reaches sealing purpose.
Supersonic welding assembly 7, primarily of end adapter plate 1, locks fixture block 108, cylinder 11, wave welding head of ultrasonic wave 110, large guidepost 111, upper mounting plate 112, formation such as end slide plate 113 grade.Be fixed in the loading stand 16 of Rack Body assembly 1 by end adapter plate 1.Cylinder 11 is fixed on upper mounting plate 112, unclamps the screw on locking fixture block 108, the height of wave welding head of ultrasonic wave 110 can be regulated to mate chemical feed pipe welding and assembling height along large guidepost 111 axis direction.
When the chemical feed pipe installing compressing tablet and plug is delivered to supersonic welding station by main conveyer chain assembly 2 and tracking wafer assembly 6, the wave welding head of ultrasonic wave 110 of cylinder 11 drive installation on end slide plate 113 runs downwards, after putting in place, ultrasonic generator starts, wave welding head of ultrasonic wave 110 starts to vibrate and keeps 0.5 ~ 1.5S, and welding completes.Cylinder 11 drives wave welding head of ultrasonic wave 110 return.Follow the tracks of wafer assembly 6 return under servomotor 6 99 drives.
Main conveyer chain assembly 2 runs, and the chemical feed pipe welded is delivered to punching and puts film station.
Eight, membrane module (see Figure 20,21,22,23) is put in punching
Punching is put membrane module and is mainly comprised tracking carrier film assembly 115, rushes membrane module 116, guide component 117.Specifically comprise right wallboard 114, left wallboard 118, support 4 119, inhale film head 120, cylinder 12, servomotor 7 122, ball wire bar pair 6 123, linear slide rail secondary 3 124, end adapter plate 2 125, stamping-out cylinder 126, motor mounting plate 127, Timing Belt 2 128, linear slide rail 7 129, regulating plate 5 130, ball wire bar pair 7 131, cylinder 13, locating plate 3 133, servomotor 8 134, caster 135, pipe position block 136, outer guiding post pair 137, elasticity stripper 138, clamping plate 139, counterdie seat board 140, end adapter plate 3 141, inner guiding post pair 142, stamping knife 143, stage clip 144, end regulating plate 2 145, cylinder 14, correcting plate 147.
To put membrane module 8 be an independent station in punching, completes the stamping-out of volume film in this station, and film feeding to chemical feed pipe follows the tracks of film feeding to next station weldering film.The correcting completing chemical feed pipe direction ensures the condition that side weldering quality provides for side welder stands.
Indicating by Figure 20,21,22,23, punching is put membrane module 8 and is formed by described.By end adapter plate 2 125, support 4 119, follows the tracks of the regulating plate 5 130 on film feeding assembly 115 and the end regulating plate 2 145 in guide component 117 is fixed in the loading stand 16 on Rack Body assembly 1.Die assembly 116 is fixed on end adapter plate 2 125 by end adapter plate 3 141.Stamping-out cylinder 126 is fixed on end adapter plate 2 125, and the piston rod on it is connected with the counterdie seat board 140 on die assembly 116, for stamping-out provides propulsive effort.
Die assembly 116 is inverted die set, and its effect is washed into single-piece film finished product after being launched by the easily tore film of rolling.
Caster 135 upside-down mounting, the edge of a knife faces down, and edge of a knife section epimere has the blanking gradient of 3 ~ 5 °, is fixed together with end adapter plate 3 141 by outer guiding post secondary 137.Caster 135 being equipped with 4 groups of pipe position blocks 136 for package easily tore film provides guiding.Caster 135 has interior guide hole, so that accurate guiding during stamping-out.Stamping knife 143 and inner guiding post 143 are fixed on clamping plate 139, run through elasticity stripper 138.Stage clip 144 is housed between elasticity stripper 138 and clamping plate 139 and has 5 ~ 8MM gap with clamping plate 139, during matched moulds, two plates are combined.Clamping plate 139 to be fixed on counterdie seat board 140 and to be connected together by screw and pin.Counterdie seat board 140 has outer guiding post hole to install the guide pin bushing of outer guiding post pair 137, and the piston rod of stamping-out cylinder 126 does plate by rod end screw thread and late summer and connects together.When stamping-out cylinder 126 acts on, it does oscilaltion campaign at secondary 137 axis directions of outer guiding post.
Following the tracks of carrier film assembly 115 is two station transfer connecting devices.Connect punching and put film station and face-bonding film station.Guiding is provided for putting film and synchronously film is transported to face-bonding film station and provides guiding for face-bonding.
Volume film launches and becomes band after being located by the pipe position block 136 on die assembly 116 to be laid on caster 135 edge of a knife face by film feeding assembly 9, and stamping-out cylinder 126 is up, and inner guiding post 143 enters in caster 135 inward oriented hole, completes the accurate guiding of rushing film; Stamping-out cylinder 126 continues up, and elasticity stripper 138 contacts with belt type film, press mold; Stamping-out cylinder 126 continues up, and stage clip 144 compresses, and stamping knife 143 stretches out from elasticity stripper 138 and enters caster 135 edge of a knife, belt type film is washed into more than one piece finished product easily tore film after matched moulds.Keep matched moulds 1 ~ 2s.
Cylinder 12 drives suction film head 120 descending, finished film is held and up return from edge of a knife material-dropping hole.Stamping-out cylinder 126 drives stamping knife 143, horizontal reset under elasticity stripper 138 grade.Servomotor 7 122 is driven by ball wire bar pair 6 123 to be inhaled film head 120 and moves on linear slide rail 3 124 and to follow the tracks of on carrier film assembly 115 directly over locating plate 3 133.
When main conveyer chain assembly 2 move to punching put film station time, cylinder 14 in guide component 117 drives correcting plate 147 to move ahead the correcting of chemical feed pipe side direction.Meanwhile, the cylinder 13 followed the tracks of on transhipment assembly 115 drives locating plate 3 133 descending, by the correcting of chemical feed pipe forward.
Cylinder 12 drives suction film head 120 descending, finished film is placed with on chemical feed pipe, horizontal reset on cylinder 12.Servomotor 7 122 drives suction film head 120 to be repositioned to directly over caster 135 edge of a knife.Meanwhile, the cylinder 14 in guide component 117 drives correcting plate to retreat reset.
Main conveyer chain 2 runs, and following the tracks of servomotor 8 134 on carrier film assembly 115, to drive locating plate 3 133 to protect finished film by Timing Belt 2 128, ball wire bar pair 7 131 synchronous with main conveyer chain assembly 2, and tracking moves to face-bonding film station.After face-bonding completes, cylinder 13 drives locating plate 3 133 up, and servomotor 8 134 drives locating plate 3 133 to get back to initial bit, completes whole actions that film station is put in punching.
Nine, film feeding assembly (see Figure 24)
Film feeding assembly comprises capsule stack 149, pulling assembly 152, specifically comprises and installs bent plate 1, pressuring diaphragm 150, roller 151, installation bent plate 2 153, winder wheel 154, servomotor 9 155, nip rolls 156, pressing film roller 157, Timing Belt 3 158, adapter plate 1, adapter plate 2 160, film 161.
Film feeding assembly 9 is secondary station, and its function is for die assembly 116 provides coating materials band, has often rushed once, and film moves segment distance stamping-out again.
Adapter plate 1 and adapter plate 2 160 are datum clamp face, and corresponding part is fixed on it.Be individually fixed on the left wallboard 118 and right wallboard 114 rushing and put membrane module 8 by installation bent plate 1 and installation bent plate 2 153.Pulling assembly 152 is for being free to slide structure, and its effect ensures that film 161 is in tension at active section all the time, thus best guarantee stamping-out quality.Film 161 is pressed on roller 151 to ensure when film 161 runs not sideslip by pressuring diaphragm 150.Nip rolls 156 are this assembly core component, and when film strips pressure to be pressed on nip rolls 156 to ensure that servomotor 9 155 drives it to run by pressing film roller 157, film 161 does not produce slippage thus makes each film feeding distance consistent.Winder wheel 154 is for collecting the discarded film after having rushed.
Ten, face-bonding membrane module (see Figure 25,26)
Face-bonding membrane module comprises face-bonding head group part 163.Specifically comprise support 5 162, adapter plate 164, cylinder 15, linear slide rail 8 166, positive soldering tip 167, heating pipe 168, spring 169, guiding sheath 170, thermocouple 171.
Face-bonding membrane module 10 is independent station, and its function and effect is welded together through heating at easily tore film and chemical feed pipe body, reaches the object of sealing.
Be fixed in the loading stand 16 of Rack Body assembly 1 by support 5 162.Face-bonding head group part 163 is by heating pipe 168, and positive soldering tip 167, spring 169, guiding sheath 170 and temperature element thermocouple 171 are formed.After temperature controller sets temperature, heating pipe 168 heats, and is heated by positive soldering tip 167 by heat transfer, when thermocouple 171 measure real time temperature reach design temperature time, temperature controller stop heating, insulation.Positive soldering tip 167 is slided at the guiding sheath 170 made by insulation high-temperature-resistant material and is fixed on adapter plate 164 by the screw on guiding sheath 170.Spring 169 is for having certain precompressed compression when making positive soldering tip 167 weld, meanwhile, and the impact of height tolerance welding quality when eliminating because installing.Adapter plate 164 be equipped with linear slide rail 166 and be connected with cylinder 15 piston rod, cylinder 15 drives adapter plate 164 and drives face-bonding head group part 163 to do oscilaltion campaign.
When main conveyer chain assembly 2 and the punching tracking carrier film assembly 115 put on membrane module 8 synchronously escort chemical feed pipe and easily tore film moves to face-bonding film station, cylinder 15 drives face-bonding head group part 163 descending, film and chemical feed pipe body are added thermofussion welding, keep after 0.5 ~ 1.5s, cylinder 15 drives positive soldering tip 163 to rise return.The action of face-bonding film completes.
11, side weldering membrane module (see Figure 27,28,29,30)
Side weldering membrane module comprises side weldering assembly 172, correcting folded film assembly 173, side soldering tip assembly 174.Specifically comprise that film 175, end regulating plate 3 176, side soldering tip adapter plate 177, cylinder 16, linear slide rail are secondary 4 179, side soldering tip 180, heating pipe 181, spring 182, guiding sheath 183, thermocouple 184, end regulating plate 4 185, correcting folded film 186, correcting adapter plate 187, linear slide rail are secondary 5 188, cylinder 17.
Side weldering membrane module 11 is independent station, and its action and function has chemical feed pipe base side millet cake solder together after being rolled over by easily tore film.
Side soldering tip assembly 11 welds assembly 172 by side and correcting folded film assembly 173 is formed.
Side weldering assembly 172 is fixed in Rack Body assembly 1 loading stand 16 by end regulating plate 3 176.Side soldering tip assembly 174 is by side soldering tip 180, and heating pipe 181, spring 182, guiding sheath 183 and temperature thermocouple 184 are formed.After temperature controller sets temperature, heating pipe 181 heats, and is heated by side soldering tip 180 by heat transfer, when thermocouple 184 measure real time temperature reach design temperature time, temperature controller stop heating, insulation.Side soldering tip 180 is slided at the guiding sheath 183 made by insulation high-temperature-resistant material and is fixed on side soldering tip adapter plate 177 by the screw on guiding sheath 183.Spring 182 is for having certain precompressed compression when making side soldering tip 180 weld, meanwhile, and the impact of height tolerance welding quality when eliminating because installing.Side soldering tip adapter plate 177 be equipped with linear slide rail secondary 4 179 and be connected with cylinder 17 piston rod, cylinder 17 drive side soldering tip adapter plate 177 also drives side soldering tip assembly 174 to seesaw.
Correcting folded film assembly 173 by end regulating plate 185, correcting folded film 186, correcting adapter plate 187, linear slide rail secondary 5 188, formation such as cylinder 17 grade.
Be fixed in the loading stand 16 of Rack Body assembly 1 by end regulating plate 4 185. correcting folded film 186 is arranged on correcting adapter plate 187, unclamp notch edges place screw can free adjustment correcting folded film 186 height consistent with chemical feed pipe.Correcting adapter plate 187 is provided with linear slide rail pair 188, the piston rod on cylinder 17 is connected with correcting adapter plate 187, and cylinder 17 drives correcting folded film 186 to do oscilaltion campaign around linear slide rail secondary 5 188.
When main conveyer chain assembly 2 moves to side weldering film station, cylinder 17 on correcting folded film assembly 173 drives correcting adapter plate 187 and drives correcting folded film 186 to run downwards, by the chemical feed pipe neighboring bending of finished film 176 source, and keeps this state 1 ~ 3S.Cylinder 16 drive side soldering tip adapter plate 177 on side weldering assembly 172 also drives side soldering tip assembly 174 to move ahead, and after welding, returns reset.Cylinder 17 is also up, and correcting folded film 186 is reset to upper.Complete the action of whole side weldering film.
12, discharge component (see Figure 31)
Discharge component comprises support 6 190, cylinder 18, clamp fixing plate 192, jaw 193, ship and resell on another market 194, servomotor 10, ball wire bar pair 8 196, cylinder 19, linear slide rail are secondary 6 198, riser 199, linear slide rail secondary 7 200.
Discharge component 12 is independent station, and its function and effect is pressed from both sides out from main conveyer chain 2 by the chemical feed pipe finished product assembled to put in Turnover Box.
Be fixed in the loading stand 16 of Rack Body assembly 1 by support 6 190.Jaw 193 is a level type structure, is corpus unguis below, middle for shipping and reselling on another market hole 194 being connected with clamp fixing plate 192 by shipping and reselling on another market, above step groove be connected with cylinder 18.Cylinder 18 moves and drives jaw 193 opening and closing.Cylinder 18 is fixed in clamp fixing plate 192, and clamp fixing plate 192 is connected with riser by linear slide rail secondary 7 200, and piston rod and the clamp fixing plate 192 of cylinder 19 are threaded togather.Cylinder 19 moves and drives jaw 193 to do oscilaltion campaign.Riser 199 is connected with servomotor 10 by ball wire bar pair 8 196 and linear slide rail secondary 6 198, and servomotor 10 rotarily drives riser 199 and seesaws.
When main conveyer chain assembly 2 moves to discharging station with the chemical feed pipe finished product assembled, cylinder 18 is descending, and jaw 193 opens.Cylinder 19 drives clamp fixing plate 192 and drives that jaw 193 is descending to put in place, the up return of cylinder 18, jaw 193 is closed clamps chemical feed pipe, the up return of cylinder 19, chemical feed pipe is jammed the main conveyer chain assembly 2 of rear disengaging, servomotor 10 drives jaw 193 and chemical feed pipe to move to Turnover Box place by ball wire bar pair 8 196, and cylinder 18 is descending, and jaw 193 opens puts into Turnover Box by chemical feed pipe.Servomotor 10 runs back original position.Complete the whole action of discharging station.
13, electrically-controlled component
Electrically-controlled component is by PLC, and touch-screen, servo-driver, temperature conditioning unit, the original papers such as pneumatic valve are formed.Each station being connected in series by program is an organic whole.Described electrically-controlled component is for controlling the operation of whole equipment.
The packaging material of medical drugs described in the utility model means high-capacity plastic bottle, the combination cover (pipe) (as chemical feed pipe, hydraulic pipe, compound tube etc.) on packed in flexible pouchy infusion solution.Method and apparatus described in the utility model means a kind of new packaging technology for rapidly and efficiently assembling this Medical Packing Materials and is the device that realizes this technique and equipment.
The utility model straight-line batch assembly method of assembly process is as follows: (dosing tube combination, for example) vibration plate automatic cut pipe on the pipe - line feeder straight pipe to separate servo even tube, vacuum suction straw and put to the conveyor belt and pipe main conveyor belt running to the next station - > (simultaneous) vibration plate automatically unscramble the rubber plug rubber plug - line feeder line send the stopper - dislocation stopper - suction vacuum stopper - will automatically be pressed into the tube stopper - (simultaneous) vibration disc automatically manage pressure and pressure pills to linear feeder to send tablet, tablet dislocation tracking to vacuum tablet, the tablet is sent to the next station to locate ultrasonic welding of tablet, the main conveyor belt, to the next station to (simultaneous) servo film feeding, automatic film, vacuum film - tracking servo positioning put film - tracking vacuum membrane and along with the main conveyor belt to the next location - tracking are welding film - the main conveyor belt to the next station to locate side welding, the main conveyor belt to the next station to detect, under the main delivery to location - the nonconforming, the qualified products.
The foregoing is only preferred embodiment of the present utility model, the utility model can also have various modifications and variations.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., be all included within protection domain of the present utility model.

Claims (5)

1. straight line assembling medical Medical Packing Materials equipment send a pipe assembly, it is characterized in that, comprise inlet pipe assembly, the upper pipe assembly connecting inlet pipe assembly and the adapter assembly being connected pipe assembly.
2. straight line assembling medical Medical Packing Materials according to claim 1 equipment send pipe assembly, it is characterized in that, described inlet pipe assembly comprises adjustable under-chassis two, dish frame of shaking, chemical feed pipe shake dish, horizontal feed device, horizontal feed rail, pole, cylinder one, briquetting, adapter assembly, cylinder two, locating plate one, servomotor two, ball wire bar pair one, linear slide rail one, regulating plate one; Described chemical feed pipe shake dish be fixedly mounted on shake dish frame on, shake dish frame below adjustable under-chassis two is installed; Chemical feed pipe shakes to coil and docks with horizontal feed rail, and horizontal feed rail is fixedly mounted on straight feeding device, and straight feeding device connects pole; Described servomotor two connects ball wire bar pair one, ball wire bar pair one connecting tubes assembly, and adapter assembly to be arranged on linear slide rail one and can to move on linear slide rail one; Cylinder one and briquetting are all positioned at above horizontal feed rail, and cylinder one connects briquetting; Be arranged on cylinder two connected positioning plate one on pole, regulating plate one is arranged on below pole.
3. straight line assembling medical Medical Packing Materials according to claim 2 equipment send pipe assembly, it is characterized in that, described upper pipe assembly comprises support one, servomotor three, ball wire bar pair two, vacuum cups one, cylinder three, linear slide rail pair one; Described servomotor three, ball wire bar pair two, vacuum cups one, cylinder three, linear slide rail pair one are installed on support one, linear slide rail pair one is positioned at support one both sides above, ball wire bar pair two is positioned at Middle face on support one, servomotor three is positioned at ball wire bar pair two end, cylinder three and vacuum cups one are installed in below ball wire bar pair two, and vacuum cups one connects cylinder three and ball wire bar pair two.
4. straight line assembling medical Medical Packing Materials according to claim 3 equipment send pipe assembly, it is characterized in that, described adapter assembly comprises cylinder four, linear slide rail pair two, adapter fixture; Cylinder four connecting tubes fixture, adapter fixture connecting linear slide rail pair two.
5. straight line assembling medical Medical Packing Materials according to claim 3 equipment send pipe assembly, it is characterized in that, the equipment of described straight line assembling medical Medical Packing Materials comprises loading stand, described in send pipe assembly to be fixed in loading stand by regulating plate one and support one; Described pole is fixed in loading stand.
CN201420534197.2U 2014-09-17 2014-09-17 A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly Expired - Fee Related CN204078883U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420534197.2U CN204078883U (en) 2014-09-17 2014-09-17 A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420534197.2U CN204078883U (en) 2014-09-17 2014-09-17 A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly

Publications (1)

Publication Number Publication Date
CN204078883U true CN204078883U (en) 2015-01-07

Family

ID=52171622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420534197.2U Expired - Fee Related CN204078883U (en) 2014-09-17 2014-09-17 A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly

Country Status (1)

Country Link
CN (1) CN204078883U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109335072A (en) * 2018-08-31 2019-02-15 安徽金三环金属科技有限公司 A kind of oral liquid bottle suction pipe assembling equipment
CN111689182A (en) * 2020-05-23 2020-09-22 苏州华维诺智能科技有限公司 Automatic assembly production line for outer pipes
CN109335072B (en) * 2018-08-31 2024-05-28 安徽金三环金属科技有限公司 Oral liquid bottle straw equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109335072A (en) * 2018-08-31 2019-02-15 安徽金三环金属科技有限公司 A kind of oral liquid bottle suction pipe assembling equipment
CN109335072B (en) * 2018-08-31 2024-05-28 安徽金三环金属科技有限公司 Oral liquid bottle straw equipment
CN111689182A (en) * 2020-05-23 2020-09-22 苏州华维诺智能科技有限公司 Automatic assembly production line for outer pipes

Similar Documents

Publication Publication Date Title
CN104589065B (en) Battery automatic spot welding equipment
CN105870761B (en) A kind of automatic insert equipment of connector pin
CN106736370B (en) Automatic cap bag machine
CN105856560A (en) Hot shrinkage molding machine for end caps
CN101130388A (en) Automatic disk loading system of soft bag
CN106695235A (en) Full-automatic welding equipment
CA2846214A1 (en) Machine for assembling, filling and sealing portioned beverage capsules
CN105292547A (en) Device for automatically folding upper cover and lower cover of carton
CN206332844U (en) A kind of earphone speaker automatic producing device
CN207141493U (en) A kind of Fruil packaging machine of improved structure
CN107600591A (en) A kind of transformer automatic detection finished product production line flow process
CN108578227A (en) Medical vessel, intelligent manufacturing assembly line and online detection process method thereof
CN105269134A (en) Automatic welding device for barrel
CN103779244A (en) Automatic production line for chip on board bonding
CN105173214B (en) Bag-feeding type package machine send bag mechanism and control method, bag-feeding type package machine
CN204078883U (en) A kind of equipment of straight line assembling medical Medical Packing Materials send pipe assembly
CN104385568B (en) A kind of method and apparatus of orthoscopic Batch assemblage medical drugs packaging material
CN105856598B (en) Automatic card folds a machine and folded Zhang Gong's skill
CN203318741U (en) Multi-station vacuum packaging machine
CN203332447U (en) Opposite-direction grouping device
CN107531346B (en) System and method for transmitting bag
CN205203519U (en) Automatic packaging machine for bulk material
CN105364347A (en) Automatic barrel production line
CN105059598A (en) Carton loading mechanism
CN105290598A (en) Automatic detection device for barrels

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20170917

CF01 Termination of patent right due to non-payment of annual fee